B I ii . , PACIFIC HYDROLOGY CONSULTANTS LTD. Consilting Hfdrogeo1ogis:s Suite 330,580 Hornby Street. Vancouver, B C.. Canada V6C 386 Phone (604) 683-9612 Fax (604) 683-9676 Project No. V704102 i i I I I I I I I I I I I I I I April 26, 1995 Value Contracting P.O. Box 256 OKANAGAN FALLS, B.C. VOH 1RO Attention: Mr. R. Pearce Subject: Evaluation of Water Quantity and Quality from Two Drilled Wells on the Proposed -- Lackey Subdivision on Anarchist Mountain East of Osoyoos, B.C. - Dear Sirs: 1.0 INTRODUCTION The purpose of this letter-report is to discuss the suitability of each of the two drilled wells proposed as individual water supply sources for a two-lot rural subdivision on the lower southwest-facing slope of Anarchist Mountain east of Osoyoos, B.C. Figure 1 in Appendix A is an area location map showing the regional topographic setting of the subdivision; Figure 2 is a plan of the proposed subdivision of the Lackey parcel of land, which is legally described as Lot 23, D.L. 2709, S.D.Y.D., Plan 21789 Except Plan 33892. Our understanding of the situation concerning the proposed Lackey Subdivision can be summarized as follows: 1. 2. 3. As shown on Figure 1 in Appendix A, the proposed two-lot rural subdivision of the subject Lackey Property is located on the southwest-facing forested slope of Anarchist Mountain. The steep topography of the site is reflected in a large difference in static water levels between the two wells; the existing Well No. 1 on the south Lot 2 of the subdivision is located at an elevation more than 30 m (100 ft) higher than the new Well No. 2 on the north Lot 1. As shown by the "Well Log Construction Records" contained in Appendix Bythe area is one of thin overburden over bedrock. The existing well (No. 1) on the proposed south Lot 2 was installed by Quality Water Wells in September 198 1. The well is a drilled rock well with 2.7 m (9 ft) of 150 mm (6") diameter steel casing installed through 2.4 m (8 ft) of unconsolidated sediments and seated 0.3 m (1 ft) in solid bedrock. A note on the water well record indicates that the main water-bearing fracture was intersected at a depth of 72.6 m (238 ft). Prior to the start of the pumping test of Well No. 1 on April 9, 1995, the static water level was 55.01 m (180.42 ft) below the well casing datum. The new well (No. 2), which was recently installed by Quality Well Drilling Ltd. as a water source for the proposed north Lot 1, is also a drilled rock well. Well No. 2 extends to a total depth of 73.8 m (242 ft), with 2.4 m (8 fi) of 150 mm (6") diameter steel casing installed through the unconsolidated sediments and seated about 0.3 m (1 fi) into the solid bedrock. Prior to the start of the pumping test of Well No. 2 on April 9, 1995, the static water level was 10.67 m (35 fi) below the well casing datum.. A member of the STEFFEN ROBERTSONAND KIRSTEN Group of Companies. Other offices in Canada.U.S.A.. United Kingdom and Africa.

Upload: others

Post on 18-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

B

I ii . , PACIFIC HYDROLOGY CONSULTANTS LTD. Consilting Hfdrogeo1ogis:s

Suite 330,580 Hornby Street. Vancouver, B C.. Canada V6C 386 Phone (604) 683-9612 Fax (604) 683-9676

Project No. V704102

i i I I I I I I I I I I I I I I

April 26, 1995

Value Contracting P.O. Box 256 OKANAGAN FALLS, B.C. VOH 1RO

Attention: Mr. R. Pearce

Subject: Evaluation of Water Quantity and Quality from Two Drilled Wells on the Proposed - - Lackey Subdivision on Anarchist Mountain East of Osoyoos, B.C. -

Dear Sirs:

1.0 INTRODUCTION

The purpose of this letter-report is to discuss the suitability of each of the two drilled wells proposed as individual water supply sources for a two-lot rural subdivision on the lower southwest-facing slope of Anarchist Mountain east of Osoyoos, B.C. Figure 1 in Appendix A is an area location map showing the regional topographic setting of the subdivision; Figure 2 is a plan of the proposed subdivision of the Lackey parcel of land, which is legally described as Lot 23, D.L. 2709, S.D.Y.D., Plan 21789 Except Plan 33892.

Our understanding of the situation concerning the proposed Lackey Subdivision can be summarized as follows:

1.

2.

3.

As shown on Figure 1 in Appendix A, the proposed two-lot rural subdivision of the subject Lackey Property is located on the southwest-facing forested slope of Anarchist Mountain. The steep topography of the site is reflected in a large difference in static water levels between the two wells; the existing Well No. 1 on the south Lot 2 of the subdivision is located at an elevation more than 30 m (100 ft) higher than the new Well No. 2 on the north Lot 1. As shown by the "Well Log Construction Records" contained in Appendix By the area is one of thin overburden over bedrock.

The existing well (No. 1) on the proposed south Lot 2 was installed by Quality Water Wells in September 198 1. The well is a drilled rock well with 2.7 m (9 ft) of 150 mm (6") diameter steel casing installed through 2.4 m (8 ft) of unconsolidated sediments and seated 0.3 m (1 ft) in solid bedrock. A note on the water well record indicates that the main water-bearing fracture was intersected at a depth of 72.6 m (238 ft). Prior to the start of the pumping test of Well No. 1 on April 9, 1995, the static water level was 55.01 m (180.42 ft) below the well casing datum.

The new well (No. 2), which was recently installed by Quality Well Drilling Ltd. as a water source for the proposed north Lot 1, is also a drilled rock well. Well No. 2 extends to a total depth of 73.8 m (242 ft), with 2.4 m (8 fi) of 150 mm (6") diameter steel casing installed through the unconsolidated sediments and seated about 0.3 m (1 fi) into the solid bedrock. Prior to the start of the pumping test of Well No. 2 on April 9, 1995, the static water level was 10.67 m (35 fi) below the well casing datum..

A member of the STEFFEN ROBERTSON AND KIRSTEN Group of Companies. Other offices in Canada. U.S.A.. United Kingdom and Africa.

Value Contracting Evaluation of Water Quantity and Quality from Two Drilled Wells on the Proposed Lackey Subdivision on Anarchist Mountain East of Osoyoos, B.C. April 26, 1995 - Page 2

I I I I I I I I I I I I I I I I I I

4. The subject Lackey Subdivision is located within Electoral Area "A" of Regional District of Okanagan-Similkameen (RDOS). RDOS Bylaw 300, as modified by Bylaw No. 966, states that "...a well capable of providing a minimum yield of three (3) gallons (23.5 L) per minute for each proposed parcel" must be provided. We assume that the 23.5 L should be 13.5 L.

2.0 WELL CAPACITY TESTING

2.1 Test Procedure

The subject two Lackey Wells were pumped simultaneously, each for almost four days, with the pump in Well No. 2 on the north Lot 1 started about two hours after the pump in Well No. 1 was started. Pumping was carried out using submersible pumps connected to electric power; the existing pump in Well No. 1 was used for the test; Value Contracting fkrnished a test pump for the new Well No. 2.

2.2 Test Results

Data collected during the capacity tests of the subject Lackey Wells No. 1 and No. 2 are contained in Appendix C, along with standard time-drawdown and time-recovery plots of the data.

2.2.1 Well No. 1 on Lot 2

Capacity testing of Well 1 commenced at 08:15 a.m. on April 9, 1994 and pumping continued for a total of 5720 minutes (3.97 days). During the first 70 minutes, pumping was at a constant rate of 36.3 Zlmin (8 igpm), following which an inline Dole valve was installed to control the rate at 13.6 Zlmin (3 igpm) for the duration of the test period.

As shown on the time-drawdown plot for Well No. 1, when the pumping rate was reduced from 36.3 to 13.6 Zlmin, the water level immediately recovered from maximum drawdown of 18.04 m (59.16 Et) to a pumping water level just over 61 m (200 ft) at drawdown of 6.4 to 6.7 m (21 to 22 ft); the pumping water level was maintained at a fairly constant level up until 720 minutes. From 720 minutes, steady drawdown continued until pumping was terminated at 5720 minutes (3.97 days), reaching final drawdown of 16.01 m (52.50 Et), still less than the initial maximum drawdown of 18.04 m reached after 70 minutes of pumping at the initial rate of 36.3 Zlmin (8 igpm).

During the pumping of Well No. 1, a total of 79380 litres (17,535 igals) of water were removed, at an average pumping rate of 13.9 Zlmin (3.06 igpm). By 5865 minutes after the termination of pumping, the water level had recovered to 74% of the pre-pumping static water level and the time-recovery plot (Figure 4, Page C - 5 ) of the data shows that complete recovery can be projected. Attention is drawn to the recovery data as well as the character of the data plot which shows that immediate recovery occurred when

Pacific Hydrology Consultants Ltd

Q

recovery data plot for Well No. 2 is markedly different from that for Well No. 1, in that it consists of one traight-line segment while that for Well No. 2 consists of three segments, like Well No. 1, immediate ecovery of the water level began as soon as pumping was terminated.

discussed above, each of the subject Lackey Wells responded uniquely to pumping. Since both were ed simultaneously, concern that use of one well will affect the other can be eliminated. Obviously, No. 2 has intersected a more extensive water-bearing fracture network than Well No. 1 and can in a higher rate for long-duration continuous pumping. However, surprisingly, the performance of No. 1 , as measured by specific capacity calculated at maximum drawdown at the end of the pumping

0.87 Zlminlm (0.06 igpmlft), with the performance of Well No. 2, as similarly measured by apacity calculated at maximum drawdown at the end of the pumping test, only marginally lower

in/m (0.05 igpdft). Based on the location of the Lackey Wells within the groundwater flow and on the observed response to both pumping and recovery, large seasonal fluctuations in

Value Contracting . Evaluation of Water Quantity and Quality from Two Drilled Wells on the Proposed Lackey Subdivision on Anarchist Mountain East of Osoyoos, B.C. April 26, 1995 - Page 3

- . ~ 1 . I . . 1 , . 1 1 . . - . . 4 1 . 1 . . ~ 1 ~ . 1 . . 1 . . I . . . . . . . . , l , I I ‘ . . , . . I I I . I I ~ I ~ . ~ . . I ~ I I , . , . ~

pumping was terminated, followed by a period from 30 to 630 minutes after the termination of pumping (t/t’ of 200 to 10) when the rate of recovery was very slow, before recovery of the water level resumed at a more rapid rate. This behaviour is interpreted to be a result of filling of a fiacture that had become dewatered during pumping. The most significant features of the recovery data and plot, insofar as suitability of the well as an individual source of domestic water supply are concerned, is the immediate start of recovery of the water level when pumping is terminated. We attribute this to the favourable location of the well in the zone of groundwater discharge on the lower slope of Anarchist Mountain.

- - -- 2.2.2 Well 2 on Lot 1 .

Capacity testing of Well 2 commenced at 1O:OO a.m. on April 9, 1994 and pumping continued for a total of 5655 minutes (3.9 days). During the first 45 minutes, pumping was at a constant pumping rate of 68.1 Zlmin (15 igpm), following which an inline Dole value controlled the rate at 13.6 Zlmin (3 igpm) for the duration of the test period.

As shown on the time-drawdown plot for Well No. 2 (Figure 5, Page C - lo), the water level immediately recovered from maximum drawdown of 41.87 m (137.33 ft) when the pumping rate was reduced, to a pumping water level just over 13.4 m (44 ft), with approximate stability maintained until about 700 minutes. After 700 minutes until testing was terminated, drawdown continued at a low continuous rate reaching maximum drawdown of 18.80 m (61.67 ft) at 5655 minutes.

During the pumping of Well No. 2, a total of 79356 litres (17,505 igals) of water were removed at an average pumping rate of 14 Zlmin (3.08 igpm). By 5820 minutes after the termination of pumping, the water level had recovered to 88% of the pre-pumping static water level and the time-recovery plot (Figure 6, Page C -10) shows that complete recovery can be projected. Although the nature of the

Pacific Hydrology Consultants Ltd.

Value Contracting Evaluation' of Water Quantity and Quality from Two Drilled Wells on the Proposed Lackey Subdivision on Anarchist Mountain East of Osoyoos, B.C. April 26, 1995 - Page 4

I

I I I I I I I I I I I 1 I I I I

2.4 Well Capacitv

The capacity testing of the subject Lackey Wells has shown the following:

3.0

Each of the Wells can sustain a pumping rate of 13.6 Z/min (3 igpm) for several days and, certainly, for more that the usual short-duration daily peak domestic water supply requirements of several hours for a single residence.

- - Based on the performance of the Wells during pumping and recovery, the average long-term capacity for continuous pumping is probably less than 13.6 Zlmin (3 igpm) in the case of Well No. 1 but it is still probably at least half that, which is still much more than an adequate individual domestic water supply source. The fact that the well has been a satisfactory water source for the Lackeys supports this conclusion.

GROUNDWATER QUALITY

Appendix D contains a report from Analytical Service Laboratories Ltd. (ASL) which presents the results of chemical and bacteriological analyses carried out by ASL on samples of groundwater collected from the subject Lackey Wells during the simultaneous pumping test.

Both the groundwater yielded by the existing Well 1 on the south (upper) Lot 2 of the Lackey Subdivision, and that yielded by the new Well 2 on the north (lower) Lot 1, are only moderately mineralized, with respective total dissolved solids reported by ASL at 296 and 280 mgll. Both waters are hard bicarbonate type waters, with a similar respective mixed cation content of C%,,MgZlN%, and Ca61Mgz Pa,,.

As stated by ASL in their report, the groundwater from both of the subject Lackey Wells, satisfied drinking water quality guidelines of Health and Welfare Canada, which have been adopted by B.C. Ministry of Health as the basis for determining potability, for all parameters checked.

In general, the groundwater from each of the Lackey Well, as represented by the ASL analyses, is of good chemical quality for domestic consumption and is free of coliform bacteria, as expected for a deep groundwater source.

Pacific Hydrology Consultants Ltd

~ ~ ~ ~

Value Contracting Evaluation of Water Quantity and Quality from Two Drilled Wells on the Proposed Lackey Subdivision on Anarchist Mountain East of Osoyoos, B.C. April 26, 1995 - Page 5

4.0 SUMMARY AND CONCLUSIONS

I t I I I I I I I I I I

The situation with respect to the subject Lackey Wells 1 and 2 on respective Lots 2 and 1 of the proposed subdivision of Lot 23, D.L. 2709, S.D.Y.D., Plan 21789 Except Plan 33892, may be summarized as follows:

1.

I

2.

3.

4.

Well 1 on the upper (south) Lot 2 is an existing well installed in September 1981 by Qua1ity:Water Wells Ltd. to a depth of 86.9 m (285 ft) in rock below 2.4 m (8 ft) of unconsolidated sediments. The Well is completed with 2.7 m (9 fi) of 150 mm (6") diameter casing installed through the overburden. Prior to the start of the capacity test of the Well on April 9, 1995, the static water level was 55.0 m (180.42 fi) below the well casing.

Testing of Well 1 was carried out for a total of 5760 minutes starting on April 9, 1995. Pumping during the fmt 70 minutes was at a rate of 36.3 Zlmin (8 igpm), following which the rate was controlled at a fEed rate of 13.6 llmin (3 igpm) by an inline Dole valve. Following the termination of pumping, the recovery of the water level was observed for 5865 minutes, by which time a trend to complete recovery of the water level could be projected.

Well 2 on the lower (north) Lot 1 is a newly drilled well installed in March 1995 by Quality Well Drilling Ltd. to a depth of 73.7 m (242 fi) in rock below 2.1 m (7 ft) of unconsolidated sediments. The Well is completed with 2.4 m of 150 mm (6") diameter casing installed through the overburden and seated in solid bedrock. Prior to the start of the capacity test of Well 2 on April 9, 1995, the static water level was 10.67 m (35 fi) below the well casing.

Well 2 was pumped for a total of 5655 minutes, also starting on April 9, 1995. Pumping during the first 45 minutes was at a rate of 68.1 Zlmin (1 5 igpm), following which the rate was controlled at a fixed rate of 13.6 llmin (3 igpm) by an inline Dole Valve. Following the termination of pumping, the recovery of the water level was observed for 5820 minutes, by which time a trend to complete recovery of the water level could be projected.

Based on the results of long-duration capacity testing and on the results of groundwater quality sampling and analysis, the following conclusions are reached about the individual domestic water sources represented by the subject Lackey Wells:

Each of the Wells is a suitable individual source of domestic water supply, as defined by RDOS Bylaw 300.

The quality of groundwater yielded by each of the Wells satisfies potability requirements of B.C. Ministry of Health.

Pacific Hydrology Consultants Ltd

Value Contracting Evaluation of Water Quantity and Quality from Two Drilled Wells on the Proposed Lackey Subdivision on Anarchist Mountain East of Osoyoos, B.C. April 26, 1995 - Page 6

We trust that this letter and attachments will be acceptable to RDOS as proof of water for the subject Lackey Subdivision on Anarchist Mountain. However, please do not hesitate to call if any clarification of the contents of the letter is required or if we can provide any further assistance with subdivision approval.

Yours truly, PACIFIC HYDROLOGY CONSULTANTS LTD.

n

Anri'Badry, P. Geo. I Hydrogeologisthlanager

Attachments

Pacific Hydrology Consultants Ltd

D I

4

LOCATION: D.L. 2709, Anarchist Mountain, east of Osoyoos, B.C.

Notes:

1. The base map is 1:50,000 scale topographic map NTS 82E/3, Osoyoos; contour interval is 100 A.

outlines area of subject Lackey Subdivision; for well 2* -a locations, see Figure 2.

AREA LOCATION AND REGIONAL TOPOGRAPHY

DRAWNBW FIGURE: 1

DATE 04/26/95 ab :

PROJECT NO.: V704102 PACIFIC HYDROLOGY CONSULTANTS LTD. CONSULTING HYDROGEOLOGISTS

~ ~~

Notes:

I . The base map is a subdivision site plan by Matthews & Associates dated March 6, 1995, File 940067-2.TNT, reduced to an approximate scale of 1 :3400.

Legal property description: Lot 23, D.L. 2709, S.D.Y.D., Plan 21789 Except Plan 33892. 2.

3. 0 denotes the location of a drilled well, as identified.

LACKEY SUBDMSION

LOCATION: D.L. 2709, Anarchist Mountain East of Osoyoos, B.C.

PROJECTNO.: V704102

PROJECT:

SUBDMSION SITE PLAN

DATE: DRAWN BY: FIGURE: 04/26/95 ab 2

PACIFIC HYDROLOGY CONSULTANTS LTD. CONSULTMG HYDROGEOLOGISTS

r 1

. . . . . . . . .

CONSTRUCTION RECORD

1 ,: ' . /J.J>, s $+. r . - L ; I-

. .

'1. to* CASING RECORD

Dia.&ns. W t . u # ) / t t . From L

Dla.-Ins. Wt -#/It. PI om-to- - - Uia.-Ins. Wt.-a/ft. From-to- Shoe. ..J Welded L/ .... ---

SCREEN RECORD Material -/ Ma ke--.

TOD Slot openin yx f t '

Fittings T o p Fittings Bottom Gravel& k - Natural '-*.'

Development Method '

ROCK WELL DATA Open Bore Hole Dia. L. ins. F r o t n L R . to- ft,

PROD I J CT ION DATA

d 4 .... -.~-* .. * ... 4 ... ...7.; .. 4 4 . Date Started ,L- ..:? :T[;?/

WATER WELLS LTD." 1

Static Lcvel Measured f r o m a , . . ' ..- Pumping Level -_. _. tt. etTGPM -&d &A. "It. tt. at 1 2 GPM Bail Test ft. a b G P H

c___c__ ft. a t G P H Hecommenctea Pump Setting 2 75 ft.

* GPMb" Recnmrnendwl Mar. P u m p O u t p u u QPlt

Duration of Tect-Hrt.

PUMP DATA

Make ---.__- Type Model --_.__ Serial No.-- Size ________.- HP- Drop Plpo-ins. CPM ..... __- Head- ft.- RPM Motor -Volt- PH .... Well Seal - Water Analysis - Hardness.. PPN PH _- Iron --PPH

-.

I Sinned B I

GENERAL REMARKS - ,

. .1.. ', 2 - - .... ....

. . . . c

-I+

8 - 2

I PUMPING TEST - DRAWDOWN DATA I I

Project: I I

I I I I I VALUE CONTRACTING - LACKEY SUBDMSION ON ANARCHIST MOUNTAIN

, I I I I I I

, .We,k No ... l on South (upper) LQt 2 of Lot 23, DL. 2709, S.D.Y.D., Phn 21789 Except Plan 33892, on h c h i s t Mountaineast, . I

of Osoyoos, B.C. I I I

Datum: Top of well casing

Static Water Level: 180.42 ft (55.01 m)

I I I I 04/09/94 I

/Well Details: 285 ft (86.9 m) deep rock well

10:45 150 11:15 180

c - 1

201.92 21.50 201.13 20.71

PUMPING TEST - DRAWDOWN DATA 1 Project:

I I I I I

VALUE CONTRACTING - LACKEY SUBDMSION ONANARCHST MOUNTAIN I I I I

ELAPSED TO 1 PUMPING TIME TIME WATER DRAWDOWN RATE REMARKS

I I I I I I I

I I

c - 2

c - 3

I PUMPING TEST - RECOVERY DATA I I I

I I Proiect: IVALUE CONTRACTING - LACKEY SUBDIVISION ON ANARCHIST MOUNTAIN

I I I

I I I I I I I

I I I I I I I

I I I I I I I

c - 4

J-.- .a-

0

5

10

15

20

25

30

35

40

45

50

55

60

65

._._A_

0

5

10

15

40

45

50

1) @ Figure 3. Time-Drawdown Plot for Pumping Test of Lackey Well

No. 1 on South Lot 2

10 100 1000

Time in Minutes Since Pumping Started

Figure 4. Time-Recovery Plot for Pumping Test of Lackey Well No. 1 on South Lot 2

10000

1 10 100 1000

Time in Minutes Since Pumping Started/Time in Minutes Since Pumping Stopped

10000

c - 5

, I

Static Water Level: 35.00 ft (10.67 m)

Datum: Top of well casing

I

ELAPSED TO PUMPING I - TIME WATER DRAWDOWN RATE I REMARKS

I I

Well Details: 242 ft (73.8 m) deep rock well

10:14 10:16

C - 6

14 100.25 65.25 16 109.2 1 74.21

I I I I I I I I I PUMPING TEST - DRAWDOWN DATA

1o:oo 20~45

, 1440 86.33 51.33 I I I 2085 87.83 52.83

I I I I I

Project: VALUE CONTRACTING - LACKEY SUBDMSION ON ANARCHIST MOUNTAIN I I

0411 1/95 08:OO 18:25

04/12/95 08:30

I I I t I I I I I 1 I I I 1 I I

!

2760 91.17 56.17 3385 91.83 56.83

4230 94.50 59.50

I I I I I I I 1

I

19:oo 4860 04/13/95 I

94.33 59.33

08:15 5655 96.67 I 61.67 I stop Pump.

I I

__

1 ~

I

c - 7

Q

a - .

I PUMPING TEST - RECOVERY DATA I

I I I I I Project:

Well: No.2 on North (lower) Lot 1 of Lot 23, D.L. 2709, S.D.Y.D., Plan 21789 Except Plan 33892, on Anarchist Mountain east

VALUE CONTRACTING - LACKEY SUBDMSION ON ANARCHIST MOUNTAIN I I

....,,.,_. O~QSO~OOS,B.C-,-L~.-- . . * a 3 - a 8 2 1 , .s 1 s - s _ n 1 s 8 s s a s 8 s s s I } * s * s * I I * 8 * * I 8 I * * s a

Static Water Level: 35.00 fi (10.67 m)

Datum: Top of well casing

Final Drawdown: 61.67 f3 (18.80 m)

08:15 08:17

L

TIMESINCE TIMESINCE DISTANCE PUMPING PUMPING TO RESIDUAL STARTED STOPPED RATIO WATER DRAWDOWN

5655 0 96.67 6 1.67 I stop Pump. 5657 2 2828.5 87.00 52.00

08:21 OR23

566 1 6 943.5 77.67 42.67 5663 8 707.9 75.50 40.50

09:30 09:45

5730 75 76.4 62.17 27.17 5745 90 63.8 61.08 26.08

C - 8

i

I

Project:

I , I I PUMPING I PUMPING TO I RESIDUAL STARTED I STOPPED RATIO I WATER I DRAWDOWN REMARKS

VALUE CONTRACTING - LACKEY SUBDMSION ON ANARCHIST MOUNTAIN

14:15 8895 3240 2.7 45.42 10.42

08:30 9990 4335 2.3 44.17 9.17

09:15 11475 5820 2.0 42.50 7.50

04/16/95

04/17/95

I !

I I I I I I I

I I I I I I

!

c - 9

Q (3 Figure 5. Time-Drawdown Plot for Pumping Test of Lackey Well

No. 2 on North Lot 1

10 100 1000

Time in Minutes Since Pumping Started

10000 ,

Figure 6. Time-Recovery Plot for Pumping Test of Lackey Well No. 2 on North Lot 1

1 10 100 1000 10000

Time in Minutes Since Pumping Startemime in Minutes Since Pumping Stopped

c - 10

. .

RE3ULT3 O F ANALY313 - Watcr F i l e N o . E0700

I .,.. A.... -,.a 2 s.. _. _.... 1 . 1 A . *....I..,. I .. . * . B A , A . - . . a . . . * I ~ . - 1 .. I I... .I I . , I . , I . * 1 , , I . . I I . I I * * * 1 * * * I . ' . I 8

I ' i Lackey Lackey

W c l l t l W C l l # 2 House New well 1 ;

95 04 10 95 06 10 07:45 08:35

P h v c i c a l T e c t c C o l O u T cu Conduc tivi tv Tota l D i c c o l v e d s o l i d e Hardness cam3 PH

T o t a l Suspended Sol ids Turbidity NTU

urrrhos I cm

A l k a l i n i t y T o t a l c h l o r i d e C l F luor ide P S i l i c e L e s io2 S u h h a t e SO4

Nucrlencs Ni t.ra t.e Ni t.rngen N i t r i t e N i t r o g c n

co l i fo rm Bacceria - Fecal Cn1 ifonn Rnct.eria - Tot.nl

w A l u n u n u m T-A1 kseriic T-As Barium T-Ba Eor an T E cadmium 'I'-Cd

C a l c i u a T-Ca Chromium T-Cr Coppcr T Cu I ron T-Pe 1.ead T- P h

Masnes ium T-Ma Manganece T-Mn Mercury T-Hg Pot .aas i i i rn T-K 3 e l c n i u m T - 3 c

S o d i u m T-Ne Z i r r c . T-ZI I

5.0 433 396 190 7. A 9

<I 0.17

CaCO3 220 4.8 0 . 2 1 ia.7 11.5

N N

1 .m 0.001

<2 c2

r .0 .20 0.0001 <o. 010 <o. 10 <0.0002

55.a <0.015 <0.010 eO.030 o . o n i

12.3 <0.005 <0.00005 A . 01 < o . 0005

2 2 . 1 0. OOG

4 . 0 403 370 181 7.72

- - e

<1 0.23

208 4.4 0 - 2 3 17. S 9.4

0 . 3 2 4 0.001

4 0 . 2 0 0.0009 <0.010 to. 10 <o. 0002 53.9 <0.015 <o. 010 <O. 030 <n. on1

11.1 <O. 005 <O. 00005 3.65 <o. 0005

16.2 C O . 005

Kemarks regarding che analyses appear a t the,beginning of c h i s repor t . R e s u l t s are expressed as milligrams Fer l i t r e except for FH. C o l a u r (CU) , C w i d u c L i v i L y ( u r d i w r / c i d , TucbidiLy (NTU) , aid C d i f u L x i BacLLcria ( M P N / l O O i t t l ) . < = Less than the de t ec t ion l i m i t ind ica ted .

I

i

. .

Page 2

Appendix 1 - KECIULAIUKY CKI'I%KIA

Hcdlk Cuada . , , . , , . . . . , . I . I , I . . l I . I . . . l I . , , l '-'d;idcGc~ to; C&idi&i D M G g Waki Q;ali&.'htth' E d . . ' l b ~ ~ .

(Revised December 1 Y Y S for ' i~alome~hanesl All limits are Maximum kceptahle Concentration (MAC) unless

Limits aqressed as milligrams per litre except pH. hrrbidib'.

4 1 4 -a 1 a ..A

I

I

1 otl~au-isc hdicatcd.

Colour. and Coliform Bacteria. I

_ - - - L w r c r Uyycz L i m i t L i m i t Notes

Physical T e s . 5 Colour cu Total Diccolved Solidc Hardness caw3 PH Turbidity NTU

Dissolved Anions cfil ocidc C l Fluoride F Culphatc C04

N i L c a L c : N i L r w y a i N N i t r i t e Nitrogen N

Eaccerloloarcal Tescs Cnlifnrm Rncf-.erin - Fecal Coliform Dacteria - Total

Arsenic T-As RFI r i i im T-RR Doxon T-D Cadmium T-Cd C h r m i u m T-Cr

Comer T-CU I r o n T Fc Lead T-Pb Manganese T-Mn MCLL'ULy T-Hy Selenium T-Se

Sodium T-Na x i nc T-7.n

- 6.S -

- c

c -

- 15 500 mg/L cu I 1

- 2 1 11.5

5 NTU 3, 4

2 5 0 1.5 500

10.0 1.0

0.025 1 .o 5.0 0.u03 0.05

1.0 0.3 0 . 0 1 0 . 0 5 0 . 0 0 1 0 . 0 1

200 5 . 0

u y / L 1 ma/L mg/L 1, 5

Illy / L mulL

c

mg/L 7 mg/T. my/L 7 ma/L %l/L

mulL 1. 3 mg/L 1 mg/L 3 , ti mg/L 1 my/L mu/L

mg/L 1 mg/T. 1. 3

- -

1 Aesthetic Objective (AO) ( t a s t e , odour. appcaxance. e t c . Z M a x i m u m not es tabl ished, levels > 200 m/L are considered Door

3 AL yuiiiL wL: c w I i s L u i i p L i o i i (AO) . 4 1 NTU maximum allowed for water enterinu d i s p i b u t i o n systems. 5 Thcrc may bc a laxatirc c f f c c t i n somc indi-.-iduala whcn aulphatc

leve ls exceed SO0 m g / ~ . 6 No sample should contain more than 10 organisms per 1 0 0 d and

IN c o t i s c c u L i v c scuuiples shwuld Lc p v s i L i v e (MAC). 7 Interim M a x i m u m Acceptable Concentration (IMAc) 9 F i r s t &awn watcr may bc high, f lush syotun bcforc scunpl ing(~~C)

but may be to l e ra t e3 (MI.

Page 3

, .. I ._. .I

...

, , ,, -,. ---- I Fila- -_ Folio

. . CASING RECORD

D i a . A i n s . Wt.;'#/ft. From L' * to$.

Dla.-Ins. Wt -*/k From-to, Dia.-lns. W t . * / f t . From-to- Shoe. ./ Welded Y _.._ w-

SCREEN RECORD Make-- Material&

Slot openin

TOD Fittings Top Fittings Bottom-

7 Gravek6ck

Development Method

- -

at u ra I '

*-..'

ROCK WELL DATA

Own Bore Hole Dia. in

F r o r n L 3 . to 2u

PRODlJCTlON DATA Static Lcvel . ..

Pumping Level -~. .. f t . at-GP _kId,P a/& "[t. tt. at 1 = GP Rail Test ft. a t G F

-ft. a t O F Recommended Pump Set t ing 2 75

GPh Rar.nmmp.nrlad Max. Pump O u t p u u QPI

Duration of Test-H,

PUMP DATA

Make ---.___ TY Pt: hlodel---- _._- Serial No.-- Size _____._..__ tip- Drop Plpo-in CPM _..._ __- Head- ft.- RP Motor Volt- PH -... Well Seal - Water Analysis - Hardness.. PF PH __ iron --PF

8 - 2

P.O. BOX 589 OKANAGAN FALLS, B.C. VOH 1RO

PH: (604) 497-5777 ~~

LOO OF FORMATlOkS

... 11 it- +/ - -

Bail Ted ..-n. at UPH . (1. fit-. GPH

Rcaommonded Pump Seltlng - = ? . I (

Reconimenaed Max. Pump OVrOul (1.2 .J

r'- --...

." -

. . :I..,:'.::. l., ..:, . . I ................. . . . . . . i ;j .. , :. ...-- . . . . .