AN TR
No. RVPN/SE(Energy Accounts)/XEN(EA)/F. D.CU Dt. 7/o32
To, The Managing Director,
A.V.V.N.Ltd., Ajmer.
Sub.: Final Account of energy drawl by Ajmer Discom for the year 2020-21 Sir,
The Final account of energy drawl by Ajmer Discom for the year 2020-21 has been
prepared after incorporating the revisions based on the revised reading of 11KV VCs,
33KV /Cs, 132KV O/G Feeders and Inter discom feeders of various GSS received from
the concerning nodal officer. Month wise detais of difference in Gross energy and Aux.
Consumption of Ajmer Discom is attached at Annexure-B. The monthwise final account
of energy drawi for the year 2020-21 is as per attached Annexure-A as matter is already
discussed in all three Discom's meeting for finalizing energy drawl for year 2020-21.
Your_ Faithfully
(Surendra Vashistha) 11102
Superintending Engineer (EA) Copy submitted/forwarded to the following for information and necessary action.
1 The Chief Engineer(LD), RVPNL, Jaipur. 2 The Chief Engineer (CPM), AVVNL, Ajmer. 3 The CEO, RUVNL, Jaipur. 4 The CCOA, RVPNL, Jaipur. 5 The CAO(ATR).JWNL,Jaipur. 6 The Superintending Engineer(M&P) AVWNL, Ajmer. 7 The Superintending Engineer(MIS) RRVPNL , jaipur.
Superintending Engineer (EÁ)
Energy Drawal by Ajmer Discom in Various Month during 2020-21 ANNEXURE-A
5.No. MONTH Fig in lu's
Energy Increase/Decrease Final Net Energy PARTICULARS Conveyed Energy of
Ajmer Discom i,e+/
APR GROSS AUX.CON. NET CON.
12,658.26620 2020 62.52988 12,720.79608 8.95515
12,711.84093
8.95515 0.00000 62.52988 12,649.31105
MAY GROSS AUX.CON. NET CON.
18,060.63786 167.74498 18,228.38284 2020
10.31318 18,050.32468
0.00000 10.31318 167.74498 18,218.06966 JUN
2020 GROSS AUX.CON. NET CON.
19,018.58298 9.93239
19,008.65059
295.74650 0.00000 295.74650
19,314.32948 9.93239
19,304.39709 GROSS |AUX.CON. NET CON.
JULY 20,160.25957
9.98132 20,150.27825
0.00000 20,160.25957 9.98132
2020
0.00000 0.00000 20,150.27825
AUG |GROSS AUX.CON. NET CON.
17,884.59670 -663.52200 0.00000
17,221.07470 2020 9.09914 17,875.49756 09914
17,211.97556 -663.52200
GROSS AUX.CON. NET CON.
SEP 17,607.47572
9.24546 17,598.23026
0.00000 17,607.47572 9.24546
2020 0.00000 0.00000 17,598.23026
GROSS AUX.CON.
NET CON.
OCT 19,285.63162
9.33834 19,276.29328
0.00000 0.00000 19,285.63162
9.33834 19,276.29328
2020
0.00000
19,430.646538.90682
19,421.73971
NOV GROSS AUX.CON.
NET CON.
0.00000 0.00000 0.00000
19,430.64653 8.90682
2020
19,421.73971 GROSS AUX.CON. NET CON.
20,934.11277 9.57966 20,934.11277
9.57966 20,924.53311
DEC 0.00000
0.00000 0.00000
2020
20,924.53311
GROSS AUX.CON. NET CON.
20,695.51851 9.62936
20,685.88915
0.00000 0.00000 0.00000
20,695.51851 9.62936
20,685.88915
JAN 2021
FEB 2021
GROSS AUX.CON. NET CON.
19,881.65682 8.40473
19,873.25209
0.00000 0.00000 0.00000
19,881.65682 8.40473
19,873.25209
GROSS AUX.CON. NET CON.
20,051.64847 9.22755
20,042.42092
20.00000 0.00000 20.00000
20,071.64847 9.22755
20,062.42092
MAR
2021
Total 2020-21
GROSS |AUX.CON NET CON.
225,669.03375 112.61310
225,556.42065
117.50064 0.00000
225,551.53311 112.61310
225,438.92001
13
117.50064
AtlN)
ANNEXURE-B Monthwise details of Gross Energy and Auxiliary energy consumption to be incorporated in Ajmer Discom for the year 2020-21 All Fig. In Units S.NO MONTH
GROSS CONSUMPTION
NAME OF GSS/FDR AUX. CONSU (a) 132KV GSS Rasoolpur
132KV Wonder Cement |132KV JKCW
April 20 4530668.932
1722320 Total
(a) 132KV GSS Rasoolpur 132KV Wonder Cement 132KV JKCW
6252988.932
2 May 20 8723337.695
8051160 Total
(a) 132KV GSS Rasoolpur 132KV Wonder Cement 132KV JKCW
16774497.7
20370409.99 June 20 9204240
3
Total 29574649.99 0
4 July 20 Total
0 l(a) 132KV GSS Sanwalpura Tanwaran 33KV /C-2 -664904000
August 20 (b) 132KV GSS Deoli 33KV 1/D Pander 138200
Total -663522000
6 September 20 Total
7 October 20 Total 0
November 20 Total
December20
Total
10 January'21
Total 0 0
11 February'21
Total 0
(a) 220Kv GSS Gulabpura
11KV /C 3536000
(b) 220KV GSS Laxmangarh (Sikar) 33KV 1/C-1 1936000
(c) 132KV RICO Bhilwara
1900000 12 March'21 33KV /C-2
(d) 132KV GSS Bhadesar 33KV /C-1
700000
e)132KV GSS Nawa 33KV /C-2
1000000
Total 2000000 0 Grand Total 11750064