bceia best conference - 2016 environmental applications of ... · environmental applications of jet...

39
BCEIA BEST Conference - 2016 Environmental Applications of Jet Grouting Whistler, BC May 27, 2016 Stephen G. Custeau, P.Eng. ,MBA MATCON Environmental Ltd.

Upload: others

Post on 03-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  • BCEIA BEST Conference - 2016

    Environmental Applications of Jet Grouting

    Whistler, BCMay 27, 2016

    Stephen G. Custeau, P.Eng. ,MBAMATCON Environmental Ltd.

  • Outline

    - History of Jet Grouting - How the technology works - Applications- Case Histories for environmental applications

    Recochem Port CoquitlamNew Westminster PierJohn Hart Dam (cut off / ground improvement)

  • History of Jet Grouting

    -Japan (CCP) 70’s

    - Europe late 70’s

    - NA – middle 80’s

  • How it worksSTEP 1 : DRILLING

    STEP 3: PULL UP THE ROTATING JET

    STEP 2 START JETTING WITH W/C GROUT MIX FROM THE BOTTOM

    RESULT: ROUND COLUMN CONSISTING OF WATER/CEMENT MIX AND INSITU SOIL

  • Resulting Column

  • Geometry

  • Environmental Containment

  • Jet Grout Parameters

    Flexibility

  • Range of Results

    Single fluid Double Fluid Triple Fluid

    Gravel 0.6-1.2 1.0-1.6 2.0-3.0 10-30 2,500-15,000Sandy Gravel 0.5-1.0 0.9-1.8 1.5-3.0 8-20 2,500-10,000

    Silty Clay 0.5-1.0 0.8-1.5 1.2-2.8 5-15 2,500-7,500Clayly Silt 0.4-0.6 0.7-1.0 1.0-1.5 2-8 1,000-5,000

    Clay 0.4-0.8 0.6-1.2 0.8-1.2 1-6 500-5,000

    E (Mpa)Type of Soil Diameter (m) UCS (Mpa)

    Hydraulic Conductivity = 10-6 to 10-9 m/sDepending on soil conditions and grout Mix (with or w/o bentonite).

    Sheet1

    Type of SoilDiameter (m)UCS (Mpa)E (Mpa)

    Single fluidDouble FluidTriple Fluid

    Gravel0.6-1.21.0-1.62.0-3.010-302,500-15,000

    Sandy Gravel0.5-1.00.9-1.81.5-3.08-202,500-10,000

    Silty Clay0.5-1.00.8-1.51.2-2.85-152,500-7,500

    Clayly Silt0.4-0.60.7-1.01.0-1.52-81,000-5,000

    Clay0.4-0.80.6-1.20.8-1.21-6500-5,000

    Sheet2

    Sheet3

  • QA/QC at Grout Plant

  • QC- Monitoring and recording jetting

  • QC- Monitoring and recording jetting

  • QA/QC- Monitoring / Recording

  • Verification

    - Coring - Permeability tests (direct-indirect)- Cross/holes, tomography- Calipers- Load test in case of piles

  • Typical JG Projects•Shoring/Cut-Off/Underpinning:

    North Vancouver - Parcel 5Richmond – The Mandarin False Creek- Olympic VillageNew Westminster- Multiuse Facility Centre

    •Cut-Off (environmental)Recochem, Port CoquitlamNew Westminster PierJohn Hart Dam Zeballos Lake

    • Soil Improvement for Settlement ControlNew Westminster- Clarkson & Sixth

    • PilingRichmond – Paloma Parkade

    •ShaftsNorth Vancouver- Esplanade & St. GeorgeIONA Treatment Plant (3 phases)

  • Recochem, Port Coquitlam

  • Port Coquitlam

  • Port Coquitlam

  • Port Coquitlam

  • Port Coquitlam

    K= 10-7 cm/sec; 10-9 m/sec

  • New Westminster Pier

  • Location

  • The Options

  • The Site

  • The Site

  • Mapping the Columns

  • John Hart DamJohn Hart Dam

  • Location

  • Field Test

    Production Area

    Field Test Area

  • Field Test

  • Drilling Procedures

    Pre-drilling and PVC installation

  • Field Test Results

  • Very Congested Site!

    Spoil/Reflow storage tanks

    Bentonite mud storage tanks

    Grout mix plant

  • Spoil/Reflow Management

  • Spoil/Reflow Management

  • Real Time Control

  • QA/QC

  • As Built

  • Questions?

    Stephen Custeau, P.Eng., MBA

    MATCON Environmental Ltd.

    Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39