CONSULTANTS: MECHANICAL: CODES: PLUMBING: ELECTRICAL: BUILDING DATA: GROUP "B" = BUSINESS OCCUPANCY TYPE "2B" UNPROTECTED SPRINKLERED TLC Engineering Solutions 1650 Prudential Drive Suite 200 Jacksonville, FL. 32207 PH: 904 - 306 - 9111 TLC Engineering Solutions 1650 Prudential Drive Suite 200 Jacksonville, FL. 32207 PH: 904 - 306 - 9111 TLC Engineering Solutions 1650 Prudential Drive Suite 200 Jacksonville, FL. 32207 PH: 904 - 306 - 9111 11,834 SQ. FT. (1ST FLOOR) 13,004 SQ. FT. (2ND FLOOR) 12,833 SQ. FT. (3RD FLOOR) TOTAL: 30,172 SQ. FT. FLORIDA EXISTING BUILDING CODE 6TH EDITION FBC TEST PROTOCOLS FOR HIGH VELOCITY HURRICANE ZONES FLORIDA FIRE PREVENTION CODE 6TH EDITION FLORIDA BUILDING CODE 6TH EDITION (2017) - BUILDING FLORIDA BUILDING CODE 6TH EDITION (2017) - ACCESSIBILITY FLORIDA BUILDING CODE 6TH EDITION (2017) - TEST PROTOCOLS FLORIDA BUILDING CODE 6TH EDITION (2017) - MECHANICAL FLORIDA BUILDING CODE 6TH EDITION (2017) - PLUMBING FLORIDA BUILDING CODE 6TH EDITION (2017) - FUEL GAS UL STANDARD 181 (2005) ASTM E 96 (2013) ASCE 7 (2010) - WITH ERRATA DATED JANUARY 11, 2011 2012 EDITION OF THE NFPA 101 LIFE SAFETY CODE PRODUCT APPROVAL DATA CATEGORY/SUB CATEGORY APPROVAL NUMBER CONTRACTOR SHALL MAINTAIN ONSITE THE FOLLOWING 1. COPY OF THE PRODUCT APPROVAL, INCLUDING PERFORMANCE CHARACTERISTICS WHICH THE PRODUCT WAS TESTED AND CERTIFIED TO COMPLY WITH. 2. COPY OF APPLICAPLE MAUNUFACTURER'S INSTALLATION INSTRUCTIONS. PRODUCT SUBSTITUTION SHALL BE MADE SUBJECT TO FULL COMPLIANCE WITH THE CRITERIA NOTED HEREON, AND SUCH SUBSTITUTION SHALL BE SUBJECT TO PRIOR APPROVAL BY THE DESIGN PROFESSIONAL AND THE LOCAL BUILDING AUTHORITY HAVING JURISDICTION. ROOF SYSTEM FLORIDA PRODUCT APPROVAL # 20324.1 EXTERIOR INSULATION & FINISH SYSTEM FLORIDA PRODUCT APPROVAL # 13447 MANUFACTURER TREMCO DRYVIT SCOPE OF WORK GYP. WALL BOARD REPAIR AND REPLACEMENT & INSULATION REPLACEMENT FLOORING TO BE REMOVED AND REPLACED CEILING GRID AND TILES TO BE REMOVED AND REPLACED BUILT UP ROOF TO BE REMOVED AND REPLACED DAMAGE TO EIFS TO BE REPAIRED EIFS SURFACE TO BE COATED WINDOWS TO BE REINSTALLED WHERE MISSING DOORS TO BE REMOVED AND REPLACED Pensacola, FL 32502 F 850.433.0508 GMCNETWORK.COM T 850.432.0706 720 Bayfront Parkway, Suite 200 DRAWN BY: ISSUE CHECKED BY: DATE 1 0 / 1 8 / 2 0 1 9 6 : 3 9 : 0 0 A M TITLE SHEET GMC # APEN190048 615 N. BONITA AVENUE PANAMA CITY, FL 32401 T1 Author 10-15-2019 BAY MEDICAL CENTER COOLEY BLDG. RESTORATION BID BAY MEDICAL CENTER COOLEY BLDG. RESTORATION 615 N. BONITA AVENUE PANAMA CITY, FL 32401 SITE CONTRACTOR SHALL MAINTAIN ON SITE THE FOLLOWING: 1. COPY OF THE PRODUCT APPROVAL, INCLUDING PERFORMANCE CHARACTERISTICS WHICH THE PRODUCT WAS TESTED AND CERTIFIED TO COMPLY WITH 2. COPY OF APPLICABLE MANUFACTURER'S INSTALLATION INSTRUCTIONS PRODUCT SUBSTITUTION SHALL BE MADE SUBJECT TO FULL COMPLIANCE WITH THE CRITERIA NOTED HEREIN, AND SUCH SUBSTITUTION SHALL BE SUBJECT TO PRIOR APPROVAL BY THE DESIGN PROFESSIONAL AND THE LOCAL BUILDING AUTHORITY HAVING JURISDICTION For THE BOARD OF TRUSTEES OF BAY MEDICAL CENTER, A SPECIAL DISTRICT VOLUME NUMBER 1 GOODWYN MILLS & CAWOOD, INC ARCHITECTURE, INTERIORS, CIVIL, LANDSCAPE BAY MEDICAL CENTER COOLEY BLDG. RESTORATION FOR THE BOARD OF TRUSTEES OF BAY MEDICAL CENTER, A SPECIAL DISTRICT

Upload: others

Post on 27-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

CONSULTANTS:MECHANICAL:

CODES:

PLUMBING:

ELECTRICAL:

BUILDING DATA:GROUP "B" = BUSINESS OCCUPANCY

TYPE "2B" UNPROTECTED SPRINKLERED

TLC Engineering Solutions1650 Prudential DriveSuite 200Jacksonville, FL. 32207PH: 904-306-9111

TLC Engineering Solutions1650 Prudential DriveSuite 200Jacksonville, FL. 32207PH: 904-306-9111

TLC Engineering Solutions1650 Prudential DriveSuite 200Jacksonville, FL. 32207PH: 904-306-9111

11,834 SQ. FT. (1ST FLOOR)

13,004 SQ. FT. (2ND FLOOR)

12,833 SQ. FT. (3RD FLOOR)

TOTAL: 30,172 SQ. FT.

FLORIDA EXISTING BUILDING CODE 6TH EDITIONFBC TEST PROTOCOLS FOR HIGH VELOCITY HURRICANE ZONESFLORIDA FIRE PREVENTION CODE 6TH EDITION

FLORIDA BUILDING CODE 6TH EDITION (2017) - BUILDINGFLORIDA BUILDING CODE 6TH EDITION (2017) - ACCESSIBILITYFLORIDA BUILDING CODE 6TH EDITION (2017) - TEST PROTOCOLSFLORIDA BUILDING CODE 6TH EDITION (2017) - MECHANICALFLORIDA BUILDING CODE 6TH EDITION (2017) - PLUMBINGFLORIDA BUILDING CODE 6TH EDITION (2017) - FUEL GAS

UL STANDARD 181 (2005)ASTM E 96 (2013)ASCE 7 (2010) - WITH ERRATA DATED JANUARY 11, 20112012 EDITION OF THE NFPA 101 LIFE SAFETY CODE

PRODUCT APPROVAL DATACATEGORY/SUB CATEGORY APPROVAL NUMBER

CONTRACTOR SHALL MAINTAIN ONSITE THE FOLLOWING1. COPY OF THE PRODUCT APPROVAL, INCLUDING PERFORMANCE CHARACTERISTICS WHICH THE PRODUCT WAS TESTED AND CERTIFIED TO COMPLY WITH.2. COPY OF APPLICAPLE MAUNUFACTURER'S INSTALLATION INSTRUCTIONS.PRODUCT SUBSTITUTION SHALL BE MADE SUBJECT TO FULL COMPLIANCE WITH THE CRITERIA NOTED HEREON, AND SUCH SUBSTITUTION SHALL BE SUBJECT TO PRIOR APPROVAL BY THE DESIGN PROFESSIONAL AND THE LOCAL BUILDING AUTHORITY HAVING JURISDICTION.

ROOF SYSTEM FLORIDA PRODUCT APPROVAL # 20324.1

EXTERIOR INSULATION & FINISH SYSTEM FLORIDA PRODUCT APPROVAL # 13447

MANUFACTURER

TREMCO

DRYVIT

SCOPE OF WORK

GYP. WALL BOARD REPAIR AND REPLACEMENT& INSULATION REPLACEMENT

FLOORING TO BE REMOVED AND REPLACED

CEILING GRID AND TILES TO BE REMOVED AND REPLACED

BUILT UP ROOF TO BE REMOVED AND REPLACED

DAMAGE TO EIFS TO BE REPAIRED

EIFS SURFACE TO BE COATED

WINDOWS TO BE REINSTALLED WHERE MISSING

DOORS TO BE REMOVED AND REPLACED

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

39:0

0A

M

TITL

ESH

EET

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

T1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

BAY MEDICAL CENTER COOLEYBLDG. RESTORATION

615 N. BONITA AVENUE PANAMA CITY, FL 32401

SITE

CONTRACTOR SHALL MAINTAIN ON SITE THE FOLLOWING:1. COPY OF THE PRODUCT APPROVAL, INCLUDING PERFORMANCE CHARACTERISTICS WHICH THE PRODUCT WAS TESTED AND CERTIFIED TO COMPLY WITH2. COPY OF APPLICABLE MANUFACTURER'S INSTALLATION INSTRUCTIONS

PRODUCT SUBSTITUTION SHALL BE MADE SUBJECT TO FULL COMPLIANCE WITH THE CRITERIA NOTED HEREIN, AND SUCH SUBSTITUTION SHALL BE SUBJECTTO PRIOR APPROVAL BY THE DESIGN PROFESSIONAL AND THE LOCAL BUILDING AUTHORITY HAVING JURISDICTION

For THE BOARD OF TRUSTEES OF BAY MEDICAL CENTER, A SPECIAL DISTRICT VOLUME NUMBER 1

GOODWYN MILLS & CAWOOD, INC ARCHITECTURE, INTERIORS, CIVIL, LANDSCAPE

BAY MEDICAL CENTER COOLEY BLDG. RESTORATION

FOR THE BOARD OF TRUSTEES OF BAY MEDICAL CENTER,A SPECIAL DISTRICT

Page 2: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:4

5A

M

IND

EXO

FD

RAW

ING

S

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

G1.0

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

INDEX OF DRAWINGS

SHEET NAME REVISION DATE

INDEX OF DRAWINGS

SHEET NAME REVISION DATE

INDEX OF DRAWINGS

SHEET NAME REVISION DATET1 TITLE SHEET

G1.01 INDEX OF DRAWINGSG1.03 GENERAL INFORMATION & MOCK UP WALLG1.11 ACCESSIBLILITY INFORMATIONG1.31 FIRESTOPPING - THRU-PENETRATION

SYSTEMSLS101 FIRST FLOOR LIFE SAFETY PLAND100 1ST FLOOR DEMOLITION PLAN

D100A FIRST FLOOR CEILING DEMOLITION PLAND101 2ND FLOOR DEMOLITION PLAN

D101A SECOND FLOOR CEILING DEMOLITION PLAND102 3RD FLOOR DEMOLITION PLAN

D102A THIRD FLOOR CEILING DEMOLITION PLAND103 PENTHOUSE DEMOLITION PLAND104 ROOF DEMO PLAND105 PENTHOUSE ROOF DEMO PLANA101 1ST FLOOR FLOOR FINISH PLANA102 2ND FLOOR FLOOR FINISH PLANA103 3RD FLOOR FLOOR FINISH PLANA201 FIRST FLOOR NEW WORK PLANA202 SECOND FLOOR NEW WORK PLANA203 THIRD FLOOR NEW WORK PLANA204 PENTHOUSE NEW WORK PLANA301 FIRST FLOOR NEW WORK CEILING PLANA302 SECOND FLOOR NEW WORK CEILING PLANA303 THIRD FLOOR NEW WORK CEILING PLAN

A400A EIFS REPAIRA400B EIFS REPAIR DETAILS & GENERAL NOTESA401 FIRST FLOOR EIFS REPAIR PLANA402 SECOND FLOOR EIFS REPAIR PLANA403 THIRD FLOOR EIFS REPAIR PLANA404 PENTHOUSE EIFS REPAIR PLANA405 ROOF NEW WORK PLANA406 PENTHOUSE NEW WORK PLAN AND DETAILSA407 EXTERIOR ELEVATIONSA408 EXTERIOR ELEVATIONSA500 DOOR SCHEDULE AND DETAILSA501 SECTIONS & DETAILSA600 FIRST FLOOR FINISH SCHEDULEA601 SECOND FLOOR FINISH SCHEDULEA602 THIRD FLOOR FINISH SCHEDULE

FP001 FIRE PROTECTION SYMBOLS, LEGEND,NOTES, AND INDEX

FP101 FIRST FLOOR PLAN FIRE PROTECTIONFP102 SECOND FLOOR PLAN FIRE PROTECTIONFP103 THIRD FLOOR PLAN FIRE PROTECTIONP001 PLUMBING SYMBOLS, LEGEND, NOTES, AND

INDEXP101 FIRST FLOOR PLAN PLUMBINGP102 SECOND FLOOR PLAN PLUMBINGP103 THIRD FLOOR PLAN PLUMBINGM001 MECHANICAL LEGEND, NOTES, & SHEET

INDEXM002 MECHANICAL SCHEDULES AND DETAILSM101 FIRST FLOOR PLAN DUCTWORKM102 SECOND FLOOR PLAN DUCTWORKM103 THIRD FLOOR PLAN DUCTWORKM104 ROOF & PENTHOUSE PLAN DUCTWORKM201 FIRST FLOOR PLAN PIPINGM202 SECOND FLOOR PLAN PIPINGM203 THIRD FLOOR PLAN PIPINGM204 ROOF & PENTHOUSE PLAN PIPINGM301 MECHANICAL ENLARGED LAUNDRY PLANM401 MECHANICAL SPECIFICATIONSE001 ELECTRICAL LEGEND AND DRAWING INDEXE002 ELECTRICAL SPECIFICATIONS AND NOTESE003 EXISTING ONE LINE DIAGRAME004 FIRE ALARM RISER, VOICE/DATA RISERE101 FIRST FLOOR PLAN LIGHTINGE102 SECOND FLOOR PLAN LIGHTINGE103 THIRD FLOOR PLAN LIGHTINGE104 ROOF & PENTHOUSE PLAN LIGHTINGE201 1ST FLOOR PLAN POWER AND SYSTEMSE202 SECOND FLOOR PLAN POWER AND SYSTEMSE203 THIRD FLOOR PLAN POWER AND SYSTEMSE204 ROOF AND PENTHOUSE PLAN POWER AND

SYSTEMS72

Page 3: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

B/BBCBDBLDGBLKGBMBOTBRGBSMTBURBOWB/W

CABCBC/CCDCFCFCI

CICIPCJCLGCLOCLRCMPCMUCOCOLCONCCONNCONSTCONTCOORDCPTCSMUCTCW

DDBLDEMDETDHDIADIAGDIMDLDSDWGDF

FACE OFFACE OF BRICK

FACE OF CONCRETEFACE OF FINISH

FACE OF MASONRYFACE OF STUD

FRAME (ED), (ING)FIRE RETARDANT TREATED

FOOT/FEETFOOTING

GAUGEGALVANIZED

GRAB BARGALVANIZED HOLLOW METAL

GALVANIZED IRONGYPSUM WALL BOARD

GYPSUM

HEIGHTHANDICAP

HOLLOW METALHIGHEST OPERABLE DEVICE

HORIZONTALHIGH POINT/HORSE POWER

HOLLOW STRUCTURAL STEELHEIGHT

HEATING / VENTILATION / AIRCONDITIONING

HARDWARE

IDIEIJININSUL

JANJGJT

NOT IN CONTRACTNUMBERNOMINAL

NOT TO SCALE

OVERHEADON CENTER (S)OCCUPANT (S)

OUTSIDE DIAMETEROWNER FURNISHED,

CONTRACTOR INSTALLEDOPPOSITE HAND

OPENINGOPPOSITE

PRECAST JOINTPROPERTY LINE, PLATE

PLASTIC LAMINATEPAINT (ED)

PREFABRICATEDPREFINISHED

PREMANUFACTUREDPOUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCH

POINT / PRESSURE TREATED / POINT OFTANGENCY

POLYVINYL CHLORIDEPAVEMENTPLYWOOD

QUARRY TILE

FBOFDFECFFEFFWFHCF/FFLFLGFND

WWBWCWDWHWINWPWTW/WWWFW/W/O

TELETERMT&GTHTHKTOTOCTOGBTOFTOJTOSTOWTYPTZ

UNO

VBVCTVERTVWC

REQUIREDRETAINING

REVISION (S), REVISEDRIGHT HAND

RECESSED JOINTROOM

ROUGH OPENINGRIGHT OF WAY

ROOF TOP UNIT

SEALED CONCRETESCHEDULED

STORM DRAINSECTION

STOREFRONTSIMILAR

SPECIFICATION (S)SQUARE

SOLID SURFACESTAINLESS STEEL

STANDARDSTEEL

STORAGESTRUCTURAL

SQUARE YARD

BACK -TO -BACKBASE OF CURB

BOARDBUILDING

BLOCKINGBENCHMARK

BOTTOMBEARING

BASEMENTBUILT -UP ROOF

BOTTOM OF WALLBETWEEN

ACCACIACTADDAFFALTALUMAPPROXARCHADJ

ACCESSIBLEAMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILEADDENDUM

ABOVE FINISH FLOORALTERNATEALUMINUM

APPROXIMATEARCHITECT (URAL)

ADJACENT

CABINETCATCH BASIN

CENTER TO CENTERCORE DECK

CUBIC FOOTCONTRACTOR FURNISHED, CONTRACTOR

INSTALLEDCAST IRON

CAST IRON PIPECONSTRUCTION OR CONTROL JOINT

CEILINGCLOSET

CLEAR (ANCE)CORRUGATED METAL PIPE

CONCRETE MASONRY UNITCLEAN OUT

COLUMNCONCRETE

CONNECTIONCONSTRUCTION

CONTINUOUS OR CONTINUECOORDINATECARPET (ED)

CALCIUM SILICATE MASONRY UNITCERAMIC TILE

CURTAIN WALL

DRYERDOUBLE

DEMOLISH OR DEMOLITIONDETAIL

DOUBLE HUNGDIAMETERDIAGONAL

DIMENSIONDEAD LOAD

DOWNSPOUTDRAWING

DRINKING FOUNTAIN

FURNISHED BY OTHERSFLOOR DRAIN

FIRE EXTINGUISHER & CABINETFINISH FLOOR ELEVATION

FINISH FACE OF WALLFIRE HOSE & CABINET

FACE TO FACEFLOOR

FLANGEFOUNDATION

FOFOBFOCFOFFOMFOSFRFRTFTFTG

GAGALVGBGHMGIGWBGYP

HHCHMHODHORIZHPHSSHTHVAC

HW

INSIDE DIAMETERINVERT ELEVATION

ISOLATION JOINTINCH / INCHES

INSULATION

JANITOR'S CLOSETJOIST GIRDER

JOINT

NICNONOMNTS

O/HOCOCCODOFCI

OHOPGOPP

PJPLPLAMPNTPREFABPREFINPREMANUFPSFPSIPT

PVCPVMTPWD

QT

REQ'DRETREVRHRJRMROROWRTU

SCSCHEDSDSECTSFSIMSPECSQSSSSTSTDSTLSTORSTRUCTSY

TELEPHONETERMINATION

TONGUE AND GROOVETHICK (NESS)THICK (NESS)

TOP OFTOP OF CURB

TOP OF GRAB BARTOP OF FOOTING

TOP OF JOISTTOP OF SLAB / TOP OF STEEL

TOP OF WALLTYPICAL

TERRAZZO

UNLESS NOTED OTHERWISE

VINYL BASEVINYL COMPOSITION TILE

VERTICALVINYL WALL COVERING

WASHER / WIDTH / WIDE FLANGEWOOD BASE

WATER CLOSETWOOD

WATER HEATERWINDOW

WORK POINT / WATERPROOFINGWEIGHT

WALL TO WALLWELDED WIRE FABRIC

WITHWITHOUT

MATERIALMAXIMUM

MISCELLANEOUS CHANNELMECHANICAL

MEZZANINEMANUFACTURE (R)

MANHOLEMINIMUM

MASONRY OPENINGMULLION

MATLMAXMCMECHMEZZMANUFMHMINMOMULL

LAMINATE (D)LINEAR FOOT

LENGTH, ANGLELABORATORY

LAVATORYLEFT HANDLIVE LOAD

LONG LEG HORIZONTALLONG LEG VERTICAL

LOW POINTLIGHT GAUGE

LIGHTLUXURY VINYL TILE

LAMLFLLABLAVLHLLLLHLLVLPLT GALTLVT

KKIPKJKSI

THOUSAND1000 #

KEY JOINT1000 # PER SQ IN

RETURN AIRRADIUS

RUBBER BASEREFLECTED CEILING PLAN

ROOF DRAINREINFORCEMENT BAR

REFRIGERATOR / REFERENCEREINFORCE (D), (ING)

RARADRBRCPRDREBARREFREINF

EAEFEIFSEJELEVELECENGREOPEOSEQEWEWCEXHEXISTEXPEXPNEXT

EACHEACH FACE

EXTERIOR INSULATION FINISH SYSTEMEXPANSION JOINT

ELEVATION / ELEVATORELECTRIC (ALL)

ENGINEEREDGE OF PAVEMENT

EDGE OF SLABEQUAL

EACH WAYELECTRIC WATER COOLER

EXHAUSTEXISTINGEXPOSED

EXPANSIONEXTERIOR

ROOM REFERENCE SYMBOL

2

COLUMN LINES:CONSECUTIVE NUMBERS ARE USED FOR

COLUMN LINES RUNNING NORTH & SOUTH

677.52 ELEVATION MARK SYMBOL:677.52 - ELEVATION (FT)

W1

0G

L1

ROOM NAME101

101

A

1

DOOR SYMBOL:DOOR NUMBER 101

WINDOW SYMBOL:WINDOW TYPE A

LOUVER SYMBOL:LOUVER TYPE L1

WALL SYMBOL:WALL TYPE 0G

REVISION SYMBOL:USED TO INDICATE SCOPE OF CURRENT

REVISION

A1.013

TRUENORTH

1

A1.01

INTERIOR ELEVATION SYMBOL:INTERIOR ELEVATION 3

ON SHEET A101

NORTH ARROW:ARCHITECTURAL ORIENTATION

FF&E:BY OTHERS

EXTERIOR ELEVATION SYMBOL:ELEVATION 1 ON SHEET A101

PLANNORTH

TA01

A

A1.01

A1.01

SPECIALTY EQUIPMENT TAG:SEE SPECIALTY EQUIPMENT SCHEDULE

PLAN KEYNOTE TAG:NOTE NUMBER A

SEE PLAN KEYNOTE SCHEDULE

BUILDING SECTION SYMBOL:SECTION 1 ON SHEET A101

WALL SECTION SYMBOL:SECTION 1 ON SHEET A101

ENLARGED DETAIL SYMBOL:DETAIL 1 ON SHEET A101

A1.01

#HEIGHT #

WIDTH #

DEPTH #

CDS#

CASEWORK TAG

1

1

1A CONSECUTIVE LETTERS ARE USED FORCOLUMN LINES RUNNING EAST & WEST

FACE OF MASONRY OR FACEOF GIRDER

2CIVIL ORIENTATION

DOOR TYPE A(SEE DOOR SCHEDULE AND

FLOOR PLANS)

(SEE EXTERIOR ELEVATIONSAND WINDOW SCHEDULE)

(SEE LOUVER SCHEDULE)

(SEE PARTITION LEGEND)

GENERAL DEMOLITION NOTES:

3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .

4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.

5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.

1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.

2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.

6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED

8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.

9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:4

7A

M

GEN

ERA

LIN

FORM

ATI

ON

&M

OC

KU

PW

ALL

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

G1.0

3A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

A B B R E V I A T I O N S

A N N O T A T I O N S Y M B O L S

Page 4: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

T Y P I C A L R E A C H R A N G E S

WALL MOUNTED DEVICE WALL MOUNTEDDEVICE

COUNTER TOP

WALL MOUNTED DEVICE WALL MOUNTEDDEVICE

WALL MOUNTED DEVICE

FIXED OBJECT

WALL MOUNTED DEVICE

FIXED OBJECT

F.F.E.

COUNTER TOP

MIN

15".

HOD

48"M

AX

SEE

ELEV HO

D

48"M

AX

SEE

ELEV

HOD

44"M

AX

10" MAX

34"M

AX

34"M

AX

HOD

46"M

AX

HOD

48"M

AX

HOD

48"M

AXM

IN

15".

>20" - 25" MAX

MAX

20" 10" MAX >10" - 24" MAX

U N O B S T R U C T E D F O R W A R DR E A C H

O B S T R U C T E D H I G H F O R W A R D R E A C H U N O B S T R U C T E D S I D E R E A C H O B S T R U C T E D H I G H S I D E R E A C H

F.F.E. F.F.E.

36" MIN BAR

17" FFW

W A T E R C L O S E T

TOGB

35"A

FF

TOSE

AT18

"AFF

GB

42" MIN

54" MIN

12" MAX

±40

"AFF

MIN

1'-6

"FFW

±40"

12" MIN24" MIN

59" MIN CLRCLR FLOOR SPACE

60" MIN

CLR

9"M

IN

TOGB

35"A

FF

AFF

44"M

AX

PARTITION

PARTITION/ EDGE OFSINK

CLR

9"M

IN

CLR6" MIN

FFW

24" MIN

URINAL SCREEN(WHERE OCCURS)

FFW13 1/2" MIN

56"A

FFM

IN

17"

MAX

AFF

TOHO

D

44"M

AX

6" MIN CLR

15" MIN CLR

TO ANYOBSTRUCTION

48" MIN CLR

TOHO

D

U R I N A L

F.F.E.

01. TYPICAL HEIGHTS: MOUNTING HEIGHTS INDICATED HEREIN ARE TYPICALMOUNTING HEIGHTS FOR DEVICE INDICATED. MOUNTING HEIGHTS FORSUBMITTED PRODUCTS MAY VARY BY MANUFACTURER. THE GENERALCONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCYBETWEEN THE INDICATED MOUNTING HEIGHT AND THE MANUFACTURERSRECOMMENDED MOUNTING HEIGHT, PRIOR TO INSTALLATION OF THEDEVICE.

02. THE GENERAL CONTRACTOR SHALL REFER TO PLANS FOR LOCATIONS OFDEVICES SHOWN HEREIN.

03. ADA DEVICES: ALL DEVICES AND FIXTURES NOTED AS “ADA” OR“ACCESSIBLE” SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THEAMERICANS WITH DISABILITIES ACT AND APPLICABLE BUILDING CODES.

04. ELECTRICAL DEVICES: SEE ELECTRICAL DRAWINGS AND SPECIFICATIONSFOR REQUIRED MOUNTING HEIGHT OF ELECTRICAL DEVICES AND FIXTURES.WHERE CONFLICTS EXIST BETWEEN MOUNTING HEIGHTS INDICATED HEREINAND THE REQUIREMENTS OF THE ELECTRICAL ENGINEER, THE GENERALCONTRACTOR SHALL NOTIFY THE ARCHITECT PRIOR TO ROUGH-IN.

M O U N T I N G H E I G H T N O T E S

05. MECHANICAL/PLUMBING DEVICES: SEE MECHANICAL AND PLUMBINGDRAWINGS AND SPECIFICATIONS FOR REQUIRED MOUNTING HEIGHT OFMECHANICAL AND PLUMBING DEVICES AND FIXTURES. WHERE CONFLICTSEXIST BETWEEN MOUNTING HEIGHTS INDICATED HEREIN AND THEREQUIREMENTS OF THE MECHANICAL ENGINEER, THE GENERALCONTRACTOR SHALL NOTIFY THE ARCHITECT PRIOR TO ROUGH-IN.

06. INSTALL ADA / ANSI COMPLIANT UNDER LAVATORY GUARDS ON ALLEXPOSED SINK PIPING.

07. CONTRACTOR MUST MAINTAIN ON THE JOB SITE A COPY OF THE CURRENTADAAG STANDARDS AND THE IBC CHAPTER 11 ACCESSIBILITYREQUIREMENTS.

08. DIMENSIONAL DESIGNATIONS 0F +/- TO HAVE +/-1/2" TOLERANCE UNLESSOTHERWISE NOTED.

09. DESIGNATION FOR FINISHED FACE OF WALL (FFW) TO BE TAKEN FROMNEAREST CONTINUOUS SURFACE IN THE PLANE OF THE WALL [I.E. FACE OFFLOOR BASE IF FACE OF BASE EXTENDS BEYOND FACE OF WALL].

CONTROLSAREA

ENTRANCE SIDE

SEAT WALLBACK WALL

TOGB

35"A

FF5"

18"M

IN

ENTRANCE SIDE

AFF

1'-6

"

FOLDING SHOWERSEAT

3" MIN

AFF

1'-6

"48

"MAX

AFF

TOGB

35".

6"MAX 6" MAX

MAX

2'-3"

HEAD WALL

A C C E S S I B L E R O L L - I N S H O W E R ( W I T H F O L D I N G S E A T )

SHOWERCURTAIN ROD

80"M

IN

42"

TOWEL BAR AT ACCESSIBLELOCATIONS

MAX4"

F.F.E.

SEE ELEVATIONS FORSTANDARD BAR HEIGHT

MIN

1'-6

"

34"C

NTRT

P.

3'-6

"U.

N.O

.

48"M

AX

TOLE

NSO

FST

ROBE

80"M

IN.-

90"M

AX

CLEAR1'-6"MIN

9" MIN

CLEQEQ

CENTERED ON TACTILECHARACTERS

TOPU

LLLE

VER

±45

"AFF

CHAR

ACTE

RS

VERI

FYEX

ACT

MO

UNTI

NGHE

IGHT

IF CEILING DOES NOT PERMIT 80" VERIFYHEIGHT W / ARCH

LATCH SIDE OR NEARESTADJACENT WALL

F I R E A L A R M W / S T R O B E

*NOTE: ROTATE ELECTRICAL COVER PLATES HORIZONTAL IFCOUNTERTOP IS ABOVE 42" HIGH

60"T

OTO

P

E L E C T R I C A L D E V I C E SA D A I N T E R I O R S I G N A G E

F.F.E.

HEAD WALL

CONTROLSAREA MAY BE ONANY SHOWER WALL

ENTRANCESIDE

END WALLBACK WALL

TOGB

35"A

FF5" 18

"MIN

ENTRANCESIDE

48"M

AXAF

F

TOGB

35"A

FF

A C C E S S I B L E R O L L - I N S H O W E R ( W I T H O U T F O L D I N G S E A T )

SHOWERCURTAIN ROD

80"

MIN6"MAX

6" MAX

6"MAX

3'-6

"

TOWEL BAR AT ACCESSIBLELOCATIONS

6" MAXMAX4"

F.F.E.

SEE ELEVATIONS FORSTANDARD BAR HEIGHT

F.F.E.TOGB

35"

AFF

CONTROL END WALL

TOGB

35"

AFF

A C C E S S I B L E T U B ( W I T H R E M O V A B L E S E A T )

TOGB9"

TOGB

2'-1

1"AF

F

BACK WALL

REMOVABLE TUBSEAT,15 1/2" W

18"A

FF

SEAT

GB

24" MIN

18"M

INGB

5"

GB12" MIN12" FFW MAX

CONTROLSAREA

HEAD WALLCONTROLWALL

24" FFW MAX

GB

24" MAX

EDGE OFTUB EDGE OF

TUB

HEAD END WALL

3'-6

"

TOWEL BAR AT ACCESSIBLELOCATIONS

SHOWERCURTAIN ROD

80"

MIN

MAX4"

SEE ELEVATIONS FORSTANDARD BAR HEIGHT

CONTROL END WALL

TOGB

35"A

FF

GB

24" MIN

18"M

INGB

5"

CONTROLSAREA

EDGE OFTUB

TOGB9"

TOGB

35"A

FF

PERMANENT TUBSEAT, 16" MIN

12" FFW MAX

HEAD WALLCONTROLWALL 15" FFW MAX

GB

24" MAX

BACK WALL ACCESSIBLE TUB (WITHPERMANENT SEAT)

AFF

SEAT

1'-6

" 3'-6

"

TOWEL BAR AT ACCESSIBLELOCATIONS

SHOWERCURTAIN ROD

80"

MIN

MAX4"

A C C E S S I B L E T U B ( W I T H P E R M A N E N T S E A T )

F.F.E.

SEE ELEVATIONS FORSTANDARD BAR HEIGHT

CONTROLSAREA

ENTRANCESIDE

SEAT WALLBACK WALL

TOGB

35"A

FF5" 18

"MIN

ENTRANCESIDE

18"A

FF

FOLDINGSHOWER SEAT

3" MIN

18"A

FF48

"MAX

AFF

TOGB

35"A

FF

6" MAX 6" MAX

HEAD WALL

A C C E S S I B L E T R A N S F E R S H O W E R ( W I T H F O L D I N G S E A T )

SHOWERCURTAIN ROD

80"

MIN

3'-6

"

TOWEL BAR AT ACCESSIBLELOCATIONS

GB EXTENT1'-6 1/4"

MAX4"

F.F.E.

SEE ELEVATIONS FORSTANDARD BAR HEIGHT

T O I L E T A C C E S S O R Y T Y P E

D R A W I N G D E S I G N A T I O N

PAPER TOWELDISPENSER

TOILET TISSUEHOLDER

TOILET TISSUEDISPENSER

WASTERECEPTACLE

SURFACEMOUNTED

WASTERECEPTACLE

RECESSED

CL

TA03

TA04

TA05

TA06

TA07

TA08

TA01

TA40

CL

CL

48"M

AX

TA02 TA10

TA11

TA09

48"M

AX

48"M

AX

48"M

AX

WASTERECEPTACLE

TA12

TA13

TA14

48"M

AX

SOAP DISPENSER

RECESSED

TA15

TA16

15"M

IN

1-1/

2"M

IN

GRAB

BAR

BOGB

WC8" FO

CL

WC8" FO

AFF

48"M

AXTO

GB12

"MIN

15"M

IN

GRAB

BAR

BOGB

1-1/

2"M

IN

48"M

AXAF

FTO

BOTT

OM

OF

SPO

OL

WC8" FO

12"M

INTO

GBWC

8" FO HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

VERIFY EXACT MOUNTING HEIGHT OF SUBMITTED DEVICEWITH ARCHITECT

T Y P I C A L A C C E S S I B L E M O U N T I N G H E I G H T S

REFER TO PLAN & SPEC FORLENGTH AND CONFIGURATION

SAFETY GRAB BAR

48"M

AX

TA55

BABY CHANGING STATION

BOTT

OM

OF

REFL

ECTI

VESU

RFAC

E

MIRROR ATACCESSIBLECONDITIONS

40"M

AX

TA23

TA24

TA25

48"M

AX

TA30

TOILET SEAT COVERDISPENSER

48"M

AX

ROBE/COAT HOOK AT ACCESSIBLELOCATIONS (SEE ELEVATIONS FOR

STANDARD HOOK HT)

TA26

48"M

AX

40"M

IN

TA44

TOILETRY SHELF

5'-6

"

TA60

MOP AND BROOMHOLDER

TA20

TA21

TA22

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HEIG

HTO

FO

PERA

BLE

DEVI

CE

48"M

AX

FIREEXTINGUISHER

FIRE EXTINGUISHERCABINET

FE FEC

18"

36"

42"

FINISH FLOOR

FINISH FLOOR

E.W.C.(ACCESSIBLE)

TOSP

OUT

36"M

AX

E.W.C.(STANDARD)

TOSP

OUT

38"-

43"

27"M

IN

48"M

AX

HEIG

HTO

FO

PERA

BLE

DEVI

CE

HAND DRYER

TA50

48"M

AX

T O I L E T A C C E S S O R Y T Y P E

D R A W I N G D E S I G N A T I O N

A B B R E V I A T I O N S A N D A C R O N Y M S

AFF . . . . . . . . . . . . . . . . . . . . . . . ABOVE FINISHED FLOOR

BOGB . . . . . . . . . . . . . . . . . . . . . . BOTTOM OF GRAB BAR

FFE . . . . . . . . . . . . . . . . . . . . . . FINISHED FLOOR ELEVATION

FFW . . . . . . . . . . . . . . . . . . . . . . . . .FINISH FACE OF WALL

GB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GRAB BAR

HOD . . . . . . . . . . . . . . . . . . . . . HIGHEST OPERABLE DEVICE

MAX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAXIMUM

MIN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MINIMUM

TOGB . . . . . . . . . . . . . . . . . . . . . . . . . TOP OF GRAB BAR

WC . . . . . . . . . . . . . . . . . . . . . . . . . . . WATER CLOSET

W/ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITH

W/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHOUT

MIN

1'-3" COUNTERWHEREOCCURS

OFFSET WASTE

ACCESSIBLE SINKBOWL 6 -1/2" DEEP

INSULATEEXPOSED PIPING

MAX

34"A

FFKN

EECL

R

27"M

INTO

ECL

R9"

MIN

FFW17" MIN

8"MIN CLR11"MIN CLR

TOE CLR6"MIN

L A V A T O R Y O R V A N I T Y S I N K

F.F.E.

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:5

0A

M

AC

CES

SIBL

ILIT

YIN

FORM

ATI

ON

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

G1.1

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

T Y P I C A L T O I L E T L A Y O U T S

NOTES:1. LOCATE FLUSH ACTIVATION ON WIDE SIDE AT ALL TOILETS - LOCATE FLUSH VALVE BENEATH ADJACENT GRAB BARS.2. SANITARY NAPKIN DISPENSERS TO BE LOCATED AT ALL FEMALE, UNISEX, & FAMILY TOILETS

T Y P I C A L A C C E S S I B L E P L U M B I N G D E T A I L S - E L E V A T I O N SEE G1.12 FOR PLAN DETAILS

Page 5: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

GYPSUM BOARD AND METALSTUD PARTITION

STEEL SLEEVE

MINERAL FIBER PACKING

METAL PIPE OR CONDUIT (MAX 12"STEEL, 6" COPPER PIPE OR 4"CONDUIT)

GLASS FIBER PIPE INSULATION

INTUMESCENT FIRESTOP SEALANT

I N S U L A T E D M E T A L P I P E T H R U G Y P S U MP A R T I T I O N

C A B L E T R A Y T H R U G Y P S UM P A R T I T I O N

I N S U L A T E D M E T A L P I P E T H R U C M U/ C O N C W A L L O R F L O O R

I N S U L A T E D H V A C D U C T T H R U C M U/ C O N C W A L L O R F L O O R

I N S U L A T E D M E T A L P I P E T H R U CO N C , O R C O N C O N M E T A L D E C K

S I N G L E U N I N S U L A T E D M E T A L P I P E T H R UC O N C O V E R M E T A L F L O O R

U N I N S U L A T E D H V A C D U C T T H R UC O N C F L O O R / W A L L O R C M U W A L L

S I N G L E U N I N S U L A T E D M E T A L P I P E T H R UC O N C F L O O R / W A L L O R C M U W A L L

I N S U L A T E D H V A C D U C T T H R UG Y P S U M B O A R D P A R T I T I O N

S I N G L E U N I N S U L A T E D M E T A L P I P ET H R U G Y P S U M B O A R D P A R T I T I O N

S I N G L E N O N M E T A L L I C M E T A L P I P ET H R U G Y P S U M B O A R D P A R T I T I O N

S I N G L E O R B U N D L E D C A B L E T H R UG Y P S U M B O A R D P A R T I T I O N

M E M B R A N E P E N E T R A T I O N S T H R UG Y P S U M B O A R D P A R T I T I O N

M U L T I P L E P E N E T R A T I O N S T H R UG Y P S U M B O A R D P A R T I T I O N

M U L T I P L E P E N E T R A T I O N S T H R UG Y P S U M B O A R D P A R T I T I O N

U N I N S U L A T E D H V A C D U C TT H R U G Y P S U M B O A R D P A R T I T I O N

S I N G L E N O N M E T A L L I C P I P E T H R UC O N C F L O O R / W A L L O R C M U W A L L

[NOT USED]

S I N G L E N O N M E T A L L I C P I P E T H R UC O N C R E T E O V E R M E T A L F L O O R

S I N G L E O R B U N D L E D C A B L E T H R UC O N C O V E R M E T A L F L O O R

B U S W A Y T H R U C O N C F L O O R / W A L L O R C M U WA L L

B U N D L E D C A B L E T H R UC O N C F L O O R / W A L L O R C M U W A L L

C A B L E T R A Y T H R UC O N C F L O O R / W A L L O R C M U W A L L

M U L T I P L E P E N E T R A T I O N S T H R UC O N C F L O O R / W A L L O R C M U W A L L

GYPSUM BOARD AND METAL STUDPARTITION

STUD FRAMED OPENING

INTUMESCENT BLOCKS OR PILLOWS

CABLE TRAY

INTUMESCENT FIRESTOP SEALANT

INTUMESCENT BLOCKS OR PILLOWS

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

STEEL SLEEVE

MINERAL FIBER PACKING

METAL PIPE OR CONDUIT (MAX 12"STEEL, 6" COPPER PIPE OR 4" CONDUIT)

GLASS FIBER PIPE INSULATION

INTUMESCENT SEALANT IN ANNULARSPACE

NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

MINERAL FIBER PACKING

GLASS FIBER PIPE INSULATION

INTUMESCENT SEALANT FIRESTOP

NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS

HVAC DUCT WITHOUT DAMPER (MAX 30" X30")

METAL ANGLE FRAME SCREWED TO DUCT

METAL PIPE OR CONDUIT

INTUMESCENT-LINED CAST-INFIRESTOP DEVICE

CONCRETE OR CONCRETE OVERMETAL DECK

PIPE INSULATION

METAL PIPE OR CONDUIT (MAX 12"STEEL, 6" COPPER PIPE OR 4"CONDUIT)

INTUMESCENT FIRESTOP SEALANT

GYPSUM BOARD AND METALSTUD PARTITION

STEEL SLEEVE

MINERAL FIBER PACKINGCONCRETE FLOOR, OR CMU ORCONCRETE WALL

STEEL SLEEVE

MINERAL FIBER PACKING

METAL PIPE OR CONDUIT (MAX 6"DIA)

INTUMESCENT SEALER INANNULAR SPACE

NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

MINERAL FIBER PACKING

INTUMESCENT FIRESTOP SEALANT

NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS

HVAC DUCT WITHOUT DAMPER (MAX30" X 30")

METAL ANGLE FRAME SCREWED TODUCT

METAL PIPE OR CONDUIT

INTUMESCENT-LINED CAST-INFIRESTOP DEVICE

CONCRETE OR CONCRETE OVERMETAL DECK

PIPE OR CONDUIT (MAX 6" PVC, ABS,FRPP, OR CPVC)

INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE

GYPSUM BOARD AND METAL STUDPARTITION

INTUMESCENT-LINED METALCOLLAR

MINERAL FIBER INSULATION

INTUMESCENT FIRESTOP SEALANT

GYPSUM BOARD AND METAL STUDPARTITION

STUD-FRAMED OPENING

MINERAL FIBER PACKING

SQUARE HVAC DUCT

INTUMESCENT FIRESTOP SEALANT

GYPSUM BOARD AND METAL STUDPARTITION

STUD-FRAMED OPENING

MINERAL FIBER PACKING

SQUARE HVAC DUCT

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

INTUMESCENT LINED METALCOLLAR

NON-METALLIC PIPE OR CONDUIT(MAX 6" DIA)

INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE

NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS

PLASTIC PIPE OR CONDUIT

INTUMESCENT-LINED CAST-INFIRESTOP DEVICE

CONCRETE OR CONCRETE OVERMETAL DECK

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

INTUMESCENT SEALANT AT POINT OFCONTACT

BUNDLED CABLE

MINERAL FIBER PACKING

NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS

INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE

STEEL SLEEVE

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

MINERAL FIBER PACKING

ELECTRICAL BUSWAY

NOTE: FIRESTOP BOTH SIDES AT WALLS;FIRESTOP ONE SIDE AT FLOORS

INTUMESCENT FIRESTOPSEALANT

SINGLE OR BUNDLED CABLE

INTUMESCENT-LINED CAST-INFIRESTOP DEVICE

CONCRETE OR CONCRETE OVERMETAL DECK

GYPSUM BOARD AND METAL STUDPARTITION

INTUMESCENT FIRESTOP SEALANT

BUNDLED CABLE (MAX 30% CROSSSECTION OF SLEEVE)

MINERAL FIBER PACKING

STEEL SLEEVE

GYPSUM BOARD AND METAL STUDPARTITION

INTUMESCENT FIRESTOP SEALANT TOOLED FLUSH WITHBOTH SIDES OF WALL

METAL PIPE OR CONDUIT

SINGLE OR BUNDLED CABLE(2" MIN BETWEEN PENETRANTS)

MINERAL FIBER PACKING

STEEL SLEEVE OR COLLAR

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

INTUMESCENT WRAP STRIP

CABLE TRAY

INTUMESCENT SHEET

INTUMESCENT FIRESTOP SEALANT

CONCRETE FLOOR, OR CMU ORCONCRETE WALL

MINERAL FIBER PACKING

SINGLE OR BUNDLED CABLE

INTUMESCENT FIRESTOP SEALANT

METAL PIPE OR CONDUIT

ABC

W-L-5040W-L-5029W-L-5014

W-L-4037W-L-4011W-L-4008

C-AJ-5024C-AJ-5096C-AJ-5087

C-AJ-7115WL-7059C-AJ-7143

F-A-5029F-A-5015F-A-5041

W-L-2073W-L-2078W-L-2029

W-J-7169W-L-7040W-L-7056

C-AJ-2005C-AJ-2109C-AJ-2038

F-A-2097F-A-2054F-A-2192

W-L-1001W-L-1054W-L-1088

W-L-7195W-L-7059W-L-7178

C-AJ-1044C-AJ-1226C-AJ-1080

C-AJ-7016WL-7109C-AJ-7027

F-A-1067F-A-1017F-A-1110

W-L-3031W-L-3065W-L-3133

W-L-1389W-L-1228W-L-1168

C-AJ-3021C-AJ-3095C-AJ-3043

C-AJ-6002C-AJ-6017C-AJ-6008

F-A-3017F-A-3007F-A-3055

W-L-1410W-L-1353--------

W-L-8010W-L-8079W-L-8026

C-AJ-4003C-AJ-4035C-AJ-4022

C-AJ-8003C-AJ-8143C-AJ-8053

1. THE ILLUSTRATIONS ON THIS DRAWING REPRESENT FREQUENTLY ENCOUNTERED FIRESTOPPING PENETRATION CONDITIONS THROUGH FIRE- RATED FLOOR AND WALL ASSEMBLIES.

2. THE NUMBERS SHOWN BELOW ARE MANUFACTURERS' UL-TEST NUMBERS FOR EACH CONDITION.

3. THE KEY TO MANUFACTURERS (A, B, OR C) IS AS INDICATED BELOW.

G E N E R A L T H R U - P E N E T R A T I O NN O T E S

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

ABC

P R O D U C T / M A N U F A C T U R E R L E G E N D

MIN. 1/2" BEAD FIRESTOP SEALANT AT ALL POINTCONTACT LOCATIONS

INTUMESCENT FIRESTOP SEALANT IN ANNULARSPACE TOOLED FLUSH WITH BOTH SIDES OF WALL

MULTIPLE METAL PIPES OR CONDUITS INSTALLED IN ASINGLE LAYER ARRAY

GYPSUM BOARD AND METALSTUD PARTITION

MIN. 1/2" BEAD FIRESTOP SEALANT AT ALL POINTCONTACT LOCATIONS

INTUMESCENT FIRESTOP SEALANT INANNULAR SPACE TOOLED FLUSHWITH BOTH SIDES OF WALL

GYPSUM BOARD AND METALSTUD PARTITION

SINGLE METAL PIPE OR CONDUITTHRU A SINGLE MEMBRANE LAYER

------------------------

ABC

ABC

3MHILTISTI

[NOT USED]

KEY TO MANUFACTURERS------------------------

ABC

1. GENERALA. ALL THROUGH-PENETRATION FIRESTOP WORK SHALL COMPLY WITH THE REQUIREMENTS OFSECTION 078413 – PENETRATION FIRESTOP SYSTEMS .B. THE DETAILS SHOWN HEREIN ILLUSTRATE FREQUENTLY ENCOUNTERED THROUGH-PENETRATIONFIRESTOP CONDITIONS. THEY ARE GENERIC REPRESENTATIONS OF SYSTEMS AVAILABLE FROMSEVERALMANUFACTURERS.C. SELECTION OF APPROPRIATE SYSTEMS SHALL BE THE RESPONSIBILITY OF THE FIRESTOPCONTRACTOR, AND MUST BE SUBMITTED FOR ARCHITECT’S APPROVAL. EACH SELECTION SHALLBE APPROPRIATE FOR THE PENETRATING ITEM AND SUBSTRATE, AND SHALL COMPLY WITH THESPECIFIC REQUIREMENTS OF A UL LISTED SYSTEM DESIGN.D. WHERE NO APPLICABLE UL DESIGN IS AVAILABLE FOR A PARTICULAR FIRESTOP CONFIGURATION,SUBMIT AN ENGINEERING JUDGMENT (EJ), OR EQUIVALENT FIRE RESISTANCE RATED ASSEMBLY(EFRRA), PREPARED BY THE FIRESTOP MANUFACTURER.

2. APPLICABILITYA. PROVIDE THROUGH-PENETRATION FIRESTOP SYSTEMS FOR ALL PENETRATIONS (INCLUDINGSINGLE-SIDED MEMBRANE PENETRATIONS) OF FIRE RESISTANCE RATED CONSTRUCTION, WHETHEROR NOT SPECIFICALLY DETAILED ON THE DRAWINGS (APPLICABLE TO BOTH EMPTY OPENINGS ANDOPENINGS CONTAINING PENETRATING ITEMS).B. ALL PIPING AND DUCTWORK SUBJECT TO MOVEMENT SHALL BE FIRESTOPPED WITH FLEXIBLEFIRE RATED SEALANT.C. TO EXTENT THAT APPROPRIATE UL DESIGNS ARE AVAILABLE FOR SUBSTRATE REQUIRED, USETHE FOLLOWING APPROACH TO SELECTION OF SYSTEMS:

1. FOR SIMPLE PENETRATIONS: ONE-PART FIRESTOP SEALANT2. FOR COMPLEX PENETRATIONS: FOAMED-IN-PLACE FIRESTOP SEALANT3. FOR INSULATED METAL PIPE: INTUMESCENT WRAP STRIP AND ONE-PART

FIRESTOP SEALANT.4. FOR DUCTS OR VENTS:5. FOR CABLE TRAYS OR RACEWAYS:

3. SLEEVINGA. THE FOLLOWING PENETRATIONS MUST BE SLEEVED:

1. SINGLE ROUND PENETRATIONS IN RATED CMU WALLS2. INSULATED PIPE PENETRATIONS IN RATED GYPSUM BOARD WALLS3. BUNDLED CABLE PENETRATIONS IN RATED GYPSUM BOARD WALLS4. ALL PENETRATIONS IN ELEVATED CONCRETE SLABS.

B. ALL SLEEVES SHALL BE METAL. PLASTIC IS NOT PERMITTED. THE JUNCTURE OF STEEL SLEEVESAND WALL SHALL BE SEALED WITH FLEXIBLE FIRE RATED SEALANT.

4. QUALITY ASSURANCEA. COMPLY WITH “INSTALLER QUALIFICATIONS” AND “ON-SITE RESPONSIBLE PARTY” PROVISIONSOF SPECIFICATION SECTION 078413 – THROUGH-PENETRATION FIRESTOP SYSTEMS.B. OBTAIN THROUGH-PENETRATION FIRESTOP SYSTEMS THROUGH ONE SOURCE FROM A SINGLEMANUFACTURER.C. COMMENCE FIRESTOPPING WORK ONLY AFTER SUBMITTALS (INCLUDING MOCKUPS WHEREAPPLICABLE) ARE APPROVED, AND PRE-INSTALLATION CONFERENCE IS SUCCESSFULLYCONCLUDED.

5. INSTALLATION - GENERALA. COMPLY WITH UL SYSTEM REQUIREMENTS AND FIRESTOPPING MANUFACTURERS’ PRINTEDINSTALLATION INSTRUCTIONS.B. INSTALL FORMING /DAMMING /BACKING MATERIALS AND OTHER ACCESSORIES OF TYPESREQUIRED TO SUPPORT FILL MATERIALS DURING THEIR APPLICATION AND IN THE POSITION NEEDEDTO PRODUCE CROSS-SECTIONAL SHAPES AND DEPTHS REQUIRED TO ACHIEVE FIRE RATINGSINDICATED.C. INSTALL FILL MATERIALS BY PROVEN TECHNIQUES TO PRODUCE THE FOLLOWING RESULTS:

1. FILL VOIDS AND CAVITIES FORMED BY OPENINGS, FORMING MATERIALS, ACCESSORIES, AND PENETRATING ITEMS AS REQUIRED TO ACHIEVE FIRE-RESISTANCE RATINGS INDICATED,

2. APPLY MATERIALS SO THEY CONTACT AND ADHERE TO SUBSTRATES FORMED BY OPENINGS AND PENETRATING ITEMS,D. FOR FILL MATERIALS THAT WILL REMAIN EXPOSED AFTER COMPLETING WORK, FINISH TOPRODUCE SMOOTH UNIFORM SURFACES THAT ARE FLUSH WITH ADJOINING FINISHES.E. REMOVE COMBUSTIBLE FORMING MATERIALS, AND OTHER ACCESSORIES, THAT ARE NOTINDICATED AS PERMANENT COMPONENTS OF FIRESTOP SYSTEMS. REMOVE EXCESS SEALANTFROM ADJOINING SURFACES.F. IDENTIFY THROUGH PENETRATION FIRESTOP SYSTEMS WITH PERMANENTLYATTACHED,PREPRINTED METAL OR PLASTIC LABELS, AS SPECIFIED.G. INSPECT FILL MATERIALS AFTER 48 HOURS FOR COMPLETE ADHESION AND SEAL INACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS. CORRECT DEFICIENCIES AND RE-INSPECT

F I R E S T O P P I N G - T H R U - P E N E T R A T I O N S Y S T E M S

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:5

2A

M

FIRE

STO

PPIN

G-

THRU

-PEN

ETRA

TIO

NSY

STEM

S

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

G1.3

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

Page 6: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

S

S

S

S

FE

F

F

F

F

F

S

FE

F

S

F

F

FEF

F

F

F

F

F

F

F

55'-0"

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FIRE RATED WALL ( 1 HR.)

MAXIMUM PATH OF TRAVEL

FIRE EXTINGUISHER DISTANCE

EGRESS WIDTH PROVIDED (IN.)

LIFE SAFETY SYMBOLS LEGEND

FIRE RATED DOOR (IN MINUTES)

FIRE ALARM PULL STATION

FIRE ALARM HORN & STROBE

FIRE ALARM STROBE

EXIT LIGHT

EMERGENCY LIGHTS

EMERGENCY CAN LIGHT

FE

FEC

PRIMARY EXIT

AUTOMATIC SMOKE DETECTOR

EXIT SIGN

F

S

F

20

XX

FIRE RATED WALL ( 2 HR.)

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:5

9A

M

FIRS

TFL

OO

RLI

FESA

FETY

PLA

N

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

LS10

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 FIRST FLOOR LIFESAFETY PLAN

Page 7: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

1

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

50

'-0

"

3

3 3

3

3

REMOVECHAIN LINKFENCE

3

3

3

3

3

3

3

3

33

REMOVE SINKCOORD. WITHPLUMBING

3

3

3

3

3

3 3

3

33

GENERAL DEMOLITION NOTES:

3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .

4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.

5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.

1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.

2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.

6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED

8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.

9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN

= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN

= EXISTING WALLS / DOORS TO BE REMOVED

= EXISTING CASEWORK TO BE REMOVED

= EXISTING DOORS TO REMAIN

= EXISTING DOORS & FRAMES TO BE REMOVED

= EXISTING FLOORING TO BE REMOVED

= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING

= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)

= BORDER WALL COVERING TO BE REMOVED1

2

3

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:19

AM

1ST

FLO

OR

DEM

OLI

TIO

NPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

0A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 FIRST FLOOR DEMO PLAN

Page 8: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

ELEVATORLOBBY

S101

CORRIDOR

S102

JANCLOSET

S103

ELEVATOREQUIPMENT

S105

TELEPHONE

S106

MEN'SRESTROOM

S108

EMPLOYEELOUNGE

S109

WOMEN'SRESTROOM

S116

PATIENTACCOUNT

DEPT.

S117

MEN'SRESTROOM

S118

WOMEN'SRESTROOM

S119

ELECTRICALROOM

S120

STAIR #1

S107OFFICE

S128

COPYROOM

S129

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

EXISTING CEILING GRID & TILESTO BE REMOVED

EXISTING CEILING GRID ONLYTO BE REMOVED

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:2

3A

M

FIRS

TFL

OO

RC

EILI

NG

DEM

OLI

TIO

NPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

0AA

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 FIRST FLOOR CEILING DEMO PLAN

Page 9: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

VESTIBULE

S200

CORRIDOR

S201

STORAGE

S202

COMM

S203

PHYSICIANPRACTICEOFFICE

S204

ELECTRICALROOM

S205

WAITINGAREA

S206

EMPLOYEEOF

CHOICECOORD.

S207

PHOTO

S208

BREAKROOM

S209

TESTINGROOM 1

S210

CORRIDOR

S211

TESTINGROOM 2

S212

EMERALDHEALTH

S213

CORRIDOR

S214

STORAGE

S215

CONFERENCEROOM

S216

OFFICE

S217

EMPLOYEEHEALTHNURSE

S218A

VENDING

S219

RESTROOM

S220

HEALTHCOORD.

S222

RECRUITER1

S224

MANAGEDCARE

S225

OFFICE

S226

RECRUITER2

S228

OFFICE

S227A

CONF.ROOM

PATIENTBILLING

S229

CORRIDOR

S230

MANAGER

S232

STORAGE

S233

CLERICALWORKROOM

S234

STAIRS

S235

BENIFITSSPECIALIST

S236

HRSPECIALIST

S238

ALCOVE

S237

JANITORCLOSET

S239

RECORDSSTORAGE

S240

WOMEN'SRESTROOM

S241

SUPPORTCLERK

S242

MEN'SRESTROOM

S243

STORAGE

S244

ACCOUNTSRECEIVABLE

S245

SECRETARY

S246

INSURANCEWORKROOM

S247

VPCORPORATESERVICES

S248

BILLINGINS.

WORKROOM

S249

SUPERVISOR

S251

RISKMGR.CCO

S252

BREAKROOM

S253

OFFICE

S254

PRINTERROOM

S255

BILLERS /COLLECTORS

S257

CONFERENCEROOM

S259

DEPARTMENTSUPERVISOR

S261

CLERICALWORKROOM

S263

STAIRS

S262

COLLECTIONSOFFICE

S270

CASHIER'SOFFICE

S271

STORAGE

S272

SUPERVISOROFFICE

S273

MAILSORTROOM

S274

ALCOVE

S275

1

1

11

1

1

1 1

1

1

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

1

1

GENERAL DEMOLITION NOTES:

3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .

4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.

5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.

1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.

2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.

6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED

8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.

9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN

= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN

= EXISTING WALLS / DOORS TO BE REMOVED

= EXISTING CASEWORK TO BE REMOVED

= EXISTING DOORS TO REMAIN

= EXISTING DOORS & FRAMES TO BE REMOVED

= EXISTING FLOORING TO BE REMOVED

= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING

= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)

= BORDER WALL COVERING TO BE REMOVED1

2

3

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:2

9A

M

2ND

FLO

OR

DEM

OLI

TIO

NPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 SECOND FLOOR DEMO PLAN

Page 10: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

EXISTING CEILING GRID & TILESTO BE REMOVED

EXISTING CEILING GRID ONLYTO BE REMOVED

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:3

4A

M

SEC

ON

DFL

OO

RC

EILI

NG

DEM

OLI

TIO

NPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

1AA

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 SECOND FLOOR CEILING DEMO PLAN

Page 11: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

ELEVATORLOBBY

S300

CORRIDOR

S301

CONFERENCEROOM

S302

COMM

S303

STORAGE

S304

VESTIBULE

S304A

RESTROOM

S306CEO

S308

ELECTRICAL

S305

REVENUECYCLE

COORD.

S307

CORRIDOR

S309

OFFICE

S310

BREAKROOM

S311

VP'SSECRETARY

S312

VESTIBULE

S313

VICEPRESIDENT

1

S314

PAYROLLWORKROOM

S315

WAITINGROOM

S316

FINACIALACCOUNT

SUPERVISOR

S317

VP'SSECRETARY

S318

ACCOUNTINGWORKROOM

S319

VICEPRESIDENT

2

S320

VP'SSECRETARY

S322

WORKROOM

S324

VICEPRESIDENT

3

S328

FINANCIALACCOUNTMANAGER

S329

FINANCIALACCOUNT

WORKROOM

S331

LIBRARY

S332

STAIR #1

S333

WOMEN'SRESTROOM

S335

STAIR #2

S336

JANITOR'SCLOSET

S337

VICEPRESIDENT

4

S336A

MEN'SRESTROOM

S339

CONFERENCEROOM

S340

PROCESSENGINEER

S342

VP'SSECRETARY

S344

VICEPRESEIDENT

5

S346

FINANCIALSTORAGE

S348WORKROOM

S350

COMPTROLLER

S352

MANAGERIALACCOUNT

WORKROOM

S354

AUDITOR

S362

MGRACCOUNT

SUPERVISOR

S364

PRODUCTION

S341

BREAKROOM

S367

SUPERVISOR

S370

STORAGE

S369

SCHEDULERS

S368

1

1

1

1

1

11

1

1

1

1

11

1

1

1

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

GENERAL DEMOLITION NOTES:

3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .

4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.

5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.

1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.

2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.

6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED

8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.

9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN

= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN

= EXISTING WALLS / DOORS TO BE REMOVED

= EXISTING CASEWORK TO BE REMOVED

= EXISTING DOORS TO REMAIN

= EXISTING DOORS & FRAMES TO BE REMOVED

= EXISTING FLOORING TO BE REMOVED

= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING

= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)

= BORDER WALL COVERING TO BE REMOVED1

2

3

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:4

1AM

3RD

FLO

OR

DEM

OLI

TIO

NPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

2A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 THIRD FLOOR DEMO PLAN

Page 12: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

EXISTING CEILING GRID & TILESTO BE REMOVED

EXISTING CEILING GRID ONLYTO BE REMOVED

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:4

3A

M

THIR

DFL

OO

RC

EILI

NG

DEM

OLI

TIO

NPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

2AA

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 THIRD FLOOR CEILING DEMO PLAN

Page 13: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

REMOVE EXISTINGDOORS AND FRAMES

GENERAL DEMOLITION NOTES:

3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .

4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBING, & CEILING PLANDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.

5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.

1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.

2. CONTRACTOR SHALL INITIATE AND SET UP A PRE -DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.

6. REMOVE EXISTING PARTITIONS AS SHOWN. EXISTING PARTITIONS ARE METALSTUDS WITH GYPSUM BOARD.SHORING IS THE CONTRACTOR'S RESPONSIBILITY (SEE NOTE 2) WHENCUTTING FREE THE EXISTING FRAMING AND WALLS.7. REMOVE ALL EXISTING CEILINGS, GRIDS, AND SUSPENSION SYSTEMS FROMAREA OF RENOVATION AS INDICATED

8. REMOVE EXISTING FLOORING AND/OR BASE AS INDICATED IN AREA OFRENOVATION.

9. REMOVE EXISTING CABINETS, COUNTERTOPS, SHELVING AND APPLIANCES AS SHOWN

= EXISTING WALLS, CASEWORK, & FLOORING TO REMAIN

= EXISTING WALLS / DOORS TO BE REMOVED

= EXISTING CASEWORK TO BE REMOVED

= EXISTING DOORS TO REMAIN

= EXISTING DOORS & FRAMES TO BE REMOVED

= EXISTING FLOORING TO BE REMOVED

= GYP BOARD & INSULATION TO BE REMOVED FROM FLOOR TO CEILING

= REMOVE GYP. BOARD 1'-0" A.F.F. (FLOOD CUT)

= BORDER WALL COVERING TO BE REMOVED1

2

3

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:4

4A

M

PEN

THO

USE

DEM

OLI

TIO

NPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

3A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 PENTHOUSE ROOF DEMO PLAN

Page 14: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

STAIRS#2

S401

PENTHOUSE

S402

RDRD

OF

RDOF

RD

RD

RDRDRDOF

RDOF

RDOF

2A406

3A406

4A406

2A406

2A406

2A406

2A406

2A406

2A406

2A406

3A406

3A406

REMOVE EXISTING DOORS AND FRAMES

GENERAL DEMOLITION NOTES:

3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .

4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBINGDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.

5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.

1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.

2. CONTRACTOR SHALL INITIATE AND SET UP A PRE-DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.

= EXISTING DOORS AND FRAMES TO BE REMOVED

= EXISTING ROOFING TO BE REMOVED

1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT

ROOF REPLACEMENT NOTES

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

45:14

AM

ROO

FD

EMO

PLA

N

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

4A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 ROOF DEMO PLAN

Page 15: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

GENERAL DEMOLITION NOTES:

3. PROTECT ALL AREAS AND COMPONENTS OF EXISTING BUILDING THAT AREAARE TO REMAIN. ANY DAMAGE TO THESE AREAS / COMPONENTS SHALL BEREPAIRED TO "LIKE NEW" CONDITION .

4. COORDINATE ALL DEMOLITION WITH ALL NEW WORK PLANS, MECHANICAL,ELECTRICAL, PLUMBINGDRAWINGS. PROVIDE ALL DEMOLITION / PREPARATION WORK AS REQUIREDTO EXECUTE THE INTENT OF THE NEW WORK.

5. CONTRACTOR SHALL COORDINATE REMOVAL OF ANY HAZARDOUSCONTAINING MATERIALS AND LEAD BASED PAINT.

1. DEMOLITION SEQUENCING, MEANS, AND METHODS ARE THE SOLERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL VERIFYEXISTING CONSTRUCTION / STRUCTURE PERTINENT TO THE INTENT OF THEDEMOLITION DOCUMENTS.

2. CONTRACTOR SHALL INITIATE AND SET UP A PRE-DEMOLITION MEETINGWITH THE DESIGN TEAM PRIOR TO THE START OF ANY DEMOLITION.

= EXISTING DOORS AND FRAMES TO BE REMOVED

= EXISTING ROOFING TO BE REMOVED

1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT

ROOF REPLACEMENT NOTES

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

45:14

AM

PEN

THO

USE

ROO

FD

EMO

PLA

N

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

D10

5A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 PENTHOUSE ROOF DEMO PLAN

Page 16: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

CUT AROUND THEDAMAGED AREA WITH ARAZOR KNIFE CUTTINGTHROUGH ALL LAYERS, TOTHE SUBSTRATE. MAKESURE THE PATCH AREA ISLARGE ENOUGH TO EASILYWORK WITHIN, EVEN IF THEDAMAGED AREA IS SMALL.

CAREFULLY REMOVE THEFINISH, REINFORCINGMESH, AND BASE COAT.

IDENTIFY DAMAGED AREA TOBE REPAIRED

REMOVE THE DAMAGEDEPS INSULATION BOARDDOWN TO THESHEATHING. REPAIR ORREPLACE ANY DAMAGEDSHEATHING. ENSURETHAT ALL EPS INSULATIONBOARD REMAINS ARECOMPLETELY REMOVED.

MARK A SQUARE AREA AROUNDREMOVED MATERIAL 3-4INCHES

WITH A SMALL GRINDER,CAREFULLY REMOVE THEFINISH APPROXIMATELY 3-4INCHES AROUND THE REPAIRAREA.

SEPARATE BASE COAT &MESH FROM INSULATIONWITH A FLAT KNIFE

REMOVE TOP AND BASE COATS ONCE FINISH HAS BEENREMOVED FROM AROUND THEDAMAGED AREA, BRUSH ORBLOW AWAY ANY REMAININGEPS INSULATION BEADS ANDDUST FROM THE GRINDING.

CUT THE EPS INSULATIONBOARD SO THAT IT WILL FITSNUGLY INTO THE OPENING.APPLY ADHESIVE TO THE EPSINSULATION BOARD ANDTHEN PLACE THE EPSINSULATION BOARD INTO THEOPENING, ENSURING A GOODADHESIVE BOND ISACHIEVED.

AFTER THE ADHESIVE HASDRIED, RASP THE EPSINSULATION BOARD DOWNTO THE LEVEL OF THEGROUND DOWN AREA.MIX BASE COAT

MASK OFF THE FINISHAROUND THE GROUNDDOWN AREA. THE EXPOSEDGROUND OFF AREA MUSTBE APPROXIMATELY 3-INCHES AROUND THEREPAIR TO ENSUREENOUGH ROOM FOR THEREINFORCING MESH TOPROPERLY OVERLAP.

APPLY THE MIXED BASECOAT TO THE REPAIRAND THEN PLACE THEPRE-CUT REINFORCINGMESH INTO THE BASECOAT.

EMBED THE REINFORCINGMESH WITH A TROWEL ORMARGIN TROWEL, TO ASMOOTH FLAT UNIFORMTHICKNESS TO THEGROUND OFF AREA ONLY.DO NOT BUILD UP THEAREA, TROWEL THE BASECOAT TIGHT, BUT THICKENOUGH TO ENCAPSULATETHE REINFORCING MESH.

MASK WITH PLASTIC AROUNDTAPED AREA

TROWEL FINISH ONTO THEPREPARED AREA USING ASTAINLESS STEEL TROWEL.

REMOVE THE TAPE BEFORETHE FINISH DRIES. TOUCHUP THE EDGES WITH ASMALL PAINT BRUSH BYLIGHTLY DABBING AROUNDTHE EDGE. THIS HELPS TOSOFTEN AND BLEND IN THEEDGE AROUND THE PATCH.

IF NECESSARY, LIGHTLYFLOAT THE FINISH AGAIN.MAKE SURE THERE IS NOEXCESS MATERIAL ON THEBACK OF THE FLOAT PRIORTO RE-FLOATING THE AREA.

COLOR COAT MAY BEREQUIRED IF THE FINISHCOLOR OF THE PATCH IS NOTACCEPTABLE.

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

44:4

7A

M

EIFS

REPA

IR

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

0AA

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

3/32" = 1'-0"1 EIFS REPAIR

Page 17: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

FACE SEALREAR SEAL

VENT

A-A

A

A

EXISTINGEPS INSULATION BOARDEXISTINGREINFORCING MESHEMBEDDED IN BASECOAT

EXISTING FINISH COAT

EXISTING FRAMING & EIFS WITHEXISTING REVEAL

PRIMER ON SURFACESTO RECEIVE SEALANT

NEW REINFORCINGMESHEMBEDDED IN BASECOAT

NEW FINISH COAT

NEW BACKER ROD& SEALANT

NEW REINFORCINGMESHEMBEDDED IN BASECOAT

NEW FINISH COAT

NEW REINFORCINGMESHEMBEDDED IN BASECOAT

NEW FINISH COAT

GENERAL LIGHT CLEANING

TO REMOVE ORDINARY DIRT AND ENVIRONMENTAL CONTAMINANTS, FINISH MAY BE CLEANED WITH A MILD DETERGENT SOLUTION OR COMMERCIAL GRADECLEANER. PREPARE THE SURFACE FOR CLEANING BY THOROUGHLY RINSING THE WALL WITH CLEAN WATER TO REMOVE SURFACE PARTICLES. APPLY THECLEANING SOLUTION TO THE ENTIRE AREA USING A SOFT BRISTLE BRUSH. DO NOT ALLOW THE CLEANING SOLUTION TO DRY ON THE WALL. RINSE THE WALLTHOROUGHLY WITH CLEAN WATER TO REMOVE ALL TRACES OF LOOSENED DIRT AND CLEANING SOLUTION.

POWER WASHING

IF POWER WASHING IS NECESSARY OR DESIRED, A LOW PRESSURE 92068-3447 kPa/300-500 PSI) POWER WASH USING COLD WATER IS RECOMMENDED.FREQUENT POWER WASHING OR THE USE OF HOT WATER SHOULD BE AVOIDED, SINCE IT MAY RESULT IN PREMATURE DETERIORATION OF THE FINISH.

MOLD AND MILDEW REMOVAL

MOLD AND MILDEW ARE LIVING ORGANISMS, CONSISTING OF A ROOT SYSTEM AND A BLOOM, WHICH MUST BE COMPLETELY REMOVED OR KILLED TO STOPGROWTH. TO KILL THE ROOTS AND REMOVE THE BLOOM, USE A FUNGUS, MILDEW, MOLD AND ALGAE REMOVER IN CONJUNCTION WITH LOW-PRESSUREPOWER WASHING. COLD WATER POWER WASHING ALONE WILL REMOVE THE BLOOM BUT MAY ACTUALLY DRIVE THE ROOTS DEEPER INTO THE FINISH ANDCREATE A STRONGER, HEALTHIER GROWTH. AVOID PHOSPHATE-BASED CLEANERS SUCH AS tsp ( TRISODIUM PHOSPHATE) WHEN CLEANING MOLD ANDMILDEW. ALTHOUGH TSP AND OTHER PHOSPHATE BASED CLEANERS MAY BE USEFUL FOR REMOVING DIRT, MOLD AND MILDEW THRIVE ON THE PHOSPHATES.

TREAT STAINS WHICH MAY REMAIN AFTER MOLD AND MILDEW REMOVAL, APPLY A SOLUTION OF 1 PART HOUSEHOLD BLEACH AND 20 PARTS CLEAN WATERTO THE WALL WITH A SOFT BRISTLE BRUSH. THE CONCENTRATION MAY BE INCREASED IF A STRONGER SOLUTION IS REQUIRED. RINSE THE WALLTHOROUGHLY WITH CLEAN WATER TO REMOVE ALL TRACES OF BLEACH SOLUTION.

PUNCTURE REPAIR

1. CUT AROUND THE DAMAGED AREA WITH A RAZOR KNIFE CUTTING THROUGH ALL LAYERS, TO THE SUBSTRATE. MAKE SURE THE PATCH AREA IS LARGEENOUGH TO EASILY WORK WITHIN, EVEN IF THE DAMAGED AREA IS SMALL.

2. CAREFULLY REMOVE THE FINISH, REINFORCING MESH, AND BASE COAT.

3. REMOVE THE DAMAGED EPS INSULATION BOARD DOWN TO THE SHEATHING. REPAIR OR REPLACE ANY DAMAGED SHEATHING. ENSURE THAT ALL EPSINSULATION BOARD REMAINS ARE COMPLETELY REMOVED.

4. WITH A SMALL GRINDER, CAREFULLY REMOVE THE FINISH APPROXIMATELY 3-4 INCHES AROUND THE REPAIR AREA. DO NOT GRIND INTO THE REINFORCINGMESH AND BASE COAT.

5. ONCE FINNISH HAS BEEN REMOVED FROM AROUND THE DAMAGED AREA, BRUSH OR BLOW AWAY ANY REMAINING EPS INSULATION BEADS AND DUST FROMTHE GRINDING.

6. CUT THE EPS INSULATION BOARD SO THAT IT WILL FIT SNUGLY INTO THE OPENING. APPLY ADHESIVE TO THE EPS INSULATION BOARD AND THEN PLACE THEEPS INSULATION BOARD INTO THE OPENING, ENSURING A GOOD ADHESIVE BOND IS ACHIEVED.

7. AFTER THE ADHESIVE HAS DRIED, RASP THE EPS INSULATION BOARD DOWN TO THE LEVEL OF THE GROUND DOWN AREA.

8. MASK OFF THE FINISH AROUND THE GROUND DOWN AREA. THE EXPOSED GROUND OFF AREA MUST BE APPROXIMATELY 3-INCHES AROUND THE REPAIR TOENSURE ENOUGH ROOM FOR THE REINFORCING MESH TO PROPERLY OVERLAP.

9. APPLY THE MIXED BASE COAT TO THE REPAIR AND THEN PLACE THE PRE-CUT REINFORCING MESH INTO THE BASE COAT.

10. EMBED THE REINFORCING MESH WITH A TROWEL OR MARGIN TROWEL, TO A SMOOTH FLAT UNIFORM THICKNESS TO THE GROUND OFF AREA ONLY. DONOT BUILD UP THE AREA, TROWEL THE BASE COAT TIGHT, BUT THICK ENOUGH TO ENCAPSULATE THE REINFORCING MESH.

11. ALLOW TIME TO DRY. SCRAPE AWAY TROWEL MARKS BEFORE APPLYING FINISH.

12. TROWEL FINISH ONTO THE PREPARED AREA USING A STAINLESS STEEL TROWEL.

13. REMOVE THE TAPE BEFORE THE FINISH DRIES. TOUCH UP THE EDGES WITH A SMALL PAINT BRUSH BY LIGHTLY DABBING AROUND THE EDGE. THIS HELPSTO SOFTEN AND BLEND IN THE EDGE AROUND THE PATCH.

14. IF NECESSARY, LIGHTLY FLOAT THE FINISH AGAIN. MAKE SURE THERE IS NO EXCESS MATERIAL ON THE BACK OF THE FLOAT PRIOR TO RE-FLOATING THEAREA.

15. COLOR COAT MAY BE REQUIRED IF THE FINISH COLOR OF THE PATCH IS NOT ACCEPTABLE.

CORNER REPAIR:

1. MATERIALS MUST BE REMOVED FROM BOTH SIDES OF THE CORNER.

2. FOLLOW STEPS 1-14 OF BASIC REPAIR PROCEDURE.

3. MAKE SURE TO USE A DOUBLE LAYER OF REINFORCING MESH IN STEP 10 TO ENSURE PROPER CORNER REINFORCING.

TEXTURE FINISH REPAIR:

1. GRIND DOWN THE FINISH JUST UNTIL THE BASE COAT SHOWS, APPROXIMATELY 1-INCH AROUND THE DAMAGED AREA.

2. MASK OFF THE FINISH AROUND THE GROUND DOWN AREA.

3. TROWEL THE PROPERLY COLOR MATCHED FINISH ONTO THE PREPARED AREA USING A STAINLESS STEEL TROWEL.

4. REMOVE THE TAPE BEFORE THE FINISH DRIES. TOUCH UP THE EDGES WITH A SMALL PAINT BRUSH BY LIGHTLY DABBING AROUND THE EDGE. THIS HELPSTO SOFTEN AND BLEND IN THE EDGE AROUND THE NEW FINISH.

RE-TEXTURING ENTIRE WALL:

1. THOROUGHLY CLEAN THE WALL SURFACE ACCORDING THE CLEANING PROCEDURE LISTED AT BEGINNING OF THIS DOCUMENT. THE AREA TO BE FINISHEDMUST BE SOUND AND FREE OF DEFECTS SUCH AS PEELING, CRACKING, DELAMINATING, AND BLISTERING.

2. LEVEL THE SURFACE WITH BASE COAT IN ORDER TO ACHIEVE A SMOOTH LEVEL SURFACE. ALLOW THE BASE COAT TO THOROUGHLY DRY BEFOREAPPLYING THE FINISH COAT.

3. TINTED PRIMER MAY BE USED TO HELP ALLEVIATE SHADOWING OF THE FINISH.

4. APPLY NEW FINISH WITH DESIRED TEXTURE AND COLOR

GENERAL NOTES:

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

44:4

8A

M

EIFS

REPA

IRD

ETA

ILS

&G

ENER

AL

NO

TES

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

0BA

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

3" = 1'-0"1 EIFS REPAIR DETAILS

*ALTERNATE BID ITEM*

Page 18: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

OFFICE

S134

OFFICE

S133

OFFICE

S132

OFFICE

S130

CONF.

S129

WOMEN'SRESTROOM

S119

WOMEN'SRESTROOM

S116

ELECTRICALROOM

S120

TELEPHONEROOM

S106

CORRIDOR

S102JANITOR

S103

MEN'SRESTROOM

S108

ENVIRONMENTALSERVICES

S109

STORAGE

S110

STORAGE

S113STORAGE

S131

OFFICE

S114

MECHANICALROOM

S115

STAIRS#1

S107

ELEVATORLOBBY

S101

ELEVATOREQUIPMENT

ROOM

S105

ENGINEERINGFACILITIES

S117

MATERIALSMANAGEMENT

S121

CLEANCART

STORAGE

S125

OFFICE

S124

OFFICE

S126

STORAGE

S127

ENVIRONMENTALSERVICES

S112

ELEVATOR

S128

STAIRS#2

S122

MEN'SRESTROOM

S118

DRAIN COVER TO REMAIN

MATERIALSMANAGEMENT

S123

= EXISTING TILE FLOOR TO REMAIN

= NEW LVT FLOORING

= SEALED CONCRETE

NOTES:

• REPAIR AND PAINT ALL GYP BOARD• REPLACE ALL RUBBER BASE• PRIME EXISTING SLABS PRIOR TO LVT INSTALLATION

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

37:3

3A

M

1ST

FLO

OR

FLO

OR

FIN

ISH

PLA

N

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A10

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 FIRST FLOOR FLOOR FINISH PLAN

Page 19: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

VESTIBULE

S200

CORRIDOR

S201

STORAGE

S202

COMM

S203

PHYSICIANPRACTICEOFFICE

S204

ELECTRICALROOM

S205

WAITINGAREA

S206

EMPLOYEEOF

CHOICECOORD.

S207

PHOTO

S208

BREAKROOM

S209

TESTINGROOM 1

S210

CORRIDOR

S211

TESTINGROOM 2

S212

EMERALDHEALTH

S213

CORRIDOR

S214

STORAGE

S215

CONFERENCEROOM

S216

OFFICE

S217

EMPLOYEEHEALTHNURSE

S218A

VENDING

S219

RESTROOM

S220

HEALTHCOORD.

S222

RECRUITER1

S224

MANAGEDCARE

S225

OFFICE

S226

RECRUITER2

S228

OFFICE

S227A

CONF.ROOM

PATIENTBILLING

S229

CORRIDOR

S230

MANAGER

S232

STORAGE

S233

CLERICALWORKROOM

S234

STAIRS

S235

BENIFITSSPECIALIST

S236

HRSPECIALIST

S238

ALCOVE

S237

JANITORCLOSET

S239

RECORDSSTORAGE

S240

WOMEN'SRESTROOM

S241

SUPPORTCLERK

S242

MEN'SRESTROOM

S243

STORAGE

S244

ACCOUNTSRECEIVABLE

S245

SECRETARY

S246

INSURANCEWORKROOM

S247

VPCORPORATESERVICES

S248

BILLINGINS.

WORKROOM

S249

SUPERVISOR

S251

RISKMGR.CCO

S252

BREAKROOM

S253

OFFICE

S254

PRINTERROOM

S255

BILLERS /COLLECTORS

S257CONFERENCE

ROOM

S259

DEPARTMENTSUPERVISOR

S261

CLERICALWORKROOM

S263

STAIRS

S262

COLLECTIONSOFFICE

S270

CASHIER'SOFFICE

S271

STORAGE

S272

SUPERVISOROFFICE

S273

MAILSORTROOM

S274

ALCOVE

S275

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

NOTES:

• REPAIR AND PAINT ALL GYP BOARD• REPLACE ALL RUBBER BASE• PRIME EXISTING SLABS PRIOR TO LVT INSTALLATION

= EXISTING TILE FLOOR TO REMAIN

= NEW LVT FLOORING

= SEALED CONCRETE

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

37:3

9A

M

2ND

FLO

OR

FLO

OR

FIN

ISH

PLA

N

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A10

2A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 SECOND FLOOR FLOOR FINISH PLAN

Page 20: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

ELEVATORLOBBY

S300

CORRIDOR

S301

CONFERENCEROOM

S302

COMM

S303

STORAGE

S304

VESTIBULE

S304A

RESTROOM

S306 CEO

S308

ELECTRICAL

S305

REVENUECYCLE

COORD.

S307

CORRIDOR

S309

OFFICE

S310

BREAKROOM

S311

VP'SSECRETARY

S312

VESTIBULE

S313

VICEPRESIDENT

1

S314

PAYROLLWORKROOM

S315

WAITINGROOM

S316

FINACIALACCOUNT

SUPERVISOR

S317

VP'SSECRETARY

S318

ACCOUNTINGWORKROOM

S319

VICEPRESIDENT

2

S320

VP'SSECRETARY

S322

WORKROOM

S324

VICEPRESIDENT

3

S328

FINANCIALACCOUNTMANAGER

S329

FINANCIALACCOUNT

WORKROOM

S331

LIBRARY

S332

STAIR #1

S333

WOMEN'SRESTROOM

S335

STAIR #2

S336

JANITOR'SCLOSET

S337

VICEPRESIDENT

4

S336A

MEN'SRESTROOM

S339

CONFERENCEROOM

S340

PROCESSENGINEER

S342

VP'SSECRETARY

S344

VICEPRESEIDENT

5

S346

FINANCIALSTORAGE

S348

WORKROOM

S350

COMPTROLLER

S352

MANAGERIALACCOUNT

WORKROOM

S354

AUDITOR

S362

MGRACCOUNT

SUPERVISOR

S364

PRODUCTION

S341

BREAKROOM

S367

SUPERVISOR

S370

STORAGE

S369

SCHEDULERS

S368

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

NOTES:

• REPAIR AND PAINT ALL GYP BOARD• REPLACE ALL RUBBER BASE• PRIME EXISTING SLABS PRIOR TO LVT INSTALLATION

= EXISTING TILE FLOOR TO REMAIN

= NEW LVT FLOORING

= SEALED CONCRETE

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

37:4

6A

M

3RD

FLO

OR

FLO

OR

FIN

ISH

PLA

N

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A10

3A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 THIRD FLOOR FLOOR FINISH PLAN

Page 21: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

8'-

10

"6

'-0

"1

0'-

10

"1

1'-

43

/4"

12

'-1

11

/4"

OFFICE

S134

OFFICE

S133

OFFICE

S132

OFFICE

S130

CONF.

S129

S129

S132

S133

S134

A

A

A

A

A

A

A

A

19

'-4

1/2

"

SEE DETAIL 3/A501FOR NEW WALL @MULLION LINE TYP.

1

A501TYP.

WOMEN'SRESTROOM

S119

WOMEN'SRESTROOM

S116

ELECTRICALROOM

S120

TELEPHONEROOM

S106

CORRIDOR

S102JANITOR

S103

MEN'SRESTROOM

S108

ENVIRONMENTALSERVICES

S109

STORAGE

S110

STORAGE

S113

STORAGE

S131

OFFICE

S114

MECHANICALROOM

S115

STAIRS#1

S107

ELEVATORLOBBY

S101

ELEVATOREQUIPMENT

ROOM

S105

ENGINEERINGFACILITIES

S117

MATERIALSMANAGEMENT

S121

CLEANCART

STORAGE

S125

OFFICE

S124

OFFICE

S126

STORAGE

S127

MATERIALSMANAGEMENT

S123

ENVIRONMENTALSERVICES

S112

ELEVATOR

S128

STAIRS#2

S122

MEN'SRESTROOM

S118

S109

= NEW FULL HEIGHT GYP. BOARD & INSULATION TO 1'-0" ABOVE CEILING GRID

NEW WORK LEGEND

= NEW WALL

= NEW GYP. BOARD 1'-0" HIGH @ FLOOD CUT

= NEW GYP. BOARD 4'-0" HIGH UNDER GLAZING

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

37:5

0A

M

FIRS

TFL

OO

RN

EWW

ORK

PLA

N

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A20

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 FIRST FLOOR NEW WORK PLAN

Page 22: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

VESTIBULE

S200

CORRIDOR

S201

STORAGE

S202

COMM

S203

PHYSICIANPRACTICEOFFICE

S204

ELECTRICALROOM

S205

WAITINGAREA

S206

EMPLOYEEOF

CHOICECOORD.

S207

PHOTO

S208

BREAKROOM

S209

TESTINGROOM 1

S210

CORRIDOR

S211

TESTINGROOM 2

S212

EMERALDHEALTH

S213

CORRIDOR

S214

STORAGE

S215

CONFERENCEROOM

S216

OFFICE

S217

EMPLOYEEHEALTHNURSE

S218A

VENDING

S219

RESTROOM

S220

HEALTHCOORD.

S222

RECRUITER1

S224

MANAGEDCARE

S225

OFFICE

S226

RECRUITER2

S228

OFFICE

S227A

CONF.ROOM

PATIENTBILLING

S229

CORRIDOR

S230

MANAGER

S232

STORAGE

S233

CLERICALWORKROOM

S234

STAIRS

S235

BENIFITSSPECIALIST

S236

HRSPECIALIST

S238

ALCOVE

S237

JANITORCLOSET

S239

RECORDSSTORAGE

S240

WOMEN'SRESTROOM

S241

SUPPORTCLERK

S242

MEN'SRESTROOM

S243

STORAGE

S244

ACCOUNTSRECEIVABLE

S245

SECRETARY

S246

INSURANCEWORKROOM

S247

VPCORPORATESERVICES

S248

BILLINGINS.

WORKROOM

S249

SUPERVISOR

S251

RISKMGR.CCO

S252

BREAKROOM

S253

OFFICE

S254

PRINTERROOM

S255

BILLERS /COLLECTORS

S257

CONFERENCEROOM

S259

DEPARTMENTSUPERVISOR

S261

CLERICALWORKROOM

S263

STAIRS

S262

COLLECTIONSOFFICE

S270

CASHIER'SOFFICE

S271

STORAGE

S272

SUPERVISOROFFICE

S273

MAILSORTROOM

S274

ALCOVE

S275

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

= NEW FULL HEIGHT GYP. BOARD & INSULATION TO 1'-0" ABOVE CEILING GRID

NEW WORK LEGEND

= NEW WALL

= NEW GYP. BOARD 1'-0" HIGH @ FLOOD CUT

= NEW GYP. BOARD 4'-0" HIGH UNDER GLAZING

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

37:5

5A

M

SEC

ON

DFL

OO

RN

EWW

ORK

PLA

N

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A20

2A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 SECOND FLOOR NEW WORK PLAN

Page 23: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

S369

S368

S367

S370

S336S300

S304

S302

S316A

S302B

S306

S304A

S308

S302A

S314

S320

S328

S336A

S346

S352S350

S362

S364S354S319

S348

S313

S313AS309

S340 S342

S332

S324

S316S303

S305

S307

S311

S317

S315

S331S329

S339

S337

S335

S301

ELEVATORLOBBY

S300

CORRIDOR

S301

CONFERENCEROOM

S302

COMM

S303

STORAGE

S304

VESTIBULE

S304A

RESTROOM

S306 CEO

S308

ELECTRICAL

S305

REVENUECYCLE

COORD.

S307

CORRIDOR

S309

OFFICE

S310

BREAKROOM

S311

VP'SSECRETARY

S312

VESTIBULE

S313

VICEPRESIDENT

1

S314

PAYROLLWORKROOM

S315

WAITINGROOM

S316

FINACIALACCOUNT

SUPERVISOR

S317

VP'SSECRETARY

S318

ACCOUNTINGWORKROOM

S319

VICEPRESIDENT

2

S320

VP'SSECRETARY

S322

WORKROOM

S324

VICEPRESIDENT

3

S328

FINANCIALACCOUNTMANAGER

S329

FINANCIALACCOUNT

WORKROOM

S331

LIBRARY

S332

STAIR #1

S333

WOMEN'SRESTROOM

S335

STAIR #2

S336

JANITOR'SCLOSET

S337

VICEPRESIDENT

4

S336A

MEN'SRESTROOM

S339

CONFERENCEROOM

S340

PROCESSENGINEER

S342

VP'SSECRETARY

S344

VICEPRESEIDENT

5

S346

FINANCIALSTORAGE

S348WORKROOM

S350

COMPTROLLER

S352

MANAGERIALACCOUNT

WORKROOM

S354

AUDITOR

S362

MGRACCOUNT

SUPERVISOR

S364

PRODUCTION

S341

BREAKROOM

S367

SUPERVISOR

S370

STORAGE

S369

SCHEDULERS

S368

S135

OFFICE

S373

OFFICE

S372

OFFICE

S371

S373S372S371 S372

S302C

= NEW FULL HEIGHT GYP. BOARD & INSULATION TO 1'-0" ABOVE CEILING GRID

NEW WORK LEGEND

= NEW WALL

= NEW GYP. BOARD 1'-0" HIGH @ FLOOD CUT

= NEW GYP. BOARD 4'-0" HIGH UNDER GLAZING

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

37:5

9A

M

THIR

DFL

OO

RN

EWW

ORK

PLA

N

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A20

3A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 THIRD FLOOR NEW WORK PLAN

Page 24: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

629P01 P02

P03

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:0

0A

M

PEN

THO

USE

NEW

WO

RKPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A20

4A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 ROOF PLAN

Page 25: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

8' - 0"

8' - 0"

8' - 0"8' - 0"

8' - 0"

8' - 0"

9' - 0"

9' - 0"

8' - 0"8' - 0"

9' - 0"

8' - 0"

9' - 0"

8' - 0"

8' - 0"8' - 0"

11' - 0"

8' - 0" 9' - 6"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

10' - 0"

OFFICE

S134

OFFICE

S133

OFFICE

S132

OFFICE

S130

CONF.

S129

WOMEN'SRESTROOM

S119

WOMEN'SRESTROOM

S116

ELECTRICALROOM

S120

TELEPHONEROOM

S106

CORRIDOR

S102JANITOR

S103

MEN'SRESTROOM

S108

ENVIRONMENTALSERVICES

S109

STORAGE

S110

STORAGE

S113STORAGE

S131

OFFICE

S114

MECHANICALROOM

S115

STAIRS#1

S107

ELEVATORLOBBY

S101

ELEVATOREQUIPMENT

ROOM

S105

ENGINEERINGFACILITIES

S117

MATERIALSMANAGEMENT

S121

CLEANCART

STORAGE

S125

OFFICE

S124

OFFICE

S126

STORAGE

S127

MATERIALSMANAGEMENT

S123

ENVIRONMENTALSERVICES

S112

ELEVATOR

S128

STAIRS#2

S122

MEN'SRESTROOM

S118

NEW ACOUSTICALCEILING GRID ANDTILE

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:0

2A

M

FIRS

TFL

OO

RN

EWW

ORK

CEI

LIN

GPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A30

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1 FIRST FLOOR NEW WORK CEILING PLAN

LINE OF CEILING ELEVATION CHANGE

Page 26: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

8' - 0"8' - 0"

8' - 0"

8' - 0"

8' - 0"8' - 0"

8' - 0"

9' - 0" 9' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0" 8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

NEW ACOUSTICALCEILING GRID ANDTILE

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:0

5A

M

SEC

ON

DFL

OO

RN

EWW

ORK

CEI

LIN

GPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A30

2A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1SECOND FLOOR NEW WORK CEILINGPLAN

Page 27: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25

'-0

"2

5'-

0"

30

'-0

"3

0'-

0"

11

3'-

93

/4"

142' - 10 1/4"

62

'-8

"5

0'-

2"

11

2'-

10

"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0" 8' - 0"

8' - 0"

8' - 0"8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

NEW ACOUSTICALCEILING GRID ANDTILE

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:0

7A

M

THIR

DFL

OO

RN

EWW

ORK

CEI

LIN

GPL

AN

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A30

3A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1/8" = 1'-0"1THIRD FLOOR NEW WORK CEILINGPLAN

Page 28: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

ELEVATORLOBBY

S101

CORRIDOR

S102JAN

CLOSET

S103

ELEVATOREQUIPMENT

S105

TELEPHONE

S106

MEN'SRESTROOM

S108

EMPLOYEELOUNGE

S109

WOMEN'SRESTROOM

S116

PATIENTACCOUNT

DEPT.

S117

MEN'SRESTROOM

S118

WOMEN'SRESTROOM

S119

ELECTRICALROOM

S120

STAIR #1

S107OFFICE

S128

COPYROOM

S129

113'

-2"

59' - 10" 19' - 4" 23' - 4" 40' - 4"

50'-

0"62

'-10

"

REPAIR LEGEND

*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT

SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES

REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING

3"MIN. MARGIN

REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA

A

A

REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.

MIN

.

3"

NEW FINISH COATNEW BASE COAT

NEW FOAM

FASTEN FOAM TO SHEATHINGPER MANUFACTURER

NEW MESH

EXISTING EIFS SYSTEM

NEW FINISH COAT

NEW BASE COAT

NEW MESH

EXISTING EIFS SYSTEM

*ALTERNATE BID ITEM*

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

44:5

1AM

1ST

FLO

OR

EIFS

REPA

IRPL

AN

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 FIRST FLOOR EIFS REPAIR PLAN

1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL

1/2" = 1'-0"NEW EIFS DETAIL

Page 29: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

VESTIBULE

S200

CORRIDOR

S201

STORAGE

S202

COMM

S203

PHYSICIANPRACTICE

OFFICE

S204

ELECTRICALROOM

S205

WAITINGAREA

S206

EMPLOYEEOF

CHOICECOORD.

S207

PHOTO

S208

BREAKROOM

S209

TESTINGROOM 1

S210

CORRIDOR

S211

TESTINGROOM 2

S212

EMERALDHEALTH

S213

CORRIDOR

S214

STORAGE

S215

CONFERENCEROOM

S216

OFFICE

S217

EMPLOYEEHEALTHNURSE

S218A

VENDING

S219

RESTROOM

S220

HEALTHCOORD.

S222

RECRUITER1

S224

MANAGEDCARE

S225

OFFICE

S226

RECRUITER2

S228

OFFICE

S227A

CONF.ROOM

PATIENTBILLING

S229

CORRIDOR

S230MANAGER

S232

STORAGE

S233

CLERICALWORKROOM

S234

STAIRS

S235

BENIFITSSPECIALIST

S236

HRSPECIALIST

S238

ALCOVE

S237

JANITORCLOSET

S239

RECORDSSTORAGE

S240

WOMEN'SRESTROOM

S241

SUPPORTCLERK

S242

MEN'SRESTROOM

S243

STORAGE

S244

ACCOUNTSRECEIVABLE

S245

SECRETARY

S246

INSURANCEWORKROOM

S247

VPCORPORATE

SERVICES

S248

BILLINGINS.

WORKROOM

S249

SUPERVISOR

S251

RISKMGR.CCO

S252

BREAKROOM

S253

OFFICE

S254

PRINTERROOM

S255

BILLERS/

COLLECTORS

S257CONFERENCE

ROOM

S259

DEPARTMENTSUPERVISOR

S261

CLERICALWORKROOM

S263

STAIRS

S262

COLLECTIONSOFFICE

S270

CASHIER'SOFFICE

S271

STORAGE

S272

SUPERVISOROFFICE

S273

MAILSORTROOM

S274

ALCOVE

S275

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25'-

0"25

'-0"

30'-

0"30

'-0"

113'

-97/

8"

142' - 10 1/8"

62'-

8"50

'-2"

112'

-10"

REPAIR LEGEND

*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT

SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES

REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING

NEW FINISH COAT

NEW BASE COAT

NEW MESH

EXISTING EIFS SYSTEM

*ALTERNATE BID ITEM*

3"MIN. MARGIN

REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA

A

A

REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.

MIN

.

3"

NEW FINISH COATNEW BASE COAT

NEW FOAM

FASTEN FOAM TO SHEATHINGPER MANUFACTURER

NEW MESH

EXISTING EIFS SYSTEM

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

44:5

4A

M

2ND

FLO

OR

EIFS

REPA

IRPL

AN

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

2A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 SECOND FLOOR EIFS REPAIR PLAN

1/2" = 1'-0"NEW EIFS DETAIL

1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL

Page 30: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

ELEVATORLOBBY

S300

CORRIDOR

S301

CONFERENCEROOM

S302

COMM

S303

STORAGE

S304

VESTIBULE

S304A

RESTROOM

S306 CEO

S308

ELECTRICAL

S305

REVENUECYCLE

COORD.

S307

CORRIDOR

S309

OFFICE

S310

BREAKROOM

S311

VP'SSECRETARY

S312

VESTIBULE

S313

VICEPRESIDENT

1

S314

PAYROLLWORKROOM

S315

WAITINGROOM

S316

FINACIALACCOUNT

SUPERVISOR

S317

VP'SSECRETARY

S318

ACCOUNTINGWORKROOM

S319

VICEPRESIDENT

2

S320

VP'SSECRETARY

S322

WORKROOM

S324

VICEPRESIDENT

3

S328

FINANCIALACCOUNTMANAGER

S329

FINANCIALACCOUNT

WORKROOM

S331

LIBRARY

S332

STAIR #1

S333

WOMEN'SRESTROOM

S335

STAIR #2

S336

JANITOR'SCLOSET

S337

VICEPRESIDENT

4

S336A

MEN'SRESTROOM

S339

CONFERENCEROOM

S340

PROCESSENGINEER

S342

VP'SSECRETARY

S344

VICEPRESEIDENT

5

S346

FINANCIALSTORAGE

S348WORKROOM

S350

COMPTROLLER

S352

MANAGERIALACCOUNT

WORKROOM

S354AUDITOR

S362

MGRACCOUNT

SUPERVISOR

S364

PRODUCTION

S341

BREAKROOM

S367

SUPERVISOR

S370

STORAGE

S369

SCHEDULERS

S368

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

59' - 10" 83' - 0"

142' - 10"

25'-

0"25

'-0"

30'-

0"30

'-0"

113'

-97/

8"

142' - 10 1/8"

62'-

8"50

'-2"

112'

-10"

REPAIR LEGEND

*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT

SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES

REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING

NEW FINISH COAT

NEW BASE COAT

NEW MESH

EXISTING EIFS SYSTEM

*ALTERNATE BID ITEM*

3"MIN. MARGIN

REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA

A

A

REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.

MIN

.

3"

NEW FINISH COATNEW BASE COAT

NEW FOAM

FASTEN FOAM TO SHEATHINGPER MANUFACTURER

NEW MESH

EXISTING EIFS SYSTEM

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

44:5

7A

M

3RD

FLO

OR

EIFS

REPA

IRPL

AN

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

3A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 THIRD FLOOR EIFS REPAIR PLAN

1/2" = 1'-0"NEW EIFS DETAIL

1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL

Page 31: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

1 1

2 2

3 3

4 4

5 5

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

12'-

0"51

'-7

7/8"

42' - 0 1/8"

REPAIR LEGEND

*ALTERNATE*REFINISH EXISTING EIFSFINISH WITH NEW BASE COAT,MESH, AND FINISH COAT

SEE COVER SHEET FOR EIFS REPAIR GENERAL NOTES

REPAIR EXISTING DAMAGE &COAT SURFACE WITHELASTOMERIC COATING

3"MIN. MARGIN

REMOVE AND REPLACEFINISH / FOAM @ DAMAGEDAREA

A

A

REMOVE MESH, BASE, AND FINISHCOATS MINIMUM 3" AROUNDDAMAGED AREA. REPLACEMESH, BASE, AND FINISH COATSFLUSH TO EXISTING EIFS.

MIN

.

3"

NEW FINISH COATNEW BASE COAT

NEW FOAM

FASTEN FOAM TO SHEATHINGPER MANUFACTURER

NEW MESH

EXISTING EIFS SYSTEM

NEW FINISH COAT

NEW BASE COAT

NEW MESH

EXISTING EIFS SYSTEM

*ALTERNATE BID ITEM*

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

44:5

8A

M

PEN

THO

USE

EIFS

REPA

IRPL

AN

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

4A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 PENTHOUSE EIFS REPAIR ROOF PLAN

1/2" = 1'-0"EIFS DAMAGE REPAIR DETAIL

1/2" = 1'-0"NEW EIFS DETAIL

Page 32: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

STAIRS#2

S401

PENTHOUSE

S402

RDRD

OF

RDOF

RD

RD

RDRDRDOF

RDOF

RDOF

2A406

3A406

4A406

3A406

3A406

2A406

2A406

2A406

2A406

2A406

2A406

2A406

P01 P02

P03

62'-

8"50

'-2"

8'-0

7/8"

120'

-10

7/8"

59' - 10" 19' - 4" 23' - 4" 40' - 4"

142' - 10"

NEW ROOF

NEW ROOF

TYP. 8'-0" X 8'-0"TAPERED INSULATION@ EACH ROOF DRAIN

NEW PARAPET CAPFLASHING TYP.

= NEW ROOF

1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT

ROOF REPLACEMENT NOTES

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

44:5

9A

M

ROO

FN

EWW

ORK

PLA

N

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

5A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 ROOF NEW WORK PLAN

Page 33: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

2A406

2A406

2A406

2A406

RD

RD

63'-

77/

8"42' - 0 1/8"

TYP. 8'-0" X 8'-0"TAPERED INSULATION@ EACH ROOF DRAIN

NEW PARAPET CAPFLASHING TYP.

EXISTING EXTERIORWALL SYSTEM TO REMAIN

REMOVE EXISTING TEMPORARY ICE AND WATER SHIELDMEMBRANE TO EXPOSE ORIGINAL CONSTRUCTION. REMOVEEXISTING GRANULAR SURFACED ROOF SYSTEM VERTICALWALL FLASHINGS AS REQUIRED TO EXPOSE EXISTING SUBSTRATE.REMOVE EXISTING ALUMINUM

COPING, ANCHOR, & SPLICE PLATE

CONTRACTOR TO DETERMINE IFP.T. WOOD NAILER IS INSUFFICIENT CONDITION TOCONTINUE TO PERFORM.IF NAILER IS NOT STRUCTURALYSOUND, REMOVE AND REPLACE.

CONTRACTOR TO DETERMINE IFSHEATHING (GYP. SHEATHING / PLYWOOD) IS INSUFFICIENT CONDITION TOCONTINUE TO PERFORM.IF SUBSTRATE IS NOT STRUCTURALYSOUND, REMOVE AND REPLACE.

REMOVE AND REPLACEEXISTING CANT STRIP

EXISTING STRUCTURE, INSULATION& LIGHTWEIGHT CONCRETE TOREMAIN

NEW METALCOPING, ANCHOR, & SPLICE PLATE

NEW CANT STRIP

NEW MEMBRANE ROOF PER MANUFACTURER

CLEAN EXISTING SUBSTRATE AND INSTALLNEW COVER BOARD OVER EXISTING, ANCHORTHRU EXISTING SUBSTRATE TO EXISTING FRAMINGWITH APPROVED DEPTH SCREW ANCHORS

REMOVE EXISTING GRANULAR SURFACED ROOF SYSTEMTO EXPOSED EXISTING LIGHTWEIGHT CONCRETE ROOF DECK

DEMO NEW WORK

NEW FLASHING

NEW CANT STRIP

NEW MEMBRANE ROOFSYSTEM PER MANUFACTURER

REMOVE EXISTING GRANULAR SURFACEDROOF SYSTEM / FLASHING TO EXPOSED EXISTINGLIGHTWEIGHT CONCRETE ROOF DECK

DEMO NEW WORK

NEW FLASHING

NEW CANT STRIP

NEW MEMBRANE ROOFSYSTEM PER MANUFACTURER

REMOVE EXISTING GRANULAR SURFACEDROOF SYSTEM / FLASHING TO EXPOSED EXISTINGLIGHTWEIGHT CONCRETE ROOF DECK

DEMO NEW WORK

SEALANT

EXISTING DRAIN

EXISTING LIGHTWEIGHTCONCRETE

RETRO-DRAIN

NEW MEMBRANEROOF MATERIAL

EPDM FLASHING

LAP SEALANT

TAPERED INSULATION

= NEW ROOF

1) REMOVE ALL ROOFING DOWN TO EXPOSED LWIC2) ADHERE 1 PLY SELF ADHERED VAPOR BARRIER3) MECHANICALLY ATTACH BASE LAYER POLYISCOCYANURATE THROUGH LWIC INTO STEEL DECK4) ADHERE 2ND LAYER OF ISO W/ LOW RISE FOAM5) ADHERE 1/4" SECUROCK USING LOW RISE FOAM6) ADHERE 1 PLY BASE PLY IN COLD ADHESIVE7) INSTALL LIQUID APPLIED BASE COAT AND FIBERGLASS8) INSTALL LIQUID APPLIED TOP COAT

ROOF REPLACEMENT NOTES

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

45:0

0A

M

PEN

THO

USE

ROO

FN

EWW

ORK

PLA

N&

DET

AIL

S

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

6A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 PENTHOUSE NEW WORK ROOF PLAN

1 1/2" = 1'-0"2 ROOF EDGE @ PARAPET

1 1/2" = 1'-0"3 ROOF WALL TRANSITION @ EIFS

1 1/2" = 1'-0"4 ROOF WALL TRANSITION @ BRICK

1 1/2" = 1'-0"5 ROOF DRAIN DETAIL

Page 34: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

FIRST FLOOR0"

SECOND FLOOR10' - 0"

PENTHOUSEROOF40' - 0"

10'-

0"10

'-0"

10'-

0"10

'-0"

2'-0

"

THIRD FLOOR20' - 0"

ROOF PLAN30' - 0"

ABCDEFGH

EXISTINGBRICK

EIFS

CONTROL JOINTS TYPICAL

10'-

0"10

'-0"

10'-

0"2'

-0"

8'-0

"2'

-0"

1' - 6 1/8" 20' - 0" 19' - 1 3/4" 10 1/4" 20' - 0" 20' - 0" 1' - 6" 18' - 6" 20' - 0" 20' - 0" 1' - 4"

142' - 10 1/8"

NEW PARAPET CAP FLASHING

FIRST FLOOR0"

SECOND FLOOR10' - 0"

PENTHOUSEROOF40' - 0"

THIRD FLOOR20' - 0"

ROOF PLAN30' - 0"

1 2 3 4 5

CONTROL JOINTS TYP.

EIFS

EXISTINGBRICK

EXISTINGBRICK

2'-0

"10

'-0"

10'-

0"10

'-0"

10'-

0"

2' - 4 1/8"2' - 3 7/8" 30' - 0" 30' - 0" 1' - 4" 23' - 8" 25' - 0" 9' - 6 7/8"

124' - 2 7/8"

DOORS TO BE REPLACED

NEW PARAPET CAP FLASHING

NOTE:FIELD VERIFY LOCATIONSOF CONTROL JOINTS AND REVEALSMATCH EXISTING W/ *ALTERNATEBID*

FINISH LEGEND

EXISTING EIFS TO BEREPAIRED AND COATED

EXISTING BRICKTO REMAIN

WINDOW REPLACEMENT LEGEND

REINSTALL WINDOWSPREVIOUSLY REMOVEDSTORED W/ FACILITIES

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

45:0

6A

M

EXTE

RIO

REL

EVA

TIO

NS

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

7A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 North

1/8" = 1'-0"2 East

Page 35: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

FIRST FLOOR0"

SECOND FLOOR10' - 0"

PENTHOUSEROOF40' - 0"

THIRD FLOOR20' - 0"

ROOF PLAN30' - 0"

A B C D E F G H

CONTROL JOINTS TYP.

EXISTINGBRICK

EIFS

EIFS

2'-0

"10

'-0"

10'-

0"10

'-0"

10'-

0"

1' - 6 1/8"20' - 0"19' - 1 3/4"10 1/4"20' - 0"20' - 0"1' - 6"18' - 6"20' - 0"20' - 0"1' - 4"

142' - 10 1/8"

NEW PARAPET CAP FLASHING

FIRST FLOOR0"

SECOND FLOOR10' - 0"

PENTHOUSEROOF40' - 0"

THIRD FLOOR20' - 0"

ROOF PLAN30' - 0"

12345

EIFSEXISTINGBRICK

CONTROL JOINTS TYP.

2'-0

"8'

-0"

2'-0

"10

'-0"

10'-

0"10

'-0"

9' - 6 7/8" 25' - 0" 23' - 8" 1' - 4" 30' - 0" 30' - 0" 2' - 4"2' - 4"

124' - 2 7/8"

DOOR TO BE REPLACED NEW PARAPET CAP FLASHING

FINISH LEGEND

EXISTING EIFS TO BEREPAIRED AND COATED

EXISTING BRICKTO REMAIN

NOTE:FIELD VERIFY LOCATIONSOF CONTROL JOINTS AND REVEALSMATCH EXISTING W/ *ALTERNATEBID*

WINDOW REPLACEMENT LEGEND

REINSTALL WINDOWSPREVIOUSLY REMOVEDSTORED W/ FACILITIES

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

45:13

AM

EXTE

RIO

REL

EVA

TIO

NS

GM

C#

apen

1900

48

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A40

8A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RES

ORA

TIO

NBI

D

1/8" = 1'-0"1 South

1/8" = 1'-0"2 West

Page 36: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

TYPICAL INTERIORPARTITION - SEEDETAILS

FULL BATT INSULATION

WRAP-AROUNDHOLLOW METAL FRAMEWITH 2" HEAD,(KNOCKDOWN) (TYPICAL)

DOOR. SEE SCHEDULE

3 5/8" METAL STUDS

5/8" GYP BOARD

CAULK

2"

DOOR. SEE SCHEDULE

INTERIOR WALLSTEEL STUD ANCHORS

TYPICAL INTERIORPARTITION - SEE DETAILS

CAULKFULL BATT INSULATION

WRAP-AROUNDHOLLOW METAL FRAMEWITH 2" HEAD,(KNOCKDOWN) (TYPICAL)

2"

DOOR - SEE SCHEDULE

HOLLOW METAL FRAME

PROVIDE TRANSITION STRIPBETWEEN DIFFERENTFLOOR FINISHES

FLOOR, SEE SCHEDULE

AEXTERIOR INSULATED & IMPACTRATED HOLLOW METAL DOORW/ HOLLOW METAL FRAME

7'-

0"

6' - 0"

BINTERIOR SINGLE WOOD PANELDOOR USE EXISTING FRAMES

7'-

0"

3' - 0"

CINTERIOR SINGLE WOOD PANEL W/LITE DOOR USE EXISTING FRAMES

7'-

0"

3' - 0"

D

7'-

0"

3' - 0"

E

7'-

0"

3' - 0"

6"

2'-

9"

3"

6"

2'-

9"

6"

6"6"

2'-

9"

INTERIOR SINGLE WOOD PANEL W/LITE DOOR USE EXISTING FRAMES

INTERIOR SINGLE WOOD PANEL W/LITE DOOR USE EXISTING FRAMES

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:0

9A

M

DO

OR

SCH

EDU

LEA

ND

DET

AIL

S

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A50

0A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

3" = 1'-0"1 HOLLOW METAL DOOR HEAD 3" = 1'-0"2 HOLLOW METAL DOOR JAMB

3" = 1'-0"3 HOLLOW METAL DOOR SILL

NUMBER ROOM

DOORSIZE

WIDTH

DOOR SIZE DOOR DESCRIPTION FRAME DESCRIPTION

Fire Rated HEAD JAMB SILL NU

MBE

RED

NO

TES

H THKDOORTYPE MAT'L FRAME TYPE MAT'L

P01 PENTHOUSE 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 45 MIN. 1/A500 2/A500 3/A500P02 PENTHOUSE 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 45 MIN. 1/A500 2/A500 3/A500P03 PENTHOUSE 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 45 MIN. 1/A500 2/A500 3/A500

S109 ENVIRONMENTAL SERVICES 7' - 0" 6' - 0" 1 3/4" A METAL HOLLOW METAL HOLLOW METAL 1/A500 2/A500 3/A500S129 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS132 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS133 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS134 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS135 WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS300 ELEVATOR LOBBY 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS301 CORRIDOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS302 CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL

S302A CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" D WOOD EXISTING HOLLOW METALS302B CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" E WOOD EXISTING HOLLOW METALS302C CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS303 COMM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS304 STORAGE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL

S304A CEO 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS305 ELECTRICAL 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS306 RESTROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS307 REVENUE CYCLE COORD. 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS308 CEO 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS309 CORRIDOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS311 BREAK ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS313 VESTIBULE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL

S313A VESTIBULE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS314 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS315 PAYROLL WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS316 WAITING ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL

S316A WAITING ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS317 FINACIAL ACCOUNT SUPERVISOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS319 ACCOUNTING WORKROOM 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS320 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS324 WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS328 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS329 FINACIAL ACCOUNT MANAGER 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS331 FINACIAL ACCOUNT WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS332 LIBRARY 7' - 0" 3' - 0" 1 3/4" C WOOD EXISTING HOLLOW METALS335 WOMEN'S RESTROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS336 STAIR #2 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL

S336A VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS337 JANITORS CLOSET 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS339 MEN'S RESTROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS340 CONFERENCE ROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS342 PROCESS ENGINEER 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS346 VICE PRESIDENT 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS348 FINACIAL STORAGE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS350 WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS352 COMPTROLLER 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS354 MANAGERIAL ACCOUNT WORKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS362 AUDITOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS364 MGR ACCOUNT SUPERVISOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS367 BREAKROOM 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS368 SCHEDULERS 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS369 STORAGE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS370 SUPERVISOR 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS371 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS372 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METALS373 OFFICE 7' - 0" 3' - 0" 1 3/4" B WOOD EXISTING HOLLOW METAL

1/2" = 1'-0"DOOR TYPES

Page 37: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

3 5/8" METAL STUDS@ 16" O.C. MAX.MIN. 20GA.

5/8" GYP. BOARDEACH SIDE

SOUND ATTENUATED BATT.INSULATION

3 1/2" RESILIENT BASE

ACOUSTICAL TILE CEILING9'-0" A.F.F.

BRACE TOP OF WALL TO STRUCTURE AS REQUIRED

CONT. STUD TRACK SETIN ACOUSTICAL SEALANT TYP.

U-ANCHOR. SHOPWELDTO FRAME

GROUT FILLFRAME(HEAD &JAMBS)

METAL STUDS2" 5 1/2"

NEOPRENE ORFLEXIBLE SEALANTBETWEEN MULLIONAND BREAK METAL

EXISTINGSTOREFRONT

BENT ALUMINUM BREAKMETAL TO MATCHSTOREFRONT SYSTEM

5/8" GYP BOARD

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:10

AM

SEC

TIO

NS

&D

ETA

ILS

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A50

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

1 1/2" = 1'-0"1 WALL TYPE "A" 3" = 1'-0"2 TYPICAL STUD ANCHOR

1 1/2" = 1'-0"3 NEW WALL OFF MULLION LINE

Page 38: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:11

AM

FIRS

TFL

OO

RFI

NIS

HSC

HED

ULE

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A60

0A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

FIRST FLOOR ROOM FINISH SCHEDULE

NUMBER Name CommentsCeilingMaterial

CeilingHeight Floor Finish

BaseFinish

North WallMaterial

North WallFinish

East WallMaterial

East WallFinish

South WallMaterial

South WallFinish

West WallMaterial

West WallFinish

S101 ELEVATOR LOBBY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS102 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS103 JANITOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS105 ELEVATOR EQUIPMENT ROOM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS106 TELEPHONE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS107 STAIRS #1 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS108 MEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS109 ENVIRONMENTAL SERVICES ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS110 STORAGE ACT 11'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS112 ENVIRONMENTAL SERVICES ACT 11'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS113 STORAGE ACT 11'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS114 OFFICE ACT 11'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS115 MECHANICAL ROOM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS116 WOMEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS117 ENGINEERING FACILITIES ACT 8'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS118 MEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS119 WOMEN'S RESTROOM ACT 8'-0" EXISTING EXISTING GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS120 ELECTRICAL ROOM EXPOSED 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS121 MATERIALS MANAGEMENT ACT 8'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS122 STAIRS #2 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS123 MATERIALS MANAGEMENT ACT 14'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS124 OFFICE ACT 14'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS125 CLEAN CART STORAGE ACT 14'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS126 OFFICE ACT 14'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS127 STORAGE ACT 14'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS128 ELEVATOR ACT EXPOSED LVT N/A GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS129 CONF. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS130 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS131 STORAGE ACT 14'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS132 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS133 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS134 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT

SEE SHEET A501 FOR EXTENT OF GYP. BOARD

Page 39: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:12

AM

SEC

ON

DFL

OO

RFI

NIS

HSC

HED

ULE

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A60

1A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

SECOND FLOOR ROOM FINISH SCHEDULE

Number Name Comments Ceiling Material Ceiling Height Floor Finish Base FinishNorth WallMaterial

North WallFinish

East WallMaterial

East WallFinish

South WallMaterial

South WallFinish

West WallMaterial

West WallFinish

S200 VESTIBULE ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS201 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS202 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS203 COMM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS204 PHYSICIAN PRACTICE OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS205 ELECTRICAL ROOM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS206 WAITING AREA ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS207 EMPLOYEE OF CHOICE COORD. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS208 PHOTO ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS209 BREAK ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS210 TESTING ROOM 1 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS211 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS212 TESTING ROOM 2 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS213 EMERALD HEALTH ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS214 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS215 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS216 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS217 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS218A EMPLOYEE HEALTH NURSE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS219 VENDING ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS220 RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS222 HEALTH COORD. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS224 RECRUITER 1 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS225 MANAGED CARE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS226 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS227A OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS228 RECRUITER 2 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS229 CONF. ROOM PATIENT BILLING ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS230 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS232 MANAGER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS233 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS234 CLERICAL WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS235 STAIRS EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT CMU PAINT CMU PAINT CMU PAINTS236 BENIFITS SPECIALIST ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS237 ALCOVE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS238 HR SPECIALIST ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS239 JANITOR CLOSET ACT 8'-0" CPT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS240 RECORDS STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS241 WOMEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS242 SUPPORT CLERK ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS243 MEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS244 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS245 ACCOUNTS RECEIVABLE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS246 SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS247 INSURANCE WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS248 VP CORPORATE SERVICES ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS249 BILLING INS. WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS251 SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS252 RISK MGR. CCO ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS253 BREAKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS254 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS255 PRINTER ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS257 BILLERS / COLLECTORS ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS259 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS261 DEPARTMENT SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS262 STAIRS EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT CMU PAINT CMU PAINT CMU PAINTS263 CLERICAL WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS270 COLLECTIONS OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS271 CASHIER'S OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS272 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS273 SUPERVISOR OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS274 MAIL SORT ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS275 ALCOVE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT

Page 40: BAY MEDICAL CENTER COOLEY BLDG. RESTORATIONbayhealthfoundation.com/wp-content/uploads/2019/10/... · & insulation replacement flooring to be removed and replaced ceiling grid and

Pens

acol

a,FL

3250

2

F85

0.43

3.05

08G

MC

NE

TW

OR

K.C

OM

T85

0.43

2.07

06

720

Bay

front

Par

kway

,Sui

te20

0

DRA

WN

BY:

ISSU

E

CH

ECK

EDBY

:

DA

TE

10/1

8/20

196 :

38:13

AM

THIR

DFL

OO

RFI

NIS

HSC

HED

ULE

GM

C#

APE

N19

0048

615

N.B

ON

ITA

AV

ENU

EPA

NA

MA

CIT

Y,F

L32

401

A60

2A

utho

r

10-1

5-20

19BA

YM

EDIC

AL

CEN

TER

CO

OLE

YBL

DG

.RE

STO

RATI

ON

BID

THIRD FLOOR ROOM FINISH SCHEDULE

Number Name Comments Ceiling MaterialCeilingHeight Floor Finish Base Finish

North WallMaterial

North WallFinish

East WallMaterial

East WallFinish

South WallMaterial

South WallFinish

West WallMaterial

West WallFinish

S300 ELEVATOR LOBBY ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS301 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS302 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS303 COMM EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS304 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS304A VESTIBULE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS305 ELECTRICAL EXPOSED EXPOSED CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS306 RESTROOM ACT 8'-0" CPT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS307 REVENUE CYCLE COORD. ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS308 CEO ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS309 CORRIDOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS310 OFFICE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS311 BREAK ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS312 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS313 VESTIBULE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS314 VICE PRESIDENT 1 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS315 PAYROLL WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS316 WAITING ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS317 FINACIAL ACCOUNT SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS318 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS319 ACCOUNTING WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS320 VICE PRESIDENT 2 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS322 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS324 WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS328 VICE PRESIDENT 3 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS329 FINANCIAL ACCOUNT MANAGER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS331 FINANCIAL ACCOUNT WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS332 LIBRARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS333 STAIR #1 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS335 WOMEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS336 STAIR #2 EXPOSED EXPOSED CONCRETE RUBBER CMU PAINT CMU PAINT CMU PAINT CMU PAINTS336A VICE PRESIDENT 4 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS337 JANITOR'S CLOSET ACT 8'-0" CONCRETE RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS339 MEN'S RESTROOM ACT 8'-0" TILE TILE GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS340 CONFERENCE ROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS341 PRODUCTION ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS342 PROCESS ENGINEER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS344 VP'S SECRETARY ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS346 VICE PRESEIDENT 5 ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS348 FINANCIAL STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS350 WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS352 COMPTROLLER ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS354 MANAGERIAL ACCOUNT WORKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS362 AUDITOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS364 MGR ACCOUNT SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS367 BREAKROOM ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS368 SCHEDULERS ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS369 STORAGE ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINTS370 SUPERVISOR ACT 8'-0" LVT RUBBER GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT GYP. BOARD PAINT