beaufort-sector1-charrette-finalpresentation
DESCRIPTION
This is the original version of the final presentation, given March 28, 2011 at City Hall Council Chambers.TRANSCRIPT
Downtown & Marina Plan
Spot Improvements to Enhance the Pedestrian Experience
Spot Building Improvements to Add Color and Interest
Conceptual Marina Area Plan
Proposed View of the Future Redevelopment of the Marina
View Looking West Along Bay Street with a Terminating Vista
Proposed Parking Deck and Liner Buildings
Liner Buildings Around the Parking Deck on Craven Street
Parking Deck Liner Buildings Along Craven Street
Parking Deck Liner Buildings Along Port Republic Street
Proposed Infill Along Port Republic Street
Conceptual Redevelopment of the Post Office Block
Waterfront Park Extension Boardwalk
Proposed Boardwalk Along Bay Street at Bladen Street
Waterfront Plan
Whitehall Plan
Conceptual Plan of Whitehall
Mixed Use Infill Carteret St
Façade Improvement for the Von Harten Building
City Hall photo
USCB Plan
Conceptual Build-out of the USC-Beaufort Campus
View of Bellamy Curve Looking Southwest
Small Increment Student Housing in Mansion House Buildings
Cuthbert Street Plans
Conceptual Artist-led Neighborhood in Higgonsonville
Shared Studio/Gallery Space in Artist’s Cluster
National Street Infill
Conceptual Bungalow Court in Pigeon Point & Higgonsonville
Ribaut Road, Piggly Wiggly, and Boundary Street Plans
Conceptual Piggly Wiggly Store Anchoring a Redeveloped Center
Bladen Street Infill
Conceptual Senior Housing and Infill at Bladen and Bay
The Old Jail District
Infill Development around the Old Jail
Existing Urban Fabric
Existing Urban Fabric
Phase 1 Infill and Redevelopment (1-10 Years)
New Infill and Redevelopment (11-30 Years)
Full Build-Out with Green Infrastructure
Green Infrastructure
Existing Urban Fabric
Full Build-Out (30 Year Plan)
Regional Greenway System
Regional Water Taxi System
Regional Rail-Trail
Regional Transit System
Pedestrian and Bicycle Circulation Plan
Pedestrian Intensity Analysis
Proposed Regulating Plan
Typical Transect/Form-Based Code Calibration
Existing Zoning to Form Based Coding
Next Steps
Refine the Plans and Drawings Focus on implementation, timelines, and
responsibility Show where public intervention is
necessary and where the market can handle things
Adopt the Form-based Code with our recommended Calibrations
Advocate, Implement, Assist, and Construct