2012 Future Brood Document Final BEAVER CR HATCHERY SOUTHWEST WASHINGTON / LOWER COL WASHINGTON DEPARTMENT OF FISH AND WILDLIFE Estimated Brood Data Brood Origin: HATCHERY Integrated/Segregated: SEGREGATED Egg Take Goal Stock: LEWIS R 27.0168 Run: Summer Species: Steelhead Brood Year: 2012 Total # Total Pounds Shipping Received 35,000 1,400 Planted 30,000 5,455 Egg Take Estimated Transfer Data Shipped or Received Facility Number FPP Total Pounds Life Stage Start Date End Date Received 10/2012 SKAMANIA HATCHERY 35,000 25.0 JUVENILE 1,400 11/2012 Num Release FPP Total Pounds Life Stage Release Site Mark Type Tagged Start Date End Date Estimated Release Data 30,000 5.5 5,455 JUVENILE BEAVER CR 25.0247 AD 05/2013 04/2013 Page 1 Wednesday, July 25, 2012 Memo: Release 4/15 to 5/15.

Upload: others

Post on 02-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • 2012 Future Brood Document FinalBEAVER CR HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: LEWIS R      27.0168

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 35,000 1,400

    Planted 30,000 5,455

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 10/2012 SKAMANIA HATCHERY 35,000 25.0 JUVENILE1,40011/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 5.5 5,455 JUVENILE BEAVER CR 25.0247 AD05/201304/2013

    Page 1Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalBEAVER CR HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: ELOCHOMAN R  25.0236

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 100,000 5,000

    Planted 90,000 16,364

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 11/2012 SKAMANIA HATCHERY 100,000 20.0 JUVENILE5,00011/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    90,000 5.5 16,364 JUVENILE BEAVER CR 25.0247 AD05/201304/2013

    Page 2Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalBEAVER CR HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: LEWIS R      27.0168

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 35,000 1,400

    Planted 30,000 5,455

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 10/2013 SKAMANIA HATCHERY 35,000 25.0 JUVENILE1,40011/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 5.5 5,455 JUVENILE BEAVER CR 25.0247 AD05/201404/2014

    Page 3Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalBEAVER CR HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 300,000

    Stock: ELOCHOMAN R  25.0236

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 250,000 0

    Received 130,000 0

    Planted 90,000 16,364

    Egg Take 300,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 12/2012 GRAYS RIVER HATCHERY 250,000 EGGS GREEN001/2013Received 02/2013 SKAMANIA HATCHERY 130,000 0.0 EGGS EYED002/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    90,000 5.5 16,364 JUVENILE BEAVER CR 25.0247 AD05/201404/2014

    Page 4Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalBINGHAM CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: SATSOP R     22.0360

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 55,000 11,000

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    55,000 5.0 11,000 JUVENILE SATSOP R -EF 22.0360 AD04/201304/2013

    Page 5Wednesday, July 25, 2012

    Memo: Excess fish into Satsop River EF

  • 2012 Future Brood Document FinalBINGHAM CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal 110,000

    Stock: SATSOP R     22.0360

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received

    Planted 55,000 11,000

    Egg Take 110,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    55,000 5.0 11,000 JUVENILE SATSOP R -EF 22.0360 AD04/201404/2014

    Page 6Wednesday, July 25, 2012

    Memo: Excess fish into Satsop River EF

  • 2012 Future Brood Document FinalBLACKBIRD ISLAND PONDS

    NORTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WENATCHEE R  45.0030

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 25,000 4,167

    Planted 25,000 4,167

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2013 CHIWAWA HATCHERY 25,000 6.0 JUVENILE4,16704/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    25,000 6.0 4,167 JUVENILE WENATCHEE R 45.0030 AD05/201304/2013

    Page 7Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalBLACKBIRD ISLAND PONDS

    NORTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WENATCHEE R  45.0030

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 25,000 4,167

    Planted 25,000 4,167

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2014 CHIWAWA HATCHERY 25,000 6.0 JUVENILE4,16704/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    25,000 6.0 4,167 JUVENILE WENATCHEE R 45.0030 AD05/201404/2014

    Page 8Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalBOGACHIEL HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: QUILLAYUTE R 20.0096

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 30,000 6,000

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 5.0 6,000 JUVENILE CALAWAH R 20.0175 AD04/201304/2013

    Page 9Wednesday, July 25, 2012

    Memo: Eggs taken mid‐December thru January. 100% Sample.

  • 2012 Future Brood Document FinalBOGACHIEL HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: BOGACHIEL R  20.0162

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 150,000 30,000

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    100,000 5.0 20,000 JUVENILE BOGACHIEL R 20.0162 AD04/201304/201350,000 5.0 10,000 JUVENILE CALAWAH R 20.0175 AD04/201304/2013

    Page 10Wednesday, July 25, 2012

    Memo: Adults must be 100% virus tested. Cooperative with Quileute Tribe.

  • 2012 Future Brood Document FinalBOGACHIEL HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 60,000

    Stock: QUILLAYUTE R 20.0096

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received

    Planted 30,000 6,000

    Egg Take 60,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 5.0 6,000 JUVENILE CALAWAH R 20.0175 AD04/201404/2014

    Page 11Wednesday, July 25, 2012

    Memo: Eggs taken mid‐December thru January. 100% Sample.

  • 2012 Future Brood Document FinalBOGACHIEL HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 275,000

    Stock: BOGACHIEL R  20.0162

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 150,000 0

    Received 130,000 867

    Planted 150,000 30,000

    Egg Take 275,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 02/2013 LONESOME CR HATCHERY 150,000 EGGS EYED002/2013Received 07/2013 LONESOME CR HATCHERY 130,000 150.0 JUVENILE86707/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    100,000 5.0 20,000 JUVENILE BOGACHIEL R 20.0162 AD04/201404/201450,000 5.0 10,000 JUVENILE CALAWAH R 20.0175 AD04/201404/2014

    Page 12Wednesday, July 25, 2012

    Memo: Adults must be 100% virus tested. Cooperative with Quileute Tribe.

  • 2012 Future Brood Document FinalCARLISLE LK PROJECT

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: SKOOKUMCHUCK 23.0761

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 30,000 1,200

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 25.0 1,200 JUVENILE CARLISLE LK (LEWI) AD10/201210/2012

    Page 13Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCARLISLE LK PROJECT

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: SKOOKUMCHUCK 23.0761

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 35,000 0

    Planted 30,000 1,200

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 SKOOKUMCHUCK HATCHRY 35,000 EGGS EYED002/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 25.0 1,200 JUVENILE CARLISLE LK (LEWI) AD10/201310/2013

    Page 14Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCHALAAT CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    HOH TRIBE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: QUINAULT R   21.0398

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 50,000 3,333

    Planted 50,000 7,143

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 QUINAULT NFH -COOK C 50,000 15.0 JUVENILE3,33302/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    5,000 7.0 714 JUVENILE HOH R 20.0422 AD04/201304/201345,000 7.0 6,429 JUVENILE HOH R 20.0422 AD05/201304/2013

    Page 15Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCHALAAT CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    HOH TRIBE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: SOOES R      20.0015

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 100,000 14,286

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    100,000 7.0 14,286 JUVENILE CHALAAT CR 20.0423 AD05/201305/2013

    Page 16Wednesday, July 25, 2012

    Memo: BY 2011 only

  • 2012 Future Brood Document FinalCHALAAT CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    HOH TRIBE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: QUINAULT R   21.0398

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 50,000 3,333

    Planted 50,000 7,143

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2014 QUINAULT NFH -COOK C 50,000 15.0 JUVENILE3,33302/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    45,000 7.0 6,429 JUVENILE HOH R 20.0422 AD04/201404/20145,000 7.0 714 JUVENILE HOH R 20.0422 AD04/201404/2014

    Page 17Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCHELAN PUD HATCHERY

    NORTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WENATCHEE R  45.0030

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 250,000 12,500

    Received

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 10/2012 CHIWAWA HATCHERY 250,000 20.0 JUVENILE12,50010/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 18Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCHELAN PUD HATCHERY

    NORTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WENATCHEE R  45.0030

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 250,000 12,500

    Received 320,000 0

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 04/2013 EASTBANK HATCHERY 320,000 EGGS EYED004/2013Shipped 10/2013 CHIWAWA HATCHERY 250,000 20.0 JUVENILE12,50010/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 19Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCHIWAWA HATCHERY

    NORTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WENATCHEE R  45.0030

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 25,000 4,167

    Received 250,000 12,500

    Planted 222,300 37,050

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 10/2012 CHELAN PUD HATCHERY 250,000 20.0 JUVENILE12,50010/2012Shipped 03/2013 BLACKBIRD ISLAND PONDS 25,000 6.0 JUVENILE4,16704/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    222,300 6.0 37,050 JUVENILE CHIWAWA R 45.0759 AD+VIE04/201304/2013

    Page 20Wednesday, July 25, 2012

    Memo: Volitional release only if space is availible.

  • 2012 Future Brood Document FinalCHIWAWA HATCHERY

    NORTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WENATCHEE R  45.0030

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 25,000 4,167

    Received 250,000 12,500

    Planted 222,300 37,050

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 10/2013 CHELAN PUD HATCHERY 250,000 20.0 JUVENILE12,50010/2013Shipped 03/2014 BLACKBIRD ISLAND PONDS 25,000 6.0 JUVENILE4,16704/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    222,300 6.0 37,050 JUVENILE CHIWAWA R 45.0759 AD+VIE04/201404/2014

    Page 21Wednesday, July 25, 2012

    Memo: Volitional release only if space is availible.

  • 2012 Future Brood Document FinalCOTTONWOOD CR POND

    EASTERN WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WALLOWA R

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 202,500 33,750

    Planted 200,000 44,444

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 LYONS FERRY HATCHERY 202,500 6.0 JUVENILE33,75002/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    180,000 4.5 40,000 JUVENILE GRAND RONDE R35.2192 AD04/201304/201314,000 4.5 3,111 JUVENILE GRAND RONDE R35.2192 AD+LV04/201304/20136,000 4.5 1,333 JUVENILE GRAND RONDE R35.2192 AD+LV+PT04/201304/2013

    Page 22Wednesday, July 25, 2012

    Memo: Eggtake Goal dependant on IHN detection.

  • 2012 Future Brood Document FinalCOTTONWOOD CR POND

    EASTERN WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 250,000

    Stock: WALLOWA R

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 250,000 0

    Received 202,500 33,750

    Planted 200,000 44,444

    Egg Take 250,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 03/2013 LYONS FERRY HATCHERY 250,000 EGGS GREEN004/2013Received 02/2014 LYONS FERRY HATCHERY 202,500 6.0 JUVENILE33,75002/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    180,000 4.5 40,000 JUVENILE GRAND RONDE R35.2192 AD04/201404/201414,000 4.5 3,111 JUVENILE GRAND RONDE R35.2192 AD+LV04/201404/20146,000 4.5 1,333 JUVENILE GRAND RONDE R35.2192 AD+LV+PT04/201404/2014

    Page 23Wednesday, July 25, 2012

    Memo: Eggtake Goal dependant on IHN detection.

  • 2012 Future Brood Document FinalCOWEEMAN R POND #2

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: ELOCHOMAN R  25.0236

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 10,100 1,263

    Planted 10,000 1,818

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 GRAYS RIVER HATCHERY 10,100 8.0 JUVENILE1,26302/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    10,000 5.5 1,818 JUVENILE COWEEMAN R 26.0003 AD05/201304/2013

    Page 24Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalCOWEEMAN R POND #2

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: ELOCHOMAN R  25.0236

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 10,100 1,263

    Planted 10,000 1,818

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2014 GRAYS RIVER HATCHERY 10,100 8.0 JUVENILE1,26302/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    10,000 5.5 1,818 JUVENILE COWEEMAN R 26.0003 AD05/201404/2014

    Page 25Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalCOWLITZ SALMON HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: COWLITZ R ‐LOWER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 550,000 1,571

    Received

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 08/2012 COWLITZ TROUT HATCH 550,000 350.0 JUVENILE1,57108/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 26Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ SALMON HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: COWLITZ R ‐UPPER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 150,000 429

    Received

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 08/2012 COWLITZ TROUT HATCH 150,000 350.0 JUVENILE42908/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 27Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ SALMON HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: TILTON R     26.0560

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 60,000 171

    Received

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 08/2012 COWLITZ TROUT HATCH 60,000 350.0 JUVENILE17108/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 28Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ SALMON HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 885,258

    Stock: COWLITZ R    26.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 700,000 2,000

    Received

    Planted

    Egg Take 885,258

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 05/2013 COWLITZ TROUT HATCH 700,000 350.0 JUVENILE2,00005/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 29Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ SALMON HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal 676,478

    Stock: COWLITZ R ‐LOWER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 550,000 1,571

    Received

    Planted

    Egg Take 676,478

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 08/2013 COWLITZ TROUT HATCH 550,000 350.0 JUVENILE1,57108/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 30Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ SALMON HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal 166,954

    Stock: COWLITZ R ‐UPPER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 150,000 429

    Received

    Planted

    Egg Take 166,954

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 08/2013 COWLITZ TROUT HATCH 150,000 350.0 JUVENILE42908/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 31Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ SALMON HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal 72,158

    Stock: TILTON R     26.0560

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 60,000 171

    Received

    Planted

    Egg Take 72,158

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 08/2013 COWLITZ TROUT HATCH 60,000 350.0 JUVENILE17108/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 32Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: COWLITZ R    26.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 650,000 118,182

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    650,000 5.5 118,182 JUVENILE COWLITZ R 26.0002 AD05/201304/2013

    Page 33Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: COWLITZ R ‐LOWER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 550,000 1,571

    Planted 478,122 86,931

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 08/2012 COWLITZ SALMON HATCH 550,000 350.0 JUVENILE1,57108/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    478,122 5.5 86,931 JUVENILE COWLITZ R 26.0002 AD05/201304/2013

    Page 34Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: COWLITZ R ‐UPPER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 150,000 429

    Planted 118,000 21,455

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 08/2012 COWLITZ SALMON HATCH 150,000 350.0 JUVENILE42908/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    118,000 5.5 21,455 JUVENILE COWLITZ R 26.0002 AD05/201304/2013

    Page 35Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: TILTON R     26.0560

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 60,000 171

    Planted 51,000 9,273

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 08/2012 COWLITZ SALMON HATCH 60,000 350.0 JUVENILE17108/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    51,000 5.5 9,273 JUVENILE COWLITZ R 26.0002 AD05/201304/2013

    Page 36Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: COWLITZ R    26.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 700,000 2,000

    Planted 625,892 113,799

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 05/2013 COWLITZ SALMON HATCH 700,000 350.0 JUVENILE2,00005/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    625,892 5.5 113,799 JUVENILE COWLITZ R 26.0002 AD05/201404/2014

    Page 37Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: COWLITZ R ‐LOWER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 550,000 1,571

    Planted 478,122 86,931

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 08/2013 COWLITZ SALMON HATCH 550,000 350.0 JUVENILE1,57108/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    478,122 5.5 86,931 JUVENILE COWLITZ R 26.0002 AD05/201404/2014

    Page 38Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: COWLITZ R ‐UPPER

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 150,000 429

    Planted 118,000 21,455

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 08/2013 COWLITZ SALMON HATCH 150,000 350.0 JUVENILE42908/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    118,000 5.5 21,455 JUVENILE COWLITZ R 26.000205/201404/2014

    Page 39Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalCOWLITZ TROUT HATCH

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: TILTON R     26.0560

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 60,000 171

    Planted 51,000 9,273

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 08/2013 COWLITZ SALMON HATCH 60,000 350.0 JUVENILE17108/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    51,000 5.5 9,273 JUVENILE COWLITZ R 26.0002 AD05/201404/2014

    Page 40Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalDAYTON ACCLIMA. POND

    EASTERN WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: LYONS FERRY HATCHERY

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 86,000 14,333

    Planted 85,000 18,889

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 LYONS FERRY HATCHERY 86,000 6.0 JUVENILE14,33302/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    16,500 4.5 3,667 JUVENILE TOUCHET R 32.0097 AD+LV04/201304/20133,500 4.5 778 JUVENILE TOUCHET R 32.0097 AD+LV+PT04/201304/2013

    65,000 4.5 14,444 JUVENILE TOUCHET R 32.0097 AD04/201304/2013

    Page 41Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalDAYTON ACCLIMA. POND

    EASTERN WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: LYONS FERRY HATCHERY

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 86,000 14,333

    Planted 85,000 18,889

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2014 LYONS FERRY HATCHERY 86,000 6.0 JUVENILE14,33302/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    65,000 4.5 14,444 JUVENILE TOUCHET R 32.0097 AD04/201404/20143,500 4.5 778 JUVENILE TOUCHET R 32.0097 AD+LV+PT04/201404/2014

    16,500 4.5 3,667 JUVENILE TOUCHET R 32.0097 AD+LV04/201404/2014

    Page 42Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalDUNGENESS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: DUNGENESS R  18.0018

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 10,500 1,750

    Planted 10,000 2,000

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2013 HURD CR HATCHERY 10,500 6.0 JUVENILE1,75003/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    10,000 5.0 2,000 JUVENILE DUNGENESS R 18.0018 AD06/201305/2013

    Page 43Wednesday, July 25, 2012

    Memo: Release May 15th.

  • 2012 Future Brood Document FinalDUNGENESS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 50,000

    Stock: DUNGENESS R  18.0018

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 50,000 0

    Received 10,500 1,750

    Planted 10,000 2,000

    Egg Take 50,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 02/2013 HURD CR HATCHERY 50,000 EGGS GREEN002/2013Received 03/2014 HURD CR HATCHERY 10,500 6.0 JUVENILE1,75003/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    10,000 5.0 2,000 JUVENILE DUNGENESS R 18.0018 AD06/201405/2014

    Page 44Wednesday, July 25, 2012

    Memo: Release May 15th.

  • 2012 Future Brood Document FinalEASTBANK HATCHERY

    NORTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal 400,000

    Stock: WENATCHEE R  45.0030

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 320,000 0

    Received

    Planted

    Egg Take 400,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 04/2013 CHELAN PUD HATCHERY 320,000 EGGS EYED004/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 45Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalECHO NP (LEWIS R‐NF)

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: LEWIS R      27.0168

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 63,000 9,000

    Planted 60,000 12,500

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2013 MERWIN HATCHERY 63,000 7.0 JUVENILE9,00003/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    60,000 4.8 12,500 JUVENILE LEWIS R -NF 27.0168 AD04/201304/2013

    Page 46Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalECHO NP (LEWIS R‐NF)

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: LEWIS R      27.0168

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 63,000 9,000

    Planted 60,000 12,500

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2014 MERWIN HATCHERY 63,000 7.0 JUVENILE9,00003/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    60,000 4.8 12,500 JUVENILE LEWIS R -NF 27.0168 AD05/201405/2014

    Page 47Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalEDUCKET CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    MAKAH TRIBE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: SOOES R      20.0015

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 22,000 3,143

    Planted 22,000 3,667

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 04/2013 MAKAH NFH ON SOOES R 22,000 7.0 JUVENILE3,14304/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    22,000 6.0 3,667 JUVENILE EDUCKET CR 20.0010 AD05/201305/2013

    Page 48Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalEDUCKET CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    MAKAH TRIBE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: SOOES R      20.0015

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 22,000 3,143

    Planted 22,000 3,667

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 04/2014 MAKAH NFH ON SOOES R 22,000 7.0 JUVENILE3,14304/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    22,000 6.0 3,667 JUVENILE EDUCKET CR 20.0010 AD05/201405/2014

    Page 49Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalEIGHT CK/UPR CHEHALI

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: SKOOKUMCHUCK 23.0761

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 32,000 3,556

    Planted 32,000 6,400

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 SKOOKUMCHUCK HATCHRY 32,000 9.0 JUVENILE3,55602/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    32,000 5.0 6,400 JUVENILE EIGHT CR 23.1117 AD04/201304/2013

    Page 50Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalEIGHT CK/UPR CHEHALI

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: SKOOKUMCHUCK 23.0761

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 32,000 3,556

    Planted 32,000 6,400

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2014 SKOOKUMCHUCK HATCHRY 32,000 9.0 JUVENILE3,55602/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    32,000 5.0 6,400 JUVENILE EIGHT CR 23.1117 AD04/201404/2014

    Page 51Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalFALLERT CR HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: SKAMANIA‐NF WASHOUGL

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 30,500 3,050

    Planted 30,000 5,455

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 11/2012 SKAMANIA HATCHERY 30,500 10.0 JUVENILE3,05011/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 5.5 5,455 JUVENILE KALAMA R 27.0002 AD05/201304/2013

    Page 52Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalFALLERT CR HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 85,000 0

    Received 90,000 0

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 01/2013 FISH FIRST RSI 10,000 EGGS EYED002/2013Received 01/2013 KALAMA FALLS HATCHRY 90,000 EGGS GREEN003/2013Shipped 03/2013 MOSSYROCK HATCHERY 75,000 EGGS EYED006/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 53Wednesday, July 25, 2012

    Memo: Fish First RSI may receive Hatchery Origin fish. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalFALLERT CR HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: SKAMANIA‐NF WASHOUGL

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 30,500 3,050

    Planted 30,000 5,455

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 11/2013 SKAMANIA HATCHERY 30,500 10.0 JUVENILE3,05011/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 5.5 5,455 JUVENILE KALAMA R 27.0002 AD05/201404/2014

    Page 54Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalFISH FIRST RSI

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 10,000 0

    Planted 10,000 7

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 01/2013 FALLERT CR HATCHERY 10,000 EGGS EYED002/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    10,000 1,500.0 7 JUVENILE KALAMA R 27.000203/201303/2013

    Page 55Wednesday, July 25, 2012

    Memo: Indian Creek RSI.Fish First RSI may receive Hatchery Origin fish.

  • 2012 Future Brood Document FinalFLAMING GEYSER PD

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: GREEN R NATIVE   (9)

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 15,000 1,250

    Planted 15,000 2,143

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2013 SOOS CREEK HATCHERY 15,000 12.0 JUVENILE1,25003/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    15,000 7.0 2,143 JUVENILE GREEN R TRIB 09.003805/201305/2013

    Page 56Wednesday, July 25, 2012

    Memo: Trout Unlimited Duwamish‐Green Chapter.

  • 2012 Future Brood Document FinalFLAMING GEYSER PD

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: GREEN R NATIVE   (9)

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 15,000 1,250

    Planted 15,000 2,143

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2014 SOOS CREEK HATCHERY 15,000 12.0 JUVENILE1,25003/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    15,000 7.0 2,143 JUVENILE GREEN R TRIB 09.003805/201405/2014

    Page 57Wednesday, July 25, 2012

    Memo: Trout Unlimited Duwamish‐Green Chapter.

  • 2012 Future Brood Document FinalFORKS CREEK HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: WILLAPA R    24.0251

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 25,000 2,500

    Received

    Planted 40,000 8,000

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 01/2013 MARCH SPAWNING CHNL 10,000 10.0 JUVENILE1,00001/2013Shipped 01/2013 PACIFIC CO ANGLERS 15,000 10.0 JUVENILE1,50001/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    40,000 5.0 8,000 JUVENILE FORK CR 24.0356 AD05/201304/2013

    Page 58Wednesday, July 25, 2012

    Memo: Fish volitionally at 5‐6 fpp.

  • 2012 Future Brood Document FinalFORKS CREEK HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 225,000

    Stock: WILLAPA R    24.0251

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 105,000 2,500

    Received

    Planted 40,000 8,000

    Egg Take 225,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 02/2013 NASELLE HATCHERY 80,000 EGGS EYED002/2013Shipped 01/2014 MARCH SPAWNING CHNL 10,000 10.0 JUVENILE1,00001/2014Shipped 01/2014 PACIFIC CO ANGLERS 15,000 10.0 JUVENILE1,50001/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    40,000 5.0 8,000 JUVENILE FORK CR 24.0356 AD05/201404/2014

    Page 59Wednesday, July 25, 2012

    Memo: Fish volitionally at 5‐6 fpp.

  • 2012 Future Brood Document FinalFRANKLIN CONSERV DIST

    SOUTH CENTRAL WASHINGTON

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: LYONS FERRY HATCHERY

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 1,600 0

    Planted 1,500 15

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 01/2013 LYONS FERRY HATCHERY 1,600 EGGS EYED001/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    1,500 100.0 15 JUVENILE SNAKE R05/201305/2013

    Page 60Wednesday, July 25, 2012

    Memo: Combined school groups.

  • 2012 Future Brood Document FinalGOBAR POND      (27)

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 65,000 8,125

    Planted 60,000 10,909

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2013 KALAMA FALLS HATCHRY 65,000 8.0 JUVENILE8,12503/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    60,000 5.5 10,909 JUVENILE GOBAR CR 27.0073 AD+BW05/201304/2013

    Page 61Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalGOBAR POND      (27)

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 50,000 5,000

    Planted 45,000 8,182

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2013 KALAMA FALLS HATCHRY 50,000 10.0 JUVENILE5,00003/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    45,000 5.5 8,182 JUVENILE GOBAR CR 27.0073 AD05/201304/2013

    Page 62Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalGOBAR POND      (27)

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 65,000 8,125

    Planted 60,000 10,909

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2014 KALAMA FALLS HATCHRY 65,000 8.0 JUVENILE8,12503/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    60,000 5.5 10,909 JUVENILE GOBAR CR 27.0073 AD+BW05/201404/2014

    Page 63Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalGOBAR POND      (27)

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 50,000 5,000

    Planted 45,000 8,182

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 03/2014 KALAMA FALLS HATCHRY 50,000 10.0 JUVENILE5,00003/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    45,000 5.5 8,182 JUVENILE GOBAR CR 27.0073 AD05/201404/2014

    Page 64Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15. Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalGRAYS RIVER HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: ELOCHOMAN R  25.0236

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 10,100 1,263

    Received

    Planted 40,000 7,273

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 02/2013 COWEEMAN R POND #2 10,100 8.0 JUVENILE1,26302/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    40,000 5.5 7,273 JUVENILE GRAYS R 25.0093 AD05/201305/2013

    Page 65Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalGRAYS RIVER HATCHERY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: ELOCHOMAN R  25.0236

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 140,100 1,263

    Received 250,000 0

    Planted 40,000 7,273

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 12/2012 BEAVER CR HATCHERY 250,000 EGGS GREEN001/2013Shipped 01/2013 SKAMANIA HATCHERY 130,000 EGGS EYED001/2013Shipped 02/2014 COWEEMAN R POND #2 10,100 8.0 JUVENILE1,26302/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    40,000 5.5 7,273 JUVENILE GRAYS R 25.0093 AD05/201405/2014

    Page 66Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalHOKO FALLS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    MAKAH TRIBE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 72,000

    Stock: HOKO R       19.0148

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 52,500 5,354

    Egg Take 72,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    5,000 250.0 20 JUVENILE AGENCY CR 19.0238 AD06/201206/20125,000 250.0 20 JUVENILE VILLAGE CR 19.0240 AD06/201206/20122,500 8.0 313 JUVENILE AGENCY CR 19.0238 AD04/201304/2013

    20,000 8.0 2,500 JUVENILE HOKO R 19.0148 AD04/201304/20137,500 8.0 938 JUVENILE SAIL R 19.0235 AD04/201304/2013

    10,000 8.0 1,250 JUVENILE SEKIU R 19.0203 AD04/201304/20132,500 8.0 313 JUVENILE VILLAGE CR 19.0240 AD04/201304/2013

    Page 67Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalHOKO FALLS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    MAKAH TRIBE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 72,000

    Stock: HOKO R       19.0148

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received

    Planted 52,500 5,354

    Egg Take 72,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    5,000 250.0 20 JUVENILE AGENCY CR 19.0238 AD06/201306/20135,000 250.0 20 JUVENILE VILLAGE CR 19.0240 AD06/201306/20132,500 8.0 313 JUVENILE AGENCY CR 19.0238 AD04/201404/2014

    20,000 8.0 2,500 JUVENILE HOKO R 19.0148 AD04/201404/20147,500 8.0 938 JUVENILE SAIL R 19.0235 AD04/201404/2014

    10,000 8.0 1,250 JUVENILE SEKIU R 19.0203 AD04/201404/20142,500 8.0 313 JUVENILE VILLAGE CR 19.0240 AD04/201404/2014

    Page 68Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalHUMPTULIPS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: HUMPTULIPS R 22.0004

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 30,000 5,000

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 6.0 5,000 JUVENILE STEVENS CR 22.0064 AD05/201304/2013

    Page 69Wednesday, July 25, 2012

    Memo: May backfill from Lake Aberdeen. Plant excess into Duck Lk (Grays Harbor) Yearly testing for detection of regulated pathogens and obtain exemption from SDCP an

  • 2012 Future Brood Document FinalHUMPTULIPS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: HUMPTULIPS R 22.0004

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 125,000 20,833

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    125,000 6.0 20,833 JUVENILE STEVENS CR 22.0064 AD05/201304/2013

    Page 70Wednesday, July 25, 2012

    Memo: Fish released at 6‐7 fpp. Excess fry released into Vance Crk Pd or Duck Lk (Grays Harbor) after yearly testing and no detection of regulated pathogens and exemptio

  • 2012 Future Brood Document FinalHUMPTULIPS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 60,000

    Stock: HUMPTULIPS R 22.0004

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received

    Planted 30,000 5,000

    Egg Take 60,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    30,000 6.0 5,000 JUVENILE STEVENS CR 22.0064 AD05/201404/2014

    Page 71Wednesday, July 25, 2012

    Memo: May backfill from Lake Aberdeen. Plant excess into Duck Lk (Grays Harbor) Yearly testing for detection of regulated pathogens and obtain exemption from SDCP an

  • 2012 Future Brood Document FinalHUMPTULIPS HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 200,000

    Stock: HUMPTULIPS R 22.0004

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received

    Planted 125,000 20,833

    Egg Take 200,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    125,000 6.0 20,833 JUVENILE STEVENS CR 22.0064 AD05/201404/2014

    Page 72Wednesday, July 25, 2012

    Memo: Fish released at 6‐7 fpp. Excess fry released into Vance Crk Pd or Duck Lk (Grays Harbor) after yearly testing and no detection of regulated pathogens and exemptio

  • 2012 Future Brood Document FinalHURD CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: DUNGENESS R  18.0018

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 10,500 1,750

    Received

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 03/2013 DUNGENESS HATCHERY 10,500 6.0 JUVENILE1,75003/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 73Wednesday, July 25, 2012

    Memo: Excess fry will be planted into non‐anadromous Jefferson Co. Lakes in Fish Health Zones.

  • 2012 Future Brood Document FinalHURD CR HATCHERY

    COASTAL / PUGET SOUND / HOOD CANAL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: DUNGENESS R  18.0018

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 10,500 1,750

    Received 50,000 0

    Planted 34,500 16

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 DUNGENESS HATCHERY 50,000 EGGS GREEN002/2013Shipped 03/2014 DUNGENESS HATCHERY 10,500 6.0 JUVENILE1,75003/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    17,250 2,200.0 8 JUVENILE HORSESHOE LK (JEFF)04/201304/201317,250 2,200.0 8 JUVENILE LUDLOW LK (JEFF)04/201304/2013

    Page 74Wednesday, July 25, 2012

    Memo: Excess fry will be planted into non‐anadromous Jefferson Co. Lakes in Fish Health Zones.

  • 2012 Future Brood Document FinalICY CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: BIG SOOS CR  09.0072

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 25,000 2,083

    Planted 20,000 3,636

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 12/2012 SOOS CREEK HATCHERY 25,000 12.0 JUVENILE2,08312/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    20,000 5.5 3,636 JUVENILE ICY CR 09.0125 AD04/201304/2013

    Page 75Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalICY CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: BIG SOOS CR  09.0072

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 40,000 3,333

    Planted 35,000 6,364

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 12/2012 SOOS CREEK HATCHERY 40,000 12.0 JUVENILE3,33312/2012

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    35,000 5.5 6,364 JUVENILE ICY CR 09.0125 AD04/201304/2013

    Page 76Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalICY CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: GREEN R NATIVE   (9)

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received 11,000 550

    Planted 10,000 1,250

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2013 SOOS CREEK HATCHERY 11,000 20.0 JUVENILE55002/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    10,000 8.0 1,250 JUVENILE ICY CR 09.0125 VIE05/201305/2013

    Page 77Wednesday, July 25, 2012

    Memo: Fish will have a blank coded wire tag and an elastomer tag.

  • 2012 Future Brood Document FinalICY CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: BIG SOOS CR  09.0072

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 25,000 2,083

    Planted 20,000 3,636

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 12/2013 SOOS CREEK HATCHERY 25,000 12.0 JUVENILE2,08312/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    20,000 5.5 3,636 JUVENILE ICY CR 09.0125 AD04/201404/2014

    Page 78Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalICY CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: BIG SOOS CR  09.0072

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 40,000 3,333

    Planted 35,000 6,364

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 12/2013 SOOS CREEK HATCHERY 40,000 12.0 JUVENILE3,33312/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    35,000 5.5 6,364 JUVENILE ICY CR 09.0125 AD04/201404/2014

    Page 79Wednesday, July 25, 2012

    Memo:

  • 2012 Future Brood Document FinalICY CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: MIXED

    Integrated/Segregated: INTEGRATED

    Egg Take Goal

    Stock: GREEN R NATIVE   (9)

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received 11,000 550

    Planted 10,000 1,250

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 02/2014 SOOS CREEK HATCHERY 11,000 20.0 JUVENILE55002/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    10,000 8.0 1,250 JUVENILE ICY CR 09.0125 VIE05/201405/2014

    Page 80Wednesday, July 25, 2012

    Memo: Fish will have a blank coded wire tag and an elastomer tag.

  • 2012 Future Brood Document FinalKALAMA FALLS HATCHRY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 65,000 8,125

    Received 70,000 5,833

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 12/2012 MOSSYROCK HATCHERY 70,000 12.0 JUVENILE5,83312/2012Shipped 03/2013 GOBAR POND (27) 65,000 8.0 JUVENILE8,12503/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 81Wednesday, July 25, 2012

    Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalKALAMA FALLS HATCHRY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping

    Received

    Planted 45,000 8,182

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    45,000 5.5 8,182 JUVENILE KALAMA R 27.0002 AD05/201304/2013

    Page 82Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalKALAMA FALLS HATCHRY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KALAMA R     27.0002

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 50,000 5,000

    Received 54,000 4,500

    Planted

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 12/2012 MOSSYROCK HATCHERY 54,000 12.0 JUVENILE4,50012/2012Shipped 03/2013 GOBAR POND (27) 50,000 10.0 JUVENILE5,00003/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 83Wednesday, July 25, 2012

    Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalKALAMA FALLS HATCHRY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 90,000

    Stock: KALAMA R     27.0002

    Run: Summer

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 155,000 8,125

    Received 70,000 5,833

    Planted

    Egg Take 90,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 01/2013 FALLERT CR HATCHERY 90,000 EGGS GREEN003/2013Received 12/2013 MOSSYROCK HATCHERY 70,000 12.0 JUVENILE5,83312/2013Shipped 03/2014 GOBAR POND (27) 65,000 8.0 JUVENILE8,12503/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 84Wednesday, July 25, 2012

    Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalKALAMA FALLS HATCHRY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 125,000

    Stock: KALAMA R     27.0002

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping

    Received

    Planted 45,000 8,182

    Egg Take 125,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    45,000 5.5 8,182 JUVENILE KALAMA R 27.0002 AD05/201404/2014

    Page 85Wednesday, July 25, 2012

    Memo: Release 4/15 to 5/15.

  • 2012 Future Brood Document FinalKALAMA FALLS HATCHRY

    SOUTHWEST WASHINGTON / LOWER COL

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: WILD

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 90,000

    Stock: KALAMA R     27.0002

    Run: Winter‐Late

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 140,000 5,000

    Received 54,000 4,500

    Planted

    Egg Take 90,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 03/2013 MOSSYROCK HATCHERY 90,000 EGGS EYED003/2013Received 12/2013 MOSSYROCK HATCHERY 54,000 12.0 JUVENILE4,50012/2013Shipped 03/2014 GOBAR POND (27) 50,000 10.0 JUVENILE5,00003/2014

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    Page 86Wednesday, July 25, 2012

    Memo: Due to IHN numbers are goals and may be transferred to Fallert, Kalama Falls, or Gobar.

  • 2012 Future Brood Document FinalKENDALL CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal

    Stock: KENDALL CR   01.0406

    Run: Winter

    Species: Steelhead

    Brood Year: 2012

    Total # Total Pounds

    Shipping 90,000 3,267

    Received 50,000 10,000

    Planted 150,000 30,000

    Egg Take

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Shipped 10/2012 WHATCOM CR HATCHERY 40,000 25.0 JUVENILE1,60010/2012Shipped 12/2012 MCKINNON PD (WHAT) 50,000 30.0 JUVENILE1,66712/2012Received 03/2013 MCKINNON PD (WHAT) 50,000 5.0 JUVENILE10,00003/2013

    Num Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date

    Estimated Release Data

    150,000 5.0 30,000 JUVENILE KENDALL CR 01.0406 AD05/201305/2013

    Page 87Wednesday, July 25, 2012

    Memo: Goal is 190,000 total for system. Whatcom Crk is backup only.

  • 2012 Future Brood Document FinalKENDALL CR HATCHERY

    NORTH PUGET SOUND

    WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

    Estimated Brood Data

    Brood Origin: HATCHERY

    Integrated/Segregated: SEGREGATED

    Egg Take Goal 190,000

    Stock: KENDALL CR   01.0406

    Run: Winter

    Species: Steelhead

    Brood Year: 2013

    Total # Total Pounds

    Shipping 90,000 3,267

    Received 240,000 10,000

    Planted 150,000 30,000

    Egg Take 190,000

    Estimated Transfer Data

    Shipped or Received Facility Number FPP Total Pounds Life StageStart Date End Date

    Received 01/2013 WHATCOM CR HATCHERY 190,000 EGGS GREEN001/2013Shipped 10/2013 WHATCOM CR HATCHERY 40,000 25.0 JUVENILE1,60010/2013Shipped 12/2013 MCKINNON PD (WHAT) 50,000 30.0 JUVENILE1,66712/2013Received 03/2014 MCKINNON PD (WHAT) 50,000 5.0 JUV