autonomous connected vehicle certificate program capstone project reports
DESCRIPTION
Autonomous Connected Vehicle Certificate Program Capstone Project Reports http://www.engin.umd.umich.edu/EPD/acvt.php Team X June, 2011. Task 1:. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/1.jpg)
Team XSlide 1
Autonomous Connected Vehicle Certificate Program
Capstone Project Reports
http://www.engin.umd.umich.edu/EPD/acvt.php
Team XJune, 2011
![Page 2: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/2.jpg)
Slide 2
Task 1:
The goal is to maximize the sphere of applications without compromise on reliability in a dense traffic scenario where hundreds of vehicles access simultaneously using WAVE connection.
1.What information set should be received and sent by the On Board Unit (OBU)? Prioritize. Justify each selection.
2.What applications would that support. Specify information subset for each.
3.Suggestions to increase basic information set (Protocol).
![Page 3: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/3.jpg)
Team XSlide 3
![Page 4: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/4.jpg)
Slide 4
Task 2:
Using maps of the Michigan Test Bed area place the Road Side Equipment (RSE) to achieve optimal performance (Application).
1.List positioning requirements and design parameters you used
2.Locate up-to 56 RSE units on the map provided to enable most applications.
1. Highway (limited apps) vs. arterial (Intersections, School –zone)
3.Suggestions to improve coverage
![Page 5: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/5.jpg)
Team XSlide 5
![Page 6: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/6.jpg)
Team XSlide 6
Download (and replace) actual map files from:http://www.engin.umd.umich.edu/EPD/acvt.php
![Page 7: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/7.jpg)
Slide 7
Task 3:
Using probe data records provided, determine the geographic structure/mapping of two intersections and the connecting road.
1.List data interpretation assumptions
2.Schematic drawing of intersection 1. Explain.
1. Complete the task based on data only and without looking into Google etc.
2. Include phases, # of lanes, turning lanes, etc.
3.Schematic drawing of intersection 2. Explain.
4.Suggestions to improve the data set or the accuracy of the results
![Page 8: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/8.jpg)
Team XSlide 8
Download (and replace) actual probe data files (excel and/or XML) from:
http://www.engin.umd.umich.edu/EPD/acvt.php
![Page 9: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/9.jpg)
Slide 9
Task 4:
Using probe data records, propose modifications to intersection programming to improve
traffic flow.
1.List data interpretation assumptions
2.Suggestions
3.Suggest other possible applications for probe data
![Page 10: Autonomous Connected Vehicle Certificate Program Capstone Project Reports](https://reader035.vdocuments.us/reader035/viewer/2022081603/56815018550346895dbdfe2f/html5/thumbnails/10.jpg)
Team XSlide 10