Construction
06/18/2015 Boat Launch Complete←
06/01/2015 Upstream Face of Dam Complete and Weir boards and Trash Rack Partially installed in Front of Closed Gate
→
Connecticut Department of Energy and Environmental Protection
• 11/05/2014 - Contract approved and Awarded. • 12/05/2014 - NTP issued.• 05/14/2015 - Right side of dam complete.• 05/28/15 - final upstream wall (left side) section complete.• 05/29/15 - trash rack and weir boards installed into gate chamber.• 06/18/15 - Boat Launch complete.• Lake refilling.
Left Wall, Cap and Buttress WorkLeft Section Stripped←
Cap being graded and seeded
Downstream Buttress Forming
Buttress Wall FinishedWall Cap Progress
→
Connecticut Department of Energy and Environmental Protection
• Lake refilling and channel is equalizing. • Upstream face of dam completed on 05/29/15• Work on buttress wall and downstream cap
has been progressing.• Backfill, grading and seeding of dam cap 50%
complete.• Right maintenance bridge abutment and
training to be formed and poured. Left training wall and spillway to follow.
Look Ahead
Connecticut Department of Energy and Environmental Protection
• Please contact Dan Biron at (860) 424-3892 or [email protected] with any concerns.
Questions and Comments
PLEASE NOTE: These are active construction sites. Hazardous conditions exist. For your own safety, no access to the site will be allowed at anytime to unauthorized persons.