Before. The hardwood in the ceiling gave a warm feeling to the pool. Before. A water aerobics class while the roof was fully functional. Before. The roof was still fully functional during the Halloween Thing of ’03. Before. During slide installation Winter 2004. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Before

Before

The hardwood in the ceiling gave a warm feeling to the pool.

Page 2: Before

Before

A water aerobics class while the roof was fully functional

Page 3: Before

Before

The roof was still fully functional during the Halloween Thing of ’03.

Page 4: Before

Before

During slide installation Winter 2004

Page 5: Before

Then the roof started to leak

Page 6: Before

Then came the rain…

Page 7: Before

Under construction

The hard wood beams are being removed

Page 8: Before

Obstacles

After one of the major snow storms this winter

2006.

Page 9: Before

Taking shape.

The foundation of the Aquatics Center starts to develop a new skeleton. June ’07

Page 10: Before

Making progress.

Setting the steel supports into place. June ’07

Page 11: Before

Progress continues.

Sunshine and steel – a

great combination

for this construction project. June

’07

Page 12: Before

A roof.

The progress continues and the beginnings of a roof emerge. July ’07

Page 13: Before

Growth.

Looking inside, at the wall where the diving boards used to be. A roof develops. July ’07

Page 14: Before

As the work continues…

Visit us again for more photos and information on the Aquatics Center’s amazing metamorphosis.