avalon road (cr 545) - ocfl.net...avalon road (cr 545) preliminary design study august 25, 2015 ceds...
TRANSCRIPT
![Page 1: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/1.jpg)
Avalon Road (CR 545) Preliminary Design Study
August 25, 2015
CEDS Department Office
![Page 2: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/2.jpg)
Study Location
Avalon Road (C.R.545)Avalon Road (C.R.545)
![Page 3: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/3.jpg)
Village H
VillageI
Village F
Town Center
Bridgewater
From 4,400’ South of Flamingo Crossings Boulevard, to 1,300 feet North of Intersection with Schofield Road
From 4,400’ South of Flamingo Crossings Boulevard, to 1,300 feet North of Intersection with Schofield Road
Ava
lon
Roa
d (C
R 5
45)
Seidel Road
Flamingo
Old YMCA Road
Schofield Road
429TOLL
Begin Study
End Study
OR
AN
GE
CO
UN
TYLA
KE
CO
UN
TY
Avalon Road (C.R.545)Avalon Road (C.R.545)
![Page 4: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/4.jpg)
Schofield Road to Old YMCA
Road, 1.00 MilesWaterleigh PD Parcel 6 Entrance to Waterleigh
PD Parcel 10 North Boundary, 0.85 Miles
– Old YMCA Road to Waterleigh PD Parcel 6
Entrance, 0.68 Miles
•Waterleigh PD Parcel 10 North Boundary to South Leg of Loop Road, 1.13 Miles
NORTH
PROJECT SEGMENTS
Avalon Road (C.R.545)Avalon Road (C.R.545)
![Page 5: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/5.jpg)
Project HistoryNeed for improvement Existing Conditions Alternatives Funding and PhasingGoals, Objectives & Policies Action Requested
Presentation OutlinePresentation Outline
![Page 6: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/6.jpg)
1995 –Adopted Horizon West Sector Plan Five Self Contained Villages Plus a Town Center 1997 –Adopted Adequate Public Facilities (APF) 2006 –Adopted Specific Area Plan (SAP) for Village “H” 2009 –Horizon West Village “H” PD
Project HistoryProject History
![Page 7: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/7.jpg)
Roadway Network Agreement Approved February 2013 9 Constructing Owners Responsible for Design, Permitting, Right‐of‐way Acquisition and Construction Project Segments will be Phased According to Trip Allocation VHB Hired to Conduct Alignment Report Orange County will Inspect
Project HistoryProject History
![Page 8: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/8.jpg)
Project HistoryNeed for improvement Existing Conditions Alternatives Funding and PhasingGoals, Objectives & Policies Action Requested
Presentation OutlinePresentation Outline
![Page 9: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/9.jpg)
Deficiency in Future Traffic Operations and capacity Horizontal/vertical Curves Along the Road Consistency with Orange County Policies and Objectives Support the Remaining West Orange County Agriculture Industry
Need For ImprovementNeed For Improvement
![Page 10: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/10.jpg)
Orange County National Golf Course Newly Opened SR429 Interchange at Schofield Road Future Valencia State College Site Future Interaction with Lake County’s Wellness Way Sector Plan & Connection to US 27
Need For ImprovementNeed For Improvement
![Page 11: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/11.jpg)
Project HistoryNeed for improvement Existing Conditions Alternatives Funding and PhasingGoals, Objectives & Policies Action Requested
Presentation OutlinePresentation Outline
![Page 12: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/12.jpg)
Avalon Road Preliminary Design Study Elements
Existing Facilities Environmental Characteristics Existing Infrastructure Existing Drainage Conditions Design Criteria Alignment Analysis Preliminary Drainage Analysis Recommended Improvement
Existing ConditionsExisting ConditionsExisting ConditionsExisting Conditions
![Page 13: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/13.jpg)
Village Land Uses
Rural Estate Open Space Wetlands & Water Bodies Village Home District Garden Home District Estate Home District Apartment District Village Center
Existing ConditionsExisting Conditions
![Page 14: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/14.jpg)
Project HistoryNeed for improvement Existing Conditions Alternatives Funding and PhasingGoals, Objectives & Policies Action Requested
Presentation OutlinePresentation Outline
![Page 15: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/15.jpg)
Centerline Alignment−Western & Eastern Right-of-Way Expansion− (Major Impacts – Utilities & Wetlands)
Segment 4−East Alignment Alternative−West Alignment Alternative−Minimize Springhill Alignment Alternative −Avoid RCID Alignment Alternative
Preferred Alignment−Segments 1, 2 & 3: Western Right-of-Way Expansion−Segment 4: East-West-East Right-of-Way Expansion
AlternativesAlternatives
![Page 16: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/16.jpg)
Pond Locations NORTH
AlternativesAlternatives
![Page 17: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/17.jpg)
NORTH
Pond Locations
AlternativesAlternatives
![Page 18: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/18.jpg)
Recommended Typical Section
AlternativesAlternatives
![Page 19: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/19.jpg)
Cost of All Alternatives
AlternativesAlternatives
![Page 20: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/20.jpg)
Public Involvement
AlternativesAlternatives
Community Meeting−April 22, 2015
LPA Hearing− June 17, 2015
BCC Hearing−August 25, 2015
![Page 21: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/21.jpg)
Project HistoryNeed for improvement Existing Conditions Alternatives Funding and PhasingGoals, Objectives & Policies Action Requested
Presentation OutlinePresentation Outline
![Page 22: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/22.jpg)
Alignment Study is First Step Final Design will Take 1 Year ‐May 2016 Construction Will Begin Shortly After Most Likely Order will be Segment 3,2,4,1 Construction Schedule is Market Driven
Funding and PhasingFunding and Phasing
![Page 23: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/23.jpg)
Project HistoryNeed for improvement Existing Conditions Alternatives Funding and PhasingGoals, Objectives & Policies Action Requested
Presentation OutlinePresentation Outline
![Page 24: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/24.jpg)
Goal T1: A safe, convenient, efficient and financially feasible multimodal system which minimizes environmental impacts
Obj. T2.1: The County will continue to ensure minimum level of service standards on County roads
Goals, Objectives & PoliciesGoals, Objectives & Policies
![Page 25: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/25.jpg)
Project HistoryNeed for improvement Existing Conditions Alternatives Funding and PhasingGoals, Objectives & Policies Action Requested
Presentation OutlinePresentation Outline
![Page 26: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village](https://reader030.vdocuments.us/reader030/viewer/2022040205/5edb5e77ad6a402d66658eab/html5/thumbnails/26.jpg)
Approve the Findings of the Avalon Road/CR 545 Preliminary Design Study
Find it Consistent with the Comprehensive Plan Goals, Objectives and Policies
Action RequestedAction Requested