    RICS Standard Form of Cost Analysis

    7 Analysis Forms

    SUMMARY OF ELEMENTAL COSTS

    ELEMENT Element

    Total Cost Cost per m2 Unit Quantity Unit Rate

    1 SUBSTRUCTURE

    2

    2A

    2B

    2C

    2D

    2E

    2F

    2G

    2H

    SUPERSTRUCTUREFrameUpper FloorsRoofStairsExternal WallsExternal Windows and DoorsInternal Walls and PartitionsInternal Doors

    Total Superstructure

    3

    3A

    3B

    3C

    FINISHESWall FinishesFloor FinishesCeiling Finishes

    Total Finishes

    4 FITTINGS AND FURNISHINGS

    5

    5A

    5B

    5C

    5D

    5E

    5F

    5G

    5H

    5I

    5J

    5K

    5L

    5M

    5N

    5O

    SERVICESSanitary AppliancesServices EquipmentDisposal InstallationsWater InstallationsHeat SourceSpace Heating and Air ConditioningVentilating SystemElectrical InstallationsFuel InstallationsLift and Conveyor InstallationsFire and Lightning ProtectionCommunications and Security InstallationsSpecial InstallationsBuilders Work in ConnectionManagement of the Commissioning of Services

    Total Services

    BUILDING SUB-TOTAL6

    6A

    6B

    6C

    6D

    6E

    EXTERNAL WORKSSite WorksDrainageExternal ServicesMinor Building WorksDemolition and Work Outside the Site

    Total External Works

    7

    8

    9

    PRELIMINARIESCONTINGENCIESDESIGN FEES

    TOTAL CONTRACT SUM

  • 8/11/2019 Bcis Index

    2/15

    RICSStandard Form of Cost Analysis

    Amplied Cost AnalysisSee Section 3 for instructions on completing this form

    PROJECT TITLE:

    Building function:

    Location: Date of acceptance:

    Date for receipt:

    Date for tender/ Base month: Date of site possession:

    PROJECT DESCRIPTION

    SITE CONDITIONS

    ACCOMMODATION AND DESIGN

    CREDITS

    Client:

    Architect:

    Quantity Surveyor:

    CDM Coordinator:

    Mechanical Engineer:

    Electrical Engineer:

    Structural Engineer:

    General Contractor:

    DETAILS OF BUILDING

    Floor Areas Storeys

    Basement oors:

    Ground oorUpper oorsTotal (Gross Internal Floor Area)

    m

    mmm

    Percentage of gross oor area:

    Below ground oorSingle storey constructionTwo storey construction____ storey construction____ storey construction

    %%%%%

    Usable AreaCirculation AreaAncillary AreasInternal divisionsTotal (Gross Internal Floor Area)

    mmmmm

    Average storey height:

    Below ground oor(s)Ground oorAbove ground oor(s)

    mmmSpaces not enclosed: m

    Internal cube m External vertical envelope(Ext. walls, windows & doors)

    m

    Area of site m Number of units

    3

  • 8/11/2019 Bcis Index

    3/15

    RICS Standard Form of Cost Analysis

    Functional Units

    Quantity Unit Quantity Unit

    1. 2.

    Building Accreditation Score(s)

    Scheme: Scheme:

    Version: Version:

    Score: Score:

    PROCUREMENT DETAILS

    Tender Documentation:

    Selection of Contractor:

    Type of Contract:

    Cost Fluctuation:

    Contract period Stipulated by Client: weeks

    Stipulated by Client: weeks

    Agreed: weeks

    MARKET CONDITION Tender Price Index

    Project Index:

    Index Series:

    Base:

    TENDERS

    Number of tenders issued: Number of tenders received:

    Competitive tender list (where appropriate)

    1. 6.

    2. 7.

    3. 8.

    4. 9.

    5. 10.

    Adjustment on accepted tender (where applicable)

    BREAKDOWN OF COST

    Contract: Analysed Building (where different)

    Measured work Measured work

    Prime cost sums Prime cost sums

    Provisional sums Provisional sums

    Preliminaries Preliminaries

    Contingencies ContingenciesContract Sum Contract Sum

    AMPLIFIED COST ANALYSIS (Continued)

  • 8/11/2019 Bcis Index

    4/15

    RICSStandard Form of Cost Analysis

    AMPLIFIED COST ANALYSIS (Continued)

    ELEMENT

    Sub-Element Element

    Quantity Unit Total Cost Total Cost Cost perm2

    Unit Quantity Unit Rate

    1 SUBSTRUCTURE

    1A Substructure

    1A1 Standard Foundations

    1A2 Special Foundations

    1A3 Lowest Floor Bed/Slab

    1A4 Basement Excavation

    1A5 Basement Retaining Walls

    Substructure m2

    2 SUPERSTRUCTURE

    2A Frame

    2A1 Structural Frame

    Frame m2

    2B Upper Floors

    2B1 Upper Floors

    Upper Floors m2

    2C Roof

    2C1 Roof Structure

    2C2 Roof Coverings

    2C3 Roof Drainage

    2C4 Rooights and Openings

    2C5 Roof Features

    Roof m2

    2D Stairs

    2D1 Stair Structure

    2D2 Stair Finishes

    2D3 Stair Balustrades and Handrails

    Stairs m

    2E External Walls

    2E1 External Enclosing Walls

    2E2 External Wall Finishes

    2E3 Solar/Rain Screening

    2E4 Basement Walls

    2E5 Faade Access

    External Walls m2

  • 8/11/2019 Bcis Index

    5/15

    RICS Standard Form of Cost Analysis

    2G1 Internal Walls/Partitions

    2G2 Balustrades and Handrails

    2G3 Moveable Room Dividers

    2G4 Cubicles

    Internal Walls and Partitions m2

    2H Internal Doors

    2H1 Internal Doors

    Internal Doors Nr

    3 FINISHES

    3A Wall Finishes

    3A1 Wall Finishes

    Wall Finishes m2

    3B Floor Finishes

    3B1 Finishes to Floors

    3B2 Raised Access Floors

    Floor Finishes m2

    3C Ceiling Finishes

    3C1 Finishes to Ceilings

    3C2 Suspended Ceilings

    Ceiling Finishes m2

    4 FITTINGS AND FURNISHINGS4A Fittings and Furnishings

    4A1 Fittings, Fixtures and Furniture

    4A2 Soft Furnishing

    4A3 Works of Art

    4A4 Equipment

    Fittings

    AMPLIFIED COST ANALYSIS (Continued)

    ELEMENT

    Sub-Element Element

    Quantity Unit Total Cost Total Cost Costper m2

    Unit Quantity Unit Rate

    2F External Windows and Doors

    2F1 External Windows

    2F2 External Doors

    External Windows and Doors m2

    2G Internal Walls and Partitions

  • 8/11/2019 Bcis Index

    6/15

    RICSStandard Form of Cost Analysis

    5 SERVICES

    5A Sanitary Appliances

    5A1 Sanitaryware5A2 Pods

    Sanitary Appliances Nr

    5B Services Equipment

    5B1 Services Equipment

    Services Equipment Nr

    5C Disposal Installations

    5C1 Internal Drainage

    5C2 Refuse Disposal

    5C3 Chemical and Industrial WasteDisposal

    Disposal Installations Nr

    5D Water Installations

    5D1 Mains Supply

    5D2 Cold Water Services

    5D3 Hot Water Services

    5D4 Steam and Condensate

    Water Installations

    5E Heat Source

    5E1 Heat Source

    Heat Source KW

    5F Space Heating and Air Conditioning

    5F1 Central Heating

    5F2 Local Heating

    5F3 Central Cooling

    5F4 Local Cooling

    5F5 Central Heating and Cooling5F6 Local Heating and Cooling

    5F7 Central Air Conditioning

    5F8 Local Air Conditioning

    5F9 Instrumentation and Controls forMore than One System

    Space Heating and Air Conditioning m3

    5G Ventilating System

    5G1 Central Ventilation

    5G2 Smoke Ventilation

    5G3 Local and Special Ventilation

    Ventilating System m3

    AMPLIFIED COST ANALYSIS (Continued)

    ELEMENT

    Sub-Element Element

    Quantity Unit Total Cost Total Cost Cost perm2

    Unit Quantity Unit Rate

  • 8/11/2019 Bcis Index

    7/15

    RICS Standard Form of Cost Analysis

    5J3 Conveyors

    5J4 Dock Levellers and Scissor Lifts

    5J5 Cranes and Unenclosed Hoists

    5J6 Car Lifts, Turntables and the Like

    Lift and Conveyor Installations Nr

    5K Fire and Lightning Protection

    5K1 Automatic Fire SuppressionSystems

    5K2 Fire-ghting Installations

    5K3 Lightning Protection

    Fire and Lightning Protection

    5L Communications and Security Installations

    5L1 Warning Installations

    5L2 Visual, Audio and Data Installations

    5L3 Security Installations

    Communications and Security

    Installations

    5M Special Installations

    5M1 Mechanical and Electrical Systems

    5M2 Building Management ControlInstallations

    Special Installations

    AMPLIFIED COST ANALYSIS (Continued)

    ELEMENT

    Sub-Element Element

    Quantity Unit Total Cost Total Cost Costper m2

    Unit Quantity Unit Rate

    5H2 Electric Power Supplies5H3 Electric Lighting

    5H4 Electric Light Fittings

    5H5 Specialist Lighting

    5H6 Local Electric Supply

    5H7 Earthing Systems

    Electrical Installations

    5I Fuel Installations

    5I1 Fuel Installations

    Fuel Installations Nr

    5J Lift and Conveyor Installations

    5J1 Lifts and Enclosed Hoists

    5J2 Escalators

    5H Electrical Installations

    5H1 Electric Source and Mains

  • 8/11/2019 Bcis Index

    8/15

    RICSStandard Form of Cost Analysis

    5N Builders Work in Connection (BWIC)

    5N1 Builders Work in Connection

    Builders Work in Connection

    5O Management of the Commissioning of Services

    5O1 Management of the Commissioningof Services

    Management of the

    Commissioning of Services

    BUILDING SUB-TOTAL

    6 EXTERNAL WORKS

    6A Site Works

    6A1 Site Preparation

    6A2 Site Remediation andDecontamination

    6A3 Surface Treatments

    6A4 Site Enclosure and Division

    6A5 Fittings and Furniture

    Site Works

    6B Drainage

    6B1 Drainage Under the Building

    6B2 Drainage Outside the Building

    6B3 Ancillary Works to Drainage

    Drainage

    6C External Services

    6C1 Service Mains

    6C2 Site Lighting

    6C3 Other Site Services

    6C4 Ancillary Works to Services

    6C5 BWIC with External Services

    External Services

    6D Minor Building Works

    6D1 Ancillary Buildings and Structures

    6D2 Alterations to Existing Buildings

    6D3 Other Buildings and Works Includedin the Contract

    Minor Building Works

    6E Demolition and Work Outside the Site

    6E1 Demolition

    6E2 Work Outside the Site

    Demolition and Work Outside

    the Site

    AMPLIFIED COST ANALYSIS (Continued)

    ELEMENT

    Sub-Element Element

    Quantity Unit Total Cost Total Cost Costper m2

    Unit Quantity Unit Rate

  • 8/11/2019 Bcis Index

    9/15

    RICS Standard Form of Cost Analysis

    7 PRELIMINARIES

    7A1 Contractors Direct Costs

    7A2 Fees Paid by the Contractor

    7A3 Clients Specic Requirements

    Preliminaries

    8 CONTINGENCIES

    8A1 Employers Contingencies

    8A2 Dayworks

    9 DESIGN FEES

    9A1 Design Fees

    TOTAL CONTRACT SUM

    AMPLIFIED COST ANALYSIS (Continued)

  • 8/11/2019 Bcis Index

    10/15

    RICSStandard Form of Cost Analysis

    2C Roof 2C1 Roof Structure

    Design loads kN/m2 2C2 Roof Coverings

    Spans m 2C3 Roof Drainage

    Angle of pitch of slopingroofs

    deg 2C4 Rooights and Openings

    Area of roof surface m2 2C5 Roof Features

    2D Stairs 2D1 Stair Structure

    Total vertical height of eachstaircase and width betweenstrings

    m 2D2 Stair Finishes

    2D3 Stair Balustrades and Handrails

    Specication and Design Notes

    SPECIFICATION AND DESIGN NOTES

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    1 SUBSTRUCTURE

    1A Substructure 1A1 Standard Foundations

    Nature of soil 1A2 Special Foundations

    Permissible soil loading kN/m2 1A3 Lowest Floor Bed/Slab

    Bearing strata depth m 1A4 Basement Excavation

    Site levels: main gradients 1A5 Basement Retaining Walls

    Water table depth m

    Average pile loading kN

    Volume of basement m3

    2 SUPERSTRUCTURE

    2A Frame 2A1 Structural Frame

    Grid pattern of main columns

    2B Upper Floors 2B1 Upper Floors

    Design loads kN/m2

    Spans m

    Sound insulation dB

    2 SUPERSTRUCTURE

    1 SUBSTRUCTURE

  • 8/11/2019 Bcis Index

    11/15

    RICS Standard Form of Cost Analysis

    2G Internal Walls and

    Partitions

    2G1 Internal Walls/Partitions

    Sound insulation dB 2G2 Balustrades and Handrails

    Number of WC cubicles Nr 2G3 Moveable Room Dividers

    2G4 Cubicles

    2H Internal Doors 2H1 Internal Doors

    Number of doors by type andsize

    Fire rating

    2E External Walls 2E1 External Enclosing Walls

    Design loads of loadbearingwalls

    kN/m2 2E2 External Wall Finishes

    Thermal conductivity - Uvalue

    W/m2K

    2E3 Solar/Rain Screening

    Area of external walls aboveground

    m2 2E4 Basement Walls

    Area of basement walls m2 2E5 Faade Access

    2F External Windows and

    Doors

    2F1 External Windows

    Total window area m2 2F2 External Doors

    Area of opening lights towindows

    m2

    External door area m2

    SPECIFICATION AND DESIGN NOTES (Continued)

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    3 FINISHES

    3A Wall Finishes 3A1 Wall Finishes

    3B Floor Finishes 3B1 Finishes to Floors

    3B2 Raised Access Floors

    3C Ceiling Finishes 3C1 Finishes to Ceilings

    3C2 Suspended Ceilings

    3 FINISHES

  • 8/11/2019 Bcis Index

    12/15

    RICSStandard Form of Cost Analysis

    SPECIFICATION AND DESIGN NOTES (Continued)

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    5D Water Installations 5D1 Mains Supply

    5D2 Cold Water Services

    5D3 Hot Water Services

    5D4 Steam and Condensate

    5E Heat Source 5E1 Heat Source

    4 FITTINGS

    AND FURNISHINGS

    4A Fittings and Furnishings 4A1 Fittings, Fixtures and Furniture

    4A2 Soft Furnishing

    4A3 Works of Art

    4A4 Equipment

    5 SERVICES

    5A Sanitary Appliances 5A1 Sanitaryware

    5A2 Pods

    5B Services Equipment 5B1 Services Equipment

    5C Disposal Installations 5C1 Internal Drainage

    5C2 Refuse Disposal

    5C3 Chemical and Industrial WasteDisposal

    5F Space Heating and Air

    Conditioning

    5F1 Central Heating

    5F2 Local Heating

    5F3 Central Cooling

    5F4 Local Cooling

    5F5 Central Heating and Cooling

    5F6 Local Heating and Cooling

    5F7 Central Air Conditioning

    5F8 Local Air Conditioning

    5F9 Instrumentation and Controlsfor More than One System

    5 SERVICES

    4 FITTINGS

    AND FURNISHINGS

  • 8/11/2019 Bcis Index

    13/15

    RICS Standard Form of Cost Analysis

    5G Ventilating System 5G1 Central Ventilation

    5G2 Smoke Ventilation

    5G3 Local and Special Ventilation

    5H Electrical Installations 5H1 Electric Source and Mains

    Total electric load kVA 5H2 Electric Power Supplies

    Illumination levels lux 5H3 Electric Lighting

    Capacity of local electricitygeneration

    % 5H4 Electric Light Fittings

    Capacity for emergencygeneration

    % 5H5 Specialist Lighting

    Capacity for uninterruptiblepower supply

    % 5H6 Local Electric Supply

    Period for uninterruptiblepower supply

    min 5H7 Earthing Systems

    5I Fuel Installations 5I1 Fuel Installations

    SPECIFICATION AND DESIGN NOTES (Continued)

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    5J Lift and Conveyor

    Installations

    5J1 Lifts and Enclosed Hoists

    Lifts - number of passengers Nr 5J2 Escalators

    Lifts - designed waiting times min 5J3 Conveyors

    Lifts - number, capacityspeed, number of doors andheight served

    5J4 Dock Levellers and Scissor Lifts

    Escalators - rise and travel 5J5 Cranes and Unenclosed Hoists

    Conveyors - rise and travel 5J6 Car Lifts, Turntables and the Like

    Goods lifts, hoists, cranes,dock levellers, scissor lifts, etc -designed load

    kN

    5K Fire and Lightning

    Protection

    5K1 Automatic Fire SuppressionSystems

    5K2 Fire-ghting Installations

    5K3 Lightning Protection

    5L Communications and

    Security Installations

    5L1 Warning Installations

    5L2 Visual, Audio and DataInstallations

    5L3 Security Installations

  • 8/11/2019 Bcis Index

    14/15

    RICSStandard Form of Cost Analysis

    5M Special Installations 5M1 Mechanical and ElectricalSystems

    5M2 Building Management ControlInstallations

    5N Builders Work in

    Connection

    5N1 Builders Work in Connection

    5O Management of the

    Commissioning of Services

    5O1 Management of theCommissioning of Services

    6 EXTERNAL WORKS

    6A Site Works 6A1 Site Preparation

    6A2 Site Remediation andDecontamination

    6A3 Surface Treatments

    6A4 Site Enclosure and Division

    6A5 Fittings and Furniture

    6B Drainage 6B1 Drainage Under the Building

    6B2 Drainage Outside the Building

    6B3 Ancillary Works to Drainage

    6C External Services 6C1 Service Mains

    6C2 Site Lighting

    6C3 Other Site Services

    6C4 Ancillary Works to Services

    6C5 BWIC with External Services

    6D Minor Building Works 6D1 Ancillary Buildings andStructures

    6D2 Alterations to Existing Buildings

    6D3 Other Buildings and WorksIncluded in the Contract

    6E Demolition and Work

    Outside the Site

    6E1 Demolition

    6E2 Work Outside the Site

    6 EXTERNAL WORKS

    SPECIFICATION AND DESIGN NOTES (Continued)

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

  • 8/11/2019 Bcis Index

    15/15

    RICS Standard Form of Cost Analysis

    7 PRELIMINARIES 7A1 Contractors Direct Costs

    7A2 Fees Paid by the Contractor

    7A3 Clients Specic Requirements

    8 CONTINGENCIES 8A1 Employers Contingencies

    8A2 Dayworks

    9 DESIGN FEES 9A1 Design Fees

    SPECIFICATION AND DESIGN NOTES (Continued)

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES