bec ary an d c - nerc.com landing page dl/candidate... · 60.02 60.01 — 59.99 59.98 ll 59.97...

12
Octo For Easter ober, 20 C : NERC R P rn, WEC 012 Fre Corresp Resources repare by D CC, ER equency pondin s Subcom y: CERTS Date: Nov RCOT an y Event g Frequ mittee an and Elec vember 15 nd Hyd ts’ Data uency nd Freque ctric Powe 5, 2012 dro Que a Summ Plots ncy Work er Group ebec mary an king Group nd p

Upload: ngokhuong

Post on 16-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Octo

For

Easter

ober, 20

C

: NERC R

P

rn, WEC

012 Fre

Corresp

Resources

repare by

D

CC, ER

equency

pondin

s Subcom

y: CERTS

Date: Nov

RCOT an

y Event

g Frequ

mittee an

and Elec

vember 15

nd Hyd

ts’ Data

uency

nd Freque

ctric Powe

5, 2012

dro Que

a Summ

Plots

ncy Work

er Group

ebec

mary an

king Group

nd

p

 

NERC INTERCONNECTIONS OCTOBER, 2012 FREQUENCY EVENTS – SUMMARY DATA

EASTERN

WESTERN

ERCOT

HYDRO QUEBEC

Frequency Response can be calculated from NERC SA Actual MW Loss divided by 10* B‐A. The results will be in MW/0.1 HZ

11/15/2012

1

EASTERN INTERCONNECTION

OCTOBER, 2012 FREQUENCY EVENTS

11/15/2012

2

11/15/2012

3

11/15/2012

4

WESTERN INTERCONNECTION

OCTOBER, 2012 FREQUENCY EVENTS

11/15/2012

5

11/15/2012

6

ERCOT INTERCONNECTION

OCTOBER, 2012 FREQUENCY EVENTS

11/15/2012

7

11/15/2012

8

HQ INTERCONNECTION

OCTOBER, 2012 FREQUENCY EVENTS

11/15/2012

9

11/15/2012

10