baltic scope joint map - energy vs environment *
TRANSCRIPT
D e n m a r kD e n m a r k
S w e d e nS w e d e n
P o l a n dP o l a n dG e r m a n yG e r m a n y
Offshore Windfarmsoperationalunder constructionauthorisedapplication submitted (in PL some holding permits)denied (DE)
Offshore Windfarms Swedenoperationalunder constructionpermissionpermission, appealedpermission, not for connecting to land)applicationinvestigation before applicationdismantlingSE: Area_of_national_interest_for_wind_energy
High Voltage Cables (status not shown correctly for all) in useunder constructionapprovedplanned
PipelinesPipeline, PlannedPipeline, inUse
Data CablesDataCable
Oil and Gas extractionSE: Areas_of_interest_for_Oil_and_Gas_extraction
IMO Shipping Routes/AreasTrafficSeparationSchemePrecautionaryAreaDeepWaterRouteRouteRecommendedInshoreTrafficZoneRestrictedArea
AIS Year201415717
0
Mineral ResourcesSand and Gravel ExtractionSE: Area_of_interest_for_Sand_extraction
Conservation AreasNatura2000 SCINatura2000 SPA
Bathymetry-500-400-300-200-100-50-20-10
BoundariesTerritorial SeaEEZ_corr_26052014
D e n m a r kD e n m a r k
Odrabank
Middle Bank
Kriegers FlakAdlergrund
Mercator (54°N), WGS84BSH/M5 28.10.2015
South-West Baltic Case - Focus Areas ENERGY