Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: LEWIS R 27.0168
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 35,000 1,400
Planted 30,000 5,455
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 10/2012 SKAMANIA HATCHERY 35,000 25.0 JUVENILE1,40011/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 5.5 5,455 JUVENILE BEAVER CR 25.0247 AD05/201304/2013
Page 1Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalBEAVER CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: ELOCHOMAN R 25.0236
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 100,000 5,000
Planted 90,000 16,364
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 11/2012 SKAMANIA HATCHERY 100,000 20.0 JUVENILE5,00011/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
90,000 5.5 16,364 JUVENILE BEAVER CR 25.0247 AD05/201304/2013
Page 2Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalBEAVER CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: LEWIS R 27.0168
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 35,000 1,400
Planted 30,000 5,455
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 10/2013 SKAMANIA HATCHERY 35,000 25.0 JUVENILE1,40011/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 5.5 5,455 JUVENILE BEAVER CR 25.0247 AD05/201404/2014
Page 3Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalBEAVER CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 300,000
Stock: ELOCHOMAN R 25.0236
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 250,000 0
Received 130,000 0
Planted 90,000 16,364
Egg Take 300,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 12/2012 GRAYS RIVER HATCHERY 250,000 EGGS GREEN001/2013Received 02/2013 SKAMANIA HATCHERY 130,000 0.0 EGGS EYED002/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
90,000 5.5 16,364 JUVENILE BEAVER CR 25.0247 AD05/201404/2014
Page 4Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalBINGHAM CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: SATSOP R 22.0360
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 55,000 11,000
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
55,000 5.0 11,000 JUVENILE SATSOP R -EF 22.0360 AD04/201304/2013
Page 5Wednesday, July 25, 2012
Memo: Excess fish into Satsop River EF
-
2012 Future Brood Document FinalBINGHAM CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal 110,000
Stock: SATSOP R 22.0360
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received
Planted 55,000 11,000
Egg Take 110,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
55,000 5.0 11,000 JUVENILE SATSOP R -EF 22.0360 AD04/201404/2014
Page 6Wednesday, July 25, 2012
Memo: Excess fish into Satsop River EF
-
2012 Future Brood Document FinalBLACKBIRD ISLAND PONDS
NORTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WENATCHEE R 45.0030
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 25,000 4,167
Planted 25,000 4,167
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2013 CHIWAWA HATCHERY 25,000 6.0 JUVENILE4,16704/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
25,000 6.0 4,167 JUVENILE WENATCHEE R 45.0030 AD05/201304/2013
Page 7Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalBLACKBIRD ISLAND PONDS
NORTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WENATCHEE R 45.0030
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 25,000 4,167
Planted 25,000 4,167
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2014 CHIWAWA HATCHERY 25,000 6.0 JUVENILE4,16704/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
25,000 6.0 4,167 JUVENILE WENATCHEE R 45.0030 AD05/201404/2014
Page 8Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalBOGACHIEL HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: QUILLAYUTE R 20.0096
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 30,000 6,000
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 5.0 6,000 JUVENILE CALAWAH R 20.0175 AD04/201304/2013
Page 9Wednesday, July 25, 2012
Memo: Eggs taken mid‐December thru January. 100% Sample.
-
2012 Future Brood Document FinalBOGACHIEL HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: BOGACHIEL R 20.0162
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 150,000 30,000
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
100,000 5.0 20,000 JUVENILE BOGACHIEL R 20.0162 AD04/201304/201350,000 5.0 10,000 JUVENILE CALAWAH R 20.0175 AD04/201304/2013
Page 10Wednesday, July 25, 2012
Memo: Adults must be 100% virus tested. Cooperative with Quileute Tribe.
-
2012 Future Brood Document FinalBOGACHIEL HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 60,000
Stock: QUILLAYUTE R 20.0096
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received
Planted 30,000 6,000
Egg Take 60,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 5.0 6,000 JUVENILE CALAWAH R 20.0175 AD04/201404/2014
Page 11Wednesday, July 25, 2012
Memo: Eggs taken mid‐December thru January. 100% Sample.
-
2012 Future Brood Document FinalBOGACHIEL HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 275,000
Stock: BOGACHIEL R 20.0162
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 150,000 0
Received 130,000 867
Planted 150,000 30,000
Egg Take 275,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 02/2013 LONESOME CR HATCHERY 150,000 EGGS EYED002/2013Received 07/2013 LONESOME CR HATCHERY 130,000 150.0 JUVENILE86707/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
100,000 5.0 20,000 JUVENILE BOGACHIEL R 20.0162 AD04/201404/201450,000 5.0 10,000 JUVENILE CALAWAH R 20.0175 AD04/201404/2014
Page 12Wednesday, July 25, 2012
Memo: Adults must be 100% virus tested. Cooperative with Quileute Tribe.
-
2012 Future Brood Document FinalCARLISLE LK PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: SKOOKUMCHUCK 23.0761
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 30,000 1,200
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 25.0 1,200 JUVENILE CARLISLE LK (LEWI) AD10/201210/2012
Page 13Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCARLISLE LK PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: SKOOKUMCHUCK 23.0761
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 35,000 0
Planted 30,000 1,200
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 SKOOKUMCHUCK HATCHRY 35,000 EGGS EYED002/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 25.0 1,200 JUVENILE CARLISLE LK (LEWI) AD10/201310/2013
Page 14Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCHALAAT CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
HOH TRIBE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: QUINAULT R 21.0398
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 50,000 3,333
Planted 50,000 7,143
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 QUINAULT NFH -COOK C 50,000 15.0 JUVENILE3,33302/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
5,000 7.0 714 JUVENILE HOH R 20.0422 AD04/201304/201345,000 7.0 6,429 JUVENILE HOH R 20.0422 AD05/201304/2013
Page 15Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCHALAAT CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
HOH TRIBE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: SOOES R 20.0015
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 100,000 14,286
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
100,000 7.0 14,286 JUVENILE CHALAAT CR 20.0423 AD05/201305/2013
Page 16Wednesday, July 25, 2012
Memo: BY 2011 only
-
2012 Future Brood Document FinalCHALAAT CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
HOH TRIBE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: QUINAULT R 21.0398
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 50,000 3,333
Planted 50,000 7,143
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2014 QUINAULT NFH -COOK C 50,000 15.0 JUVENILE3,33302/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
45,000 7.0 6,429 JUVENILE HOH R 20.0422 AD04/201404/20145,000 7.0 714 JUVENILE HOH R 20.0422 AD04/201404/2014
Page 17Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCHELAN PUD HATCHERY
NORTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WENATCHEE R 45.0030
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 250,000 12,500
Received
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 10/2012 CHIWAWA HATCHERY 250,000 20.0 JUVENILE12,50010/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 18Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCHELAN PUD HATCHERY
NORTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WENATCHEE R 45.0030
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 250,000 12,500
Received 320,000 0
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 04/2013 EASTBANK HATCHERY 320,000 EGGS EYED004/2013Shipped 10/2013 CHIWAWA HATCHERY 250,000 20.0 JUVENILE12,50010/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 19Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCHIWAWA HATCHERY
NORTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WENATCHEE R 45.0030
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 25,000 4,167
Received 250,000 12,500
Planted 222,300 37,050
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 10/2012 CHELAN PUD HATCHERY 250,000 20.0 JUVENILE12,50010/2012Shipped 03/2013 BLACKBIRD ISLAND PONDS 25,000 6.0 JUVENILE4,16704/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
222,300 6.0 37,050 JUVENILE CHIWAWA R 45.0759 AD+VIE04/201304/2013
Page 20Wednesday, July 25, 2012
Memo: Volitional release only if space is availible.
-
2012 Future Brood Document FinalCHIWAWA HATCHERY
NORTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WENATCHEE R 45.0030
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 25,000 4,167
Received 250,000 12,500
Planted 222,300 37,050
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 10/2013 CHELAN PUD HATCHERY 250,000 20.0 JUVENILE12,50010/2013Shipped 03/2014 BLACKBIRD ISLAND PONDS 25,000 6.0 JUVENILE4,16704/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
222,300 6.0 37,050 JUVENILE CHIWAWA R 45.0759 AD+VIE04/201404/2014
Page 21Wednesday, July 25, 2012
Memo: Volitional release only if space is availible.
-
2012 Future Brood Document FinalCOTTONWOOD CR POND
EASTERN WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WALLOWA R
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 202,500 33,750
Planted 200,000 44,444
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 LYONS FERRY HATCHERY 202,500 6.0 JUVENILE33,75002/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
180,000 4.5 40,000 JUVENILE GRAND RONDE R35.2192 AD04/201304/201314,000 4.5 3,111 JUVENILE GRAND RONDE R35.2192 AD+LV04/201304/20136,000 4.5 1,333 JUVENILE GRAND RONDE R35.2192 AD+LV+PT04/201304/2013
Page 22Wednesday, July 25, 2012
Memo: Eggtake Goal dependant on IHN detection.
-
2012 Future Brood Document FinalCOTTONWOOD CR POND
EASTERN WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 250,000
Stock: WALLOWA R
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 250,000 0
Received 202,500 33,750
Planted 200,000 44,444
Egg Take 250,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 03/2013 LYONS FERRY HATCHERY 250,000 EGGS GREEN004/2013Received 02/2014 LYONS FERRY HATCHERY 202,500 6.0 JUVENILE33,75002/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
180,000 4.5 40,000 JUVENILE GRAND RONDE R35.2192 AD04/201404/201414,000 4.5 3,111 JUVENILE GRAND RONDE R35.2192 AD+LV04/201404/20146,000 4.5 1,333 JUVENILE GRAND RONDE R35.2192 AD+LV+PT04/201404/2014
Page 23Wednesday, July 25, 2012
Memo: Eggtake Goal dependant on IHN detection.
-
2012 Future Brood Document FinalCOWEEMAN R POND #2
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: ELOCHOMAN R 25.0236
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 10,100 1,263
Planted 10,000 1,818
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 GRAYS RIVER HATCHERY 10,100 8.0 JUVENILE1,26302/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
10,000 5.5 1,818 JUVENILE COWEEMAN R 26.0003 AD05/201304/2013
Page 24Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalCOWEEMAN R POND #2
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: ELOCHOMAN R 25.0236
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 10,100 1,263
Planted 10,000 1,818
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2014 GRAYS RIVER HATCHERY 10,100 8.0 JUVENILE1,26302/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
10,000 5.5 1,818 JUVENILE COWEEMAN R 26.0003 AD05/201404/2014
Page 25Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalCOWLITZ SALMON HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: COWLITZ R ‐LOWER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 550,000 1,571
Received
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 08/2012 COWLITZ TROUT HATCH 550,000 350.0 JUVENILE1,57108/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 26Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ SALMON HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: COWLITZ R ‐UPPER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 150,000 429
Received
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 08/2012 COWLITZ TROUT HATCH 150,000 350.0 JUVENILE42908/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 27Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ SALMON HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: TILTON R 26.0560
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 60,000 171
Received
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 08/2012 COWLITZ TROUT HATCH 60,000 350.0 JUVENILE17108/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 28Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ SALMON HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 885,258
Stock: COWLITZ R 26.0002
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 700,000 2,000
Received
Planted
Egg Take 885,258
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 05/2013 COWLITZ TROUT HATCH 700,000 350.0 JUVENILE2,00005/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 29Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ SALMON HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal 676,478
Stock: COWLITZ R ‐LOWER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 550,000 1,571
Received
Planted
Egg Take 676,478
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 08/2013 COWLITZ TROUT HATCH 550,000 350.0 JUVENILE1,57108/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 30Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ SALMON HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal 166,954
Stock: COWLITZ R ‐UPPER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 150,000 429
Received
Planted
Egg Take 166,954
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 08/2013 COWLITZ TROUT HATCH 150,000 350.0 JUVENILE42908/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 31Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ SALMON HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal 72,158
Stock: TILTON R 26.0560
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 60,000 171
Received
Planted
Egg Take 72,158
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 08/2013 COWLITZ TROUT HATCH 60,000 350.0 JUVENILE17108/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 32Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: COWLITZ R 26.0002
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 650,000 118,182
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
650,000 5.5 118,182 JUVENILE COWLITZ R 26.0002 AD05/201304/2013
Page 33Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: COWLITZ R ‐LOWER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 550,000 1,571
Planted 478,122 86,931
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 08/2012 COWLITZ SALMON HATCH 550,000 350.0 JUVENILE1,57108/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
478,122 5.5 86,931 JUVENILE COWLITZ R 26.0002 AD05/201304/2013
Page 34Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: COWLITZ R ‐UPPER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 150,000 429
Planted 118,000 21,455
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 08/2012 COWLITZ SALMON HATCH 150,000 350.0 JUVENILE42908/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
118,000 5.5 21,455 JUVENILE COWLITZ R 26.0002 AD05/201304/2013
Page 35Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: TILTON R 26.0560
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 60,000 171
Planted 51,000 9,273
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 08/2012 COWLITZ SALMON HATCH 60,000 350.0 JUVENILE17108/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
51,000 5.5 9,273 JUVENILE COWLITZ R 26.0002 AD05/201304/2013
Page 36Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: COWLITZ R 26.0002
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 700,000 2,000
Planted 625,892 113,799
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 05/2013 COWLITZ SALMON HATCH 700,000 350.0 JUVENILE2,00005/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
625,892 5.5 113,799 JUVENILE COWLITZ R 26.0002 AD05/201404/2014
Page 37Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: COWLITZ R ‐LOWER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 550,000 1,571
Planted 478,122 86,931
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 08/2013 COWLITZ SALMON HATCH 550,000 350.0 JUVENILE1,57108/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
478,122 5.5 86,931 JUVENILE COWLITZ R 26.0002 AD05/201404/2014
Page 38Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: COWLITZ R ‐UPPER
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 150,000 429
Planted 118,000 21,455
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 08/2013 COWLITZ SALMON HATCH 150,000 350.0 JUVENILE42908/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
118,000 5.5 21,455 JUVENILE COWLITZ R 26.000205/201404/2014
Page 39Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalCOWLITZ TROUT HATCH
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: TILTON R 26.0560
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 60,000 171
Planted 51,000 9,273
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 08/2013 COWLITZ SALMON HATCH 60,000 350.0 JUVENILE17108/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
51,000 5.5 9,273 JUVENILE COWLITZ R 26.0002 AD05/201404/2014
Page 40Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalDAYTON ACCLIMA. POND
EASTERN WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: LYONS FERRY HATCHERY
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 86,000 14,333
Planted 85,000 18,889
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 LYONS FERRY HATCHERY 86,000 6.0 JUVENILE14,33302/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
16,500 4.5 3,667 JUVENILE TOUCHET R 32.0097 AD+LV04/201304/20133,500 4.5 778 JUVENILE TOUCHET R 32.0097 AD+LV+PT04/201304/2013
65,000 4.5 14,444 JUVENILE TOUCHET R 32.0097 AD04/201304/2013
Page 41Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalDAYTON ACCLIMA. POND
EASTERN WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: LYONS FERRY HATCHERY
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 86,000 14,333
Planted 85,000 18,889
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2014 LYONS FERRY HATCHERY 86,000 6.0 JUVENILE14,33302/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
65,000 4.5 14,444 JUVENILE TOUCHET R 32.0097 AD04/201404/20143,500 4.5 778 JUVENILE TOUCHET R 32.0097 AD+LV+PT04/201404/2014
16,500 4.5 3,667 JUVENILE TOUCHET R 32.0097 AD+LV04/201404/2014
Page 42Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalDUNGENESS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: DUNGENESS R 18.0018
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 10,500 1,750
Planted 10,000 2,000
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2013 HURD CR HATCHERY 10,500 6.0 JUVENILE1,75003/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
10,000 5.0 2,000 JUVENILE DUNGENESS R 18.0018 AD06/201305/2013
Page 43Wednesday, July 25, 2012
Memo: Release May 15th.
-
2012 Future Brood Document FinalDUNGENESS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 50,000
Stock: DUNGENESS R 18.0018
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 50,000 0
Received 10,500 1,750
Planted 10,000 2,000
Egg Take 50,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 02/2013 HURD CR HATCHERY 50,000 EGGS GREEN002/2013Received 03/2014 HURD CR HATCHERY 10,500 6.0 JUVENILE1,75003/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
10,000 5.0 2,000 JUVENILE DUNGENESS R 18.0018 AD06/201405/2014
Page 44Wednesday, July 25, 2012
Memo: Release May 15th.
-
2012 Future Brood Document FinalEASTBANK HATCHERY
NORTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal 400,000
Stock: WENATCHEE R 45.0030
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 320,000 0
Received
Planted
Egg Take 400,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 04/2013 CHELAN PUD HATCHERY 320,000 EGGS EYED004/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 45Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalECHO NP (LEWIS R‐NF)
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: LEWIS R 27.0168
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 63,000 9,000
Planted 60,000 12,500
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2013 MERWIN HATCHERY 63,000 7.0 JUVENILE9,00003/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
60,000 4.8 12,500 JUVENILE LEWIS R -NF 27.0168 AD04/201304/2013
Page 46Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalECHO NP (LEWIS R‐NF)
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: LEWIS R 27.0168
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 63,000 9,000
Planted 60,000 12,500
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2014 MERWIN HATCHERY 63,000 7.0 JUVENILE9,00003/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
60,000 4.8 12,500 JUVENILE LEWIS R -NF 27.0168 AD05/201405/2014
Page 47Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalEDUCKET CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
MAKAH TRIBE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: SOOES R 20.0015
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 22,000 3,143
Planted 22,000 3,667
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 04/2013 MAKAH NFH ON SOOES R 22,000 7.0 JUVENILE3,14304/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
22,000 6.0 3,667 JUVENILE EDUCKET CR 20.0010 AD05/201305/2013
Page 48Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalEDUCKET CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
MAKAH TRIBE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: SOOES R 20.0015
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 22,000 3,143
Planted 22,000 3,667
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 04/2014 MAKAH NFH ON SOOES R 22,000 7.0 JUVENILE3,14304/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
22,000 6.0 3,667 JUVENILE EDUCKET CR 20.0010 AD05/201405/2014
Page 49Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalEIGHT CK/UPR CHEHALI
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: SKOOKUMCHUCK 23.0761
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 32,000 3,556
Planted 32,000 6,400
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 SKOOKUMCHUCK HATCHRY 32,000 9.0 JUVENILE3,55602/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
32,000 5.0 6,400 JUVENILE EIGHT CR 23.1117 AD04/201304/2013
Page 50Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalEIGHT CK/UPR CHEHALI
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: SKOOKUMCHUCK 23.0761
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 32,000 3,556
Planted 32,000 6,400
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2014 SKOOKUMCHUCK HATCHRY 32,000 9.0 JUVENILE3,55602/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
32,000 5.0 6,400 JUVENILE EIGHT CR 23.1117 AD04/201404/2014
Page 51Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalFALLERT CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: SKAMANIA‐NF WASHOUGL
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 30,500 3,050
Planted 30,000 5,455
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 11/2012 SKAMANIA HATCHERY 30,500 10.0 JUVENILE3,05011/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 5.5 5,455 JUVENILE KALAMA R 27.0002 AD05/201304/2013
Page 52Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalFALLERT CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 85,000 0
Received 90,000 0
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 01/2013 FISH FIRST RSI 10,000 EGGS EYED002/2013Received 01/2013 KALAMA FALLS HATCHRY 90,000 EGGS GREEN003/2013Shipped 03/2013 MOSSYROCK HATCHERY 75,000 EGGS EYED006/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 53Wednesday, July 25, 2012
Memo: Fish First RSI may receive Hatchery Origin fish. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalFALLERT CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: SKAMANIA‐NF WASHOUGL
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 30,500 3,050
Planted 30,000 5,455
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 11/2013 SKAMANIA HATCHERY 30,500 10.0 JUVENILE3,05011/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 5.5 5,455 JUVENILE KALAMA R 27.0002 AD05/201404/2014
Page 54Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalFISH FIRST RSI
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 10,000 0
Planted 10,000 7
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 01/2013 FALLERT CR HATCHERY 10,000 EGGS EYED002/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
10,000 1,500.0 7 JUVENILE KALAMA R 27.000203/201303/2013
Page 55Wednesday, July 25, 2012
Memo: Indian Creek RSI.Fish First RSI may receive Hatchery Origin fish.
-
2012 Future Brood Document FinalFLAMING GEYSER PD
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: GREEN R NATIVE (9)
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 15,000 1,250
Planted 15,000 2,143
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2013 SOOS CREEK HATCHERY 15,000 12.0 JUVENILE1,25003/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
15,000 7.0 2,143 JUVENILE GREEN R TRIB 09.003805/201305/2013
Page 56Wednesday, July 25, 2012
Memo: Trout Unlimited Duwamish‐Green Chapter.
-
2012 Future Brood Document FinalFLAMING GEYSER PD
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: GREEN R NATIVE (9)
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 15,000 1,250
Planted 15,000 2,143
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2014 SOOS CREEK HATCHERY 15,000 12.0 JUVENILE1,25003/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
15,000 7.0 2,143 JUVENILE GREEN R TRIB 09.003805/201405/2014
Page 57Wednesday, July 25, 2012
Memo: Trout Unlimited Duwamish‐Green Chapter.
-
2012 Future Brood Document FinalFORKS CREEK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: WILLAPA R 24.0251
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 25,000 2,500
Received
Planted 40,000 8,000
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 01/2013 MARCH SPAWNING CHNL 10,000 10.0 JUVENILE1,00001/2013Shipped 01/2013 PACIFIC CO ANGLERS 15,000 10.0 JUVENILE1,50001/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
40,000 5.0 8,000 JUVENILE FORK CR 24.0356 AD05/201304/2013
Page 58Wednesday, July 25, 2012
Memo: Fish volitionally at 5‐6 fpp.
-
2012 Future Brood Document FinalFORKS CREEK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 225,000
Stock: WILLAPA R 24.0251
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 105,000 2,500
Received
Planted 40,000 8,000
Egg Take 225,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 02/2013 NASELLE HATCHERY 80,000 EGGS EYED002/2013Shipped 01/2014 MARCH SPAWNING CHNL 10,000 10.0 JUVENILE1,00001/2014Shipped 01/2014 PACIFIC CO ANGLERS 15,000 10.0 JUVENILE1,50001/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
40,000 5.0 8,000 JUVENILE FORK CR 24.0356 AD05/201404/2014
Page 59Wednesday, July 25, 2012
Memo: Fish volitionally at 5‐6 fpp.
-
2012 Future Brood Document FinalFRANKLIN CONSERV DIST
SOUTH CENTRAL WASHINGTON
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: LYONS FERRY HATCHERY
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 1,600 0
Planted 1,500 15
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 01/2013 LYONS FERRY HATCHERY 1,600 EGGS EYED001/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
1,500 100.0 15 JUVENILE SNAKE R05/201305/2013
Page 60Wednesday, July 25, 2012
Memo: Combined school groups.
-
2012 Future Brood Document FinalGOBAR POND (27)
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 65,000 8,125
Planted 60,000 10,909
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2013 KALAMA FALLS HATCHRY 65,000 8.0 JUVENILE8,12503/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
60,000 5.5 10,909 JUVENILE GOBAR CR 27.0073 AD+BW05/201304/2013
Page 61Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalGOBAR POND (27)
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 50,000 5,000
Planted 45,000 8,182
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2013 KALAMA FALLS HATCHRY 50,000 10.0 JUVENILE5,00003/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
45,000 5.5 8,182 JUVENILE GOBAR CR 27.0073 AD05/201304/2013
Page 62Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalGOBAR POND (27)
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 65,000 8,125
Planted 60,000 10,909
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2014 KALAMA FALLS HATCHRY 65,000 8.0 JUVENILE8,12503/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
60,000 5.5 10,909 JUVENILE GOBAR CR 27.0073 AD+BW05/201404/2014
Page 63Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalGOBAR POND (27)
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 50,000 5,000
Planted 45,000 8,182
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 03/2014 KALAMA FALLS HATCHRY 50,000 10.0 JUVENILE5,00003/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
45,000 5.5 8,182 JUVENILE GOBAR CR 27.0073 AD05/201404/2014
Page 64Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalGRAYS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: ELOCHOMAN R 25.0236
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 10,100 1,263
Received
Planted 40,000 7,273
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 02/2013 COWEEMAN R POND #2 10,100 8.0 JUVENILE1,26302/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
40,000 5.5 7,273 JUVENILE GRAYS R 25.0093 AD05/201305/2013
Page 65Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalGRAYS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: ELOCHOMAN R 25.0236
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 140,100 1,263
Received 250,000 0
Planted 40,000 7,273
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 12/2012 BEAVER CR HATCHERY 250,000 EGGS GREEN001/2013Shipped 01/2013 SKAMANIA HATCHERY 130,000 EGGS EYED001/2013Shipped 02/2014 COWEEMAN R POND #2 10,100 8.0 JUVENILE1,26302/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
40,000 5.5 7,273 JUVENILE GRAYS R 25.0093 AD05/201405/2014
Page 66Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalHOKO FALLS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
MAKAH TRIBE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 72,000
Stock: HOKO R 19.0148
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 52,500 5,354
Egg Take 72,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
5,000 250.0 20 JUVENILE AGENCY CR 19.0238 AD06/201206/20125,000 250.0 20 JUVENILE VILLAGE CR 19.0240 AD06/201206/20122,500 8.0 313 JUVENILE AGENCY CR 19.0238 AD04/201304/2013
20,000 8.0 2,500 JUVENILE HOKO R 19.0148 AD04/201304/20137,500 8.0 938 JUVENILE SAIL R 19.0235 AD04/201304/2013
10,000 8.0 1,250 JUVENILE SEKIU R 19.0203 AD04/201304/20132,500 8.0 313 JUVENILE VILLAGE CR 19.0240 AD04/201304/2013
Page 67Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalHOKO FALLS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
MAKAH TRIBE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 72,000
Stock: HOKO R 19.0148
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received
Planted 52,500 5,354
Egg Take 72,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
5,000 250.0 20 JUVENILE AGENCY CR 19.0238 AD06/201306/20135,000 250.0 20 JUVENILE VILLAGE CR 19.0240 AD06/201306/20132,500 8.0 313 JUVENILE AGENCY CR 19.0238 AD04/201404/2014
20,000 8.0 2,500 JUVENILE HOKO R 19.0148 AD04/201404/20147,500 8.0 938 JUVENILE SAIL R 19.0235 AD04/201404/2014
10,000 8.0 1,250 JUVENILE SEKIU R 19.0203 AD04/201404/20142,500 8.0 313 JUVENILE VILLAGE CR 19.0240 AD04/201404/2014
Page 68Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: HUMPTULIPS R 22.0004
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 30,000 5,000
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 6.0 5,000 JUVENILE STEVENS CR 22.0064 AD05/201304/2013
Page 69Wednesday, July 25, 2012
Memo: May backfill from Lake Aberdeen. Plant excess into Duck Lk (Grays Harbor) Yearly testing for detection of regulated pathogens and obtain exemption from SDCP an
-
2012 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: HUMPTULIPS R 22.0004
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 125,000 20,833
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
125,000 6.0 20,833 JUVENILE STEVENS CR 22.0064 AD05/201304/2013
Page 70Wednesday, July 25, 2012
Memo: Fish released at 6‐7 fpp. Excess fry released into Vance Crk Pd or Duck Lk (Grays Harbor) after yearly testing and no detection of regulated pathogens and exemptio
-
2012 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 60,000
Stock: HUMPTULIPS R 22.0004
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received
Planted 30,000 5,000
Egg Take 60,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
30,000 6.0 5,000 JUVENILE STEVENS CR 22.0064 AD05/201404/2014
Page 71Wednesday, July 25, 2012
Memo: May backfill from Lake Aberdeen. Plant excess into Duck Lk (Grays Harbor) Yearly testing for detection of regulated pathogens and obtain exemption from SDCP an
-
2012 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 200,000
Stock: HUMPTULIPS R 22.0004
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received
Planted 125,000 20,833
Egg Take 200,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
125,000 6.0 20,833 JUVENILE STEVENS CR 22.0064 AD05/201404/2014
Page 72Wednesday, July 25, 2012
Memo: Fish released at 6‐7 fpp. Excess fry released into Vance Crk Pd or Duck Lk (Grays Harbor) after yearly testing and no detection of regulated pathogens and exemptio
-
2012 Future Brood Document FinalHURD CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: DUNGENESS R 18.0018
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 10,500 1,750
Received
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 03/2013 DUNGENESS HATCHERY 10,500 6.0 JUVENILE1,75003/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 73Wednesday, July 25, 2012
Memo: Excess fry will be planted into non‐anadromous Jefferson Co. Lakes in Fish Health Zones.
-
2012 Future Brood Document FinalHURD CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: DUNGENESS R 18.0018
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 10,500 1,750
Received 50,000 0
Planted 34,500 16
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 DUNGENESS HATCHERY 50,000 EGGS GREEN002/2013Shipped 03/2014 DUNGENESS HATCHERY 10,500 6.0 JUVENILE1,75003/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
17,250 2,200.0 8 JUVENILE HORSESHOE LK (JEFF)04/201304/201317,250 2,200.0 8 JUVENILE LUDLOW LK (JEFF)04/201304/2013
Page 74Wednesday, July 25, 2012
Memo: Excess fry will be planted into non‐anadromous Jefferson Co. Lakes in Fish Health Zones.
-
2012 Future Brood Document FinalICY CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: BIG SOOS CR 09.0072
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 25,000 2,083
Planted 20,000 3,636
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 12/2012 SOOS CREEK HATCHERY 25,000 12.0 JUVENILE2,08312/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
20,000 5.5 3,636 JUVENILE ICY CR 09.0125 AD04/201304/2013
Page 75Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalICY CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: BIG SOOS CR 09.0072
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 40,000 3,333
Planted 35,000 6,364
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 12/2012 SOOS CREEK HATCHERY 40,000 12.0 JUVENILE3,33312/2012
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
35,000 5.5 6,364 JUVENILE ICY CR 09.0125 AD04/201304/2013
Page 76Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalICY CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: GREEN R NATIVE (9)
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received 11,000 550
Planted 10,000 1,250
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2013 SOOS CREEK HATCHERY 11,000 20.0 JUVENILE55002/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
10,000 8.0 1,250 JUVENILE ICY CR 09.0125 VIE05/201305/2013
Page 77Wednesday, July 25, 2012
Memo: Fish will have a blank coded wire tag and an elastomer tag.
-
2012 Future Brood Document FinalICY CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: BIG SOOS CR 09.0072
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 25,000 2,083
Planted 20,000 3,636
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 12/2013 SOOS CREEK HATCHERY 25,000 12.0 JUVENILE2,08312/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
20,000 5.5 3,636 JUVENILE ICY CR 09.0125 AD04/201404/2014
Page 78Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalICY CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: BIG SOOS CR 09.0072
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 40,000 3,333
Planted 35,000 6,364
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 12/2013 SOOS CREEK HATCHERY 40,000 12.0 JUVENILE3,33312/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
35,000 5.5 6,364 JUVENILE ICY CR 09.0125 AD04/201404/2014
Page 79Wednesday, July 25, 2012
Memo:
-
2012 Future Brood Document FinalICY CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: MIXED
Integrated/Segregated: INTEGRATED
Egg Take Goal
Stock: GREEN R NATIVE (9)
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received 11,000 550
Planted 10,000 1,250
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 02/2014 SOOS CREEK HATCHERY 11,000 20.0 JUVENILE55002/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
10,000 8.0 1,250 JUVENILE ICY CR 09.0125 VIE05/201405/2014
Page 80Wednesday, July 25, 2012
Memo: Fish will have a blank coded wire tag and an elastomer tag.
-
2012 Future Brood Document FinalKALAMA FALLS HATCHRY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Summer
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 65,000 8,125
Received 70,000 5,833
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 12/2012 MOSSYROCK HATCHERY 70,000 12.0 JUVENILE5,83312/2012Shipped 03/2013 GOBAR POND (27) 65,000 8.0 JUVENILE8,12503/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 81Wednesday, July 25, 2012
Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalKALAMA FALLS HATCHRY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping
Received
Planted 45,000 8,182
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
45,000 5.5 8,182 JUVENILE KALAMA R 27.0002 AD05/201304/2013
Page 82Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalKALAMA FALLS HATCHRY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KALAMA R 27.0002
Run: Winter‐Late
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 50,000 5,000
Received 54,000 4,500
Planted
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 12/2012 MOSSYROCK HATCHERY 54,000 12.0 JUVENILE4,50012/2012Shipped 03/2013 GOBAR POND (27) 50,000 10.0 JUVENILE5,00003/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 83Wednesday, July 25, 2012
Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalKALAMA FALLS HATCHRY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal 90,000
Stock: KALAMA R 27.0002
Run: Summer
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 155,000 8,125
Received 70,000 5,833
Planted
Egg Take 90,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 01/2013 FALLERT CR HATCHERY 90,000 EGGS GREEN003/2013Received 12/2013 MOSSYROCK HATCHERY 70,000 12.0 JUVENILE5,83312/2013Shipped 03/2014 GOBAR POND (27) 65,000 8.0 JUVENILE8,12503/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 84Wednesday, July 25, 2012
Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalKALAMA FALLS HATCHRY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 125,000
Stock: KALAMA R 27.0002
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping
Received
Planted 45,000 8,182
Egg Take 125,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
45,000 5.5 8,182 JUVENILE KALAMA R 27.0002 AD05/201404/2014
Page 85Wednesday, July 25, 2012
Memo: Release 4/15 to 5/15.
-
2012 Future Brood Document FinalKALAMA FALLS HATCHRY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: WILD
Integrated/Segregated: SEGREGATED
Egg Take Goal 90,000
Stock: KALAMA R 27.0002
Run: Winter‐Late
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 140,000 5,000
Received 54,000 4,500
Planted
Egg Take 90,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 03/2013 MOSSYROCK HATCHERY 90,000 EGGS EYED003/2013Received 12/2013 MOSSYROCK HATCHERY 54,000 12.0 JUVENILE4,50012/2013Shipped 03/2014 GOBAR POND (27) 50,000 10.0 JUVENILE5,00003/2014
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
Page 86Wednesday, July 25, 2012
Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.
-
2012 Future Brood Document FinalKENDALL CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal
Stock: KENDALL CR 01.0406
Run: Winter
Species: Steelhead
Brood Year: 2012
Total # Total Pounds
Shipping 90,000 3,267
Received 50,000 10,000
Planted 150,000 30,000
Egg Take
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Shipped 10/2012 WHATCOM CR HATCHERY 40,000 25.0 JUVENILE1,60010/2012Shipped 12/2012 MCKINNON PD (WHAT) 50,000 30.0 JUVENILE1,66712/2012Received 03/2013 MCKINNON PD (WHAT) 50,000 5.0 JUVENILE10,00003/2013
Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Estimated Release Data
150,000 5.0 30,000 JUVENILE KENDALL CR 01.0406 AD05/201305/2013
Page 87Wednesday, July 25, 2012
Memo: Goal is 190,000 total for system. Whatcom Crk is backup only.
-
2012 Future Brood Document FinalKENDALL CR HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Estimated Brood Data
Brood Origin: HATCHERY
Integrated/Segregated: SEGREGATED
Egg Take Goal 190,000
Stock: KENDALL CR 01.0406
Run: Winter
Species: Steelhead
Brood Year: 2013
Total # Total Pounds
Shipping 90,000 3,267
Received 240,000 10,000
Planted 150,000 30,000
Egg Take 190,000
Estimated Transfer Data
Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date
Received 01/2013 WHATCOM CR HATCHERY 190,000 EGGS GREEN001/2013Shipped 10/2013 WHATCOM CR HATCHERY 40,000 25.0 JUVENILE1,60010/2013Shipped 12/2013 MCKINNON PD (WHAT) 50,000 30.0 JUVENILE1,66712/2013Received 03/2014 MCKINNON PD (WHAT) 50,000 5.0 JUV