Baudette, Minnesota/Rainy River, Ontario International Bridge. Location. Location. US and Canadian Customs facilities are at each end of the bridge approach Alignment on US side made challenging by US Customs equipment, City park, substation and archeological sites - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/1.jpg)
Baudette, Minnesota/Rainy River, Ontario International
Bridge
![Page 2: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/2.jpg)
Location
![Page 3: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/3.jpg)
Location US and Canadian Customs
facilities are at each end of the bridge approach
Alignment on US side made challenging by US Customs equipment, City park, substation and archeological sites
Alignment on Canadian side expected to be less affected by Customs location, but archeological and other issues may still exist
![Page 4: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/4.jpg)
This bridge provides access to Baudette, Minnesota and Rainy River, Ontario, a connection between the United States and Canada as well as a full-service, 24-hour Port of Entry
Originally built in 1959 by the Cities of Baudette, MN and Rainy River, ON
The bridge has a total length of 1,285 feet and accomodates a 2-lane roadway with a width of 24 feet and an open grate steel deck
Operated locally as a toll bridge until 1988, when ownership was taken over by the Minnesota Department of Transportation (MnDOT) and the Ministry of Transportation, Ontario (MTO)
History
![Page 5: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/5.jpg)
The current project was initiated to address structural issues and the long-term need to continue providing a safe and reliable river crossing at this location
The bridge is classified as fracture critical (non redundant)
Project Purpose
![Page 6: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/6.jpg)
Wooden Walkway
![Page 7: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/7.jpg)
Open Steel Deck
![Page 8: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/8.jpg)
Floor Beam Corrosion
![Page 9: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/9.jpg)
Low Vertical Clearance
![Page 10: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/10.jpg)
Bridge was found ineligible for inclusion on the Ontario Heritage Bridge List
MTO provided a position paper to the MnDOT stating MTO does not consider rehabilitation viable
Project Details
![Page 11: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/11.jpg)
Bridge is eligible for the National Register of Historical Places in the United States
MnDOT is nearly complete with its rehabilitation study
Next steps will be to work through Section 106 of the National Historic Preservation Act and likely Section 4(f) of the Department of Transportation Act
Project Details
![Page 12: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/12.jpg)
In the meantime, concurrent work has begun looking at replacement
Initial discussions were focused on developing project separately
This approach potentially solved some of the bureaucratic concerns, but it created others……
Project Details
![Page 13: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/13.jpg)
Current approach is to have MnDOT lead (with close coordination with MTO) the environmental documentation, preliminary design, structure type study and early stakeholder coordination of the project
Work is underway to develop a cost-sharing agreement
Consultant will be required to either have offices in both the US and Canada, or at least partnering with approved firms on both sides of the border
Handling of detail design and construction will be decided in the future
Project Details
![Page 14: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/14.jpg)
Presidential Permit not required◦ Congressional Authorized Bridge under International
Bridge Act of 1972◦ Existing owners of congressional authorized bridges
may replace, repair or expand their existing bridges without further State Department approval
Early consultant effort ongoing◦ Compile agency stakeholder list with contact
information◦ Compile list of permits/approvals needed◦ Anticipated duration for obtaining permits/approvals◦ Comparison of design standards/requirements between
MnDOT and MTO
Project Details
![Page 15: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/15.jpg)
Potential Agency Stakeholders: MN SHPO MN DNR USACE FHWA US Customs US State Department US Coast Guard GSA Ontario Ministry of the Environment Department of Fisheries and Oceans Division of Water Quality Ontario Ministry of Natural Resources First Nations Transport Canada, Navigable Waters Canadian Border Service Agency
Project Details
![Page 16: Baudette, Minnesota/Rainy River, Ontario International Bridge](https://reader035.vdocuments.us/reader035/viewer/2022062812/56816326550346895dd39f6d/html5/thumbnails/16.jpg)
A detailed critical path schedule has been developed
Schedule shows 300 days of float given a late summer 2013 consultant notice to proceed and letting date of November 2017
Project needs to be let no later than April 2018 to take advantage of Minnesota bonding dollars
Current schedule only includes MnDOT processes
Need to allow procurement time for detail design consultant
Project Timeline