b e a c h l i n e - images4.loopnet.com · prior written permission of jones lang lasalle lp, inc....
TRANSCRIPT
BUILDING SPECIFICATIONS
PROPOSED SPACE: 510,300 s.f. (1,134’ x 470’)
OFFICE SPACE: Build-to-suit offices
CONSTRUCTION: Tilt-wall
FLOORING SYSTEM: 6” Reinforced @4000 PSI
CEILING HEIGHT: 32’ minimum clear height
COLUMN SPACING: 50’ x 54’ Inner bays60’ x 54’ Staging bays
LOADING: 140 Dock doors (9’ x 10’)4 Drive-in doors (12’ x 14’)
TRUCK COURT: 200’ Truck court depth
LIGHTING SYSTEM: T-5
SPRINKLER SYSTEM: ESFR
ELECTRICAL: 1200 Amp/480 Volt power
ROOFING SYSTEM: TPO Roofing system
TRAILER PARKING: 229
EMPLOYEE PARKING: 302
ZONING: I-2/I-3
Josh LipoffVice President+1 407 982 [email protected]
Joe HillsSenior Vice President+1 407 982 [email protected]
© 2016 Jones Lang LaSalle, lP, Inc. All rights reserved. No part of this publication may be reproduced by any means, whether graphically, electronically, mechanically, or otherwise howsoever, including without limitation photocopying and recording on magnetic tape, or included in any information store and/or retrieval system without prior written permission of Jones Lang LaSalle lP, Inc.
HOFFNER RD
TRA
DEPO
RT D
R
SEMO
RA
N B
LVD
S CO
NW
AY R
D
GO
LDEN
RO
D R
D
LEE VISTA BLV
D
CURRY FORD RDCURRY FORD RD
S OR
AN
GE A
VE
OR
AN
GE B
LOSSO
M TR
JOH
N YO
UN
G PK
Y
LANDSTREET RD
NA
RC
OO
SEE RD
BOGGY CREEK RDSAND LAKE RD
ICP B
LVD
ICP B
LVD
ORLANDO
B E A C H L I N E
Corporate Center
2.3 miles
14.2 miles
18 miles
6.7 miles
22 miles
24 miles