bagley school 2014-2015 angela lamb 1st quarter (8/11/13 –10/15/13) welcome back 2014-15 september...
TRANSCRIPT
Bagley School 2014-2015 Angela Lamb 1st QUARTER (8/11/13 –10/15/13)
• WELCOME BACK 2014-15• September is Realistic Fiction Month (Chapter Book Read Alouds & Discussions: Junie B. Jones & I Survived: Japanese Tsunami)
• Global Scholar Testing• Bagley Book Club Review w/Mrs. Atchley• Dewey Decimal System Review/ Rap
(Pinterest) (https://www.youtube.com/watch?v=NHiUQb5xg7A&feature=player_embedded)
• Fiction/Non-Fiction T-chart sort• Resource Hunt 2nd-5th • Dictionary Skills Review (technologytailgate.com)
• Fiction vs. Nonfiction (Compare and Contrast, Titanic)
• October is Scary Story & Mystery Month (Read alouds: Stink and the Midnight Zombie Walk, Going Batty, Zombie Halloween)
Compare and Contrast Fiction and Nonfiction
technologytailgate.com
Realistic Fiction Read Alouds/Discussions
Halloween Scary
Story and
Mystery Read
Alouds K-3rd
Fiction/Nonfiction T-chart
Your School Name 2013-2014 librarian(s) & aide names here 1st QUARTER (8/14/13 – 10/21/13)
* Last 3 rows show the number of class periods that student equipment was reserved; these numbers are not included in the circulation statistics column.
Utilization Report:
Days Open 47 47
Average Daily Attendance 136.1 136.1
Total Quarterly Circulation 6533 6533
Books 6314 6314
OverDrive & other eBooks 0 0
VHS/DVD/audio 10 10
Teacher Equipment (projectors, TVs, etc.) 220 220
*Class Reservations COMP LAB 10 10
*Class Reservations LAPTOPS 30 30
*Class Reservations NOOKS 40 40
Bagley School 2014-2015 Angela Lamb 1st QUARTER (8/11/13 –10/15/13)
Your School Name 2013-2014 librarian(s) & aide names here 1st QUARTER (8/14/13 – 10/21/13)
Topic & Brief Description Grade Level & Subject Area
*Level of Collaboration
1 2 3 4 Standards
Global Scholar Testing 5th- 8th X
George Washington Carver 9/1/14
Blakney X
Henry and Mudge 9/11/14 Jett X
Farm Life 9/5/14 Ledlow X
Easy Chapter Books 9/15/14 Ledlow X
How I Became a Pirate 9/10/14
Mayfield 4th X
Thank You Mr. Falker 9/15/14 Mayfield 4th X
The Tiger Rising 9/1/14 Humber 6th X
6th grade Current events research
Orange 6th X
Library Utilization & Collaboration Highlights: PAGE ONE
Bagley School 2014-2015 Angela Lamb 1st QUARTER (8/11/13 –10/15/13)
Your School Name 2013-2014 librarian(s) & aide names here 1st QUARTER (8/14/13 – 10/21/13)
Topic & Brief DescriptionGrade Level & Subject
Area*Level of Collaboration
1 2 3 4 Standards
Halloween Stories/Mysteries Ledlow X
Welcome Back *Intro. * Review Procedures (OPAC, Ordering, etc.)* Parts of A Book
K-1st 2nd -5th
X 4.1.1,4.1.2, .2.1, 4.2.4, 1.1.6,1.1.4, 1.4.6, 1.2.2, 4.4.6,3.3.4, 4.1.8,2.1.2, .1.4,2.1.2,
Realistic Fiction *Read Alouds *Discussions Compare Realistic and Nonfiction
K-5 X 1.1.4,4.4.4, 4.2.1, 4.1.3,
Dewey Decimal System *Review: What is it? How do I? *Rapwww.youtube.com/watch?v=NHiUQb5xg7A&feature=player_embedded
K-5 X 2.1.2, 1.1.4, 4.1.4,4.2.1,
Fiction/Nonfiction *Sort *Compare and Contrast
K-5 X 1.1.4,4.1.4, 4.2.1
Resource Hunt * Review * Partner Search
K-5 X 1.1.1, 1.1.2, 1.1.5, 1.1.8,1.2.4,1.3.1,1.3.3,1.3.5,2.1.4,3.1.6,4.1.7
Dictionary Skills Review (technologytailgate.com)
K-5 X 1.1.1,1.1.2,1.1.8,1.2.4, 1.3.1,1.3.3, .3.5,2.1.4, 3.1.6,4.1.7
Library Utilization & Collaboration Highlights: PAGE TWO
Bagley School 2014-2015 Angela Lamb 1st QUARTER (8/11/13 –10/15/13)
Your School Name 2013-2014 librarian(s) & aide names here 1st QUARTER (8/14/13 – 10/21/13)
Date Teacher Topic & Brief Description
8/12 Bagley Remind101 Re-set and set up for new Teachers
8/12 Bagley Google Drive & Tech. info questionnaire
8/12 Bagley Created & Set up school wide work order form for office.
8/14 Humber Java & Lync Uninstall, Promethean Trouble shooting
8/15 Bagley Java & Lync Uninstall, Promethean Trouble shooting, work orders for now working boards or pens.
8/15 Moody Work order completed for Computer Lab set-up
8/20 Ogle Projector/Promethean troubleshoot, work order
9/10 Moody Work Order for Promethean set-up/Installation, two computers in lab need repaired
9/10 Humber Promethean repair work order
Teacher Training & Tech Support PAGE ONE (highlights, not an all-inclusive list)
Bagley School 2014-2015 Angela Lamb 1st QUARTER (8/11/13 –10/15/13)
Your School Name 2013-2014 librarian(s) & aide names here 1st QUARTER (8/14/13 – 10/21/13)
Date Teacher Topic & Brief Description
9/22 S. Wakefield Reset Promethean board, will not turn on, flame isn’t glowing, completed work order.
9/29 Bagley Setting adjustments made to Lync startup, help make it work correctly with Promethean Boards
10/6/14 Dr. KB & Bridier Website set-up, Work order
10/6/14 S. Wakefield Promethean trouble shooting, no signal, work order
Teacher Training & Tech Support PAGE TWO (highlights, not an all-inclusive list)
Bagley School 2014-2015 Angela Lamb 1st QUARTER (8/11/13 –10/15/13)