barriers frameworks policies

Upload: minamperu

Post on 05-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Barriers Frameworks Policies

    1/30

    21.05.2012 Seite 1

    Barriers, frameworks and policies toNAMAs - TRANSfer and its handbook

    Navigating Transport NAMAs

    Carlosfelipe Pardo, GIZ TRANSfer manager for Colombia

    Movilidad, mitigacin de emisiones y calidad de vida en ciudades de Asia y

    Amrica Latina Lima, Per, 28-29 Mayo 2012

  • 7/31/2019 Barriers Frameworks Policies

    2/30

    21.05.2012 Seite 2

    Page 2

  • 7/31/2019 Barriers Frameworks Policies

    3/30

    21.05.2012 Seite 3

    Page 3

    TRANSfer Work Packages

  • 7/31/2019 Barriers Frameworks Policies

    4/30

    21.05.2012 Seite 4

    Page 4

    TRANSfer Paquetes de trabajo

    WP1:Gestin de

    proyecto yredes

    WP2:Asesoratcnica enlos 3 pasessocios

    WP3:Trasfondotcnico detransporte yclima

    WP4: Difusinde resultadosycomunicacin

  • 7/31/2019 Barriers Frameworks Policies

    5/30

    21.05.2012 Seite 5

    Page 5

    Handbook Navigating Transport NAMAs

    Contains all relevant information

    for decision makers andpractitioneers in the transportsector Available online at

    www.TRANSferProject.org

    Status:

    Draft Part I(v 0.0) Review byproject partners Draft online(v 0.1)

    Review by

    partners andexperts

    Draft Part IIFinal ReviewOnline

    publication

    http://www.transferproject.org/http://www.transferproject.org/
  • 7/31/2019 Barriers Frameworks Policies

    6/30

    21.05.2012 Seite 6

    Page 6

    Handbook Navigating Transport NAMAs

  • 7/31/2019 Barriers Frameworks Policies

    7/3021.05.2012 Seite 7Page 7

    Status Toolbox

    Contains tools and approaches that are country-specific or trans-

    regional Abgestimmt auf Bedarfe der Partnerlnder, gemeinsam entwickelt

    Elements and drafts available in 2012 Planned for 2013

    Screening Tool MRV Guideline

    Training Material Matching Platform for Funding

    Templates for NAMA Fact Sheet und Concept Note

    Overview of GHG emission mitigation actions in Land Transport

    Guideline for Local Mitigation Actions in Land Transport

  • 7/31/2019 Barriers Frameworks Policies

    8/30

  • 7/31/2019 Barriers Frameworks Policies

    9/3021.05.2012 Seite 9Page 9

    Qu hace que una poltica sea un NAMA?

    Poltica deTransporteSustentable

    Medida CO2(MRV)

    NAMA

    enTransporte

    Apoy

    o

    Internacional

    Apoyo

    Internacional

    PasesDesarrolladoscompromisos

    Internacionales

  • 7/31/2019 Barriers Frameworks Policies

    10/3021.05.2012 Seite 10Page 10

    Hurdles to clear towards NAMAs

    Policy Identification

    MRV

    Financing

    Registration

    Copyright Ko Sakamoto

  • 7/31/2019 Barriers Frameworks Policies

    11/3021.05.2012 Seite 11Page 11

    Dificultades potenciales para t-NAMAs

    Identificacin de poltica

    MRV

    Financiacin

    Registro

    Copyright Ko Sakamoto

  • 7/31/2019 Barriers Frameworks Policies

    12/3021.05.2012 Seite 12Page 12

    NAMAs enter the climate policy arena

    21.05.2012

    TechnologyTransfer

    (e.g. TNA)

    CleanDevelopment

    Mechanism (e.g.methodologies)

    Policiesand measures

    (e.g. estimation ofeffects)

    CapacityBuilding

    (e.g. inventorytrainings)

    NAMAs

  • 7/31/2019 Barriers Frameworks Policies

    13/3021.05.2012 Seite 13Page 1321.05.2012

    SHIFTAVOID

    IMPROVE

    Reduction ofsubsidies /(Fuel Tax)

    High Quality PublicTransport

    NMT Infrastructure

    Fuel EconomyStandards

    Urban landuse planning

    ParkingManagement

    Green Logisticsavoid empty

    haulage

    Road Pricing

    Eco-DrivingCampaign

    Regular carinspection

    Converter Kit for Taxis (CNG)

    Regulation onTruck design

    LowCarbonDevelopm

    entStrateg

    y

    What could be registered as a NAMA?

    Eco ports/airports

    Economic developmentaround railway corridors

    Infrastructuremanagement

  • 7/31/2019 Barriers Frameworks Policies

    14/3021.05.2012 Seite 14Page 1421/05/2012

    CAMBIAREVITAR

    MEJORAR

    Reduccin desubsidios

    (Impuestos)y/o poltica de

    precios

    Transporte Pblicode alta calidad

    Infraestructura de TNM

    Estndares deeconomavehicular

    Planificacin desuelos con DOT

    Gestin deestacionamientos

    Logstica verdeevitar carga vaca

    Preciacin devas

    Campaa deconduccin

    racional

    Inspeccin devehculos

    Converter Kit para Taxis (CNG)

    Regulacin dediseo decamiones

    E

    strategiade

    Desarrollobajaencarb

    ono

    Qu se puede registrar como un NAMA?

    Renovacinvehicular

  • 7/31/2019 Barriers Frameworks Policies

    15/3021.05.2012 Seite 15Page 15

    9 Steps of a NAMA Development

    1. NAMA idea

    2. NAMA pledge

    3. NAMA proposal

    4. Planned NAMA

    5. Adopted NAMA

    6. Registered NAMA

    7. NAMA under implementation8. Implemented NAMA

    9. Closed / finalized / verified / aborted / cancelled NAMA

  • 7/31/2019 Barriers Frameworks Policies

    16/3021.05.2012 Seite 16Page 16

    TRANSfer 8 key messages and approaches

    Objective: Support decision makers to develop climate strategies in

    transport as Nationally Appropriate Mitigation Actions (NAMAs)

    1. Offer attractive carbon investment opportunities in the transportsector, based on the Avoid-Shift-Improve approach

    2. Provide bankable solutions in all sub-sectors (urban passenger

    transport, inter-urban passenger transport, freight transport andlogistics, domestic aviation and shipping, rail, vehicle and fuel techn.)

    3. Ensure sound inter-ministerial coordination in all stages of designand implementation of transport NAMAs,with Ministers of Transport as central key players

  • 7/31/2019 Barriers Frameworks Policies

    17/3021.05.2012 Seite 17Page 17

    TRANSfer 8 key messages and approaches

    4. Allow for active participation of private sector and civil society

    through multi-stakeholder workshops

    5. Provide simple yet comprehensive and solidmethodologies for MRV of transport NAMAs

    6. Offer capacity building to partner countries

    on sustainable transport options for future transport NAMAs

    7. Create a platform to allow matching of transport NAMA proposalswith funding opportunities

    8. Spread the news about transport NAMAs via a network for

    dissemination of good practices and lessons learned

  • 7/31/2019 Barriers Frameworks Policies

    18/3021.05.2012 Seite 18Page 18

    generates comparable,

    transparent information

    highlights lessonsand good practices

    supports decision-makingand national planning in thehost country

    supports implementationof NAMAs and generatesfeedback on NAMAeffectiveness

    promotes coordination andcommunication amongst thedifferent emitting sectors

    facilitates the tracking ofprogress towards achievingmitigation goals

    MRV of NAMAs

    increases the

    likelihood of gaininginternational support

    Initiated in the Bali Action Plan, MRV (Measurement, Reporting,Verification) is a key requirement under the UNFCCC.

    The MRV approach

  • 7/31/2019 Barriers Frameworks Policies

    19/3021.05.2012 Seite 19Page 19

    3 steps for the elaboration of a MRV-system fortNAMAs

    Step 1

    Identify key parameters for the MRV approach Data requirements may differ depending on the type

    of NAMA (direct, indirect, process indicators)

    Step 2

    Check data availability and needs Data has to be generated, gathered and updated

    Step 3

    Develop a MRV process for mitigation effects oftransport NAMAs

    Include co-benefits in the monitoring plan

    21.05.2012

    MRV of Transport NAMAs

  • 7/31/2019 Barriers Frameworks Policies

    20/3021.05.2012 Seite 20Page 20

    Financing TechnologyTransfer

    CapacityBuilding

    Financing low carbon transport

    Concepts &Plansfinance of

    organization

    Infrastructuremainly initialInvestments

    Operation &Managementcontinuousfinancial flows

    Transportmodelling

    Data gathering(e.g. traffic

    counting)

    Efficient vehiclesand retrofitting

    E-ticketing Passenger infor-

    mation systems

    Integrated urbanand transport plans

    Guidelines & Rules Outlining Transport

    systems (e.g. BRT)

    Construction of Bus lanes, rail, stops NMT networks Interchanges

    (integration of modes)

    Organisationdevelopment

    Trainings Setting up networks

    MRV concept

    Green publicprocurement

    BuildingStandards

    Intel. TransportSystems (ITS)

    Chargingsystems

    Operationalsubsidies

    Campaigns Reporting on

    performance

    Maintenance &Inspection

    Systemoptimization

    Eco Driving

  • 7/31/2019 Barriers Frameworks Policies

    21/3021.05.2012 Seite 21Page 21

    Better energysecurity

    Lessexternalities

    IncreasedQuality of Live

    Stronger economicdevelopment

    21/05/2012

    Sustainabletransport

    Lessimported fuel

    Betterair quality

    Lower

    energy costs

    Betterroad safety &

    lessaccidents

    Lowerwelfare costs

    (hospitalsetc.)

    More localjobs

    Reducedcongestion &time savings

    Lesshealth risks

    Increasedprivate

    investments

    Less noise

    Co-benefits as rationale for domestic action

  • 7/31/2019 Barriers Frameworks Policies

    22/3021.05.2012 Seite 22Page 22

    Context of tNAMA: Renovation of HDV fleet

    4-year presidential term has just started in 2010

    Strong and decided support from national government

    (including Presidential mandate) Well-informed and pro-active key stakeholders in all

    ministries

    Second pilot NAMA on freight logistics (supported by

    IADB) is complementary to HDV fleet renovation Synergy to Mexican NAMA => South-South Cooperation

    Other tNAMAs are currently being planned in Colombia(e.g. urban mobility management)

    Case Study: TRANSfer Colombia

  • 7/31/2019 Barriers Frameworks Policies

    23/3021.05.2012 Seite 23Page 23

    Fleet renovation tNAMA- steps for MRV

    MoE developing MACcurves

    GIZ supporting in

    preliminary CO2estimations anddevelopment ofstudies

    Currently identifyingdata, information andstudies that areneeded for tNAMA

    Case Study: TRANSfer Colombia

  • 7/31/2019 Barriers Frameworks Policies

    24/30

    21.05.2012 Seite 24Page 24

    Complementary activities of the project

    Installation of a workinggroup on tNAMAS forColombia

    Participation in eventsrelated to NAMAs andwith Colombiandelegations

    Individual meetings withother key stakeholders(experts, industry, otherministries, etc)

    Photo: Workshop activity in Santiago de Chilerelated to NAMA development for Colombia

    (November, 2011)

    Case Study: TRANSfer Colombia

  • 7/31/2019 Barriers Frameworks Policies

    25/30

    21.05.2012 Seite 25Page 25

    tNAMA Fleet renovation: Barriers/obstacles/challenges

    Data quality must be improvedconsiderably (some steps havealready been taken by variousparties)

    Some opportunities (i.e. plans for10 ppm diesel sulphur content)have not been seized bygovernment

    Coordination of various actors takes

    longer (but yields better results) Freight sector needs organizational

    enhancement to nurture all tNAMAdevelopments via fleet renovation

    Photo: Preparatory meeting with localgovernment identifying timelines related to

    diesel fuel quality

    Case Study: TRANSfer Colombia

  • 7/31/2019 Barriers Frameworks Policies

    26/30

    21.05.2012 Seite 26Page 26

    Potential Activities in Partner Countries

    Identifiypolicies/

    measures

    Assessemissionreductionpotential

    Set upMRV /GHG

    inventory

    Identifyneed for

    intlsupport

    RegisterNAMAsunder theUNFCCCUNFCCC

    ImplementtransportNAMAs

    The NAMA development and registration process

    Monitoring

    Workshop

    includinginternational

    experts

    Studies bylocal/regionalconsultants ofemission red.

    potential

    Presentation ofinternational

    examples

    Trainingsessions

    Provision ofguidance through

    local andinternational

    experts

    Actividades potenciales en pases

  • 7/31/2019 Barriers Frameworks Policies

    27/30

    21.05.2012 Seite 27Page 27

    Actividades potenciales en pasesmiembros

    Identifica-cin depolticas ymedidas

    Evaluacin

    de potencialde reduc-cin de

    emisiones

    InventarioMRV / GEI

    Identifi-

    cacin denecesidadde apoyo

    inter-nacional

    RegistroNAMAbajo

    UNFCCC

    El proceso de desarrollo y registro de NAMA

    Presentacin deejemplos

    internacionales

    Misiones brevesde expertos

    internacionales

    Estudios deconsultores

    locales depotencial dereduccin de

    emisiones

    Talleres conactores locales

    Sesiones deentrenamiento

    Provisin deguianza a travs

    de expertoslocales e

    internacionales

  • 7/31/2019 Barriers Frameworks Policies

    28/30

    21.05.2012 Seite 28Page 28

    Supporting the process of identification and registration of NAMAs

    Benefits for Partner Countries

    Short termtechnical

    advice from

    international

    experts

    Financial

    support for

    studies and

    background

    research

    Training of staffon transport and

    climate related

    topics

    Exchange of

    knowledge and

    experiences in a

    South-South-

    North expert

    network

    Improvement of

    your transport

    system and

    related co-

    benefits

    Visibility of your countryas inspiring examples in the

    NAMA handbook

  • 7/31/2019 Barriers Frameworks Policies

    29/30

    21.05.2012 Seite 29Page 29

    Apoyo al proceso de identificacin y registro de NAMAs

    Beneficios para pases socios

    Corto plazoasesora

    tcnica de

    expertos

    internacionales

    Apoyo financiero

    para estudios e

    investigacin de

    fondo

    Capacitacin de

    personal sobre temas

    de transporte y

    cambio climtico

    Intercambio de

    conocimiento y

    experiencias en una

    red de expertos Sur-

    Sur-Norte

    Mejoramiento de su

    sistema de

    transporte y

    cobeneficios

    relacionados

    Visibilidad de los pasescomo ejemplo inspirador en el

    NAMA handbook

  • 7/31/2019 Barriers Frameworks Policies

    30/30

    Contacto TRANSfer:

    Harald Diaz-Bone (Director), [email protected] Felipe Pardo (Gerente Colombia), [email protected]

    Juan Camilo Florentino Mrquez (Apoyo MdT),[email protected]

    www.transferproject.org, www.giz.de

    mailto:[email protected]:[email protected]:[email protected]://www.transport-nama.org/http://www.giz.de/http://www.giz.de/http://www.transport-nama.org/mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]