BARLOW TYRIE quality since 1920 P avilions Before you begin These installation instructions will lead you through the process of installing your new pavilion. The installation of the pavilion requires special attention to certain detail. Before you begin you should: Check your order Make sure the contents of the carton match the product numbers on your order. Contact your dealer if there are any damaged, missing or incorrect parts. Pay attention to safety Because of the size and weight of certain parts, installation is recommended with no fewer than two people. Always maintain a clean, organized work area. Make sure you have the right tools and materials Barlow Tyrie supplies the appropriate fasteners upon request through your dealer for anchoring the pavilion securely to the ground. If you are unsure about the required anchoring system best suited for your pavilion consult your dealer for the proper fastening method. Review entire installation guide This step gives you the opportunity to contact your dealer to answer any questions before you begin. Assembly requirements Two people Spirit level Hand drill Screwdriver set Step ladder Long nose pliers Spanners Rubber hammer Tape measure www.teak.com Page 1 of 16 Step by Step Assembly Instructions 3.66 x 3m - 12’ x 10’ Pavilion with Cabrio Folding Roof Product Ref: 9111210

Upload: others

Post on 09-Feb-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • BARLOW TYRIE quality since 1920

    3.66 x 4.5m - 12’ x 15’ Pavilion Shelter with Double Rail Beams Ref: 9011215

    Step by Step Assembly Instructions

    Pavilions

    Before you begin

    These installation instructions will lead you through the process of installing your new pavilion. The installation of the pavilion requires special attention to certain detail. Before you begin you should:

    Check your order Make sure the contents of the carton match the product numbers on your order. Contact your dealer if there are any damaged, missing or incorrect parts.

    Pay attention to safety Because of the size and weight of certain parts, installation is recommended with no fewer than two people. Always maintain a clean, organized work area.

    Make sure you have the right tools and materials Barlow Tyrie supplies the appropriate fasteners upon request through your dealer for anchoring the pavilion securely to the ground. If you are unsure about the required anchoring system best suited for your pavilion consult your dealer for the proper fastening method.

    Review entire installation guide This step gives you the opportunity to contact your dealer to answer any questions before you begin.

    Assembly requirements

    Two people Spirit level

    Hand drill Screwdriver set

    Step ladder Long nose pliers

    Spanners Rubber hammer

    Tape measure

    www.teak.com Page 1 of 16

    Step by Step Assembly Instructions

    3.66 x 3m - 12’ x 10’ Pavilion with Cabrio Folding Roof Product Ref: 9111210

  • Assembly overview BARLOW TYRIE quality since 1920

    www.teak.com Page 2 of 16

  • Part list BARLOW TYRIE quality since 1920

    www.teak.com Page 3 of 16

    2x B1

    1x L1

    3x T1

    2x T2

    4x T3

    T3

    T3

    T4

    T4

    T5

    4x T4

    2x T5

    4x R1

    1x R2

    2x B2

    4x P1

    4x P2

    Lower Truss with 5/16” dia hole about pivot point

    Middle Truss with 5/16” dia hole about pivot point

    Center Truss with plastic spring slide insert

    Lever Arm Strap

    Flat BarRoof Trusses

    1x

    1x

    1x

    1x

    1x

    1x

    Post End Plate

    Inlcudes the following sub kits:

    Inlcudes the following sub kits:

    16x 002

    4x AL005

    Roof Hinge

    Roof Hinge

    1x KC.02L

    1x KC.02R

    1x PL005

    1x PL005

    Roof Hinge Cover

    Roof Hinge Cover

    Plastic Corner Bracket4x K4.01

    8x 025

    16x 015

    Plastic Corner Insert10x PL007

    KC.01

    KC.04-A

    KC.05

    KC.03 (RHS KIT)

    KC.02 (LHS KIT)

    SKC.03-1 SKC.03-2 SKC.03-3

    SKC.03-3SKC.03-2SKC.03-1

    Beam 3 mtrs 10 feet (roof hinge side)

    Beam 3.66 mtrs 12 feet (transverse side)

    Triangular Corner Post

    Corner Post Cover

    Full Length Lever Arm 1x L2 Dummy Lever Arm

    Transverse Roof Support (no grove)

    Transverse Roof Support (with grove)

    Cross-Sectional View

    Cross-Sectional View

    Plate Screw 1/4” x 13/4”

    Metal Screw #10 - 3/4”

    Metal Screw #8 - 3/4”

  • Part list BARLOW TYRIE quality since 1920

    www.teak.com Page 4 of 16

    1/4” dia Nylon Bushing

    Nylon Lock Nut - 1/4”-20

    Plastic Finishing Hole Cap

    Hinge Box Side Cover

    Lever Arm Fork

    Fork Installation Guide

    Lever EndCover

    16x 002

    4x PL014

    2x PL01 1

    1x PL012

    2x PL010 2x PL013

    4x PL016

    4x PL07 4x PL015

    1/4” Flat Washer

    1x 002

    2x 020

    2x 018

    1x 005

    1x 010

    2x 016

    #8 Square Head Screwdriver Bit

    #10 Square Head Screwdriver Bit

    Pulleys included with curtainsPL101

    20x R3 Velcro Strips

    Carriage Bolt - 5/16” x 2”

    5/16” Flat Washer

    16x 003

    16x 007

    16x 012 5/16” Nylon Lock Nut

    5/16” Nylon Lock Nut

    Nylon Bushing - 5/16”

    5/16” Flat Washer

    5x 012

    10x 006

    5x 004

    10x 019

    2x

    Tab Washer 1/4”-20

    Roof Hinge Cover Screw #10-3/8”

    1/4” Flat Washer

    1/4” Lock Washer

    Hex Bolt - 1/4”-20 x 5/8”

    2x 008

    2x 001

    2x

    2x 005

    2x 014

    2x 026

    2x

    Nylon Bushing - 5/16”

    Carriage Bolt - 5/16”x 2”

    5/16” Flat Washer

    5/16” Lock Washer

    5/16” Nut2x 011

    2x 009

    2x 003

    4x 006

    2x 019

    SKC.03-1

    SKC.03-2

    SKC.03-3

    KC.07

    KC.06

    KIT - 08

    MISC

    Hex Bolt - 5/16” x 31/4”

    Cover Screw - 1/4” x 13/4”

    Strap Screw - 1/4” x 13/4”

    Self-tapping Screw - #12 x 13/4”

  • BARLOW TYRIE quality since 1920

    www.teak.com Page 5 of 16

    Getting started

    3

    2

    1P1

    AL005

    002

    Roof will openfrom this sideCardboard

    B1

    B1

    B1

    B2

    B2

    KC.02L

    A-A

    001

    005

    014

    008

    View A-A

    015

    K4.01

    Secure the base plates (AL005) to the bottom of each of the aluminium corner posts (P1) using metal bolts (002) as shown in the diagram. (Repeat step for all four corner posts.)

    Install the two roof hinges on the beams (B1) by first inserting two tab nuts into the bottom interior groove of both beams. Then slide the tab nuts till the mid section of the beams. Install the roof hinges on both beams using bolts and washers shown in the above right hand side diagram. LIGHTLY TIGHTEN BOLTS. The hinge will be centered and bolts will be tighten in step 6.

    On a flat surface, assemble all the beams together by fixing the aluminum corner bracket (K4.01) at each corner, using the metal scews (015) supplied, as shown in the diagram. You may use pieces of the cardboard box to protect the frame from scratches.

  • Assembling the roof BARLOW TYRIE quality since 1920

    www.teak.com Page 6 of 16

    5

    4

    T1 T2&

    T3 T4&

    Use a RubberHammer

    Nylon Bushing

    Roof Truss Ends

    View A-AUse a RubberHammer

    Middle Truss Assembly

    A-A

    PL007

    019

    Install the plastic corner inserts (PL007) at each end of the transverse roof supports (T1) and (T2) as shown in the figure above. You will need a rubber hammer to insert them properly

    Complete the assembly by inserting the trusses (T3), (T4) and (T5) at each end of the transverse roof supports as shown in the figure above. Again you will need a rubber hammer to insert them properly.

    On each end of the roof truss assemblies (T3) and (T4) install two plastic bushings as shown in the diagram

  • BARLOW TYRIE quality since 1920

    www.teak.com Page 7 of 16

    Assembling the roof framework

    6

    B-B

    View C-CView B-B

    Install the middle plastic stub truss on Theupper hole can be used in time if more pressure needs to

    be exerted by the middle truss onto the roof fabric.

    the lower hole.

    Lay the trusses on top of the beam assembly in the order and orientation shown by the diagram above. Consult views B-B, C-C, D-D and E-E for specific detail. Then turn to the next page for a description on how to fix each trusses to the hinges.

    E-E

    D-D

    TransverseGroove Should be

    Facing Downwards

    Support

    T2T2

    T3T3

    T4

    T5T4

    View D-D View E-E

    C-C

    Holes used for Lever Armand Dummy Lever Arm(see Step 9)

    Holes used for Lever Armand Dummy Lever Arm(see Step 9)

  • Assembling the roof framwork BARLOW TYRIE quality since 1920

    www.teak.com Page 8 of 16

    F-F F-F

    Transverse SupportGroove Facing

    Downwards

    Tighten Bolts(repeat on other side)

    Center Hinge Assembly

    View B-B(Hardware Installation)

    View B-B(TOP VIEW)

    See ThroughView

    View F-F

    004

    006

    002

    006

    KC.02L

    014

    Install the trusses on the hinge using hardware shown in views B-B. Notice that only one side is shown. Repeat this step on the other hinge.

    Once the trusses have been fixed properly to each hinge, center the roof assembly by allowing the protruding groove of (T2) to extend just beyond the edge of beam (B2) (see view F-F). Then tighten the hinge bolts as shown in the bottom right diagram.

  • Installing the corner posts BARLOW TYRIE quality since 1920

    www.teak.com Page 9 of 16

    View G-G View G-G(TOP VIEW)

    Flat Washer007

    Lock-Nut012

    003

    0037

    Top View

    G-G

    P1

    P1

    P2

    P2P2

    LockingKey

    AssemblyKC-07

    002

    Attach one of the four corner posts (P1) to each corner of the structure using hardware shown in the top right diagrams. This step may require a second person or a ladder to lift the roof assembly in order to fix all four corner posts (P1). See diagrams below for further assembly steps.

    To complete the post assembly, snap together the corner post (P1) and corner post covers (P2). Repeat step for each corner.

    Then fasten the top cover assembly (KC.07) on top of each corner post (P1) DO NOT OVER TIGHTEN SCREWS. The locking key can be in the unlocked position or removed from the cover assembly by turning then pulling it.

  • Anchoring the pavilion BARLOW TYRIE quality since 1920

    www.teak.com Page 10 of 16

    8Make sure the structure is well aligned and levelled with the floor as shown in the diagram below. Consult the section below for recommendations on the type of anchorage required for fixing the structure on the floor.

    level

    Ground Fixing

    WOOD

    OPTION AWOOD DECK/FLOOR

    Requirements:8 (2 per plates) of each- 5/16" x 2" wood screws- 5/16" washers

    CONCRETE

    SOIL

    OPTION BCONCRETE/CEMENT FLOOR

    The Permo Lock anchoring system is the recommended method that offers a strong permanent solution for anchoring your shelter and to protect it against the wind. See next page for instructions on how to install this anchor

    C1

    C2C3

    Remaining holes in plate (AL005) are used for fixing the structure on the floor

    W

    L

    D

    Distances W, L, and D are calculated from centre to centre of plates (AL005)

    Requirements:8 (2 per plate) of each- 3/8” x 11/2” expansion anchor* use 1/2” cement drillm bit

    Dimensions inches (cm)

    W 111 (282)

    L 138 (350)

    D 177 (450)

    C1 79 (200)

    C2 114 (290)

    C3 144 (366)

  • Anchoring the pavilion BARLOW TYRIE quality since 1920

    www.teak.com Page11 of 16

    Top View

    3-1/4” (8.2cm)

    Permo ® Lock Anchoring System

    Insert the assembledPermo Lock anchor into the drilled hole

    Unscrew the coupling and rod completley from the fixed Permo Lock anchor and remove the two washers

    Place the corner of the structure over the anchor and afix it using the supplied ½” bolt and washers. Grease the threads of the bolt

    Screw in the coupling nut without turning the rod and anchor. The maximum opening of the Permo Lock anchor occurs when the rod extends 3¾” (8.2cm) above the coupling nut

    Drill a 1” x 19¾” (2.5cm x 50cm) hole at each marked location using a percussion drill with a diamond tip masonry drill bit

    Apply grease on threads

    19¾” (50cm)

    x4lock washer

    x4washer

    x1rod

    x4bolt

    x1coupling

    x4anchor

    Position your assembled structure on the chosen location then mark the center of each corner plate

    Packaging Contents

    One Permo Lock anchor comes preassembled and ready to use as shown on the right. Verify that the rod end is flush with the end of the anchor.

  • Final frame assembly BARLOW TYRIE quality since 1920

    www.teak.com Page 12 of 16

    H-H

    I-I

    9

    View H-H(step a)

    View H-H(step b)

    Remove the guideafter installing the fork.

    View H-H(step c)

    L1

    L1

    T4

    View I-I(TOP VIEW)

    SeeThrough

    View

    Install the Plastic Finishing Cap

    L1

    10

    016

    006011

    009

    019

    003

    026 020

    PL01 1

    PL01 1

    PL005

    PL010

    PL012

    KC.02L

    Install the plastic fork on the (T4) truss assembly on the opening side. Locate the proper position of the fork by using the fork installation guide as shown in views H-H. Then use the self tapping screw (016) to fix the fork on the transverse truss member. Then insert the end of the lever arm on the fork and fix the lever using hardware shown in view I-I. Repeat step on other side for the dummy lever arm.

    To complete the roof hinge mechanism, install the plastic hinge cover (PL005) over the roof hinge using screws (026).Then install side cover (PL010) and the hole cap (020). Repeat step on both sides.

  • Final frame assembly BARLOW TYRIE quality since 1920

    www.teak.com Page 13 of 16

    12

    R2

    11

    Velcro Strip(top groove)

    16” apart

    Valance

    TOP VIEW

    Velcro Strip(top groove) Roof will open

    from this side

    R3

    002

    005

    010

    018

    PL013

    Insert velcro strips at every 16” in the top groove of the beams. Then fix the valance to the velcro strips (R3). Start from one end of the valance and work your way around the frame assembly. See adjacent diagrams for detail.

    Install the lever strap on the end of the lever arm using hardware shown in the left diagram. Then install the plastic cap (PL013) on the end of both the lever and dummy lever arm.

  • Installing the roof fabric BARLOW TYRIE quality since 1920

    www.teak.com Page 14 of 16

    SIDE VIEW

    J-J

    K-K

    M-M

    L-L

    13

    View L-LView K-K View J-J

    Roof Support

    Velcro Strip

    Roof Fabric Weld Line

    View M-M(Step a)

    Insert a flat bar on eachend of the pocket

    View M-M(Step b)

    R1

    T2

    The next step will give instructions on how to fix the roof cover to the frame assembly. Slide the flat bars (R1) in the pocket of the fabric as shown in View M-M.Then raise the truss assembly and push the flat bar and fabric into the groove of the transverse truss (T2). Then fix the velcro strip around the 2 roof supports (T4). Note that the velcro should be fitted around the support as shown in views K-K (left hand side support) and L-L (right hand side support). Then raise the middle roof support (T5) in its upright position and fix the velcro around it as shown in view J-J.

    Install the roof fabric cover over the frame assembly with roof trusses down. Make sure that all 4 corners of the roof fabric are aligned properly.

  • Installing the curtains BARLOW TYRIE quality since 1920

    www.teak.com Page 15 of 16

    15

    14

    025

    outside rail

    curtains on outside rail

    decorative curtains(installed using velcro strips

    on bottom beam groove)

    inside rail

    curtains on inside rail TOP VIEW

    Velcro StripsBottom Groove

    16” apart

    Profile View

    Zipper(Interior Side)

    MetallicEyelet

    Curtain(Exterior Side)

    CurtainExterior Side

    Plastic Pulley Snap Pulleyin place

    PL101

    Roof fabric and valence not shown for clarity

    Install plastic pulleys (PL101) by snapping them in each metallic curtain eyelet. Use long nose pliers to facilitate this operation. Pulleys should be facing towards the curtain side on which the zipper is located (see above steps). Then install each curtain sections into the provided beam slots as shown by left hand diagram. After installing all pulleys, block the access with the screws (025) as shown in the diagram. Repeat step for each corner. See next step (15) for curtain installation example

    Curtain Type Rail

    Decorative curtains Inner or OuterMosquito curtains InnerAcrylic curtains OuterPlastic curtains Inner or Outer

    The decorative curtains are installed using velcro strips (R3) inserted 16” apart in the bottom groove of the beams similarly to the valance in step 13. If you have purchased optional curtains (mesh netting, transparent plastic or acrylic fabric) install them on the inside or outside rail of the beams.

  • Installing the curtains BARLOW TYRIE quality since 1920

    www.teak.com Page 16 of 16 Ref 3412

    Barlow Tyrie Limited Braintree Essex CM7 2RN England t: + 44 (0)1376 557 600 f: + 44 (0)870 460 1100

    Barlow Tyrie Inc1263 Glen Avenue Suite 230MoorestownNJ 08057 - 8101 USA

    t: + 1 856 273 7878f: + 1 856 273 9199

    15 Install the decorative curtains on the iterior or exterior rail of the beams (B1) and (B2). If you have purchased optional curtains (mosquito netting, transparent plastic or acrylic fabric) install them on the inside rail of the beams.