PROJECT NAMELOCCATION/STRUCTURE

Bar bending schedule for 10Rm

Remarks

8 mm 10 mm 12 mm 16mm 20mm 25mm

B10.96 0.96 Raft bottom 8 150 67 28.365 1900.455 750.680 0 0 0 0 0

26.445 0.000 0 0 0 0 0

B30.22 0.22 Raft top 12 150 67 26.885 1801.295 0.000 0 1599.55 0 0 0

26.445 0.000 0 0 0 0 0

B924.6 10 200 266 9.92 2638.72 0.000 1625.452 0 0 0 0

9.92 20 200 266 10.35 2753.10 0.000 0 0 0 6800.157 0

B110.35 16 200 67 0.60 40.20 0.000 0 0 63.3552 0 0

0.60 0.000 0 0 0 0 0

B320 200 67 0.50 33.50 0.000 0 0 0 82.745 0

0.50 750.680 1625.452 1599.550 63.355 6882.902 0.000

Total Wt in MT 10.922

Bar Mark (1)

Shape of Bar (2)

Description (3)

Bar Dia (in mm)

(4)

Spacing c/c (in mm) (5)

No. (6)

Length Rmt (7)

Total Length

Rmt (6x7)

Dia Wise Wt Reinforcement (in Kg.)

Distributor in bottom and Top

Raft bottom over lap

Raft Top over lap