    DESIGN CALCULATIONS &

    EARTH WORK CALCULATIONS

  • 7/22/2019 Battigalluru Bridge data

    2/188

    Fly wing

    Return wall

    Expansion Joint Dirt wall

    13.30m

    Pier cap T-Beam Deck slab&Kerb

    Abutment Pier

    Top plugging

    Curb

    Steining

    Bottom plugging

    Note:-Due to limitation of space,only 5 piers are shown,out of total 11 piers proposed.

    Assistant Exe.Engineer Dy. Exe.Engineer

    PR,Sompeta PR,Sompeta

    GENERAL ALIGNMENT OF THE PROPOSED HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

  • 7/22/2019 Battigalluru Bridge data

    3/188

  • 7/22/2019 Battigalluru Bridge data

    4/188

    TOTAL LENGTH OF THE BRIDGE : 150 Metres CONSTITUENCY : SOMPE

    ESTIMATED COST:-Rs.437.00 lakhs DISTRICT : SRIKA

    DETAILED PROJECT PROPOSALS

    GOVERNMENT OF ANDHRA PRADESH

    HYDERABAD

    CONSTRUCTION OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER ON THE ROAD FR

    TO BATTIGALLURU

  • 7/22/2019 Battigalluru Bridge data

    5/188

    TA

    ULAM

    M BARUVA

  • 7/22/2019 Battigalluru Bridge data

    6/188

    Name of the work:-Construction of High level Bridge on Mahendratanaya River on the Road from Baruva to Battigalluru

    Est.Cost:-Rs.437.00 lakhs

    I.SCOPE:

    The Road from Baruva to Battigalluruis an important road connecting most of the fisherman population of Sompeta Mandal to

    the Mandal head quarters by shortest route.The total length of the Road is 3.00 Km.In this connection,it is to be informed that one high level

    bridge is to be constructed on Mahendratanaya River to provide access to the public to Mandal head quarters.Further,the above bridge

    is not only useful to the public of Sompeta Mandal,but also useful to the people of Palasa and Mandasa mandals also in view of connectivity

    to NH-5 also.

    There is heavy pneumatic traffic such as trucks,tractors and iron wheel vehicles,Lorries on the road .Hence,it is necessary to

    provide 7.5m widthbridge on Mahendratanaya River to ensure connectivity as explained above.

    II.EXISTING FEATURES:

    There is existing road in between BARUVA and BATTIGALLURU with a missing high level bridge on Mahendratanaya River.

    Hence,one high level bridge is required.

    III.PROVISIONS IN THE ESTIMATE

    1.Quarry rubbish filling for embankment for a length of 200m on either side of the proposed bridge,as the side soil is not

    suitable for formation of embankment.

    2.Construction of high level T-beam bridge of 12 spans,each span being 13.10m with well foundations

    3.Formation of Approaches&Road for a length of 200m on either side of the Bridge

    IV.DESIGN CRITERIA

    1.The bridge is designed as per the specifications of the IRC

    2.The designs of bridge are enclosed seperately.

    V.ESTIMATED AMOUNT

    The estimate for construction of high level bridge along with approaches is prepared for an

    amount of Rs.437.00 lakhs

    Assistant Exe.Engineer Dy. Exe.Engineer

    PR,Sompeta PR,Sompeta

    SPECIFICATION REPORT

  • 7/22/2019 Battigalluru Bridge data

    7/188

    Name of the work:-Construction of High level Bridge on Mahendratanaya River on the Road from

    Baruva to Battigalluru

    Est.Cost:Rs.437.00 lakhs

    Proposed

    Road

    1/0

    Sompeta Baruva

    1.5 km

    8/6 0/0 Sand

    Railway 2/3 Battigalluru

    Crossing

    Mahendratanaya

    11/6 0/0

    Ichapuram 209/2 207/2 202/0 Vizag

    Korlam

    2.0 Km

    HBG metal J.L.Kota Quarry

    &Gravel

    Assistant Exe.Engineer Dy.Exe.Engineer

    PR,Sompeta PR,Sompeta

    Quarry Chart

  • 7/22/2019 Battigalluru Bridge data

    8/188

    Name of the work:-Construction of High level Bridge on Mahendratanaya River on the Road from

    Baruva to Battigalluru

    Est.Cost:Rs.437.00 lakhs

    Proposed

    Bridge

    1/0 Sompeta Baruva

    1.5 km

    8/6 0/0

    R&B Road Railway 2/3 Battigalluru

    Crossing

    Mahendratanaya

    11/6 0/0

    Ichapuram NH--5 209/2 207/2 202/0 Vizag

    Korlam

    R&B Road

    P.Sasanam

    Assistant Exe.Engineer Dy.Exe.Engineer

    PR,Sompeta PR,Sompeta

    KEY MAP

  • 7/22/2019 Battigalluru Bridge data

    9/188

    Name of the work:-Construction of High level Bridge on the R/F Baruva to Battigalluru

    Est.Cost:-Rs.437.00 lakhs

    S.No Description of item Nos Quantity Rate Per AmountLength Bredth Depth

    A)BRIDGE PROPER

    1 Earth work exacavation and depositing on bank with an initial lead and lift in loamy&clayey soils

    like Black Cotton soils,red earth etc complete including dewatering below low water level

    for foundations of curtain walls&flexible aprons

    Curtain walls 1X4 12.3 1.80 2.9 256.82Cum

    3.14(13.18)/4 = 10.35

    (10.35+8.45-6.5) = 12.30For flexible aprons 1X2 21.63 6.00 2 519.12Cum

    (8.45+2*6.59)

    775.94Cum 159.64 1.00Cum 123872

    2 Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing charges for

    Curtain walls 1X4 12.3 1.20 0.15 8.86Cum 4348.96 1.00Cum 38514

    Approach slab 1X2 3.6 7.45 0.15 8.05Cum 3768.64 1.00Cum 30322

    3 Mild steel wrought and put up for well cutting edge with MS angles 2 Nos.of 100X100X12mm size and MS plate of size200X12mm including cost and conveyance of steel to site and all labour charges for fabrication,welding,fixing in position

    duly bent upto sharp,anchoring hooks,threading,bolting of all bent up rods of steining and fixing in position etc.complete

    for cutting edges of well curbs under piers and abutments.

    Piers 1X11 3.14*5.15 0.0542 9.641MT

    Abutments 1X2 3.14*6.65 0.0542 2.264MT

    11.905MT 52312.00 1.000MT 622774

    4 VRCC(1:11/2:3) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for well curbs of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    DETAILED-CUM-ABSTRACT ESTIMATE

    Measurements

  • 7/22/2019 Battigalluru Bridge data

    10/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    Piers 1X11 9.218Cum 101.398Cum

    A1=(3.14)/4 * 5.15 * 5.15 = 20.83 Sqm

    A2=(3.14)/4 * 3.80 * 3.80 = 11.34 Sqm

    A3=(3.14)/4 * 4.95 * 4.95 = 19.24 Sqm

    V = (20.83-11.34)*0.3+(20.83-19.24)*1.15

    +0.5*(19.24-11.34)*1.15

    Abutments 1X2 16.96Cum 33.920Cum

    A1=(3.14)/4 * 6.65 * 6.65 = 34.73 Sqm

    A2=(3.14)/4 * 5.00 * 5.00 = 19.64 Sqm

    A3=(3.14)/4 * 6.45 * 6.45 = 32.67 Sqm

    V = (34.73-19.64)*0.3+(34.73-32.67)*1.45

    +0.5*(32.67-19.64)*1.45

    135.318Cum 5516.78 1Cum 746519

    5 VRCC(1:2:4) mix using 40mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for well steining of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    Piers 1X11 3.14*4.4 0.6 9.155 834.804Cum

    (11.75+0.55-1.2-1.45= 9.155)

    Abutments 1X2 3.14*5.75 0.75 8.855 239.816Cum

    (11.75+0.55-1.2-1.75= 8.855)

    1074.620Cum 4829.13 1Cum 5189476

    6 VCC(1:2:4) mix using 40mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for top plugging of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    Piers 1X11 3.14*(3.8*3.8)/4 ---- 0.5 62.345Cum

  • 7/22/2019 Battigalluru Bridge data

    11/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    Abutments 1X2 3.14*(5.0*5.0)/4 ---- 0.5 19.625Cum

    81.970Cum 3659.96 1Cum 300006

    7 Well sinking in sandy and other loose soils under water either by manual labour,divers or dredgers,

    weighing the top of steining to assist sinking etc.including dewatering and other incidental charges

    such as hire charges for mechanical equipment etc.complete for wells of internal dia 6.5m and 5.00m

    Piers

    Upto 2m below GL 1X11 ---- ---- 2.00m 22.00m 17907.66 1.00m 393969

    From 2 to 4m below GL 1X11 ---- ---- 2.00m 22.00m 21284.41 1.00m 468257

    From 4 to 6m below GL 1X11 ---- ---- 2.00m 22.00m 23424.05 1.00m 515329

    From 6 to 8m below GL 1X11 ---- ---- 2.00m 22.00m 25790.54 1.00m 567392

    From 8 to 10m below GL 1X11 ---- ---- 2.00m 22.00m 27995.34 1.00m 615897

    From 10 to 11m below GL 1X11 ---- ---- 1.00m 11.00m 28401.59 1.00m 312417

    From 11 to 12m below GL 1X11 ---- ---- 0.75m 8.25m 28807.84 1.00m 237665

    Abutments

    Upto 2m below GL 1X2 ---- ---- 2.00m 4.00m 30263.95 1.00m 121056

    From 2 to 4m below GL 1X2 ---- ---- 2.00m 4.00m 35970.66 1.00m 143883

    From 4 to 6m below GL 1X2 ---- ---- 2.00m 4.00m 39586.64 1.00m 158347

    From 6 to 8m below GL 1X2 ---- ---- 2.00m 4.00m 43586.01 1.00m 174344

    From 8 to 10m below GL 1X2 ---- ---- 2.00m 4.00m 47312.12 1.00m 189248

    From 10 to 11m below GL 1X2 ---- ---- 1.00m 2.00m 47998.68 1.00m 95997

    From 11 to 12m below GL 1X2 ---- ---- 0.75m 1.50m 48685.25 1.00m 73028

    8 CC(1:2:4) mix with 10% extra cement using 40mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost andfabrication charges of steel for bottom plugging of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    Piers 1X11 3.14*(3.8*3.8)/4 ---- 0.60 74.814Cum

    5.15-0.20=4.95,(4.95+3.80)/2 = 4.374 1X11 3.14*(4.37*4.37)/4 ---- 1.15 189.984Cum

    For Concave portion 2/3(dXd)h 1X11 2/3(4.95*4.95) ---- 0.385 69.213Cum

    Abutments 1X2 3.14*(5.0*5.0)/4 ---- 0.60 23.550Cum

    6.65-0.20=6.45,(6.45+5.0)/2 = 5.725 1X2 3.14*(5.73*5.73)/4 ---- 1.415 72.813Cum

    For Concave portion 2/3(dXd)h 1X2 2/3(6.45*6.45) ---- 0.485 26.916Cum

    457.290Cum 4548.02 1Cum 2079762

  • 7/22/2019 Battigalluru Bridge data

    12/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    9 Sand filling in between top and bottom pluggings including cost and conveyance of all materials

    and all labour charges etc.complete

    Piers 1X11 3.14*(3.8*3.8)/4 ---- 8.355 1041.780Cum

    Abutments 1X2 3.14*(5.0*5.0)/4 ---- 8.055 316.159Cum

    1357.939Cum 173.78 1Cum 235988

    10 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for well caps of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    Piers 1X11 3.14*(5.0*5.0)/4 ---- 1.2 259.050Cum

    Abutments 1X2 3.14*(8.5*8.5)/4 ---- 1.2 136.119Cum

    395.169Cum 5516.78 1Cum 2180059

    11 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for piers,abutments,hammer head bed blocks and return wallsincluding bailing

    out of water and formation of bunds for diversion of water,if necessary etc.complete

    Piers(3.70-1.20=2.50m) 1X11 3.14*(1.5*1.5)/4 ---- 2.5 48.572Cum

    Abutments(3.70-0.50=3.20m) 1X2 8.45 (1.0+0.9)/2 3.2 51.376Cum

    Hammer head bed blocks(Rectangular) 1X11 6.00 1.5 0.6 59.400Cum

    Hammer head bed blocks(Trapezoidal) 1X11 (6.0+1.5)/2 1.5 0.6 37.125Cum

    Return walls 1X4 3.75 0.5 5.144 38.580Cum

    235.053Cum 5412.78 1Cum 1272288

    12 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for bed blocks,backing walls,bearing pedastalsincluding bailing

    out of water and formation of bunds for diversion of water,if necessary etc.complete

    Flywings: 1X4 0.15 (0.5+0.35)/2 2.14 0.546Cum

    1X4 1.84 0.35 0.3 0.773Cum

    1X4 0.92 0.35 1.84 2.370Cum

    Backing wall: 1X2 8.45 0.3 1.481 7.509Cum

    Abutment caps 1X2 8.45 1.0 0.3 5.070Cum

  • 7/22/2019 Battigalluru Bridge data

    13/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    Bearing pedastals 1X118 0.83 0.42 0.15 6.170Cum

    Pier pedastals 1X11 1.5 1.5 0.5 12.375Cum

    34.812Cum 5412.78 1Cum 188431

    13 Supplying and fixing of fully moulded type Neoprene Rubber Bearingof 500X320X84mm size

    including the cost and conveyance of bearings and labour charges for fixing the same in positionconfirming to specifications stipulated in specification for bridges and road works of MOST

    drawings.

    Abutments 1X6 63.00 22.00 6.10 50727.60cc

    Piers 1X80 63.00 22.00 6.10 676368.00cc

    727095.60cc 0.70 1.00cc 508967

    14 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for Super structure.

    Deck slab 1X12 41.30 ---- ---- 495.600Cum

    Kerbs over fly wings 1X4 5.59 0.475 0.275 2.921Cum

    498.521Cum 6585.90 1Cum 3283206

    15 VRCC(1:1:2) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for wearing coat

    Over Deck slab 1X12 13.07 7.50 0.075 88.223Cum

    Over approach 1X2 3.50 7.50 0.075 3.938Cum92.160Cum 6166.69 1Cum 568322

    16 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for approach slab

    Approach Slab 1X2 3.50 7.45 0.300 15.645Cum 4855.34 1Cum 75962

    17 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for hand rails&hand posts

  • 7/22/2019 Battigalluru Bridge data

    14/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    Over Deck slab 1X24 13.07 ---- ---- 313.68m

    Over approach 1X4 5.59 ---- ---- 22.36m

    336.04m 518.22 1.00m 174142

    18 Cost supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete

    189995Kg 46.70 1Kg 8872007

    19 Rough stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size Rough stone including cost and conveyance of all

    materials and all labour charges etc.complete

    Quadrants 1X4 3.14*(6.59*6.59) ---- 1.414*0.3 57.846Cum 1358.69 1Cum 78594

    20 Rough stone dry packing for revetment using 300mm size Rough stone including cost and conveyance of all materials and all labour

    charges etc.complete.

    Approaches 1X4 100.00 5.19 0.300 622.726Cum 648.52 1Cum 403852

    21 Providing gravel backing 150mm thickunder revetment including cost,sienorage and conveyance

    of all materials to site including all labour charges etc.complete

    1X4 3.14*(6.59*6.59) ---- 1.414*0.15 28.923Cum 443.31 1Cum 12822

    22 Providing gravel filling behind abutment after laying filter mediaincluding cost,sienorage and

    conveyance of gravel to site including spreading,watering,rolling with hand road roller etc.complete

    with 1/3rd compaction including all labour charges etc.complete

    1X2 3.15 6.25 4.270 168.131Cum 344.03 1Cum 57843

    23 Providing filter media behind abutments using 50% of 150mm size soling stone of HBG metal

    and remaining 50% with 40mm size HBG metal including cost,sienorage and conveyance of all

    materials including all labour charges etc.complete

    Length=7.45-0.6+2(3.75-0.3) = 13.75m 1X2 13.75 0.60 4.270 70.455Cum 1234.05 1Cum 86945

    24 Providing aprons with jeddy stone of 450mm to 600mm size including cost,seinorage and

    conveyance of all materials including all labour charges etc.complete

    1X2 ---- 216.72 ---- 433.440Cum 724.86 1Cum 314183

  • 7/22/2019 Battigalluru Bridge data

    15/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    25 Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing charges for Curtain walls.

    1X2 22.65 0.50 2.000 45.300Cum

    1X2 22.65 1.00 0.500 22.650Cum67.950Cum 4348.96 1Cum 295512

    26 Supplying and fixing of GI Drainage spouts complete as per MOST specification

    No.2705.

    1X12 ---- ---- ---- 12Nos 869.11 1Nos 10429

    27 Providingexpansion joints including cost and conveyance of all materials from approved

    source to site fabricated with 2 Nos.MS angles of size 75X75X6mm for 7.5m 1 No.MS plate

    of 140X6mm for 7.5m 200 Nos.of 12mm dia MS iron anchor bars of 30.6 Cms and

    nuts including welding of MS plate and MS angles and also welding MS anchor bars and

    fitting with anchor bolts and nuts including all labour charges for cutting,fixing and painting

    the exposed faces of MS angles with anti corrosive paint including 4% TOT

    1X13 ---- ---- ---- 13Nos 1598.10 1Nos 20775

    28 Providing 100mm dia AC pipe for weep holesat 1m c/c in both horizontal and vertical

    directions so that the weep holes in each horizontal row staggered from the weep holes

    lying immediately above and below for abutmentys and wing walls including cost and

    conveyance of AC pipe and labour charges for cutting to required length,placing the pipe

    with a slope of 1:20 towards retaining face etc.complete for finished item of work

    Abutments 1X96 0.95 ---- ---- 91.20m

    Return walls 1X84 0.50 ---- ---- 42.00m

    133.20m 126.62 1.00m 16866

    29 Drilling of 150mm dia conformatory bore holesbelow water level in all types of soils at each

    pier and abutment locations to required depth(excluding refusal strata) including transport

    of boring craft and all other accessories to site,providing boring platform,drilling,insertion of

    150mm dia MS casing pipe for collection of disturbed/undisturbed soil samples at 1.50m

    interval or at the change strata for conducting various tests as per specifications,removing

    casing pipe after completing boring works,incidental royalties etc.complete as per MOSTtechnical specification No.2400

  • 7/22/2019 Battigalluru Bridge data

    16/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    1X19 15.00 ---- ---- 285.00m 450.00 1.00m 128250

    30 Rough stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size Rough stone

    including cost and conveyance of all materials and all labour charges etc.complete for bridge approaches

    1X2 100.00 3.50 0.300 210.00Cum 1358.69 1.00Cum 285324

    B)Bridge approaches:-

    31 Filling with quarry rubbish from approved quarry and carted to road

    side including conveyance charges etc.complete for widening and

    filling including spreading,watering and rolling with power road roller

    irrespective of thickness etc.complete

    As per Calculation Sheet 4863.757Cum 292.55 1.00Cum 1422902

    32 Earth work exacavation and depositing on the bank with an initial

    lead and lift in loamy and clayey soils as per SS-20B by manual

    labour for foundations

    1X2 100.00 1.20 1.50 360.00Cum 55.64 1.00Cum 20030

    33 Cement Concrete(1:4:8) mix using 40mm HBG chips including

    cost and conveyance of all materials and all labour charges

    including machine mixing charges

    1X2 100.00 1.20 0.30 72.00Cum 2840.65 1.00Cum 204527

    34 Cement Concrete(1:3:6) mix using 40mm HBG chips including

    cost and conveyance of all materials and all labour charges

    including machine mixing charges

    1X2 100.00 (0.90+0.3)/2 1.50 180.00Cum 3166.38 1.00Cum 569948

    35 Provision for Caution Boards. ----------------------------- LS -------------------------------------------------------- 10000

    36 Provision for design deviation&price escalation ------------ LS -------------------------------------------------------- 3449625

  • 7/22/2019 Battigalluru Bridge data

    17/188

    S.No Description of item Nos Quantity Rate Per Amount

    Length Bredth Depth

    Measurements

    37 Provision for over heads&contractors profit ------------ LS -------------------------------------------------------- 5691881

    38 Provision for unforeseen items ------------ LS -------------------------------------------------------- 62246

    TOTAL 43700000

    Assistant Exe.Engineer Dy.Exe.Engineer

    PR,Sompeta PR,Sompeta

  • 7/22/2019 Battigalluru Bridge data

    18/188

    Name of the work:-Construction of High level Bridge on the R/F Baruva to Battigalluru

    Est.Cost:- Rs.437.00 Lakhs

    S.No Description of item Name of the quarry Initial Conveyance Seinorage Blasting Machine Deduct Total

    MR CT Total Cost charges crushing stacking

    charges

    1 Gravel J.L.Kota 12.00 0.00 12.00 48.00 143.60 20.00 0.00 0.00 (-)4.60 207.00

    2 Sand for filling Mahendratanaya 1.20 0.00 1.20 37.00 90.80 36.00 0.00 0.00 (-)9.20 154.60

    3 Sand for Mortar Mahendratanaya 1.20 0.00 1.20 89.00 90.80 36.00 0.00 0.00 (-)9.20 206.60

    4 Granite stone(225mm) for revetment J.L.Kota 12.00 0.00 12.00 102.00 162.00 45.00 0.00 0.00 (-)15.20 293.80

    5 40mm HBG metal-SS5 J.L.Kota 12.00 0.00 12.00 385.00 162.00 45.00 60.00 0.00 (-)15.20 636.806 20mm HBG metal-SS5 J.L.Kota 12.00 0.00 12.00 650.00 162.00 45.00 60.00 162.50 (-)15.20 1064.30

    7 Quarry rubbish J.L.Kota 12.00 0.00 12.00 20.50 162.00 0.00 0.00 0.00 (-)9.20 173.30

    8 Soling stone 150mm size J.L.Kota 12.00 0.00 12.00 65.50 162.00 45.00 0.00 0.00 (-)15.20 257.30

    9 Jeddy stone for aprons 450 to 600mm size J.L.Kota 12.00 0.00 12.00 136.00 162.00 45.00 0.00 0.00 (-)15.20 327.80

    1.Certified that the above leads are correct to the best of my knowledge

    Assistant Exe.Engineer Dy.Exe.Engineer

    PR,Sompeta PR,Sompeta

    Lead in Kms

    LEAD STATEMENT

  • 7/22/2019 Battigalluru Bridge data

    19/188

    Hydraulic Particulars:-

    1.Maximum Flood Level 103.55m

    2.Ordinary Flood level 101.11m

    3.Lowest Bed level 97.01m

    4.Average bed slope 0.0008

    5.Rugosity Coefficient 0.03

    6.Bottom of deck proposed 104.15m

    7.Road Crest level 104.990m

    8.Width of carriage way 7.50m

    9.Catchment area 176.62SqKm

    10.Dickens constant 13.00

    11.Ryve's constant 6.80

    Soil Particulars:-

    0.00 to 2.00m Silty clay

    2.00 to 5.00m Silty sand

    5.00 to 7.00m Fine sand

    Above 7.00m Coarse sand

    Discharge Calculations:-

    1)Area Velocity method:-

    a)At the proposed bridge site:-

    Maximum Flood level 103.55m

    Slope 0.0008

    Rugosity Coefficient 0.03

    S.No Chainage R.L Depth of Average Distance Area Wetted

    flow depth of (m) (Sqm) perimeter (m) flow (m)

    (m)

    1 0 103.55 0.00 0.00 0.00 0.00 0.00

    2 20 101.35 2.20 1.10 20.00 22.00 20.05

    3 45 99 43 1 92 2 06 25 00 51 50 25 05

    DESIGN OF HIGH LEVEL BRIDGE ON THE ROAD FROM BARUVA TO BATTIGALLURU

    2/3 1/2

  • 7/22/2019 Battigalluru Bridge data

    20/188

    Velocity V = 1/nX(R2/3

    XS1/2

    ) 1.36m/sec

    Discharge Q = AXV 356.35Cumecs

    b)At 400m Upstream of proposed bridge site:-

    Maximum Flood level 103.59m

    Slope 0.0008

    Rugosity Coefficient 0.03

    S.No Chainage R.L Depth of Average Distance Area Wetted

    flow depth of (m) (Sqm) perimeter

    (m) flow (m)

    (m)

    1 0 103.59 0.00 0.00 0.00 0.00 0.002 20 101.85 1.74 0.87 20.00 17.40 20.05

    3 45 99.93 1.92 1.83 25.00 45.75 25.05

    4 65 98.62 1.31 1.61 20.00 32.30 20.05

    5 85 97.51 1.11 1.21 20.00 24.20 20.05

    6 110 100.37 2.86 1.99 25.00 49.63 25.06

    7 130 102.39 2.02 2.44 20.00 48.80 20.05

    8 150 103.73 1.34 1.68 20.00 33.60 20.06

    251.68 150.37

    Hydraulic Radius R= Total area/Wetted perimeter = 1.67

    Velocity V = 1/nX(R2/3

    XS1/2

    ) 1.33m/sec

    Discharge Q = AXV 334.73Cumecs

    c)At 400m Downstream of proposed bridge site:-

    Maximum Flood level 103.35mSlope 0.0008

    Rugosity Coefficient 0.03

    S.No Chainage R.L Depth of Average Distance Area Wetted

    flow depth of (m) (Sqm) perimeter

    (m) flow (m)

    (m)

    1 0 102.85 0.00 0.00 0.00 0.00 0.00

    2 20 99.85 3.00 1.50 20.00 30.00 20.053 45 98.93 0.92 1.96 25.00 49.00 25.05

    4 65 97.62 1.31 1.11 20.00 22.30 20.05

    5 85 96.12 1.50 1.41 20.00 28.10 20.05

    6 110 99.37 3.25 2.38 25.00 59.38 25.06

    7 130 101.39 2.02 2.64 20.00 52.70 20.05

    8 150 102.73 1.34 1.68 20.00 33.60 20.06

    )Di k ' f l

  • 7/22/2019 Battigalluru Bridge data

    21/188

    a)Dicken's formula:-

    Q = CM3/4

    = 629.83Cumecs

    b)Ryve's formula:-

    Q = CM

    2/3

    = 214.43Cumecs

    Maximum Discharge = 629.83Cumecs

    Maximum Velocity = 1.41m/sec

    Ventway Calculations(H.F.L Condition):-

    Assuming afflux = x = 0.15m

    Width of river at H.F.L = 150.00mClear span = 13.30m

    Depth of flow = di = 6.54m

    Head due to velocity of approach = (Vmax /2g)X[di/(di+x)] 0.097m

    Combined head due to Velocity of approach and hi = 0.247m

    afflux

    Velocity through vents Vv = 0.90X(2ghi) = 1.98m/sec

    Linear water way required LWW = Qd/(VvXdi) = 48.61m

    No.of vents required = LWW /LC = 3.654887218

    As per the width of the river = 11.27819549

    at H.F.L

    No.of vents to be provided 12Nos

    No.of piers = 11Nos

    Afflux Calculations(H.F.L Condition):-

    Un obstructed area of cross section = A = 262.03Sqm

    Total vented area provided = No.of ventsXClear spanX(BDL-LBL) = 1139.54Sqm

    Which is greater than the Un obstructed area of cross section

    Using Orifice formula for calculation of discharge

    Q = CoX (2g) X L X DdX [h+(1+e)u /2g]

    In the present case,

  • 7/22/2019 Battigalluru Bridge data

    22/188

    448.61 = 0.89X4.43X69X3.7X[h+1.6u2/2g]

    1/2

    0.198632 = h + 0.0815u

    At just upstream of the bridge

    Q = W X (Dd+ h) X u

    448.61 = 80X[3.70+h]u

    u = 5.607/(3.70+h)

    Substituting

    0.1986 = h + 0.0815[5.607/(3.70+h)]2

    Solving h = 12 cm,which is already accounted for.

    Scour Depth Calculations:-

    Discharge for design of foundations = 1.30XMax.Discharge = 837.67Cumecs

    Lacey's Silt factor for very fine silt = 1.76Xm1/2

    = 1.5

    Discharge per metre width of foundations = q = 5.249

    Normal scour depth D = 1.34(q2/f)

    1/3= 3.50m

    Maximum scour depth Dm = 2.0XD = 7.00m

    Depth of foundation = Dm + Max.of 1.2m or 1/3 D m= 9.33m

    Bottom level of foundation = 94.22m

    Depth of foundation below low bed level = 2.79m

    Individual well foundations are proposed due to poor bearing capacity of soil in shallow depths

    The well foundations are proposed to be found at a depth of 11.75m from Lowest bed level

    No launching aprons,cut off walls are proposed.

    Assistant Exe.Engineer Dy.Exe.Engineer

    PR,Sompeta PR,Sompeta

  • 7/22/2019 Battigalluru Bridge data

    23/188

    95.00

    96.00

    97.00

    98.00

    99.00

    100.00

    101.00

    102.00

    103.00

    104.00

    0 10 20 30 40 50 60 70 80 90 100 110 120 130

    Cross section at Proposed Bridge site

  • 7/22/2019 Battigalluru Bridge data

    24/188

    97.00

    98.00

    99.00

    100.00

    101.00

    102.00

    103.00

    104.00

    Cross section at 400m U/S of the Proposed Bridge site

  • 7/22/2019 Battigalluru Bridge data

    25/188

    95.00

    96.00

    0 10 20 30 40 50 60 70 80 90 100 110 120 130

    96.00

    97.00

    98.00

    99.00

    100.00

    101.00

    102.00

    103.00

    104.00

    Cross section at 400m D/S of the Proposed Bridge site

  • 7/22/2019 Battigalluru Bridge data

    26/188

    95.000 10 20 30 40 50 60 70 80 90 100 110 120 130

  • 7/22/2019 Battigalluru Bridge data

    27/188

    140 150

  • 7/22/2019 Battigalluru Bridge data

    28/188

  • 7/22/2019 Battigalluru Bridge data

    29/188

    140 150

  • 7/22/2019 Battigalluru Bridge data

    30/188

    140 150

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

  • 7/22/2019 Battigalluru Bridge data

    31/188

    F- Level 100.100 102.020 102.075 102.120 102.075 102.020 100.100

    G- Level 100.100 100.500 101.505 101.550 101.505 100.300 100.100

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -5.670 100.100 100.100 0.000 0.000 0.000 0.000

    2 -3.750 102.020 100.500 1.520 0.760 1.920 1.459

    3 -1.875 102.075 101.505 0.570 1.045 1.875 1.959

    4 0.000 102.120 101.550 0.570 0.570 1.875 1.069

    5 1.875 102.075 101.505 0.570 0.570 1.875 1.069

    6 3.750 102.020 100.300 1.720 1.145 1.875 2.1477 5.670 100.100 100.100 0.000 0.860 1.920 1.651

    9.354

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 99.750 102.460 102.515 102.560 102.515 102.460 99.900

    G- Level 99.750 100.100 100.955 101.000 100.955 100.200 99.900

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -6.460 99.750 99.750 0.000 0.000 0.000 0.000

    CROSS SECTION AT - 0/000

    CROSS SECTION AT - 0/020

    98.000

    99.000

    100.000

    101.000

    102.000

    103.000

    -6.000 -5.000 -4.000 -3.000 -2.000 -1.000 0.000 1.000 2.000 3.000 4.000 5.000 6.000

    99.000

    100.000

    101.000

    102.000

    103.000

    104.000

    -7.000 -6.000 -5.000 -4.000 -3.000 -2.000 -1.000 0.000 1.000 2.000 3.000 4.000 5.000 6.000 7.000

    103 000

  • 7/22/2019 Battigalluru Bridge data

    32/188

    F- Level 99.750 102.900 102.955 103.000 102.955 102.900 99.700

    G- Level 99.750 99.950 100.255 100.300 100.255 99.850 99.700

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -6.900 99.750 99.750 0.000 0.000 0.000 0.000

    2 -3.750 102.900 99.950 2.950 1.475 3.150 4.646

    3 -1.875 102.955 100.255 2.700 2.825 1.875 5.297

    4 0.000 103.000 100.300 2.700 2.700 1.875 5.063

    5 1.875 102.955 100.255 2.700 2.700 1.875 5.063

    6 3.750 102.900 99.850 3.050 2.875 1.875 5.391

    7 6.950 99.700 99.700 0.000 1.525 3.200 4.880

    30.339

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 101.570 103.340 103.395 103.440 103.395 103.340 101.500

    G- Level 101.570 102.210 102.535 102.580 102.535 101.920 101.500

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area1 2 3 4 5 6 7 8

    1 -5.520 101.570 101.570 0.000 0.000 0.000 0.000

    2 -3.750 103.340 102.210 1.130 0.565 1.770 1.000

    3 -1.875 103.395 102.535 0.860 0.995 1.875 1.866

    4 0 000 103 440 102 580 0 860 0 860 1 875 1 613

    CROSS SECTION AT - 0/040

    CROSS SECTION AT - 0/060

    99.000

    100.000

    101.000

    102.000

    103.000

    -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8

    99.000

    100.000

    101.000

    102.000

    103.000

    104.000

    -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8

    101 000

    102.000

  • 7/22/2019 Battigalluru Bridge data

    33/188

    F- Level 99.160 103.780 103.835 103.880 103.835 103.780 99.170

    G- Level 99.160 98.410 98.805 98.850 98.805 98.410 99.170

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -8.370 99.160 99.160 0.000 0.000 0.000 0.000

    2 -3.750 103.780 98.410 5.370 2.685 4.620 12.405

    3 -1.875 103.835 98.805 5.030 5.200 1.875 9.7504 0.000 103.880 98.850 5.030 5.030 1.875 9.431

    5 1.875 103.835 98.805 5.030 5.030 1.875 9.431

    6 3.750 103.780 98.410 5.370 5.200 1.875 9.750

    7 8.360 99.170 99.170 0.000 2.685 4.610 12.378

    63.145

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 99.100 104.060 104.115 104.160 104.115 104.060 99.150

    G- Level 99.100 97.640 98.055 98.100 98.055 97.460 99.150

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -8.710 99.100 99.100 0.000 0.000 0.000 0.0002 -3.750 104.060 97.640 6.420 3.210 4.960 15.922

    3 -1.875 104.115 98.055 6.060 6.240 1.875 11.700

    4 0.000 104.160 98.100 6.060 6.060 1.875 11.363

    5 1.875 104.115 98.055 6.060 6.060 1.875 11.363

    6 3.750 104.060 97.460 6.600 6.330 1.875 11.869

    7 8 660 99 150 99 150 0 000 3 300 4 910 16 203

    CROSS SECTION AT - 0/080

    CROSS SECTION AT - 0/100

    98.000

    99.000

    100.000

    101.000

    -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

    97.000

    98.000

    99.000

    100.000

    101.000

    102.000

    103.000

    104.000

    105.000

    -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

    98 000

    99.000

    .

  • 7/22/2019 Battigalluru Bridge data

    34/188

    F- Level 104.990 104.990 104.990 104.990 104.990 104.990 104.990

    G- Level 101.215 101.260 101.305 101.350 101.305 101.260 101.215

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -3.750 104.990 101.215 3.775 1.888 0.000 0.000

    2 -3.750 104.990 101.260 3.730 1.865 0.000 0.000

    3 -1.875 104.990 101.305 3.685 3.708 1.875 6.952

    4 0.000 104.990 101.350 3.640 3.663 1.875 6.867

    5 1.875 104.990 101.305 3.685 3.663 1.875 6.867

    6 3.750 104.990 101.260 3.730 3.708 1.875 6.9527 3.750 104.990 101.215 3.775 3.753 0.000 0.000

    27.638

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 104.990 104.990 104.990 104.990 104.990 104.990 104.990

    G- Level 99.120 99.230 99.340 99.430 99.340 99.230 99.120

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -3.740 104.990 99.120 5.870 2.935 0.000 0.000

    2 -3.750 104.990 99.230 5.760 2.880 0.010 0.029

    3 -1.875 104.990 99.340 5.650 5.705 1.875 10.697

    4 0.000 104.990 99.430 5.560 5.605 1.875 10.5095 1.875 104.990 99.340 5.650 5.605 1.875 10.509

    6 3.750 104.990 99.230 5.760 5.705 1.875 10.697

    7 3.750 104.990 99.120 5.870 5.815 0.000 0.000

    42.441

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    CROSS SECTION AT - 0/120

    CROSS SECTION AT - 0/140

    96.000

    97.000

    98.000

    -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12

    99.000

    100.000

    101.000

    102.000

    103.000

    104.000

    105.000

    106.000

    -6.000 -5.000 -4.000 -3.000 -2.000 -1.000 0.000 1.000 2.000 3.000 4.000 5.000 6.000

    97.000

    .

    -6.000 -5.000 -4.000 -3.000 -2.000 -1.000 0.000 1.000 2.000 3.000 4.000 5.000 6.000

  • 7/22/2019 Battigalluru Bridge data

    35/188

    F- Level 104.990 104.990 104.990 104.990 104.990 104.990 104.990

    G- Level 97.430 97.650 97.890 98.120 97.890 97.650 97.430

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -3.740 104.990 97.430 7.560 3.780 0.000 0.000

    2 -3.750 104.990 97.650 7.340 3.670 0.010 0.037

    3 -1.875 104.990 97.890 7.100 7.220 1.875 13.538

    4 0.000 104.990 98.120 6.870 6.985 1.875 13.097

    5 1.875 104.990 97.890 7.100 6.985 1.875 13.097

    6 3.750 104.990 97.650 7.340 7.220 1.875 13.538

    7 3.750 104.990 97.430 7.560 7.450 0.000 0.000

    53.305

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 104.990 104.990 104.990 104.990 104.990 104.990 104.990

    G- Level 96.450 96.680 96.890 97.010 96.890 96.680 96.450

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area1 2 3 4 5 6 7 8

    1 -3.740 104.990 96.450 8.540 4.270 0.000 0.000

    2 -3.750 104.990 96.680 8.310 4.155 0.010 0.042

    3 -1.875 104.990 96.890 8.100 8.205 1.875 15.384

    4 0.000 104.990 97.010 7.980 8.040 1.875 15.075

    5 1.875 104.990 96.890 8.100 8.040 1.875 15.075

    6 3.750 104.990 96.680 8.310 8.205 1.875 15.384

    7 3.750 104.990 96.450 8.540 8.425 0.000 0.00060.960

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    CROSS SECTION AT - 0/160

    CROSS SECTION AT - 0/180

    6.000 5.000 4.000 3.000 2.000 1.000 0.000 1.000 2.000 3.000 4.000 5.000 6.000

    96.000

    97.000

    98.000

    99.000

    100.000101.000

    102.000

    103.000

    104.000

    105.000

    106.000

    -6.000 -5.000 -4.000 -3.000 -2.000 -1.000 0.000 1.000 2.000 3.000 4.000 5.000 6.000

    105.000

    106.000

    F- Level 104.990 104.990 104.990 104.990 104.990 104.990 104.990

    G- Level 99.450 99.560 99.690 99.870 99.690 99.560 99.450

    CROSS SECTION AT 0/200

  • 7/22/2019 Battigalluru Bridge data

    36/188

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -3.740 104.990 99.450 5.540 2.770 0.000 0.000

    2 -3.750 104.990 99.560 5.430 2.715 0.010 0.027

    3 -1.875 104.990 99.690 5.300 5.365 1.875 10.059

    4 0.000 104.990 99.870 5.120 5.210 1.875 9.769

    5 1.875 104.990 99.690 5.300 5.210 1.875 9.769

    6 3.750 104.990 99.560 5.430 5.365 1.875 10.059

    7 3.750 104.990 99.450 5.540 5.485 0.000 0.000

    39.683

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 104.990 104.990 104.990 104.990 104.990 104.990 104.990

    G- Level 101.755 101.800 101.845 101.890 101.845 101.800 101.755

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -3.750 104.990 101.755 3.235 1.618 0.000 0.0002 -3.750 104.990 101.800 3.190 1.595 0.000 0.000

    3 -1.875 104.990 101.845 3.145 3.168 1.875 5.939

    4 0.000 104.990 101.890 3.100 3.123 1.875 5.855

    5 1.875 104.990 101.845 3.145 3.123 1.875 5.855

    6 3.750 104.990 101.800 3.190 3.168 1.875 5.939

    7 3.750 104.990 101.755 3.235 3.213 0.000 0.000

    23.588

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    CROSS SECTION AT - 0/200

    CROSS SECTION AT - 0/220

    101.000

    102.000

    103.000

    104.000

    105.000

    106.000

    -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11

    105.000

    106.000

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

  • 7/22/2019 Battigalluru Bridge data

    37/188

    1 -3.750 104.990 103.095 1.895 0.947 0.000 0.000

    2 -3.750 104.990 103.140 1.850 0.925 0.000 0.000

    3 -1.875 104.990 103.185 1.805 1.827 1.875 3.427

    4 0.000 104.990 103.230 1.760 1.782 1.875 3.342

    5 1.875 104.990 103.185 1.805 1.782 1.875 3.342

    6 3.750 104.990 103.140 1.850 1.827 1.875 3.427

    7 3.750 104.990 103.095 1.895 1.873 0.000 0.000

    13.537

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 101.490 104.640 104.695 104.740 104.695 104.640 101.480

    G- Level 101.490 102.030 102.480 103.130 102.580 102.230 101.480

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -6.900 101.490 101.490 0.000 0.000 0.000 0.000

    2 -3.750 104.640 102.030 2.610 1.305 3.150 4.111

    3 -1.875 104.695 102.480 2.215 2.413 1.875 4.523

    4 0.000 104.740 103.130 1.610 1.913 1.875 3.5865 1.875 104.695 102.580 2.115 1.863 1.875 3.492

    6 3.750 104.640 102.230 2.410 2.262 1.875 4.242

    7 6.910 101.480 101.480 0.000 1.205 3.160 3.808

    23.762

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    CROSS SECTION AT - 0/260

    98.000

    99.000

    100.000

    101.000

    102.000

    103.000

    104.000

    105.000

    -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

    102.000

    103.000

    104.000

    105.000

    1 -6.880 101.010 101.010 0.000 0.000 0.000 0.000

    2 -3.750 104.140 101.550 2.590 1.295 3.130 4.053

    3 -1 875 104 195 102 000 2 195 2 392 1 875 4 486

  • 7/22/2019 Battigalluru Bridge data

    38/188

    3 1.875 104.195 102.000 2.195 2.392 1.875 4.486

    4 0.000 104.240 102.650 1.590 1.892 1.875 3.548

    5 1.875 104.195 102.100 2.095 1.842 1.875 3.455

    6 3.750 104.140 101.750 2.390 2.242 1.875 4.205

    7 6.890 101.000 101.000 0.000 1.195 3.140 3.752

    23.499

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 101.480 103.640 103.695 103.740 103.695 103.640 101.470

    G- Level 101.480 102.020 102.470 103.120 102.570 102.220 101.470

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area1 2 3 4 5 6 7 8

    1 -5.910 101.480 101.480 0.000 0.000 0.000 0.000

    2 -3.750 103.640 102.020 1.620 0.810 2.160 1.750

    3 -1.875 103.695 102.470 1.225 1.422 1.875 2.667

    4 0.000 103.740 103.120 0.620 0.922 1.875 1.730

    5 1.875 103.695 102.570 1.125 0.872 1.875 1.636

    6 3.750 103.640 102.220 1.420 1.272 1.875 2.386

    7 5.920 101.470 101.470 0.000 0.710 2.170 1.541

    11.709

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    CROSS SECTION AT - 0/300

    100.000

    101.000

    102.000

    103.000

    104.000

    105.000

    -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8

    100.000

    101.000

    102.000

    103.000

    104.000

    105.000

    4 0.000 103.240 102.670 0.570 0.872 1.875 1.636

    5 1.875 103.195 102.120 1.075 0.822 1.875 1.542

    6 3.750 103.140 101.770 1.370 1.222 1.875 2.292

  • 7/22/2019 Battigalluru Bridge data

    39/188

    6 3.750 103.140 101.770 1.370 1.222 1.875 2.292

    7 5.870 101.020 101.020 0.000 0.685 2.120 1.452

    11.152

    Name of the Road: CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

    F- Level 100.730 102.640 102.695 102.740 102.695 102.640 100.720

    G- Level 100.730 101.270 101.720 102.370 101.820 101.470 100.720

    Sl.No. Chainage Formation L. Ground Level Difference Mean Distance Area

    1 2 3 4 5 6 7 8

    1 -5.660 100.730 100.730 0.000 0.000 0.000 0.000

    2 -3.750 102.640 101.270 1.370 0.685 1.910 1.308

    3 -1.875 102.695 101.720 0.975 1.172 1.875 2.198

    4 0.000 102.740 102.370 0.370 0.672 1.875 1.261

    5 1.875 102.695 101.820 0.875 0.622 1.875 1.167

    6 3.750 102.640 101.470 1.170 1.022 1.875 1.917

    7 5.670 100.720 100.720 0.000 0.585 1.920 1.123

    8.975

    CROSS SECTION AT - 0/350

    100.000

    101.000

    102.000

    103.000

    104.000

    105.000

    -6.000 -5.000 -4.000 -3.000 -2.000 -1.000 0.000 1.000 2.000 3.000 4.000 5.000 6.000

  • 7/22/2019 Battigalluru Bridge data

    40/188

  • 7/22/2019 Battigalluru Bridge data

    41/188

  • 7/22/2019 Battigalluru Bridge data

    42/188

  • 7/22/2019 Battigalluru Bridge data

    43/188

  • 7/22/2019 Battigalluru Bridge data

    44/188

  • 7/22/2019 Battigalluru Bridge data

    45/188

  • 7/22/2019 Battigalluru Bridge data

    46/188

    104.74

  • 7/22/2019 Battigalluru Bridge data

    47/188

  • 7/22/2019 Battigalluru Bridge data

    48/188

  • 7/22/2019 Battigalluru Bridge data

    49/188

  • 7/22/2019 Battigalluru Bridge data

    50/188

  • 7/22/2019 Battigalluru Bridge data

    51/188

  • 7/22/2019 Battigalluru Bridge data

    52/188

  • 7/22/2019 Battigalluru Bridge data

    53/188

    *-

    ABSTRACT QUANTITY OF QUARRY RUBBISH FOR APPROA

  • 7/22/2019 Battigalluru Bridge data

    54/188

    Name of the Work: Construction of High level Bridge on the R/F Baruva to Batt

    Sl.No. Chainage Area Mean Distance Quantity1 2 3 4 5 6

    1 0 9.354 0.000 0.00 0.000

    2 20 19.197 14.275 20.00 285.510

    3 40 30.339 24.768 20.00 495.356

    4 60 9.535 19.937 20.00 398.733

    5 80 63.145 36.340 20.00 726.796

    6 100 78.418 70.782 20.00 1415.634

    7 120 27.638 53.028 0.00 0.0008 140 42.441 35.039 0.00 0.000

    9 160 53.305 47.873 0.00 0.000

    10 180 60.960 57.133 0.00 0.000

    11 200 39.683 50.322 0.00 0.000

    12 220 23.588 31.635 0.00 0.000

    13 240 13.537 18.563 0.00 0.000

    14 260 23.762 18.650 10.00 186.499

    15 280 23.499 23.631 20.00 472.617

    16 300 11.709 17.604 20.00 352.084

    17 320 11.152 11.431 20.00 228.61318 350 8.975 10.064 30.00 301.914

    TOTAL QUANTITY 4863.76Cum

    NOTE:-As the side earth is not suitable for formation of embankment,quarry rubbis

    Asst.Executive Engineer Dy.Exe.Engineer

    PR,Sompeta PR,Sompeta

    ABSTRACT QUANTITY OF QUARRY RUBBISH FOR APPROA

  • 7/22/2019 Battigalluru Bridge data

    55/188

  • 7/22/2019 Battigalluru Bridge data

    56/188

  • 7/22/2019 Battigalluru Bridge data

    57/188

  • 7/22/2019 Battigalluru Bridge data

    58/188

  • 7/22/2019 Battigalluru Bridge data

    59/188

  • 7/22/2019 Battigalluru Bridge data

    60/188

  • 7/22/2019 Battigalluru Bridge data

    61/188

  • 7/22/2019 Battigalluru Bridge data

    62/188

  • 7/22/2019 Battigalluru Bridge data

    63/188

  • 7/22/2019 Battigalluru Bridge data

    64/188

  • 7/22/2019 Battigalluru Bridge data

    65/188

  • 7/22/2019 Battigalluru Bridge data

    66/188

  • 7/22/2019 Battigalluru Bridge data

    67/188

  • 7/22/2019 Battigalluru Bridge data

    68/188

  • 7/22/2019 Battigalluru Bridge data

    69/188

  • 7/22/2019 Battigalluru Bridge data

    70/188

  • 7/22/2019 Battigalluru Bridge data

    71/188

  • 7/22/2019 Battigalluru Bridge data

    72/188

  • 7/22/2019 Battigalluru Bridge data

    73/188

  • 7/22/2019 Battigalluru Bridge data

    74/188

  • 7/22/2019 Battigalluru Bridge data

    75/188

  • 7/22/2019 Battigalluru Bridge data

    76/188

  • 7/22/2019 Battigalluru Bridge data

    77/188

  • 7/22/2019 Battigalluru Bridge data

    78/188

  • 7/22/2019 Battigalluru Bridge data

    79/188

  • 7/22/2019 Battigalluru Bridge data

    80/188

  • 7/22/2019 Battigalluru Bridge data

    81/188

  • 7/22/2019 Battigalluru Bridge data

    82/188

  • 7/22/2019 Battigalluru Bridge data

    83/188

  • 7/22/2019 Battigalluru Bridge data

    84/188

  • 7/22/2019 Battigalluru Bridge data

    85/188

  • 7/22/2019 Battigalluru Bridge data

    86/188

  • 7/22/2019 Battigalluru Bridge data

    87/188

  • 7/22/2019 Battigalluru Bridge data

    88/188

  • 7/22/2019 Battigalluru Bridge data

    89/188

  • 7/22/2019 Battigalluru Bridge data

    90/188

  • 7/22/2019 Battigalluru Bridge data

    91/188

  • 7/22/2019 Battigalluru Bridge data

    92/188

  • 7/22/2019 Battigalluru Bridge data

    93/188

  • 7/22/2019 Battigalluru Bridge data

    94/188

  • 7/22/2019 Battigalluru Bridge data

    95/188

  • 7/22/2019 Battigalluru Bridge data

    96/188

  • 7/22/2019 Battigalluru Bridge data

    97/188

  • 7/22/2019 Battigalluru Bridge data

    98/188

  • 7/22/2019 Battigalluru Bridge data

    99/188

  • 7/22/2019 Battigalluru Bridge data

    100/188

  • 7/22/2019 Battigalluru Bridge data

    101/188

  • 7/22/2019 Battigalluru Bridge data

    102/188

  • 7/22/2019 Battigalluru Bridge data

    103/188

  • 7/22/2019 Battigalluru Bridge data

    104/188

  • 7/22/2019 Battigalluru Bridge data

    105/188

  • 7/22/2019 Battigalluru Bridge data

    106/188

  • 7/22/2019 Battigalluru Bridge data

    107/188

  • 7/22/2019 Battigalluru Bridge data

    108/188

  • 7/22/2019 Battigalluru Bridge data

    109/188

  • 7/22/2019 Battigalluru Bridge data

    110/188

  • 7/22/2019 Battigalluru Bridge data

    111/188

  • 7/22/2019 Battigalluru Bridge data

    112/188

  • 7/22/2019 Battigalluru Bridge data

    113/188

  • 7/22/2019 Battigalluru Bridge data

    114/188

    Total Quantity of Earth work 9727.515

    Deduct Crust Portion

    Earth work Quantity -19177.387

    Asst. Exe.Engineer Deputy Exe.Engineer Executive Engineer

    PR,Ichapuram PR,Ichapuram PR,Tekkali

  • 7/22/2019 Battigalluru Bridge data

    115/188

    igalluru

    Remarks

    7

    CHES

  • 7/22/2019 Battigalluru Bridge data

    116/188

    h is proposed.

  • 7/22/2019 Battigalluru Bridge data

    117/188

  • 7/22/2019 Battigalluru Bridge data

    118/188

  • 7/22/2019 Battigalluru Bridge data

    119/188

  • 7/22/2019 Battigalluru Bridge data

    120/188

  • 7/22/2019 Battigalluru Bridge data

    121/188

  • 7/22/2019 Battigalluru Bridge data

    122/188

  • 7/22/2019 Battigalluru Bridge data

    123/188

  • 7/22/2019 Battigalluru Bridge data

    124/188

  • 7/22/2019 Battigalluru Bridge data

    125/188

  • 7/22/2019 Battigalluru Bridge data

    126/188

  • 7/22/2019 Battigalluru Bridge data

    127/188

  • 7/22/2019 Battigalluru Bridge data

    128/188

  • 7/22/2019 Battigalluru Bridge data

    129/188

  • 7/22/2019 Battigalluru Bridge data

    130/188

  • 7/22/2019 Battigalluru Bridge data

    131/188

  • 7/22/2019 Battigalluru Bridge data

    132/188

  • 7/22/2019 Battigalluru Bridge data

    133/188

  • 7/22/2019 Battigalluru Bridge data

    134/188

  • 7/22/2019 Battigalluru Bridge data

    135/188

  • 7/22/2019 Battigalluru Bridge data

    136/188

  • 7/22/2019 Battigalluru Bridge data

    137/188

  • 7/22/2019 Battigalluru Bridge data

    138/188

  • 7/22/2019 Battigalluru Bridge data

    139/188

  • 7/22/2019 Battigalluru Bridge data

    140/188

  • 7/22/2019 Battigalluru Bridge data

    141/188

  • 7/22/2019 Battigalluru Bridge data

    142/188

  • 7/22/2019 Battigalluru Bridge data

    143/188

  • 7/22/2019 Battigalluru Bridge data

    144/188

  • 7/22/2019 Battigalluru Bridge data

    145/188

  • 7/22/2019 Battigalluru Bridge data

    146/188

  • 7/22/2019 Battigalluru Bridge data

    147/188

  • 7/22/2019 Battigalluru Bridge data

    148/188

  • 7/22/2019 Battigalluru Bridge data

    149/188

  • 7/22/2019 Battigalluru Bridge data

    150/188

  • 7/22/2019 Battigalluru Bridge data

    151/188

  • 7/22/2019 Battigalluru Bridge data

    152/188

  • 7/22/2019 Battigalluru Bridge data

    153/188

  • 7/22/2019 Battigalluru Bridge data

    154/188

  • 7/22/2019 Battigalluru Bridge data

    155/188

  • 7/22/2019 Battigalluru Bridge data

    156/188

  • 7/22/2019 Battigalluru Bridge data

    157/188

  • 7/22/2019 Battigalluru Bridge data

    158/188

  • 7/22/2019 Battigalluru Bridge data

    159/188

  • 7/22/2019 Battigalluru Bridge data

    160/188

  • 7/22/2019 Battigalluru Bridge data

    161/188

  • 7/22/2019 Battigalluru Bridge data

    162/188

  • 7/22/2019 Battigalluru Bridge data

    163/188

  • 7/22/2019 Battigalluru Bridge data

    164/188

  • 7/22/2019 Battigalluru Bridge data

    165/188

  • 7/22/2019 Battigalluru Bridge data

    166/188

  • 7/22/2019 Battigalluru Bridge data

    167/188

  • 7/22/2019 Battigalluru Bridge data

    168/188

  • 7/22/2019 Battigalluru Bridge data

    169/188

  • 7/22/2019 Battigalluru Bridge data

    170/188

  • 7/22/2019 Battigalluru Bridge data

    171/188

  • 7/22/2019 Battigalluru Bridge data

    172/188

  • 7/22/2019 Battigalluru Bridge data

    173/188

  • 7/22/2019 Battigalluru Bridge data

    174/188

  • 7/22/2019 Battigalluru Bridge data

    175/188

  • 7/22/2019 Battigalluru Bridge data

    176/188

    Superintending Engineer

    PR,Srikakulam

  • 7/22/2019 Battigalluru Bridge data

    177/188

    Name of the work:-Construction of High level Bridge on the R/F Baruva to Battigalluru

    Est.Cost:- Rs.437.00 lakhs

    S.No Quantity Description Rate Per Amount

    1 Cement Mortor (1:3) (1:5) (1:6)

    1.00Cum Cost of sand 206.60 206.60 206.60

    5800/1MT Cost of SR Cement 2784.00 1670.40 1392.001.00Cum Mixing charges 19.00 19.00 19.00

    3009.60 1896.00 1617.60

    2 Cement Concrete(1:3:6) mix using 40mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing charges

    0.92Cum Cost of 40mm HBG metal 636.80 1Cum 585.86

    0.46Cum Cost of sand 206.60 1Cum 95.04

    220.00Kg Cost of SR cement 5800.00 1000Kg 1276.00

    1.00Cum Labour charges 449.20 1Cum 449.20

    1.00Cum Centring charges 601.00 1Cum 601.00

    DATA SHEET

  • 7/22/2019 Battigalluru Bridge data

    178/188

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    Add VAT@4% 121.78

    3166.38

    3 Cement Concrete(1:4:8) mix using 40mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing charges

    0.92Cum Cost of 40mm HBG metal 636.80 1Cum 585.86

    0.46Cum Cost of sand 206.60 1Cum 95.04

    166.00Kg Cost of SR cement 5800.00 1000Kg 962.801.00Cum Labour charges 449.20 1Cum 449.20

    1.00Cum Centring charges 601.00 1Cum 601.00

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    Add VAT@4% 109.26

    2840.65

    4 Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing charges

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04331.00Kg Cost of SR cement 5800.00 1000Kg 1919.80

    1.00Cum Labour charges 449.20 1Cum 449.20

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    Add VAT@4% 139.23

    3619.92

    S.No Quantity Description Rate Per Amount

    5 Sand filling in foundations including watering and ramming including cost and conveyance of all materials

    and all labour charges etc.complete

    1.00Cum Cost of sand 154.60 1Cum 154.60

    1.00Cum Labour charges 12.50 1Cum 12.50

    Add VAT@4% 6.68

    173.78

    6 Granite stone dry packing for revetment using 300mm size Rough stone including cost and conveyance of all materials and all labour charges etc.complete.

    1.10Cum Rough stone 300m for revetment 293.80 1Cum 323.18

    1.00Cum Labour charges 300.40 1Cum 300.40Add VAT@4% 24.94

    648.52

    7 Ganite stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size Rough stone including cost and conveyance of all materials and all labour charges

    etc.complete.

    1.10Cum Rough stone 300m for revetment 293.80 1Cum 323.18

    1.00Cum Labour charges 300.40 1Cum 300.40

    0.25Cum CC(1:4:8) 2731.39 1Cum 682.85

    Add VAT@4% 52.26

    1358.69

    8 CC(1 2 ) 20 G f

  • 7/22/2019 Battigalluru Bridge data

    179/188

    8 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for bed blocks of culverts

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    331.00Kg Cost of SR cement 5800.00 1000Kg 1919.80

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 679.00 1Cum 679.001.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 181.74

    4725.13

    9 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for deck slab of culverts

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    331.00Kg Cost of SR cement 5800.00 1000Kg 1919.801.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 1430.00 1Cum 1430.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 211.78

    5506.17

    S.No Quantity Description Rate Per Amount

    10 Collection and supply of Quarry Rubbish from the approved quarry and stacking at the site including conveyance charges etc.complete for widening and

    filling including spreading,watering and rolling with power road roller of 8-10 Tonnes capacity including the hire charges of PRR

    1.50Cum Cost of Quarry Rubbish 173.30 1Cum 259.95

    1.00Cum Labour charges for filling 12.50 1Cum 12.50

    1.00Cum Rolling charges with PRR 88.50 10Cum 8.85

    Add VAT@4% 11.25

    292.55

    11 Earth work exacavation and depositing on bank with an initial lead and lift in loamy&clayey soils

    like Black Cotton soils,red earth etc complete

    1.00Cum Earth work exacavation 33.50 1.00Cum 33.50 13.00 1.00Cum 13.00

    1.00Cum Seinorage Charges 20.00 1.00Cum 20.00 20.00 1.00Cum 20.00

    Add VAT@4% 2.14 0.66

    55.64 33.66

    12 Cost supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete

    1 00Kg Cost and supply of Fe415 Steel 38 90 1 00Kg 38 90

    Manual Machinery

  • 7/22/2019 Battigalluru Bridge data

    180/188

    1.00Kg Cost and supply of Fe415 Steel 38.90 1.00Kg 38.90

    1.00Kg Fabrication charges 6.00 1.00Kg 6.00

    Add VAT@4% 1.80

    TOTAL 46.70

    Bridge Data:-

    13 Earth work exacavation and depositing on bank with an initial lead and lift in loamy&clayey soils

    like Black Cotton soils,red earth etc complete including dewatering below low water level

    1.00Cum Earth work exacavation 33.50 1.00Cum 33.50

    1.00Cum Seinorage Charges 20.00 1.00Cum 20.00

    1.00Cum Dewatering charges 100.00 1.00Cum 100.00

    Add VAT@4% 6.14

    159.64

    14 Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing charges for

    CC(1:2:4) for approach slab

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    331.00Kg Cost of SR cement 5800.00 1000Kg 1919.80

    1.00Cum Labour charges 449.20 1Cum 449.20

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 143.00 1Cum 143.00

    Manual

    S.No Quantity Description Rate Per Amount

    Add VAT@4% 144.95

    3768.64

    15 CC(1:2:4) for curtain walls

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    331.00Kg Cost of SR cement 5800.00 1000Kg 1919.80

    1.00Cum Labour charges 449.20 1Cum 449.20

    1.00Cum Machine mixing charges 37.50 1Cum 37.501.00Cum Centring charges 601.00 1Cum 601.00

    1.00Cum Bailing out of water 100.00 1.00Cum 100.00

    Add VAT@4% 167.27

    4348.96

    16 Mild steel wrought and put up for well cutting edge with MS angles 2 Nos.of 100X100X12mm size and MS plate of size

    200X12mm including cost and conveyance of steel to site and all labour charges for fabrication,welding,fixing in position

    duly bent upto sharp,anchoring hooks,threading,bolting of all bent up rods of steining and fixing in position etc.complete

    for cutting edges of well curbs under piers and abutments.

    1.00MT Cost and supply of MS angles 38900.00 1.00MT 38900.001 00MT Fabrication charges 9500 00 1 00MT 9500 00

  • 7/22/2019 Battigalluru Bridge data

    181/188

    1.00MT Fabrication charges 9500.00 1.00MT 9500.00

    Add MBA@20% 1900.00

    Add VAT@4% 2012.00

    TOTAL 52312.00

    17 VRCC(1:11/2:3) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for well curbs of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    VRCC(1:11/2:3) for well curbs

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 679.00 1Cum 679.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    1.00Cum Bailing out of water 100.00 1Cum 100.00

    Add VAT@4% 212.185516.78

    18 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for well steining of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    S.No Quantity Description Rate Per Amount

    VRCC(1:2:4) for well steining

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    331.00Kg Cost of SR cement 5800.00 1000Kg 1919.80

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 679.00 1Cum 679.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    1.00Cum Bailing out of water 100.00 1Cum 100.00Add VAT@4% 185.74

    4829.13

    19 VCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for top plugging of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    VCC(1:2:4) for top plugging of well

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.160.46Cum Cost of sand 206.60 1Cum 95.04

  • 7/22/2019 Battigalluru Bridge data

    182/188

    331.00Kg Cost of SR cement 5800.00 1000Kg 1919.80

    1.00Cum Labour charges 449.20 1Cum 449.20

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 140.77

    3659.96

    20 Well sinking in sandy and other loose soils under water either by manual labour,divers or dredgers,

    weighing the top of steining to assist sinking etc.including dewatering and other incidental charges

    such as hire charges for mechanical equipment etc.complete for wells upto 4m internal dia

    1.00m Upto 2m below GL 11020.10 1.00m 11020.10 17218.9 1.00m 17218.91 29099.95 1.00m 29099.95

    Add VAT@4% 440.80 688.76 1164.00

    Total 11460.90 17907.66 30263.95

    1.00m From 2 to 4m below GL 13098.10 1.00m 13098.10 20465.8 1.00m 20465.78 34587.17 1.00m 34587.17

    Add VAT@4% 523.92 818.63 1383.49

    Total 13622.02 21284.41 35970.66

    1.00m From 4 to 6m below GL 14414.80 1.00m 14414.80 22523.1 1.00m 22523.13 38064.08 1.00m 38064.08

    Add VAT@4% 576.59 900.93 1522.56

    Total 14991.39 23424.05 39586.64

    1.00m From 6 to 8m below GL 15871.10 1.00m 15871.10 24798.6 1.00m 24798.59 41909.62 1.00m 41909.62

    Add VAT@4% 634.84 991.94 1676.38

    4.00m internal dia 5.00m internal dia 6.50m internal dia

    S.No Quantity Description Rate Per Amount

    Total 16505.94 25790.54 43586.01

    1.00m From 8 to 10m below GL 17227.90 1.00m 17227.90 26918.6 1.00m 26918.59 45492.42 1.00m 45492.42

    Add VAT@4% 689.12 1076.74 1819.70

    Total 17917.02 27995.34 47312.12

    1.00m From 10 to 11m below GL 17477.90 1.00m 17477.90 27309.2 1.00m 27309.22 46152.58 1.00m 46152.58

    Add VAT@4% 699.12 1092.37 1846.10

    Total 18177.02 28401.59 47998.68

    1.00m From 11 to 12m below GL 17727.90 1.00m 17727.90 27699.8 1.00m 27699.84 46812.74 1.00m 46812.74

    Add VAT@4% 709.12 1107.99 1872.51

    Total 18437.02 28807.84 48685.25

    21 CC(1:2:4) mix with 10% extra cement using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for bottom plugging of all wellsincluding bailing out of water and formation

    of bunds for diversion of water etc.complete

    CC(1:2:4) for bottom plugging of wells

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

  • 7/22/2019 Battigalluru Bridge data

    183/188

    0.46Cum Cost of sand 206.60 1Cum 95.04

    364.00Kg Cost of SR cement 5800.00 1000Kg 2111.20

    1.00Cum Labour charges 449.20 1Cum 449.20

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 601.00 1Cum 601.00

    1.00Cum Bailing out of water 100.00 1Cum 100.00

    Add VAT@4% 174.92

    4548.02

    22 Sand filling in between top and bottom pluggings including cost and conveyance of all materials

    and all labour charges etc.complete

    Sand filling

    1.00Cum Cost of sand 154.60 1Cum 154.60

    1.00Cum Labour charges 12.50 1Cum 12.50

    Add VAT@4% 6.68

    173.78

    23 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for well caps of all wellsincluding bailing out of water and formationof bunds for diversion of water etc.complete

    VRCC(1:11/2:3) for well caps

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    S.No Quantity Description Rate Per Amount1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 679.00 1Cum 679.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    1.00Cum Bailing out of water 100.00 1Cum 100.00

    Add VAT@4% 212.18

    5516.78

    24 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost andfabrication charges of steel for piers,abutments,hammer head bed blocks and return wallsincluding bailing

    out of water and formation of bunds for diversion of water,if necessary etc.complete

    VRCC(1:11/2:3) for Piers,abutments etc.

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 679.00 1Cum 679.001.00Cum Vibrating Charges 38.50 1Cum 38.50

  • 7/22/2019 Battigalluru Bridge data

    184/188

    Add VAT@4% 208.18

    5412.78

    25 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for bed blocks,backing walls,bearing pedastalsincluding bailing

    out of water and formation of bunds for diversion of water,if necessary etc.complete

    VRCC(1:11/2:3) for bed blocks,backing walls etc.

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 679.00 1Cum 679.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 208.18

    5412.78

    26 Supplying and fixing of fully moulded type Neoprene Rubber Bearingof 500X320X84mm size

    including the cost and conveyance of bearings and labour charges for fixing the same in position

    confirming to specifications stipulated in specification for bridges and road works of MOST

    drawings.

    13440 50*32*8.4cc provisional rate 1.30 1.00cc 17472.00

    Add VAT@4% 698.88

    S.No Quantity Description Rate Per Amount18170.88

    27 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for Beams of bridge.

    VRCC(1:11/2:3) for Beams

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 1807.00 1Cum 1807.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 253.30

    6585.90

    28 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for deck slab of bridge.

    CC( ) f f

  • 7/22/2019 Battigalluru Bridge data

    185/188

    VRCC(1:11/2:3) for deck slab of bridge

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 1430.00 1Cum 1430.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add MBA@20% 158.88

    Add VAT@4% 244.58

    6359.05

    29 VRCC(1:1:2) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for wearing coat

    VRCC(1:1:2) for wearing coat

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.160.46Cum Cost of sand 206.60 1Cum 95.04

    662.40Kg Cost of SR cement 5800.00 1000Kg 3841.92

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 143.00 1Cum 143.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 237.18

    S.No Quantity Description Rate Per Amount6166.69

    30 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for approach slab

    VRCC(1:2:4) for approach slab

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 143.00 1Cum 143.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 186.74

    4855.34

    31 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials

    and all labour charges including machine mixing and vibrating charges but excluding cost and

    fabrication charges of steel for hand rails&hand posts

    VRCC(1:2:4) for hand rails and hand posts

  • 7/22/2019 Battigalluru Bridge data

    186/188

    VRCC(1:2:4) for hand rails and hand posts

    0.92Cum Cost of 20mm HBG chips 1064.30 1Cum 979.16

    0.46Cum Cost of sand 206.60 1Cum 95.04

    445.00Kg Cost of SR cement 5800.00 1000Kg 2581.00

    1.00Cum Labour charges 794.40 1Cum 794.40

    1.00Cum Machine mixing charges 37.50 1Cum 37.50

    1.00Cum Centring charges 1987.00 1Cum 1987.00

    1.00Cum Vibrating Charges 38.50 1Cum 38.50

    Add VAT@4% 260.50

    6773.10

    Per RM 518.22

    32 Providing gravel backing 150mm thickunder revetment including cost,sienorage and conveyance

    of all materials to site including all labour charges etc.complete

    1.18Cum Cost of gravel 207.00 1Cum 244.26

    0.70Cum Man Mazdoor 130.00 1Cum 91.00

    0.70Cum Woman Mazdoor 130.00 1Cum 91.00

    Add VAT@4% 17.05443.31

    33 Providing gravel filling behind abutment after laying filter mediaincluding cost,sienorage and

    conveyance of gravel to site including spreading,watering,rolling with hand road roller etc.complete

    with 1/3rd compaction including all labour charges etc.complete

    S.No Quantity Description Rate Per Amount1.50Cum Cost of gravel 207.00 1Cum 310.50

    1.00Cum Spreading,watering and rolling 203.00 10Cum 20.30

    Add VAT@4% 13.23

    344.03

    34 Providing aprons with jeddy stone of 450mm to 600mm size including cost,seinorage and

    conveyance of all materials including all labour charges etc.complete

    1.10Cum Cost of Jeddy stone 327.80 1Cum 360.58

    1.00Cum Labour charges 336.40 1Cum 336.40Add VAT@4% 27.88

    724.86

    35 Supplying and fixing of GI Drainage spouts complete as per MOST specification

    No.2705.

    1No MS grating 260X260mm at site 92.00 1No 92.00

    1No 100mm dia GI pipe 1Rmt 782.30 1No 711.18

    0.10Kg Cost of anti corrosive paint 325.00 1Kg 32.50

    Add VAT@4% 33.43

    869.11

    36 Providing expansion joints including cost and conveyance of all materials from approved

  • 7/22/2019 Battigalluru Bridge data

    187/188

    36 Providingexpansion joints including cost and conveyance of all materials from approved

    source to site fabricated with 2 Nos.MS angles of size 75X75X6mm for 7.5m 1 No.MS plate

    of 140X6mm for 7.5m 200 Nos.of 12mm dia MS iron anchor bars of 30.6 Cms and

    nuts including welding of MS plate and MS angles and also welding MS anchor bars and

    fitting with anchor bolts and nuts including all labour charges for cutting,fixing and painting

    the exposed faces of MS angles with anti corrosive paint including 4% TOT

    1Rmt Provisional rate 1598.10 1Rmt 1598.10

    37 Providing 100mm dia AC pipe for weep holesat 1m c/c in both horizontal and vertical

    directions so that the weep holes in each horizontal row staggered from the weep holes

    lying immediately above and below for abutmentys and wing walls including cost and

    conveyance of AC pipe and labour charges for cutting to required length,placing the pipe

    with a slope of 1:20 towards retaining face etc.complete for finished item of work

    1Rmt Cost of 100m AC pipe Cl-15 102.09 1Rmt 102.09

    Add CED@12% 12.25

    Add VAT@4% 4.57

    Add Conveyance @6% 6.13

    Add for cutting&positioning 1.58126.62

    38 Drilling of 150mm dia conformatory bore holesbelow water level in all types of soils at each

    pier and abutment locations to required depth(excluding refusal strata) including transport

    of boring craft and all other accessories to site,providing boring platform,drilling,insertion of

    150mm dia MS casing pipe for collection of disturbed/undisturbed soil samples at 1.50m

    interval or at the change strata for conducting various tests as per specifications,removing

    S.No Quantity Description Rate Per Amountcasing pipe after completing boring works,incidental royalties etc.complete as per MOST

    technical specification No.2400

    1Rmt Provisional rate 450.00 1Rmt 450.00

    Assistant Exe.Engineer Dy.Exe.Engineer

    PR,Sompeta PR,Sompeta