›BC Hydro Rock Bay Remediation Project›Management and Technical Achievementsof a Major Remediation ProgramIan Mace, SNC-Lavalin Inc.Ryan Stewart, BC Hydro & Power Authority
![Page 2: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/2.jpg)
A world leaderFounded in 1911, SNC-Lavalin is one of the leading engineering and construction groups in the world and a major player in the ownership of infrastructure. Fromoffices in over 50 countries, SNC-Lavalin's employees are proud to build whatmatters. Our teams provide EPC and EPCM services to clients in a variety of industrysectors, including oil and gas, mining and metallurgy, infrastructure and power. SNC-Lavalin can also combine these services with its financing and operationsand maintenance capabilities to provide complete end-to-end project solutions.
2
![Page 3: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/3.jpg)
Overview
3
› Site History
› Tailored Project Management Approach
› Remediation History
› Key Technical Achievements
![Page 4: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/4.jpg)
Manufactured Gas Plant
4
![Page 5: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/5.jpg)
History of Rock Bay
5
Rock Bay
1884 Shoreline
Gov
ernm
ent S
treet
Former MGP
Pembroke Street
![Page 6: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/6.jpg)
Project Management – Working Areas
6
Rock Bay
Working Area 4
Working Area 3
Working Area 1
Working Area 2
![Page 7: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/7.jpg)
Risk Register - Background
7
›A Risk Register is a management tool for monitoring the risk management process within the project. It is used to identify, assess and manage risks down to acceptable levels*.
›Risk Register – implemented due to project complexity and importance of overall project schedule.›* https://www.simplilearn.com/risk-management-framework-article
![Page 8: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/8.jpg)
Risk Register - Implementation
8
› Regular ongoing review (every 2 – 3 months)› Risks separated into 40 different categories› Risk levels assigned based on probability and consequence severity
Risk LevelConsequence Severity
Insignificant Minor Moderate Major Catastrophic
Probability
Rare Low Low Low Medium Medium
Unlikely Low Low Medium Medium High
Possible Low Medium Medium High High
Likely Medium Medium High High Very high
Frequent Medium High High High Very high
![Page 9: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/9.jpg)
Risk Register – “Shelf-Ready” Solutions
9
• Early review and engagement with CSAP. Potential concerns were brought forward early allowing them to be addressed.
REGULATORY: CSAP requires more work to be done following
review.
• BC Hydro Project Manager responsible for early communication and negotiation with third parties.
OFF-SITE PARTIES: Inability to conclude working
agreements with off-site third parties.
• Excavation in this area to include all of weathered clay to ensure all DNAPL is removed.
SITE/GROUND/FACILITIES: DNAPL may be present at
greater depth at SW corner of WA3
![Page 10: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/10.jpg)
Remedial Program – History
10
Rock Bay
WA4 Risk Assessment
2014/5 (54,000 tonnes)
2004/5 (110,000 tonnes)
2013 (11,000 tonnes)
2004/5 (130,000 tonnes)
![Page 11: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/11.jpg)
Preservation of Heritage Buildings
11
›Rock Bay (Powerhouse) Building
›Instrumentation Building
›Administration Building
![Page 12: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/12.jpg)
Shoring Techniques
12
›Project size and variability required multiple types of shoring› Options considered based on depth of excavation, stratigraphy, access and
presence of utilities› Project team received input from contractors and BC Hydro construction team
![Page 13: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/13.jpg)
Shoring Techniques – Secant Wall
13
›Secant Wall› Interlocking concrete piles with reinforcing H-piles› Extended to design depth (15.0 m bgs) or keyed into
bedrock› Capable of drilling through 1 – 2 m diameter
sections of rip rap› Excavation to 8 m bgs without slot cutting
![Page 14: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/14.jpg)
14
› Identified during the excavation around the perimeter of the Former Instrumentation Building
› 1.9 m diameter / 14 m depth› Estimated to contain 26,000 litres of
coal tar NAPL
Shoring Techniques – Tar Well
![Page 15: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/15.jpg)
Shoring Techniques – Tar Well
15
› Overlapping unreinforced secant piles installed surrounding the tar well
› Tar stabilized in-situ with hog-fuel to satisfy treatment facility requirements
› Tar well void backfilled with CDF to encapsulate any residual contamination
![Page 16: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/16.jpg)
Shoring Techniques – Sheet Pile
16
› Used where rip rap not present / removed mechanically and in areas of utilities› Excavation to 4 to 5 m bgs without slot cutting› Excavation to 8.1 m bgs with additional support and/or slot cutting
![Page 17: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/17.jpg)
WA3 - Modified Sheet Pile
17
›Excavation to the property line was required within HW area at WA3› Sheet pile wall with backing steel plate installed› Material within the void subsequently removed to the depth of excavation (hydrovac)› Minimal water infiltration through sheet pile wall observed.
![Page 18: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/18.jpg)
Hazardous Waste Transport
18
› Reduction of vapours / odours was achieved by wrapping the HW soil with poly
› Reduce potential for spillage during transport
![Page 19: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/19.jpg)
Stockpile Soil Tracking
19
› Soil classified based on in-situ data› Tracking system implemented to insure
proper stockpiling of excavated material› Coloured card provided to driver › Material Movement Approval forms used
![Page 20: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/20.jpg)
WA3 - Over-excavation into Underlying Clay
20
›Purpose: to reduce the potential for residual contamination to negatively effect the post-remediation groundwater quality› Excavation extended 0.5 m into the underlying weathered clay› Within the HW area, excavation extended 1 - 2 m to remove weathered clay
![Page 21: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/21.jpg)
WA3 - Storm Water Pipe Reroute
21
› 0.9 m diameter storm water discharge pipe - southern area of WA3 excavation
› Located in area of HW contamination requiring excavation to 8 m bgs
![Page 22: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/22.jpg)
WA3 - Storm Water Pipe Reroute
22
› Contractor implemented design› Two new manholes installed› Utility rerouted in area previously
excavated using a gravity feed system› Former storm water pipe replaced
![Page 23: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/23.jpg)
WA4 – Source of Contaminant
23
› MGP-contaminants migrated across the bay
› Contaminants deposited at bottom of unfilled Rock Bay and buried (primarily between 1884 to 1918) during the filling of portions of the bay;
› Buried sediments called Bay Bottom Sediment
![Page 24: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/24.jpg)
WA4 - Approach
24
›Risk Assessment of MGP-Sourced Contamination•Contamination
› Difference between pre and post-industrial era sediment quality› Widespread contamination in present from surface to BBS› MGP contaminant of concern in BBS - PAH and LEPH
•CofC Approach
› BC Hydro only responsible for MGP sourced contamination› Residual contamination (within the BBS) addressed by means of risk assessment
![Page 25: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/25.jpg)
Rock Bay Achievements
25
› 11 of 16 Certificates of Compliance with remaining 5 expected shortly› 2017 Association of Consulting Engineering Companies BC – Awards for Engineering
Excellence› 2017 BROWNIE Award› Property ready for
redevelopment
![Page 26: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/26.jpg)
QUESTIONS?
![Page 27: BC Hydro Rock Bay Remediation Project](https://reader031.vdocuments.us/reader031/viewer/2022012219/61dfee9e1b887f303b253114/html5/thumbnails/27.jpg)
Our values keep us anchored and on track. They speak to how we run our business, how we express ourselves as a group, and how we engage with our stakeholders and inspire their trust.
Values that guide us
Teamwork & excellenceWe’re innovative, collaborative, competent and visionary.
Customer focusOur business exists to serve and add long-term value to our customers’ organizations.
Strong investor returnWe seek to reward our investors’ trust by delivering competitive returns.
Health & safety, security and environmentWe have a responsibility to protect everyone who comes into contact with our organization.
Ethics & complianceWe’re committed to making ethical decisions.
RespectWe consistently demonstrate respect for all our stakeholders.
Change Footer here: Insert > Header and Footer (delete if none) 27