    BASIC DESAIN

    ROAD AND PAVEMENT

    0 18-12-2015 Issued for Implementasion MCH AGN PGN

    Rev Date Description By Chkd Apvd

    Document No: PDST-COTE--C!-BD-"

    !e"ision #

    PT Per#sahaan $as Ne%ara &Persero' T(k

  • 7/26/2019 Basis Desain Road and Pavement

    2/13

    DESAIN BASIS

    ROAD AND PAVEMENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: *a,+ :" dari ii

    RE!ISION *ISTORICA S*EET

    Rev+ Date Description o. Chan%es

    0 02 No"em$er 2015 Issued for Implementation

  • 7/26/2019 Basis Desain Road and Pavement

    3/13

    No+ Dok : PDST-COTE--C!-BD-" Revisi: *a,+ :/ dari ii

    "+

    /+ DA0TAR ISI1+2+

    3+ TABE O0 CONTENT4+5+

    1 %u&uan 1

    2 !uan' (in')up 1

    * Definisi 1

    + !eferensi *

    5 Desain ,ondisi *

    Parameter Desain *

    6+

    1 .$&ecti"e 1

    2 /cope 1

    * Definition 1

    + !eference *

    5 Desi'n Condition *

    Desi'n Parameter *

    7+

    "+ ""+

    "/+ "1+"2+ "3+

    "4+ "5+

    "6+ "7+

    /+ /"+

    //+ /1+

    /2+ /3+

  • 7/26/2019 Basis Desain Road and Pavement

    4/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: " dari 6

    26.

    "+ T#9#an O(9ective/5+ Mem$eri)an acuan $a'i PGN dalam

    medesain &alan dan per)erasan sein''a

    men'asil)an suatu desain an' memenui

    )aida te)nis $iaa dan )eselamatan

    /6+ %o pro"ide a 'uidance for PGN to

    desi'n road and pa"ement ten te desi'n can

    fullfill te re3uirements in "ie4 of en'ineerin'

    cost and safet/7+ 1+/+ R#an% in%k#p Scope

    21 !uan' lin')up $asis desain ana menca)up

    pada per)erasan &alan dan per)erasan di

    area stasiun PGN

    22 alan dan per)erasan an' didesain dalam

    do)umen ini ana di$atasi pada lapisan

    su$'rade su$ $ase $ase dan lapisan

    permu)aan

    2* enis per)erasan pada &alan a)ses utama

    adala per)erasan )a)u

    2+ enis per)erasan pada area 4al)4a adala

    pa"in' $loc) dan area an' lain adala

    lapisan permu)aan )eri)il

    25 Persaratan lainna an' tida) diatur dalam

    do)umen desain $asis ini arus men'acu

    )epada do)umen pen'adaan 6bid document)

    an' $erla)u

    21%e scope of $asis desi'n is onl co"erin' for

    road and pa"ement desi'n in station area of

    PGN

    22!oad and pa"ement desi'ned in tis

    documents is scoped onl for su$'rade laer

    su$ $ase laer $ase laer and surface laer

    1"+

    2*%pe of pa"ement for main access road is ri'id

    pa"ement

    2+Pa"ement tpe in 4al)4a area is pa"in' $loc)

    and te oters area is 'ra"el surface laer

    1/+

    25Anoter re3uirement tat does not include in

    tis $asic desi'n sall refer to applica$le $id

    documents

    11+12+ 13+

    1+ De.inisi 1+ De.inition3.1. P$N adala P% Perusaaan Gas Ne'ara

    6Persero7 %$).

    1+"+ P$N is P% Perusaaan Gas Ne'ara

    6Persero7 %$)1+/+ Dok#en Pen%adaan adala do)umen an'

    disiap)an ole ,elompo)9un'siPanitia

    Pen'adaan $eri)ut lampiranna se$a'ai

    pedoman dalam proses pem$uatan dan

    penampaian pena4aran ole peserta

    pen'adaan

    1+/+ Bid Doc#ent is a document prepared $

    Group 9unction Procurement Committee and

    its attacment as a 'uideline in te process of

    creation and su$mission of tenders $

    procurement participants

    1+1+ Desain Basis

    14+ ,etentuan-)etentuan dasar an' arus dipa)ai

    dalam mem$uat desain

    3.4. California Bearing Ratio (CBR)

    15+ Per$andin'an antara $e$an perco$aan 6test

    load7 den'an $e$an /tandar 6Standard Load7

    1+1+ Basic Desi%n

    24+:asic re3uirements tat sall $e used for

    desi'n

    1+2+ Ca,i.ornia Bearin% Ratio &CBR'

    25+Comparasion $et4een test load and

    standard load as a precenta'e C:! is used to

  • 7/26/2019 Basis Desain Road and Pavement

    5/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: / dari 6

    dalam persentase C:! ini di'una)an untu)

    menilai )e)uatan an' dipa)ai se$a'ai dasar

    untu) penentuan te$al lapisan dari suatu

    per)erasan

    3.5. S!gra"e

    16+ (apisan tana asli an' $erada palin' $a4a

    pada suatu per)erasan

    3.#. S!!a$e Cor$e

    17+ (apisan di$a4a base course pada suatu

    per)erasan (apisan ini di'una)an untu)

    memper)uat pondasi per)erasan a'ar men'emat

    pen''unaan material per)erasan

    2+

    1+5+ Base Co#rse

    2"+ (apisan an' $erada di $a4a surface course

    an' $er'una untu) menaan 'aa lintan' a)i$at

    $e$an roda dan menerus)an $e$an )e lapisan

    $a4ana

    2/+

    3.%. Srfa&e Cor$e

    21+ (apisan per)erasan palin' atas lapisan ini

    di'una)an untu) menaan $e$an roda mempunai

    sta$ilitas tin''i dan )edap air untu) melindun'

    lapisan $a4ana

    22+

    1+7+ 0aktor Ekiva,en Be(an

    23+ /uatu fa)tor an' menun&u))an $esar suatu

    sum$u )endaraan an' dapat merusa) suatu

    per)erasan Di'una)an untu) men')on"ersi

    &umla lalu lintas dalam satuan )endaraan )e

    satuan $e$an sum$u dalam Equivalent Single

    Axle Load 6;/A(7

    e"aluate stren't 4ic is used as $asis of

    determinin' te laer tic)ness of a pa"ement

    26+

    27+

    3.5. S!gra"e

    3+%e ori'inal soil laer tat are most $ottom of

    a pa"ement

    1+4+ S#((ase Co#rse

    3"+%e laer $efore te $ase course on a

    pa"ement tis laer is used to stren'ten te

    foundation of pa"ement in order to reduce te

    cost in te usa'e of pa"in' materials

    3/+

    1+5+ Base Co#rse

    31+%e laer $elo4 surface course used for

    supportin' sear force due to 4eel load and

    trasfer it to $elo4 laers

    32+

    3.%. Srfa&e Cor$e

    33+%e top laer of pa"ement tis laer is used

    to support te 4eel load a"in' i' sta$ilit

    and 4aterproof to protect te underlin' laers

    34+

    35+

    1+7+ E;#iva,ent oad 0actor

    36+A factor indicate a "alue of "eicle a

  • 7/26/2019 Basis Desain Road and Pavement

    6/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: 1 dari 6

    document37+ 4+

    2+ Re.erensi 2+ Re.erence4"+ Desain &alan dan per)erasan arus sesuai

    den'an persaratan an' ditentu)an dalam

    spesifi)asi ini dan persaratan an' $erla)u

    dalam referensi ,ode dan /tandar edisi ter$aru

    )ecuali &i)a disetu&ui lain ole PGN

    4/+!oad and pa"ement desi'n sall $e in

    accordance 4it te re3uirements specified

    erein and te applica$le re3uirements of te

    latest editions of te reference Codes and

    /tandards unless oter4ise appro"ed $ PGN#3. ACI 318-10 #4. uilding Code

    !equirement "or Structural

    Concrete

    43+ ACI *18-10 44+ :uildin' Code

    !e3uirement for /tructural

    Concrete#'. ACI 3#0! #%. $esign o" Slabs on

    %rade

    47+ ACI *0!-0 5+ Desi'n of /la$s on

    Grade'1. ACI 3&'(3! '. %uide "or $esign o"

    oundation and S*oulders

    "or Concrete +avement

    '3. ACI 3&'(3! 52+ Guide for Desi'n of

    9oundation and /oulders

    for Concrete Pa"ement'5. ACI3&'(,! '#. %uide "or Construction

    o" Concrete +avements and

    Concrete ases(

    ''. ACI3&'(,! 56+ Guide for Construction

    of Concrete Pa"ements and

    Concrete :ases'. AAS./ 1,,3 %*. %uide "or $esign o"

    +avement Structures

    6"+ AA/H%.

    1==*

    6/+ Guide for Desi'n of

    Pa"ement /tructures%3. AAS./

    %$+S

    62+

    %5. %uide "or $esign o"

    +avement Structures

    64+ AA/H%.

    GDP/+

    65+

    66+ Guide for Desi'n of

    Pa"ement /tructures

    %. AS. A18' *. Steel 2ire abric "or

    Concrete !ein"orcement

    7"+ A/%M A185 7/+ /teel >ire 9a$ric for

    Concrete !einforcement3. AS. C33 4. Seci"ication "or

    Concrete Aggregates

    73+ A/%M C** 74+ /pecification for

    Concrete A''re'ates'. AS. C1'0 %. Seci"ication "or

    +ortland Cement

    77+ A/%M C150 "+ /pecification for

    Portland Cement1*1. AS.

    CC,

    1*. Seci"ication "or

    C*emical Admixtures "or

    Concrete

    "1+ A/%M

    CC+=+

    "2+ /pecification for

    Cemical Admi

  • 7/26/2019 Basis Desain Road and Pavement

    7/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: 2 dari 6

    5.

  • 7/26/2019 Basis Desain Road and Pavement

    8/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: 3 dari 6

    minimal ?0B dan minimal C:! su$-$ase

    course arus *0B

    f alan arus di)lasifi)asi)an men&adi )ate'ori-

    )ate'ori $eri)ut#

    e+ :ase course C:! sall $e ?0B

    minimum and su$$ase course C:!

    sall $e *0B minimum

    .+ !oad sall $e classified into te

    follo4in' cate'ories#

    "15+ Classifi

    cation

    "16+ !oad

    4idt

    "17+ erti

    cal

    "2+ Clea

    rance

    "2"+ /oulder

    "2/+ >idt

    6minimum7

    "21+ Inside

    "22+ %urnin

    ' !adius

    "23+ Access

    !oad"24+ 50m "25+ 50m "26+ 0m "27+ 8m

    "3+"3"+ "3/+

    12 Per)erasan :eton

    121 ,ate'ori Pem$e$anan

    "31+ Per)erasan $eton arus terdiri atas

    $e$erapa tipe#

    1 Per)erasan eav6 $ut6

    "32+ Per)erasan *eav6 dut6 arus

    didesain den'an men''una)an $e$an umum

    ole H/-20-++ $e$an tru) atau HC-218- tru)

    $ermuatan crane

    2 Per)erasan Lig*t $ut6

    "33+ Per)erasan lig*t dut6 arus

    diapli)asi)an dimana lalu lintas )endaraan

    sedi)it atau )endaraan rin'an se$a'aimana

    diper)ira)an :e$an )endaraan rin'an arus5 ton atau )uran'

    * Per)erasan :eton den'an lapisan

    Anti Asam

    "34+ Area per)erasan $eton dimana

    )emun')inan cairan )imia tertumpa)an

    arus diantisipasi selama operasi dan dilapisi

    ole material lapisan anti asam

    "35+

    122 Gra"el Pa"ement

    "36+ Gra"el Pa"ement di 'una)an untu)

    area $au &alan dan area lain

    12 Concrete Pa"ement

    121 (oadin' cate'or

    "42+ Concrete pa"ement sall consist of

    te follo4in' tpes#

    1 Hea" Dut Pa"ement

    "43+ Hea" dut pa"ement sall $e

    desi'ned for 'eneral load $ a H/-20-++ truc)

    loadin' or a HC-218- truc) mounted crane

    "44+

    2 (i't Dut Pa"ement

    "45+ (i't dut Pa"ement sall $e applied

    4ere onl ero "eicular traffic or li't

    "eicle es e

  • 7/26/2019 Basis Desain Road and Pavement

    9/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: 4 dari 6

    "37+ Per)erasan 'ra"el terdiri atas#

    1 Sur"ace course den'an te$al

    100mm dan )eri)il $erdiameter tida)

    le$i dari *?5mm dan minimal

    10mm

    2 /u$'rade course an' dipadat)an

    sampai =5B ma

  • 7/26/2019 Basis Desain Road and Pavement

    10/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: 5 dari 6

    area par)ir arus dialir)an pada saluran

    ter$u)a atau catc* basins

    2 alan

    "4"+ Aliran air pada &alan arus

    di)umpul)an )e ditc ter$u)a lo)asi tertentu

    atau tiap sisi pada tiap &alan

    1+ C#,vert

    "4/+ Cul"ert arus dipasan' untu)

    menedia)an drainase menurut lo)asi

    "41+

    side of all roads

    1+ C#,vert

    "56+ Cul"ert sall $e installed to pro"ide

    draina'e accordin' to locations

    4+/+)#r Rencana

    "57+ @mur rencana per)erasan &alan

    ditetap)an minimum 20 taun

    4+/+ Desi%n i.e Tie

    "6+ Desi'n life time for road and

    pa"ement are defined 20 ears minimum4+1+Estiasi Tra..ic oad Data

    "6"+ Pertum$uan lalu lintas ditetap)an

    se$esar 2B selama masa )onstru)si 61 taun7

    dan *B selama umur rencana 620 taun7

    Pertum$uan lalu lintas diran')um dalam %a$le 1

    .ra""ic Load $ata

    4+2+a,# intas *arian Rata-rata &*R'

    "6/+ i)a tida) ditentu)an dalam do)umen

    %ender ma)a minimal (H! adala se$a'aimana

    dise$ut)an dalam %a$el 1

    4+1+Estiated Tra..ic oad Data

    "61+ %raffic load 'ro4t is defined 2B

    durin' construction 61-ear period7 and *B at

    te end of desi'n perid 620 ears7 %raffic

    'ro4t are compiled at %a$le 1 %raffic (oad

    Data

    "62+

    4+2+Avera%e Dai,y Tra..ic

    "63+ If it not stated in $id document

    minimum of a"era'e dail traffic sall refer to

    %a$le 1 oter4ise stated in $id document"64+ Ta(,e "+ Tra..ic oad Data

    "65+ !ehic,es Type"66+ Avera%e Dai,y

    Tra..ic

    "67+ (i't "eicles less tan 5tonnes

    "7+ 50"eiclesda

    "7"+ %ruc) (oadin' H20-++ 6182tonnes7

    "7/+ 15"eiclesda

    "71+ %ruc) (oadin' H/20-++ 6+2tonnes7

    "72+ 10"eiclesda

    "73+ %ruc) (oadin' HC 218 & 680

    tonnes7

    "74+ 1 "eiclesda

    "75+"76+ "77+/+ (H! untu) &alan a)ses di luar area /2+ (H! for access road outside of

  • 7/26/2019 Basis Desain Road and Pavement

    11/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: 6 dari 6

    station arus dianalisa ulan' sesuai )e$utuan

    dalam desain

    /"+

    4+3+Spesi.ikasi 8ateria, Perkerasan

    //+ ,uat te)an $eton arus meru&u)

    pada /%M :eton dan :a&a

    /1+ Material $a&a an' di'una)an

    ditentu)an di $a4a ini#

    station area sall $e re-analed as re3uired in

    te desi'n

    /3+

    4+3+Paveent 8ateria, Speci.ication

    /4+ Compressif stren't of concrete

    sall refer to S. eton dan a5a(

    /5+ /teel material 4ic are used is

    defined $elo4#/6+

    /7+ Eield stren't of deformed $ar /"+ f

    F

    /""+ +

    00

    /"/+

    MPa

    /"1+ Eield stren't of plain $ar /"2+ f

    F

    /"3+ 2

    +0

    /"4+

    MPa

    /"5+ Eield stren't of 4iremes /"6+ f

    F

    /"7+ +

    55

    //+

    MPa

    //"+///+

    4+4+Trans.er oad &='

    //1+ F *1 6sam$un'an per)erasan

    $eton $ertulan' den'an men''una)an do4el

    $ars se$a'ai peran')at transfer $e$an7

    !eferensi dari AA/H%.

    4+5+E;#iva,ent A>,e oads &E'

    //2+ ;3ui"alent A

  • 7/26/2019 Basis Desain Road and Pavement

    12/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: 7 dari 6

    /1+

    /1"+

  • 7/26/2019 Basis Desain Road and Pavement

    13/13

    DESAIN BASIS

    ROAD AND PA!E8ENT

    PT PER)SA*AAN $AS NE$ARA &Persero' T(k+

    No+ Dok : PDST-COTE--C!-BD-" Revisi: B *a,+: " dari 6

    /1/+

    /11+ !eference # AA/%H. 1==?/12+ /13+

    /14+

    /15+

    /16+

    239.