Project Management for Practice Ayla Oasis Construction Project

Faris H. SalousMasters of Science Project Management

Birmingham School of Engineering and Manufacturing Systems

Page 2: AYLA OASIS PROJECT CONSTRUCTION
Page 3: AYLA OASIS PROJECT CONSTRUCTION

6• PESTLE Analysis

7• Conclusion

Page 4: AYLA OASIS PROJECT CONSTRUCTION

A middle point between four countries. (3)Aqaba is considered as a safe destination for the Middle East people. (7)

Aqaba is the largest city on the Gulf of Aqaba & one of the major tourist attraction in Jordan, famous for warm water and various marine life. (2)

Page 5: AYLA OASIS PROJECT CONSTRUCTION

Aqaba – Jordan

Page 6: AYLA OASIS PROJECT CONSTRUCTION

Aqaba was chosen as the Arab Tourism City of 2011. (12)

Its strategic location at the junction of 4 countries made Aqaba trading routes between Asia and Africa since 4000BC. (33)

Page 7: AYLA OASIS PROJECT CONSTRUCTION

To create the gate to all tourist areas in order to extend the length of stay of tourists in Jordan

- To increase the waterfront line from 235 meters into 17 KMs

- To make a synergise with all of the world heritage sites in Jordan reference(3,5)

Page 8: AYLA OASIS PROJECT CONSTRUCTION

To decrease the unemployment number by providing more job opportunities especially during construction period, the operational stages of the Project and after the project finishes. (15)

To transfer new skills to the Jordanian workforce. (15) To support Aqaba into a leading tourist destination

within the next few years (3,9) To support the use of sustainable climate resilience

technologies in the built environment. (9,15)

Page 9: AYLA OASIS PROJECT CONSTRUCTION

This section was made by group members using PRINCE2

Page 10: AYLA OASIS PROJECT CONSTRUCTION

•By applying the main themes of - Business Case:1. The short length of stay of tourists.2. The shortage of waterfront areas in Aqaba.3. The needing for a safe stable destination for the people of gulf and middle east

Project Management Method

Reference: (33,15)

Page 11: AYLA OASIS PROJECT CONSTRUCTION

Reference (27,28)

Page 12: AYLA OASIS PROJECT CONSTRUCTION

Reference: Team Work

AYLA OASIS DEVELOPMENT

COMPANY (AODC)

Arab Supply and Trading company

(ASTRA)

Ayla Consultancy and Project

Management (ACPM)

Contractors Contractors

Sub-Contractors

Page 13: AYLA OASIS PROJECT CONSTRUCTION

ASTRA: Arab Supply and Trading company, Saudi company, considered as a sponsor for Ayla Oasis development (15)

Ayla Oasis Development Company (AODC): considered as the owner of the project and generally controls the process of construction through a project management company (ACPM).

ACPM (Ayla Consultancy & Project Management) : providing consultancy and management services. ACPM is appointed as Project Managers of Ayla Oasis Project.

There are a set of contractors that actually working on-site, the main contractor for the infrastructure was the huge Italian contracting company called Condotte.

Group Analysis

Page 14: AYLA OASIS PROJECT CONSTRUCTION

Reference: Group Work

Page 15: AYLA OASIS PROJECT CONSTRUCTION

PRIME & SUB-CONTRACTINGCOMPANY POSITION SCOPE OF WORKS

PRIME CONTRACTOR

2008-2014-MARINE WORKS Expanding 235 metre shoreline into 17 KMs waterline-the construction of artificial lagoons, hotels, apartments & villas, a golf course and harbour facilities. (27,28)

CONSULTANT 2008 - present- Site investigation and geotechnical evaluation. Engineering Studies company -Geophysical surveys, field and laboratory testing, piezometer installation-materials testing and quality control.(12)

SUB- CONTRACTOR

2013 - present- Architecture, Interior-Design&Landscape (2013 – Current)(26)

Page 16: AYLA OASIS PROJECT CONSTRUCTION

PRIME & SUB-CONTRACTINGCOMPANY POSITION SCOPE OF WORKS

DESIGNERIn Progress

-Design Consultant and supporting Architect for residential apartments & for the Ayla Marina Village & Hotel (29)

CONSULTANTJanuary 2013

-Design and consultant for the maintenance operations building and for the Beach on the Golf Course(31)

SUB- CONTRACTOR

2008-Geosynthetic Reinforced Soil (GRS) system for construction of lagoon areas. (32)

CONSULTANT October 2008Architects & Designers of Ayla Oasis Village. (32)

Page 17: AYLA OASIS PROJECT CONSTRUCTION

COMPANY POSITION SCOPE OF WORKS

MAIN CONTRACTOR

2014 - presentAyla oasis Beach Club 10, skeleton works and finishing.(36)

MAIN CONTRACTOR

2015 - presentFinishing works for Hyatt Regency Hotel .

(38)

MAIN CONTRACTOR

2012 - presentAyla Island Apartments, skeleton works and finishing, MEP works .

(37)

SUB- CONTRACTOR

2012 - presentMarina Dry Stag, skeleton works and Finishing & Building construction and electromechanical works

(30)

PRIME & SUB-CONTRACTING

Page 18: AYLA OASIS PROJECT CONSTRUCTION

The Total Estimated Cost : US$ 1.4 billion (3,15) The development of construction will be carried out by

three main phases: 1.The First Phase:

Time: started at 2008 and estimated to finish by 2017. Cost : US$ 250M (3,15)

2.The continuous project phases (the second and the third phase)Time: started at the end of 2017 (14)

In 2017 while the owners and tourists start to use the project, the second phase will initiate with a continuous construction process. by finishing the third phase the development will cover 43km2 of residential and commercial space. (3)

Page 19: AYLA OASIS PROJECT CONSTRUCTION

AOD

ACPM

CONTRACTORSSUB-

CONTRACTORS

CONSULTANTS

Reference: team work

(ASEZA)

Page 20: AYLA OASIS PROJECT CONSTRUCTION

Reference (34)

Page 21: AYLA OASIS PROJECT CONSTRUCTION

A GLOBAL DESCRIPTION OF AYLA OASIS PROJECTInitiated through a private-public partnership between the Aqaba Special Economic Zone Authority (ASEZA) and ASTRA GROUP. (35,15) with the ultimate goal : regenerating and repositioning Aqaba into a primary tourist destination on the Red Sea. (3)

Page 22: AYLA OASIS PROJECT CONSTRUCTION

Arab Supply and Trading Company (ASTRA), as the investors, has signed OASIS agreement with Aqaba Special Economic Zone Authority (ASEZA). (35,39)

Involving a world-class leading constructor, Italy Condette, and other local contructors. (28)

All plans of Ayla Project must be acknowledged by ASTRA and must comply with ASEZA regulation. (35)

Additional References (3, 4)

Page 23: AYLA OASIS PROJECT CONSTRUCTION

Transforming a 235-meter shoreline into 17 KM of new waterfront with 750,000 SQM of series of man made lagoons (3,8)

Building up 1,500 hotel rooms in 5 hotels (6) Building up 3,000 residential units (6)Setting up 20,000 SQM of commercial retail and food

and beverage outletsA 18-hole championship world-class golf course

designed by Greg Norman, one of the world’s leading golf course designers (3), (6)

Marina Village with first aid services/clinics (3) Implementing system to allow individuals with

special needs to access (5)

Page 24: AYLA OASIS PROJECT CONSTRUCTION

Aqaba Special Economic Zone Authority (ASEZA) was established in February 2001 under to transform Aqaba into a world class Red Sea business centre and tourist destination.

The project must comply with ASEZA Environmental Protection Regulation and Environmental Commissioner regarding waste management, use of sea water, and emission of harmful substances to the environment

Reference (35)

Page 25: AYLA OASIS PROJECT CONSTRUCTION

• The first phase will be operating 2017• Setting up management to market and promote

Ayla • Expanding a sustainable Ayla project.

Reference: (3,1,15)

Page 26: AYLA OASIS PROJECT CONSTRUCTION

Setting up the world-class golf course designed by Greg Norman, one of the world’s leading golf course designers with a 40-year experience in golf which greatly enhance the position on the global golf tourism map. (24,45)

setting up water conservancy and creates power through solar panels on the golf course. (15,23)

Install solar panel on infrastructure works (3)

Page 27: AYLA OASIS PROJECT CONSTRUCTION

Sea water quality is monitored and recorded on regular basis and waste water from the development is treated by the municipal waste water treatment plant. Construction impacts are also monitored. (4)

Page 28: AYLA OASIS PROJECT CONSTRUCTION

Reference (3,24)

Reference (13)

Page 29: AYLA OASIS PROJECT CONSTRUCTION

Reference (41,42,43)

Page 30: AYLA OASIS PROJECT CONSTRUCTION

More than four thousands job opportunities will be created through Ayla Oasis that will contribute to the sustainable development of the Jordanian economy. The project is expected to help decreasing the unemployment percentage in Jordan.

Figure shows the trend of unemployment percentage in Jordan. The number fluctuates showing averaged 12.59 percent from 2007 until 2015.

Actual Previous Highest Lowest Dates Unit

13.80 % 11.90 % 14.30 % 10.80 % 2007 - 2015 percent

Reference (18,19,46)

Page 31: AYLA OASIS PROJECT CONSTRUCTION

Tourism plays vital importance that contributes more than USD 800 million to Jordan’s economy and approximately 10 percent of the country’s gross domestic product (GDP)”. Between 2004 and 2007, the total number of people employed in the tourism sector rose 50% from 23,544 to 35,484. (National Tourism Strategy 2004-2010). The figure shows the steadily increasing GDP in Jordan. Ayla Oasis project (aimed as business and tourism hub) is expected to give positive implication to Jordan Financial condition by creating more job and reducing poverty rate

Reference (10,48)

Page 32: AYLA OASIS PROJECT CONSTRUCTION

The figure of World Bank shows a significantly increasing trend in tourism in Jordan.

 Ayla Oasis project (aimed as a world business and tourism hub) is expected to double tourism revenues and to support economic growth in Jordan

Reference (17,48)

Page 33: AYLA OASIS PROJECT CONSTRUCTION

Ayla Oasis is believed to be able to turn Aqaba into the world business hub. The graph shows the growth in cargo volumes at Jordan’s Aqaba port over the past decade.

Ayla Oasis project contribute to turn Aqaba into a major business and tourism hub that is capable to attract global logistic companies such as APM Terminals and Agility to invest in logistics that may enable to double the cargo volume investing in Aqaba

Reference (40)

Page 34: AYLA OASIS PROJECT CONSTRUCTION

ASEZA Environmental Policies: The water policy: the protection and management of groundwater resources & waste-water on Ayla Project can be renewable at a certain rate to waste less water and be environmental friendly. The energy conservation policy: promotes the provision of adequate energy to consumers at the least possible levelThe impact: the project will cost less money to do the daily construction.

Reference (20,21)

Page 35: AYLA OASIS PROJECT CONSTRUCTION

Discriminatory National laws in Jordan: Positive impact: The refugees from other middle-east countries get less salaries. Therefore, for the project, it can employ those refugees by paying less money and get same labour force , rather than paying salaries for locals.Negative impact: The refugees who are employed by the project may have some social problems, such as no accommodation, lack of food, crime and so on. Therefore, if the project employ those refugees, it will take risk.

References (20,21,22)

Page 36: AYLA OASIS PROJECT CONSTRUCTION

1. A unique world-class golf course in Ayla Oasis designed by Greg Norman (international golf designer) to attract international golfers of all standards and all nationalities , which greatly enhance Ayla position on the global golf tourism map

2. Low tax rate applied by ASEZA to attract international investors

Reference: (3,44)

Page 37: AYLA OASIS PROJECT CONSTRUCTION

Reference: (46)

3. The graphic shows a decreasing trend the corruption index in Jordan from 57% in 2005 into 49% in 2014. It gives positive impact on Ayla Oasis to attract more international investors to invest

Page 38: AYLA OASIS PROJECT CONSTRUCTION

Reference (45)

Page 39: AYLA OASIS PROJECT CONSTRUCTION

ELEMENTS OF SUCCESS & LACK OF IT IDENTIFIED.

SUCCESS ELEMENTS IDENTIFIED: (3)The location is very ideal and strategic between 4 countries on the Red Sea. It has status as Special Economic Zone of Jordan.The economic growth in Aqaba is higher than the average economic growth in Jordan.Ayla Oasis is an efficient and sustainable projects.It has a financially strong reputable sponsor, ASTRA. (39)

LACK ELEMENTS IDENTIFIED:No further actions implied telling about the second and third phases.

References (3,15,39)

Page 40: AYLA OASIS PROJECT CONSTRUCTION

SWOTSWOTAnalysisAnalysis

Oppurtunity

Threats

Strengths

Weakness

Page 41: AYLA OASIS PROJECT CONSTRUCTION

Strengths Weaknesses

Qualified designers & architects

Short planned Lead time

Strong financial funding by sponsors

Royal and governmental support

High distribution cost

High dependency on foreign suppliers

High raw materials cost

The absence of well defined recovery plan.

Reference (49)

Page 42: AYLA OASIS PROJECT CONSTRUCTION

Opportunities Threats

Strategic location, by the Red Sea, meeting point of 4 countries (Jordan, Palestine, Saudi Arabia, Egypt)

Stable Environment compared to other countries in the region

Growing rate of population

Increase in infrastructure and real estate development

Tourism rate is increasing

Financial crisis reduced the cash flow.

Unstable fuel price on shipping and production cost.

Conflicts happens in other countries, unstable political situation.

Mega projects that are under construction; Marketing challenge and value.

Reference (49)

Page 43: AYLA OASIS PROJECT CONSTRUCTION
Page 44: AYLA OASIS PROJECT CONSTRUCTION

Political To emphasize Jordan’s location as a stable safe destination for tourism

Economical Develop the tourism industry in Jordan as the main factor in the growth of national economy

Social vocational training programs and upgrade labours to accommodate the requirements of labour market changes.

Technological Solar power can be used with 3.2MW renewable energy project.

To make it the largest renewable energy project in the region, total capacity of phases reach up to 5.8MW.

Legal Comply with ASEZA laws and regulations .

Environmental Effective Environmental management plan .

Investment in solar energy power plant .

Page 45: AYLA OASIS PROJECT CONSTRUCTION

The Aqaba taskforce was created and equipped to transform Aqaba into a world class Red Sea business location and tourism destination for the economic growth of Jordan

The area was named Aqaba Special Economic Zone (ASEZ) with an empowered Authority known as (ASEZA) with regulatory, administrative, fiscal and economic responsibilities. (5)

Recently and since 2001 Aqaba is authorized by a Jordanian

special economic zone (ASEZ), It is a duty free multi sectoral free tax development zone that holds the 27 Kms Jordanian coastline and covering an area of 375 square kilometers.

The special zone offers a strong investment opportunities especially in the tourism and logistics services, to increase the development activities in Aqaba and Jordan in general.

Reference (5,15)

Page 46: AYLA OASIS PROJECT CONSTRUCTION

Stable environment in Jordan compared to other countries in the region

Benefit from the migration from other countries due to regional conflicts.

Signing multi-trade agreements including accession to WTO, Arab free trade, Euro med partnership, as well as Arab special economic zone.

Reference (15,22)

Page 47: AYLA OASIS PROJECT CONSTRUCTION

Government budget increased by 10 % each year, it will cause the economic growth in Jordan. Therefore, the project can enhance the growth.

Unemployment rate stay 14 %. In order to decrease the unemployment, the project will give opportunity to employ the labour force.

Inflation rate goes up by 2% each year.

The project has no financial problems and has increased its capital from JD200 million to JD250 million

Reference (13,15,22)

Page 48: AYLA OASIS PROJECT CONSTRUCTION

Tourism is a prime component of the Jordanian economy. A project is proposed to develop the tourism industry in Jordan as the main factor in the growth of national economy. (1,15)

The economic growth in Aqaba is higher than the average economic growth in the country. And Aqaba economy is based on the tourism and port industry sectors. (3)

Infrastructures are part of Ayla project to support an advanced tourism industry and create new job opportunities. (3,15)

Page 49: AYLA OASIS PROJECT CONSTRUCTION

Jordan is a diverse community. There are many different ethnic groups living in this small country; it has been a mixing pot of cultures for millennia.

Syrian refugee problem: Government agreed that they allow 120,000 refugee , but it will more than that about 700,000 refugee. So that it cause problem with lack of food , service and infrastructure

It has been developing vocational training programs and upgrade labours to accommodate the requirements of labour market changes.

Reference (15,22)

Page 50: AYLA OASIS PROJECT CONSTRUCTION

• By using solar power, the project will be environment friendly. (3,45)

• Ayla project has connected a 3,2MW solar power plant to the national electricity grid, which can have one of the largest private renewable energy projects in this region. (4,23)

• Sea water quality has been monitored and recorded on regular basis. However, for the waste water, it can be used by waste water plant. (15)

Reference (3, 4,15,45)

Page 51: AYLA OASIS PROJECT CONSTRUCTION

• Solar power can be used with 3.2MV renewable energy project.• The power has been used to operate the seawater pumping station

that feeds a chain of lagoons at Ayla’s project in Aqaba.• The man-made lagoons have covered the area of 750,000 m^2, and

added 17km of new water frontage to Aqaba. Also it has increased the 52 percent waterline.

• It costs JD60,000 (USD 84,620)per year by using electronic power to irrigate the golf court. So that in order to minimise the cost , the project use solar power.

• To make it the largest renewable energy project in the region, we use total capacity of two phases reach up to 5.8MW.

Reference (15)

Page 52: AYLA OASIS PROJECT CONSTRUCTION

• A specific environment plan has been used to make sure the development of the Environmental Management Plan. (3,10)

• One of the world largest golf court will be built in Ayla project , which has 18 holes. Greg Norman , one of the most respected golf court designer said that. (3,44)

Page 53: AYLA OASIS PROJECT CONSTRUCTION

RISKS RISK MANAGEMENT

what Aqaba offers currently is very limited

creating 17 kilometres of new seafront from a 250-metre strip on the Gulf of Aqaba by creating a new bay

tourists do not stay long enough to spend money that makes a difference to businesses and the local communityArab Spring (revolutionary movements in Tunisia, Egypt, Libya, Yamen), Jordan lost 25% in tourism market in 2011.

Investment at Aqaba is an example not only for the region but also for many cities around the world which would benefit from improved land use planning.

Reference (3,10)

Page 54: AYLA OASIS PROJECT CONSTRUCTION

RISKS RISK MANAGEMENT There is a massive

projects that are currently under construction at Aqaba (competitors) are considered a major challenge and can puts a question on all of these tourism projects and the sudden increase in hotel rooms; It is planned that Ayla will provide Aqaba with a 1,550 room hotels whereas Saraya Al Aqaba (competitors) will also increases the hotel rooms by 1,200.

Good marketing strategies; the key is developing a marketing strategy that forms a solid foundation for promotional efforts. Implementing promotional activities such as advertising, one to one sale and international marketing especially for gulf countries.

pricing policy; 1. Recognize the factors that affect price strategy. 2. Identify marketing objectives related to pricing. 3. Describe the components that go into making price strategy decisions. 4. Apply formulas used in setting prices. 5. List considerations for updating price strategy.

Reference (10,48)

Page 55: AYLA OASIS PROJECT CONSTRUCTION

RISKS RISK MANAGEMENT

Financial crisis and region instability reduce the cash flow.

Starting earning revenues from the completed phases, i.e marina village apartments and golf course academy

Strong financial capabilities for shareholders with a strategical support from ASEZA.

Reference (10, 18,19)

Page 56: AYLA OASIS PROJECT CONSTRUCTION
Page 57: AYLA OASIS PROJECT CONSTRUCTION

Reference (3,28)

Page 58: AYLA OASIS PROJECT CONSTRUCTION

Reference (26)

Page 59: AYLA OASIS PROJECT CONSTRUCTION

Reference (32)

Page 60: AYLA OASIS PROJECT CONSTRUCTION

Reference (29)

Page 61: AYLA OASIS PROJECT CONSTRUCTION

Reference (32)

Page 62: AYLA OASIS PROJECT CONSTRUCTION

Reference (31)

Page 63: AYLA OASIS PROJECT CONSTRUCTION

Reference (37)

Page 64: AYLA OASIS PROJECT CONSTRUCTION

Reference (3)

Page 65: AYLA OASIS PROJECT CONSTRUCTION

• Ayla oasis Project has a strong impact on the Jordanian Economy and considered as one of the “Achievable” projects in the country.

• There are a list of advantages and disadvantages of applying Prince2

Page 66: AYLA OASIS PROJECT CONSTRUCTION

Advantages Disadvantages

1. Save time: Standardize; mature methodology

2. Save money: easy to use3. Good quality: controlled

changes; can make improvement

4. Effective communication

1. Does not have many specialists

2. Does not address the leadership and people management skill

3. It presents a large overheard, and thus cannot be applied in small projects.

4. It is a hard methodology to adopt.

Reference: (25)

Page 67: AYLA OASIS PROJECT CONSTRUCTION

References:1. Keay, J. (2015) Global finance magazine - Jordan: Big changes afoot in Aqaba.

Available at: https://www.gfmag.com/magazine/march-2014/jordan-big-changes-afoot-in-aqaba (Accessed: 11 November 2015).

2. Arabtechjardaneh (no date) Arabtech Jardaneh. Available at: http://www.arabtechjardaneh.com/Files/Brochure%20final%2029-10-2014.pdf (Accessed: 11 November 2015).

3. Ayla (2015) Marina. Available at: http://www.ayla.com.jo/category/our-districts/marina/ (Accessed: 11 November 2015).

4. European bank. (2015). Ayla Oasis Regeneration Project Aqaba. Available: http://www.ebrd.com/work-with-us/projects/psd/ayla-oasis-regeneration-project-aqaba.html. Last accessed [11/11/2015].

5. AQABA development corporation (2010) Major Investments | real estate & tourism projects | Ayla oasis. Available at: http://www.adc.jo/Public/English.aspx?Lang=&Site_ID=1&Page_ID=2291&Menu_ID=27&M_ID=&M_Title=&T=1 (Accessed: 11 November 2015).

6. ANSA med (2010) Jordan’s Ayla oasis breaks ground for latest luxury hotel - economy - ANSAMed.it. Available at: http://www.ansamed.info/ansamed/en/news/sections/economics/2013/04/08/Jordan-Ayla-Oasis-breaks-ground-latest-luxury-hotel_8518273.html (Accessed: 11 November 2015).

Page 68: AYLA OASIS PROJECT CONSTRUCTION

References:

7. Oxford Business Group (ed.) (2011) The Report: Jordan 2011. United Kingdom: Oxford Business Group.

8. Manasrah, R. (2015). Water Exchange Calculations Using the Salt Conservation Law in Ayla Lagoons in the Northern Gulf of Aqaba, Red Sea. Natural Science, 07(04), pp.197-209.

9. Looney, R. (2014) Handbook of uS-middle east relations. Edited by Robert Looney. United Kingdom: Routledge.

10.Fischer, J., Khan, I., Khemani, T., Mak, D. and Najmi, R. (2009) Jordan Tourism Cluster. Available at: http://www.isc.hbs.edu/resources/courses/moc-course-at-harvard/Documents/pdf/student-projects/Jordan_Tourism_2009.pdf (Accessed: 9 November 2015).

11.Research reports from Jordan (2006) Bulletin of the Council for British Research in the Levant, 1(1), pp. 22–38

12.ACES (2010) Ayla Oasis. Available at: http://www.aces-int.com/projects?plocation=33 (Accessed: 12 November 2015).

Page 69: AYLA OASIS PROJECT CONSTRUCTION

References:

13. The Jordan Times (2012) Golf expert commends Ayla project. Available at: http://www.jordantimes.com/news/business/golf-expert-commends-ayla-project (Accessed: 12 November 2015).

14. ZAWYA (2015) Ayla oasis development company continues turning vision into reality. Available at: https://www.zawya.com/story/Ayla_Oasis_Development_Company_Continues_Turning_Vision_into_Reality-ZAWYA20150818115837/ (Accessed: 12 November 2015).

15. MarketLine advantage (2014) Country Analysis Report: Jordan, PEST Insights. Available at: http://advantage.marketline.com/Product?pid=ML00003-059 (Accessed: 9 November 2015).

16. Port Reform Tool Kit (no date) MODULE 5 financial implications of port reform: Measuring economic profitability from the perspective of the concessioning authority. Available at: http://www.ppiaf.org/sites/ppiaf.org/files/documents/toolkits/Portoolkit/Toolkit/module5/measuring.html (Accessed: 12 November 2015).

17. The World Bank (2014) Project map - Jordan. Available at: http://data.worldbank.org/country/jordan (Accessed: 9 November 2015).

Page 70: AYLA OASIS PROJECT CONSTRUCTION

18. Reeder, N. and Colantonio, A. (2013) Measuring Impact and Non-financial Returns in Impact Investing:   A Critical Overview of Concepts and Practice. Available at: https://files.lsecities.net/files/2013/10/Measuring_Impact-full-length-Oct-20131.pdf (Accessed: 12 November 2015).

19. Plumstead, J. (2012) Economic Impact Analysis. Available at: http://www.pwc.com/gx/en/mining/school-of-mines/2012/pwc-realizing-the-value-of-your-project-economic-impact-analysis.pdf (Accessed: 12 November 2015).

20. Library of Congress (2013) Legal status of refugees: Egypt, Jordan, Lebanon, and Iraq. Available at: http://www.loc.gov/law/help/refugees/legal-status-refugees.php (Accessed: 12 November 2015).

21. Jordan ICZM (2014) Jordan ICZM Country Report 2014: Towards Sustainable Coastal Zone Development. Available at: http://www.jo.undp.org/content/dam/jordan/docs/Publications/Enviro/Aqaba%20ICZM%20report%202014.pdf (Accessed: 12 November 2015).

22. Sharif, O. A. (2013) Jordan faces major challenges in 2014. Available at: http://gulfnews.com/opinion/thinkers/jordan-faces-major-challenges-in-2014-1.1262353 (Accessed: 12 November 2015).

References:

Page 71: AYLA OASIS PROJECT CONSTRUCTION

23. The Jordan Times (2015) Aqaba developer launches major private solar power project. Available at: http://www1.jordantimes.com/aqaba-developer-launches-major-private-solar-power-project (Accessed: 12 November 2015).

24. Greg Norman (n. d.) Norman: Ayla project is among the best in the world. Available at: http://www.gngcd.com/news_item.php?news=377 (Accessed: 12 November 2015).

25. Advantage Learning (2010) Value and benefits of PRINCE2 methodology. Available at: http://www.advantagelearning.co.uk/prince2/the-benefits.html (Accessed: 12 November 2015).

26. OAOA (n. d.) Ayla golf apartments Masterplan. Available at: http://oaoa.co/ayla-golf-apartments-masterplan/ (Accessed: 12 November 2015).

27. Condotte (2015). Società Italiana per Condotte d'Acqua S.p.A.. Available at: http://www.condotte.com/en/opere/opere.aspx?id=48 [Accessed 12 Nov. 2015].

28. Condotte d’Acqua (2014) MARINE WORKS: Ayla Oasis Project. Available at: http://www.condotte.com/en/opere/opere.aspx?id=48 (Accessed: 12 November 2015).

References:

Page 72: AYLA OASIS PROJECT CONSTRUCTION

29. 3rd Dimension Architect (2013) AYLA Oasis: Ayla Marina Village. Available at: http://www.3darchitects-lb.com/#!architecture/ctzx (Accessed: 06 November 2015).

30. EUBC AND DEPAH (2011) LIST OF PROJECTS EXECUTED & IN HAND BY EUBC-Depah DURING THE LAST TEN YEARS. Available at: http://www.depah-con.com/?ID=38 (Accessed: 07 November 2015).

31. DARB (2013) GOLF COURSE MA. BUILDING. Available at: http://www.darb.com.jo/content/golf-course-ma-building (Accessed: 12 November 2015).

32. GmbH, H. S. (2015) Highly resilient, flexible geogrid with a proven track record in soil reinforcement. Available at: http://www.huesker.co.uk/products/geosynthetics/fortrac.html (Accessed: 12 November 2015).

33. Drsuhad. (2015). Jordan Tourism. Available at: http://www.drsuhad.com/jordan_map/jordan_aqaba.htm [Accessed 12 Nov. 2015].

34. Picariello, G. (2015) The Five steps of the project management life cycle. Available at: http://www.brighthubpm.com/monitoring-projects/1907-successfully-guide-your-projects-to-completion-with-the-pm-life-cycle/ (Accessed: 12 November 2015).

References:

Page 73: AYLA OASIS PROJECT CONSTRUCTION

REFERENCES:

35. Aqaba (2013) Mission & vision - ASEZA. Available at: http://www.aqabazone.com/en/about-aseza/mission-vission/ (Accessed: 6 November 2015).

36. Majdcontracting, (2015). MAJD CONTRACTING COMPANY | AMMAN | JORDAN. Available at: http://www.majdcontracting.com/our_projects.html#.VkUUi7crLIU [Accessed 9 Nov. 2015].

37. Test.masarunited, (2015). Ayla Island Apartments | Masar United Contracting Co.Available at: http://test.masarunited.com/?p=257 [Accessed 10 Nov. 2015].

38. Atcco, (2015). ATCCO. Available at: http://www.atcco.com.jo/20-4-2015/UI/English/flash/atcco3.htm [Accessed 8 Nov. 2015].

39. Astra-group, (2015). Astra _ Arab Supply and Trading Co.Available at: http://www.astra-group.net/tour_ayla.asp [Accessed 10 Nov. 2015].

40. BSAA (2013) Trade profile: The red sea (Egypt and Jordan). Available at: http://www.thaibsaa.com/news/world-shipping-news/1843--trade-profile-the-red-sea-egypt-and-jordan.html (Accessed: 8 November 2015)

Page 74: AYLA OASIS PROJECT CONSTRUCTION

REFERENCES

41. Explore Wealth Management Ltd. (2015) How we define financial advice. Available at: http://www.explorewealth.co.uk/how-we-define-financial-advice/ (Accessed: 11 November 2015).

42. TranslateMedia (2013) New EU legal translation law comes into effect. Available at: http://www.translatemedia.com/translation-blog/new-legal-translation-law-comes-into-effect/ (Accessed: 10 November 2015).

43. BelizeDC (2016) BelizeDC Legal and Terms. Available at: http://belize-real-estate-online.com/index.php?option=com_content&view=article&id=338&Itemid=208 (Accessed: 10 November 2015).

44. GNGCD (2015) Greg Norman hails Ayla oasis One of the top 3 most Eco-Friendly golf courses in the world. Available at: http://www.gngcd.com/news_item.php?news=415 (Accessed: 12 November 2015).

45. Fifth Element Associates (2014) Http://fifthelementassociates.com/the-alchemy-of-success/. Available at: http://www.ayla.com.jo/the-developer-aodc/ (Accessed: 12 November 2015).

Page 75: AYLA OASIS PROJECT CONSTRUCTION

REFERENCES•Trading Economics (2015) Jordan unemployment rate | 2007-2015 | data | chart | calendar | forecast. Available at: http://www.tradingeconomics.com/jordan/unemployment-rate (Accessed: 11 November 2015).•Hausler, D. (n.d.) Join as reviewers, biotechnology, microbiology, biochemistry, Bioinformatics, cell biology, cellular and developmental biology, ecology , Entomology. Available at: http://www.ijpab.com/Joinasreviewers.html (Accessed: 8 November 2015).•Anon, (2015). Available at: http://www.undp.org/content/dam/undp/documents/projects/JOR/PIMS%25204002_Jordan_ASEZA_Prodoc_final.docx+&cd=1&hl=en&ct=clnk&gl=uk [Accessed 10 Nov. 2015].•Alafi, K. K. (2014) ‘Developing world: Increasing Jordanian tourism: A strategic plan’, Journal of Management Research, 6(1), pp. 192–210