b & t group presentation on modern practices in power utilities
TRANSCRIPT
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
1/14
MODERN PRACTICES IN POWER
UTILITIES
A presentation
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
2/14
1. New Connection Application Management process.
2. New Meter & Service Line Installation Process.
NEW CONNECTION MANAGEMENTPROCESS:
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
3/14
Field Visit toCustomer
FieldVerification
Form Fillingand
Documentation
lication
rocessed atback-end
NEW CONNECTION APPLICATION MANAGEMENTPROCESS:
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
4/14
NEW CONNECTION APPLICATION MANAGEMENT
PROCESSA picture of Bac end Team at wor .
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
5/14
NEW CONNECTION APPLICATION MANAGEMENT
PROCESS
2. Customer details li ename, place where newconnection is required,
type of connection domestic/industrial/agri
cultural/etc., contactdetails li e phone nos.,
e-mail id, etc. ta en.
3. Bac end Team contactscustomer and fixes up
appointment at a convenientdate and time for Field
Service Executive visit andexplains the documentation
to e ept ready y the
customer.
5. The ac end TEAMverifies the filled upforms and attached
documentation and if allcorrect, puts it up for
processing the fees andDemand Note
4.Field Executive visits thecustomer at his premises atthe pre-fixed appointment
time, inspects the premises,verifies the documents
provided y the customer andif all found OK gets the
documentation done andta es a photograph of the
premises and returns the fileto the ac end.
1. Customercontacts utility(phone call, e-
mail, post,personal visit,
etc).
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
6/14
NEW CONNECTION APPLICATION MANAGEMENT PROCESS
Bac end TEAM verifying consumer application file rought ac y the Field
Service Executive.
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
7/14
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
8/14
NEW METER & SERVICE LINE INSTALLATION MANAGEMENT
PROCESSA picture of the Mo ile units deployed for speedy wor flow process
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
9/14
NEW METER & SERVICE LINE INSTALLATION MANAGEMENT
PROCESS
1. Mo ile Teams collect the meters, service line, seals etc. from the ac -end
stores and leave in the morning.
2. They reach the customer site and install the new meter and service lineand energise the premises.
3. They get the protocol sheets filled up and signed y the customer.
4. These are then su mitted to the ac end at the end of the day when all
given installations are completed.
5. The ac -end stores Team verifies the protocol sheets and the material
issued to the mo ile Team is reconciled in the evening itself.
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
10/14
NEW METER & SERVICE LINE INSTALLATION MANAGEMENT
PROCESS
SERVICE LINE BEING TAKEN FROMTHE NEAREST POLE
A LINEMAN ON THE POLE FIXING ASERVICE LINE
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
11/14
NEW METER & SERVICE LINE INSTALLATION MANAGEMENT
PROCESS
SERVICE LINE BEING BROUGHT TOCUSTOMER PREMISES
LAYING OF SERVICE LINE
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
12/14
NEW METER & SERVICE LINE INSTALLATION MANAGEMENT
PROCESS
NEWLY INSTALLED METER NEWLY INSTALLED METER
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
13/14
NEW METER & SERVICE LINE INSTALLATION MANAGEMENT
PROCESS
MOBILE VAN MEMBERSMOBILE VAN WITH ISSUED
MATERIALS
-
8/8/2019 B & T Group Presentation on Modern Practices in Power Utilities
14/14
NEW METER & SERVICE LINE INSTALLATION MANAGEMENT
PROCESS
MOBILE TEAM (MEMBERS OF A VAN) BACKEND TEAM