BCPC LOADING JETTY AND STOCK PILE Perbedaan ketinggian elevasi air dengan daratan ± 5 meter dari level
muka air Survey 27 July 2011
![Page 2: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/2.jpg)
Kondisi Lahan untuk Stock Pile Survey Tgl 27 July 2011
![Page 3: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/3.jpg)
Orientation of Location from mine pit to loading jetty
Hauling Road 40 KM
Loading Jetty
![Page 4: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/4.jpg)
Schematic Flow Diagram Stock Pile and Loading Jetty
MINING AREA ROM STOCKPILE AT MINESITE
MINE - HAUL ROAD LONG DISTANCEHAUL ROAD
COAL TERMINAL
DUMP STATION
EMERGENCY STOCKPILE
CRUSHINGSTATION
BARGE LOADING CONVEYOR
BARGE
Loading Conveyor
![Page 5: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/5.jpg)
Stock pile and Loading conveyor conceptual
![Page 6: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/6.jpg)
Conveyor Lay Out
![Page 7: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/7.jpg)
Conveyor Configuration
![Page 8: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/8.jpg)
Propose Coal Handling and stock pile, for reference only
Loading conveyor 1500 ton/hour capacity
![Page 9: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/9.jpg)
Other Optional Propose Plot Plan Gadur Jetty and Mess,Housing and other facility
Proposed for mess
and housing facility
Extend Stock Pile
Stock pile and reclaim feeder
![Page 10: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/10.jpg)
Contoh Pondasi Jetty
Dolphin to Accommodate 8000 DWT Barge
![Page 11: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/11.jpg)
Loading jetty for 8000 DWT Barge
Coal pile configuration on 8000 DWT barge
Loading conveyor 1500 ton/hours
![Page 12: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/12.jpg)
Long Profile Of Loading JETTY Accommodate 8000 DWT Barge
Walkways on the trestle
![Page 13: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/13.jpg)
Typical Tower Loading Conveyor ke Barge
![Page 14: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/14.jpg)
CPT Location and land boundary yang dilakukan oleh GRM
![Page 15: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/15.jpg)
Stock Pile,Loading Conveyor dan Loading Jetty untuk 8000 DWT
![Page 16: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/16.jpg)
Survey tanggal 29 July 2011
CONE PENETRATION TEST CPT-10 DENGAN KEDALAMAN 27,4 M
![Page 17: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/17.jpg)
Hasil Cone Penetration Test CPT-10
![Page 18: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/18.jpg)
Contoh Laporan hasil Sondir sebagai referensi
![Page 19: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/19.jpg)
Contoh Laporan Sondir untuk design pondasi dan tiang pancang
![Page 20: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/20.jpg)
Contoh laporan Deep bore hole untuk piling dan pondasi
![Page 21: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/21.jpg)
Kondisi Banjir 10 tahunan menurut data penduduk lokal elevasi tinggi kurang lebih 2 meter dari muka tanah
Ketinggian elevasi air pada saat banjir 10 tahunan,pada posisi 1,2 km dari bibir sungai
![Page 22: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/22.jpg)
Kondisi Tanah di Jetty
Tanah keras 350 mDari bibir sungai
Tanah lembekberlumpur 1,2 km dari bibir sungai
![Page 23: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/23.jpg)
Contoh test beban untuk mendapatkan consolidated settlement dengan menggunakan model PLAXIS 2 D
![Page 24: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/24.jpg)
Indikasi tanah Lembek/Rawa-2 dari hauling road sepanjang 10,5 KM
Tanah lembek dan berawa
![Page 25: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/25.jpg)
Project Plan Chart
![Page 26: BCPC LOADING JETTY AND STOCK PILE Presentation](https://reader035.vdocuments.us/reader035/viewer/2022062412/5877b6481a28ab2c668b5aa3/html5/thumbnails/26.jpg)
Jetty &Stock Pile Milestone
• Construction of Loading and Stock Pile / Jetty Milestone• • Item Job description PIC Est Completion• • AMDAL Yuanito October 2011• • Land Identification/Additional Sukadi August 2011• • Land Acquisition Sukadi End Of Sept • • Boundary identification Construction team Early Oct 2011• • BED/DED Of loading jetty Paul/Ardyan/Adi End Oct 2011• Stock pile, coal handling• Bathymetry,Geotech, Topo• Hydrology, estimate CBM fill• • Set up Temporary facility Adi Sumanto Nov 2011• • Stacking out area for land clearing Adi Sumanto Nov 2011• And checking final elevation• Conveyor center line, jetty position• Stock pile and chain feeder position• Coal Crushing Plant,Site Facility• • Selected Land clearing Contractor Adi Sumanto Oct 2011• • Mobilization land clearing sub con Adi Sumanto Nov 2011• • Land Clearing Activities Adi Sumanto March 2012•