avure technologies only... · 2018-11-12 · avure technologies the global leader in ... quintus®...

28
Avure Technologies The Global Leader in High Pressure Technology Presentation at National Board Chief Inspectors meeting Linda Fridlund, Stress Analyst, Member of ASME Section VIII, Div 3 Subgroup of High Pressure Vessels

Upload: others

Post on 07-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Technologies

The Global Leader in High Pressure Technology

Presentation at National Board Chief Inspectors meetingLinda Fridlund, Stress Analyst, Member of ASME Section VIII, Div 3 Subgroup of High Pressure Vessels

Page 2: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Agenda

Avure Confidential 20122

History Avure/ QUINTUS® Press ASME

High Pressure Vessels Press Types and Applications Pressure Vessel Design QUINTUS® Wire-Wound Design

Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Questions

Page 3: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure History

Avure Confidential 20123

• 1953 First man made diamonds, by ASEA in aQUINTUS® wire-wound press

• 1960’s QUINTUS® department started First Hot Isostatic Press 1965

• 1970’s 203 ksi hydrostatic extrusion press • 1980’s World’s largest HIP, ID=5.5 ft, 20 ksi• 1990’s World’s largest Flexform Press, 340Mlbf • 1994 First commercial delivery to the food industry• 2002 New name, Avure Technologies• 2009 World’s largest HIP, ID=7.9 ft, 17 ksi• 2011 World’s largest CIP, ID=7.2 ft, 20 ksi

Page 4: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Confidential 20114

Avure Throughout the World

Sales & Service partnersAvure offices

Page 5: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Confidential 20125

• World-wide group with head quarter in Nashville, Tennessee, USA

• Largest facility with product development, manufacturing, sales, product support in Västerås, Sweden

• Sales, service and small system development and production in Columbus, OH, USA

• 100 MUSD annual revenue• 140 employees

Avure Facilities

Page 6: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Västerås

Avure Confidential 20126

Wire winding of vessel and frame in the workshop in Västerås, Sweden

Page 7: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

ASME

Avure Confidential 20127

• Avure Technologies is certified to manufacture high pressure vessels according to ASME Boiler & Pressure Vessel Code, Section VIII, Division 3, since 1999

• In the 1980’s/1990’s Avure Technologies played an active role in the development of the ASME B&PV Code, Section VIII, Division 3, first published in 1997

• Avure Technologies has a member in the ASME Subgroup of High Pressure Vessels

Page 8: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Confidential 20128

Applications

High Pressure Pasteurization

Advanced Material Densification

Sheet Metal Forming

Page 9: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Confidential 20129

Advanced Material Densification• Hot Isostatic Press

15,000 to 30,000 psiArgon gas medium4000 °FID=0.5 to 7.9 ft

• Cold Isostatic Press15,000 to 58,000 psiWater/Oil emulsion mediumAmbient temperatureID=1.3 to 8.2 ft, up to 23 ft long internally

Page 10: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Confidential 201210

Hot Isostatic Press

• A combination of temperature and pressure heal internal voids in metal and ceramic materials to substantially improve strength

Page 11: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Confidential 201211

Cold Isostatic Press

• Pressing encapsulated metal and ceramic powder to achieve high density, high green strength and consistent properties before subsequent sintering

Metal filters Nozzles for continuous casting and stopper rods

Page 12: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Confidential 201212

Food Press

• Food Press58,000 to 87,000 psiWater mediumAmbient temperatureID=0.6 to 1.6 ft

Page 13: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Food Press

Avure Confidential 201213

• Pre-packed food is exposed to high pressure by water media

• No mechanical damage is caused to the food as isostatic pressure, equal pressure from all sides, is used

• Microbiological reduction without using destructive heat

• Increased shelf life without the use of chemicals or preservatives

• Tender meat, shell easier to remove from oysters• Press cycle 5 – 10 min

Page 14: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

ASME Section VIII, Div 3 Designs

Avure Confidential 201214

Pre-stressed thin-walled cylinderNo pressure Pressure

Monobloc cylinderNo pressure Pressure

Page 15: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

ASME Section VIII, Div 3 Designs

Avure Confidential 201215

Schematic cross section of a closed-end monobloc vessel with a threaded closure

Page 16: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

QUINTUS® Wire-Wound Design

Avure Confidential 201216

Wire winding, frame

Work loadWire winding, cylinderCylinder

Lower closure

Lower yoke

Upper closure

Upper yoke

Column

Page 17: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Alternative Frame Design

Avure Confidential 201217

Several steel plates, bolted togetherAlso called yoke

Page 18: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Inspection of QUINTUS® Pressure Vessel

Avure Confidential 201218

The in service inspection of QUINTUS® pressure vessels can be divided into 2 groups

• Maintenance and inspection for safe and reliable operation

• Inspections and measurements for safe operation and check of wire wound components

Page 19: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Maintenance

Avure Confidential 201219

Maintenance and inspections for safe and reliable operation includes

• Visual inspection of- Vessel and closure, High temperature furnace- Hydraulic system, Gas system- Electrical equipment, Cooling water system

• Water and oil check, oil change, filter cleaning, leakage check

• Lubrication of high pressure seals• Back-up battery change

Page 20: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Pre Stress Cylinder

Avure Confidential 201220

Page 21: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Pre Stress Frame

Avure Confidential 201221

Page 22: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Crack Inspection

Avure Confidential 201222

Page 23: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Hot Isostatic Pressing Systems

Avure Confidential 201223

Page 24: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Hot Isostatic Pressing Systems

Avure Confidential 201224

Page 25: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Argon Hazards

Avure Confidential 201225

• A heavy gasIt can accumulate in low places

• It is not poisonous• Dangerous, it displaces air and its

oxygen in a way our senses cannot detect

• Unconsciousness occurs in seconds when inhaled

Page 26: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Argon Hazards

Avure Confidential 201226

Oxygen concentrations• 21% Normal air• 17% Normal exhalation• 12% Stupidity• 8% Unconsciousness• 6% Heart and Lungs stops

working

Always carry an oxygen detector!

Page 27: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Thank You

Avure Confidential 201227

Questions?

Page 28: Avure Technologies Only... · 2018-11-12 · Avure Technologies The Global Leader in ... QUINTUS® Wire-Wound Design Inspection Maintenance Pre Stress Crack Inspection Argon Hazards

Avure Technologies

The Global Leader in High Pressure Technology