beaufort county public works stormwater infrastructure project … · 2019. 4. 12. · december...
TRANSCRIPT
Project Summary: Sheldon Vacuum Truck - Kelly Road, Site PhotographsHalf Moon Island Road
Project #: 2010-069 Completed: Dec-09 Before
Narrative Description of Project: Jetted (2) crossline pipes.
Material Cost, Rental Equipment Summary, and Labor
Material Unit Cost/Unit Qty CostWater gallon $0.01 450.0 $4.50Diesel gallon $2.41 25.0 $60.25Labor hours 9.5 $303.16Total Cost of Materials, Rental Equip., and Labor $367.91
Note: Labor cost includes the employee's salary plus fringe benefits. During Equipment Cost
Item Asset Cost/Hour Hrs. Cost Vacuum Truck 22812 $20.30 4.5 $91.35 Total Equipment Cost $91.35 Cost/hour excludes fuel cost. Total Cost: $459.26
After
Beaufort County Public WorksStormwater Infrastructure
Project Summary
D/W
CUTHBERT FARM RDKELLY RD
SHELDON DRGEORGE W ILLIAMS LN
JOHNSON RD
D/W
D/W
KELLY RD
LegendDrainage Type
River
Stream
Outfall
Lateral
Roadside
Roadside Pipe
Crossline
D/W
Access
Piped
Bleeder
Parcels¬
Project: KellyRoad
Activity: VacuumTruck
Project #: 2010-114
Township: Sheldon
Completed:December 2009
0 160 320 480 64080Feet
1 inch equals 214.75 feetPrepared By: BC Stormwater Management UtilityDate Print: 2/16/10File:C:\sethdata\projects\projectmaps\vactruck\Kelly Rd 2010-114
Jetted (1) crossline pipe.
HALF MOON ISLAND RD
LegendDrainage Type
River
Stream
Outfall
Lateral
Roadside
Roadside Pipe
Crossline
D/W
Access
Piped
Bleeder
Parcels
¬Project: Half MoonRoad
Activity: VacuumTruck
Project #: 2010-069
Township: Sheldon
Completed:December 2009
0 90 180 270 36045Feet
1 inch equals 122.03 feetPrepared By: BC Stormwater Management UtilityDate Print: 2/16/10File:C:\sethdata\projects\projectmaps\vactruck\Half Moon 2010-069