BALLYRONAN MARINA, CASE STUDY IN WATERWAYS REGENERATION

Clones Canal Workshop 23/Jun/11

Page 2: Ballyronan marina, case study in waterways regeneration 2

CLONES MARINA AND REGENERATION

Page 3: Ballyronan marina, case study in waterways regeneration 2

BALLYRONAN MARINA CASE STUDY

Page 4: Ballyronan marina, case study in waterways regeneration 2

BALLYRONAN TOWN

• SMALL TOWN NORTH EAST OF LOUGH• WAS A CONNECTING PORT FOR LOUGH WITH

OLD HARBOUR AND STORAGE WAREHOUSES• MAIN INDUSTRIES FISHING AND AGRICULTURE• LINKED TO WWII AND ADJOINING RUNWAYS• DECLINED AND BADLY AFFECTED BY TROUBLES• LOSS OF PROTESTANT COMMUNITY

Page 5: Ballyronan marina, case study in waterways regeneration 2

BALLYRONAN CASE STUDY

• BREAKWATER AND MARINA BUILT IN 1972• NEVER WORKED AND LEFT DERELICT• TABDA COMMUNITY GROUP SET UP IN 1995• PROPOSED TO REDEVELOP MARINA AND

TOWN IN PARTNERSHIP WITH COUNCIL VIA EUROPEAN CAPITAL FUNDS

• RECENT CHANGES

Page 6: Ballyronan marina, case study in waterways regeneration 2

BALLYRONAN SHORE FACILITY

Page 7: Ballyronan marina, case study in waterways regeneration 2

COMMUNITY FACILITY

Page 8: Ballyronan marina, case study in waterways regeneration 2

RESTAURANT

Page 9: Ballyronan marina, case study in waterways regeneration 2

OFFICE UNITS

Page 10: Ballyronan marina, case study in waterways regeneration 2

MARINA

Page 11: Ballyronan marina, case study in waterways regeneration 2

SECURITY GATES TO MARINA

Page 12: Ballyronan marina, case study in waterways regeneration 2

BOAT YARD

Page 13: Ballyronan marina, case study in waterways regeneration 2

BOAT YARD

Page 14: Ballyronan marina, case study in waterways regeneration 2

BEACH: WATER SHORE INTERFACE

Page 15: Ballyronan marina, case study in waterways regeneration 2

ACTIVE PLAY AREA

Page 16: Ballyronan marina, case study in waterways regeneration 2

PLAY AREA

Page 17: Ballyronan marina, case study in waterways regeneration 2

SAILING NURSERY AND CANOE POLO SPACE

Page 18: Ballyronan marina, case study in waterways regeneration 2

CARAVAN AND CAMPING SPACE AND CLUB HOUSE

Page 19: Ballyronan marina, case study in waterways regeneration 2

BIRD HIDE AND ENTRANCE TO WOOD WALK

Page 20: Ballyronan marina, case study in waterways regeneration 2

EXCURSION BOAT AND MAST HOIST

Page 21: Ballyronan marina, case study in waterways regeneration 2

BLUE FLAG STATUS

Page 22: Ballyronan marina, case study in waterways regeneration 2

EVENTS AND CLUBS

Page 23: Ballyronan marina, case study in waterways regeneration 2

CLONES MARINA

Page 24: Ballyronan marina, case study in waterways regeneration 2

WHAT ARE SUCESSFULL CHARACTERISTICS OF PROJECT

• PARTNERSHIP (COMMUNITY, COUNCIL, WATERWAYS IRELAND, PRIVATE)

• PUBLIC SPACE• SECURITY• EVENTS AND PROGRAMMES• ENVIRONMENTAL QUALITY• CLUBS AND GROUPS AND EQUIPMENT• WALKING, FISHING, BIRDWATCHING, CYCLING• RETAIL UNITS (RENT SPACE NOT EXPERTISE)• CARAVAN AND CAMPING SITE• MARKETING AND RECONNECTION• LONG TERM BERTHS AND BOAT YARD• PLANNING ZONED FOR RESIDENTIAL, BUSINESS AND RECREATION