Baird Conference Call December 21, 2015 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Upload: others

Post on 05-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Baird Conference Call - WordPress.com

Baird Conference Call

December 21, 2015

Justin J Kringstad Geological Engineer

Director

North Dakota Pipeline Authority

Page 2: Baird Conference Call - WordPress.com

2 JJ Kringstad - North Dakota Pipeline Authority

Page 3: Baird Conference Call - WordPress.com

Presentation Outline

• Understanding current and future oil production

– Activity

– Forecasts

– Drilling economics

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– NGL Outlook

JJ Kringstad - North Dakota Pipeline Authority 3

Page 4: Baird Conference Call - WordPress.com

Presentation Outline

• Understanding current and future oil production

– Activity

– Forecasts

– Drilling economics

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– NGL Outlook

JJ Kringstad - North Dakota Pipeline Authority 4

Page 5: Baird Conference Call - WordPress.com

North Dakota Drilling Activity

5 JJ Kringstad - North Dakota Pipeline Authority 5

Page 6: Baird Conference Call - WordPress.com

North Dakota Drilling Activity

6 JJ Kringstad - North Dakota Pipeline Authority 6

Page 7: Baird Conference Call - WordPress.com

North Dakota Drilling & Completions

7 JJ Kringstad - North Dakota Pipeline Authority 7

Page 8: Baird Conference Call - WordPress.com

Understanding Current Production Dynamics Non-Confidential Spud to Initial Production Timeline

8 8 JJ Kringstad - North Dakota Pipeline Authority

Page 9: Baird Conference Call - WordPress.com

North Dakota Oil Production Forecast

9

9 JJ Kringstad - North Dakota Pipeline Authority 9

Page 10: Baird Conference Call - WordPress.com

North Dakota Forecast Activity Assumptions

10

10 JJ Kringstad - North Dakota Pipeline Authority 10

Page 11: Baird Conference Call - WordPress.com

North Dakota Oil Differential

11

11 11 JJ Kringstad - North Dakota Pipeline Authority

Based on EIA Data

Page 12: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 12

Peak Month Minimum 500 BOPD

4,115 Wells

$40 Wellhead

Page 13: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 13

Peak Month Minimum 600 BOPD

2,855 Wells

$40 Wellhead

Page 14: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 14

Peak Month Minimum 700 BOPD

1,859 Wells

$40 Wellhead

Page 15: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 15

Peak Month Minimum 800 BOPD

1,175 Wells

$40 Wellhead

Page 16: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 16

Peak Month Minimum 900 BOPD

700 Wells

$40 Wellhead

Page 17: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 17

Peak Month Minimum 1,000 BOPD

438 Wells

$40 Wellhead

Page 18: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 18

Peak Month Minimum 1,200 BOPD

200 Wells

$40 Wellhead

Page 19: Baird Conference Call - WordPress.com

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 19

Peak Month Minimum 1,500 BOPD

59 Wells

$40 Wellhead

Page 20: Baird Conference Call - WordPress.com

Peak Month:

100-300 BOPD* *Low production wells also occur in areas deemed “Core” or “Hot Spot”.

Risk is still present in most areas.

Mapped wells drilled 2012-2014

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 20

1,169 Wells

Page 21: Baird Conference Call - WordPress.com

JJ Kringstad - North Dakota Pipeline Authority 21

Breakeven Summary

Page 22: Baird Conference Call - WordPress.com

Arguments

• Well economic assumptions too optimistic

or conservative

– Jump to lower or higher well performance

footprints

• Some rigs are not drilling Bakken/Three

Forks wells

– No economics were run on wells in other

formations

JJ Kringstad - North Dakota Pipeline Authority 22

Page 23: Baird Conference Call - WordPress.com

Presentation Outline

• Understanding current and future oil production

– Activity

– Forecasts

– Drilling economics

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– NGL Outlook

JJ Kringstad - North Dakota Pipeline Authority 23

Page 24: Baird Conference Call - WordPress.com

Estimated Williston Basin Oil Transportation

24

24 JJ Kringstad - North Dakota Pipeline Authority 24

October 2015

Page 25: Baird Conference Call - WordPress.com

Estimated Williston Basin Oil Transportation

25

25 JJ Kringstad - North Dakota Pipeline Authority 25

Page 26: Baird Conference Call - WordPress.com

26

Estimated ND Rail Export Volumes

JJ Kringstad - North Dakota Pipeline Authority 26

Page 27: Baird Conference Call - WordPress.com

Rail Destinations Market Share (Sep 2015)

27 JJ Kringstad - North Dakota Pipeline Authority 27

Data for Rail Destination Market Share Provided by the US Energy Information Administration

Page 28: Baird Conference Call - WordPress.com

Williston Basin Oil Production & Export Capacity, BOPD

Production forecast is for visual demonstration purposes only and should

not be considered accurate for any near or long term planning.

28 28 JJ Kringstad - North Dakota Pipeline Authority

Page 29: Baird Conference Call - WordPress.com

Energy Transfer Partners: Dakota Access

29

29

• Successful Open Season During the First Half of 2014

• 450,000 BOPD Capacity to Patoka, IL (30”)

• Expandable Up To 570,000 BOPD if Shipper Demand Exists

• Target In-service Date: Late 2016

Map Source: Energy Transfer Partners

29 JJ Kringstad - North Dakota Pipeline Authority

Page 30: Baird Conference Call - WordPress.com

North Dakota Pipeline Company LLC - formerly known as Enbridge

Pipelines (North Dakota) LLC

• Open Season Dates: November 26, 2013 – January 24, 2014

• 225,000 BOPD ND Capacity to Clearbrook, MN (24”)

• 375,000 BOPD Clearbrook, MN to Superior, WI (30”)

• Target In-service Date: 2017

Sandpiper Pipeline

30

30

Map: Enbridge

30 JJ Kringstad - North Dakota Pipeline Authority

Page 31: Baird Conference Call - WordPress.com

TransCanada: Upland Pipeline

Map: NEB – NDPA Upland Addition

• Successful Open Season During 2014

• Initial Capacity 220,000 BOPD (Expandable to 300,000 BOPD)

• Target In-service Date: 2020

• Energy East Project Capacity 1.1 MMBOPD

31 JJ Kringstad - North Dakota Pipeline Authority

Page 32: Baird Conference Call - WordPress.com

Forecasting Future Market Share is Difficult

32

Predicting how future oil production will move with any

degree of confidence is difficult/impossible due to:

• Future oil production uncertainty

• Shifting market conditions

• Project commitments are unknown (pipe & rail)

• Regulatory uncertainty (pipe, rail, exports, etc)

32 JJ Kringstad - North Dakota Pipeline Authority

Page 33: Baird Conference Call - WordPress.com

Presentation Outline

• Understanding current and future oil production

– Activity

– Forecasts

– Drilling economics

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– NGL Outlook

JJ Kringstad - North Dakota Pipeline Authority 33

Page 34: Baird Conference Call - WordPress.com

Evolution of Oil Gathering in ND

34 JJ Kringstad - North Dakota Pipeline Authority

Page 35: Baird Conference Call - WordPress.com

Evolution of Oil Gathering in ND Statewide Totals

35 JJ Kringstad - North Dakota Pipeline Authority

Page 36: Baird Conference Call - WordPress.com

Estimated Loaded Oil Truckloads Per Day

April 2015 Data 220 bbls/Truck

36 JJ Kringstad - North Dakota Pipeline Authority

Page 37: Baird Conference Call - WordPress.com

Presentation Outline

• Understanding current and future oil production

– Activity

– Forecasts

– Drilling economics

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– NGL Outlook

JJ Kringstad - North Dakota Pipeline Authority 37

Page 38: Baird Conference Call - WordPress.com

Simple Terms Blue – Lack of pipelines Orange – Challenges on existing infrastructure

GREEN – % of gas captured and sold Blue – % flared from zero sales wells Orange – % flared from wells with at least one mcf sold.

October 2015 Data – Non-Confidential Wells Statewide

Solving the Flaring Challenge

38 JJ Kringstad - North Dakota Pipeline Authority

Page 39: Baird Conference Call - WordPress.com

Solving the Flaring Challenge

39 JJ Kringstad - North Dakota Pipeline Authority

Page 40: Baird Conference Call - WordPress.com

Solving the Flaring Challenge

40 JJ Kringstad - North Dakota Pipeline Authority

Page 41: Baird Conference Call - WordPress.com

Capturing the 3% Faster Well Connections

41 41 JJ Kringstad - North Dakota Pipeline Authority

Page 42: Baird Conference Call - WordPress.com

NGL Pipeline Transportation

42 JJ Kringstad - North Dakota Pipeline Authority

Page 43: Baird Conference Call - WordPress.com

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: [email protected]

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

43 JJ Kringstad - North Dakota Pipeline Authority

Contact Information

43