Project Summary: Sheldon Vacuum Truck - Kelly Road, Site Photographs Half Moon Island Road Project #: 2010-069 Completed: Dec-09 Before Narrative Description of Project: Jetted (2) crossline pipes. Material Cost, Rental Equipment Summary, and Labor Material Unit Cost/Unit Qty Cost Water gallon $0.01 450.0 $4.50 Diesel gallon $2.41 25.0 $60.25 Labor hours 9.5 $303.16 Total Cost of Materials, Rental Equip., and Labor $367.91 Note: Labor cost includes the employee's salary plus fringe benefits. During Equipment Cost Item Asset Cost/Hour Hrs. Cost Vacuum Truck 22812 $20.30 4.5 $91.35 Total Equipment Cost $91.35 Cost/hour excludes fuel cost. Total Cost: $459.26 After Beaufort County Public Works Stormwater Infrastructure Project Summary

Upload: others

Post on 29-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Beaufort County Public Works Stormwater Infrastructure Project … · 2019. 4. 12. · December 2009. 0 80 160 320 480 640 Feet. 1 inch equals 214.75 feet. Prepared By: BC Stormwater

Project Summary: Sheldon Vacuum Truck - Kelly Road, Site PhotographsHalf Moon Island Road

Project #: 2010-069 Completed: Dec-09 Before

Narrative Description of Project: Jetted (2) crossline pipes.

Material Cost, Rental Equipment Summary, and Labor

Material Unit Cost/Unit Qty CostWater gallon $0.01 450.0 $4.50Diesel gallon $2.41 25.0 $60.25Labor hours 9.5 $303.16Total Cost of Materials, Rental Equip., and Labor $367.91

Note: Labor cost includes the employee's salary plus fringe benefits. During Equipment Cost

Item Asset Cost/Hour Hrs. Cost Vacuum Truck 22812 $20.30 4.5 $91.35 Total Equipment Cost $91.35 Cost/hour excludes fuel cost. Total Cost: $459.26

After

Beaufort County Public WorksStormwater Infrastructure

Project Summary

Page 2: Beaufort County Public Works Stormwater Infrastructure Project … · 2019. 4. 12. · December 2009. 0 80 160 320 480 640 Feet. 1 inch equals 214.75 feet. Prepared By: BC Stormwater

D/W

CUTHBERT FARM RDKELLY RD

SHELDON DRGEORGE W ILLIAMS LN

JOHNSON RD

D/W

D/W

KELLY RD

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

Parcels¬

Project: KellyRoad

Activity: VacuumTruck

Project #: 2010-114

Township: Sheldon

Completed:December 2009

0 160 320 480 64080Feet

1 inch equals 214.75 feetPrepared By: BC Stormwater Management UtilityDate Print: 2/16/10File:C:\sethdata\projects\projectmaps\vactruck\Kelly Rd 2010-114

Jetted (1) crossline pipe.

Page 3: Beaufort County Public Works Stormwater Infrastructure Project … · 2019. 4. 12. · December 2009. 0 80 160 320 480 640 Feet. 1 inch equals 214.75 feet. Prepared By: BC Stormwater

HALF MOON ISLAND RD

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

Parcels

¬Project: Half MoonRoad

Activity: VacuumTruck

Project #: 2010-069

Township: Sheldon

Completed:December 2009

0 90 180 270 36045Feet

1 inch equals 122.03 feetPrepared By: BC Stormwater Management UtilityDate Print: 2/16/10File:C:\sethdata\projects\projectmaps\vactruck\Half Moon 2010-069

Jetted (1) crossline pipe.