My Personal “One Thing“
I’m Lee, Dong - Hee one of the General Manager
from Water supply and Sewerage Department.
My first personal one thing is to use the stairs twice a day for my health
However, the BBWSP overseas projects change it.
It’s technically, one step is to further develop.
1
![Page 3: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/3.jpg)
Challenges with New Project
![Page 4: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/4.jpg)
Challenges with BBWSP
Lack of experience in
Overseas projects
Strain in English, Word and other
uncommonly practice.
Lack of information
about Philippines
Lack of Self-Confidence
about oversea project
But, The Dies is Cast !!!
2
![Page 5: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/5.jpg)
Introduction of BBWSP
![Page 6: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/6.jpg)
3
BBWSP Characteristic
![Page 7: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/7.jpg)
Stage 1(6 Water Districts)
Stage 2 (7 Water Districts)
Stage 3 (11 Water Districts)
PED(Stage 1, 2 -13 WDs)
DBP(Stage 1, 2, 3 - 24WDs)
Water Treatment Plant = 388MLD
- Phase 1 : 200MLD
- Phase 2 : 188MLD
Conveyance Pipeline
- D 300 ~ 1,600mm
- L=65.5 km
4
BBWSP SUMMARY
![Page 8: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/8.jpg)
SMC-K water Consortium
PROJECT OWNER
Metropolitan Waterworks
and Sewerage System
(MWSS)
SPC
San Miguel Holdings
Corporation(SMC)
Korea Water Resources
Corporation (K-water)
Nominated DESIGN
Kunhwa Engineering &
Consulting Co., Ltd.
Yooshin Engineering
Corporation
Nominated CONSTRUCTION
Daewoo Engineering &
Construction Co., Ltd.
Daelim Industrial
Co., Ltd.
5
![Page 9: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/9.jpg)
Business Plan of stage 1, 2 & 3(b)
Angat River at Calumpit
WTP(Q=388MLD)
6
Conveyance pipeline
D300~1,600, L=65.5km
![Page 10: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/10.jpg)
Water Treatment Plant Layout
7
![Page 11: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/11.jpg)
Conveyance Pipeline Layout
- Treated Water Reservoir(B) is integrated in the conveyance pipe route.
- One line is only for SJDM Water District, while the second line will supplied
the 12 remaining WDs for easy management and efficient energy saving.
8
![Page 12: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/12.jpg)
Beyond The Border !!! Ⅲ
![Page 13: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/13.jpg)
Project Ups and Downs
5
Uncertainty
Oversea Project
Change of
Bidding Date
Possibility of
Business give
up and post -
pone
permanently
Spread
Negative
Outlook !!
Difficulty of
Communicating
Language
Barrier between
Korea and
Philippines
Lack of Trust
among
Consortium
Members
9
SPC and Conflicts
with EPC
Conflict of TA
and EPC
Lack of sharing
information
about design
Delayed
Contract Design
EPC Team
Withdrawl
EPC Cost
Over-
Estimated
Change the
EPC Members
Joint Office
Closed twice
![Page 14: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/14.jpg)
The answer lies in the Field
10
![Page 15: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/15.jpg)
11
⇒ Clients requirements for Bidder career based experience is too high
⇒ Difficulties during preparation of pre-qualification document due to
given ceiling requirements
⇒ As of now we haven’t meet the required sufficient years of
experience set by the Client
⇒ Insufficient experience engineer for different specific line of work
⇒ Inconvenient Authentication of required documents from Notary
Office, Ministry of Foreign Affairs and the Philippine Embassy
![Page 16: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/16.jpg)
12
![Page 17: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/17.jpg)
13
![Page 18: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/18.jpg)
14
⇒ Sharing of Knowledge and experiences with Local Company
⇒ Coordination with Local Company during the PED and detailed
estimate
⇒ Proper approached and understanding of requirements on given
tender documents
⇒ Reliability of Technical Proposal Content is more important than
Design Format Presentation.
⇒ Having a good working environment helps to make a good results
⇒ Smooth environment between MWSS and other bidders
![Page 19: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/19.jpg)
We Finally Won the BBWSP(15.11.24)!!
15
![Page 20: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/20.jpg)
16
Lesson Learn from BBWSP
![Page 21: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/21.jpg)
Next Goal
Be Part of Philippines Development
Completion of Project New Project Development
4 17
![Page 22: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/22.jpg)
Especially our Department Whole Boss
and Team Leader for
all the support, encouragement and wisdom.
To our Chairmans and President
Who gave us the privilege to be part of BBWSP
always there to support the whole Team.
Special Thanks…….
18
![Page 23: Bbwsp one thing edited file rev.04](https://reader034.vdocuments.us/reader034/viewer/2022052418/588415881a28ab95518b68ed/html5/thumbnails/23.jpg)
Thank You ! Salamat Po !