Dynamically optimal trajectories for earthmoving excavators Young Bum Kim, Junhyoung Ha , Hyuk Kang, Pan Young Kim, Jinsoo Park, F.C. Park abstract article info Article history: Accepted 10 December 2012 Available online 7 March 2013 Keywords: Excavator Earthmoving Motion optimization Minimum torque We consider the problem of generating time-efcient, minimum torque motions for earthmoving excavators. Limits on actuator forces, as well as on joint velocities and accelerations, are assumed given, and the objective is to produce the fastest possible minimum torque motions while avoiding torque saturation limits. Relying on a set of recursive geometric algorithms for calculating the excavator dynamics that also calculates analytic gradients and Hessians of the dynamics as a by-product, we develop robust, reliable algorithms that generate such optimal trajectories. The resulting trajectories are compared with actual digging motions of experienced operators. © 2013 Elsevier B.V. All rights reserved. 1. Introduction Interest in unmanned excavators is driven by many consider- ations, from a desire to reduce the numerous fatal accidents that occur regularly to human operatorsparticularly in dangerous envi- ronments involving highly uneven terrain and unstable groundto improving task efciency by automating excavation in an optimal manner. To realize such potential benets, an unmanned excavator must have the capability to produce optimal motions in a reliable and efcient manner. While there are many possible notions of opti- mality, our focus in this paper is on excavator motions that are fast, power-efcient, and smooth. These criteria naturally require careful consideration of the excavator dynamics. In some relevant previous work, [1] reports on a fully automated excavator that senses the dig face, recognizes and localizes the truck, de- tects any obstacles, and nally produces a feasible digging path via three planning algorithms: a coarse-to-ne dig point planning, template- based dump planning, and script-based planning. It is important to note that none of these planning algorithms take into account the dy- namics of the excavator; only the geometry of the terrain and kinematic constraints are considered. More recently in [2], a high-level hierarchi- cal framework for autonomous construction machinery is proposed, in which the planning, measurement, and control functions are clearly identied and dened. While the general issues involved in planning are addressed, no specic planners are proposed. In this paper we report on a class of algorithms for generating dynamically optimal excavator trajectories, and more broadly, on an ofine simulation and motion planning system for unmanned excava- tors. The benets of a computer simulation and planning tool for such purposes are obvious: a means of evaluating and optimizing system performance, from design to motion planning and control, as well as reduced development time and costs with fewer iterations of pro- totype construction and testing. Our main technical contribution is a class of motion optimization algorithms for generating the fastest possible minimum torque mo- tions. As has been reported in some of our earlier work, [3], that motion optimization taking into account the dynamics is, although seemingly straightforward in principle, computationally and numerically highly challenging in practice. For one thing, the availability of analytic gradi- ents of the objective function and constraints impacts numerical con- vergence in a signicant way; nite difference approximations of the gradient often result in numerical instabilities and poor convergence behavior. Moreover, the presence of closed loop constraintsthe kine- matics of a typical excavator involves several closed loops and passive joints that are not actuatedcomplicates the calculation of the dynam- ics and the gradients. Drawing upon some of our previous work [35], we develop an optimization algorithm that robustly and efciently obtains the fastest possible minimum torque motionthat is, without violating any actua- tor saturation limits, or other constraints on cylinder velocities or accel- erations; we call such motions minimum torque/time motionstaking into account the closed-loop structure of excavators, and the soil dy- namics during digging and dumping, i.e., in a way that reects the inu- ence of soiltool interaction forces during digging, and the effects of soil loads during lifting and dumping. Such motions avoid the undesirable bang-bang characteristics of typical minimum-time trajectories, while being fast, smooth, and energy-efcient. The key to our algorithm lies in the ability to efciently calculate analytic gradients (and if necessary analytic Hessians) of the objective function, all as a simple by-product of the recursive dynamics calculationthis is achieved by drawing upon the geometric algorithms rst derived in [5]. More broadly, our motion optimization algorithm is part of an ofine planning and simulation system that integrates disparate com- ponents, ranging from a dynamics simulation engine to methods for soil model parameter identication, into a coherent and easy-to-use framework. We describe the basic elements of our overall motion Automation in Construction 35 (2013) 568578 Corresponding author. E-mail address: [email protected] (J. Ha). 0926-5805/$ see front matter © 2013 Elsevier B.V. All rights reserved. http://dx.doi.org/10.1016/j.autcon.2013.01.007 Contents lists available at ScienceDirect Automation in Construction journal homepage: www.elsevier.com/locate/autcon

Upload: others

Post on 14-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

Automation in Construction 35 (2013) 568–578

Contents lists available at ScienceDirect

Automation in Construction

j ourna l homepage: www.e lsev ie r .com/ locate /autcon

Dynamically optimal trajectories for earthmoving excavators

Young Bum Kim, Junhyoung Ha ⁎, Hyuk Kang, Pan Young Kim, Jinsoo Park, F.C. Park

⁎ Corresponding author.E-mail address: [email protected] (J. Ha).

0926-5805/$ – see front matter © 2013 Elsevier B.V. Allhttp://dx.doi.org/10.1016/j.autcon.2013.01.007

a b s t r a c t

a r t i c l e i n f o

Article history:Accepted 10 December 2012Available online 7 March 2013

Keywords:ExcavatorEarthmovingMotion optimizationMinimum torque

We consider the problem of generating time-efficient, minimum torque motions for earthmoving excavators.Limits on actuator forces, as well as on joint velocities and accelerations, are assumed given, and the objectiveis to produce the fastest possible minimum torque motions while avoiding torque saturation limits. Relyingon a set of recursive geometric algorithms for calculating the excavator dynamics that also calculates analyticgradients and Hessians of the dynamics as a by-product, we develop robust, reliable algorithms that generatesuch optimal trajectories. The resulting trajectories are compared with actual digging motions of experiencedoperators.

© 2013 Elsevier B.V. All rights reserved.

1. Introduction

Interest in unmanned excavators is driven by many consider-ations, from a desire to reduce the numerous fatal accidents thatoccur regularly to human operators—particularly in dangerous envi-ronments involving highly uneven terrain and unstable ground—toimproving task efficiency by automating excavation in an optimalmanner. To realize such potential benefits, an unmanned excavatormust have the capability to produce optimal motions in a reliableand efficient manner. While there are many possible notions of opti-mality, our focus in this paper is on excavator motions that are fast,power-efficient, and smooth. These criteria naturally require carefulconsideration of the excavator dynamics.

In some relevant previous work, [1] reports on a fully automatedexcavator that senses the dig face, recognizes and localizes the truck, de-tects any obstacles, andfinally produces a feasible digging path via threeplanning algorithms: a coarse-to-fine dig point planning, template-based dump planning, and script-based planning. It is important tonote that none of these planning algorithms take into account the dy-namics of the excavator; only the geometry of the terrain and kinematicconstraints are considered. More recently in [2], a high-level hierarchi-cal framework for autonomous construction machinery is proposed, inwhich the planning, measurement, and control functions are clearlyidentified and defined. While the general issues involved in planningare addressed, no specific planners are proposed.

In this paper we report on a class of algorithms for generatingdynamically optimal excavator trajectories, and more broadly, on anoffline simulation andmotion planning system for unmanned excava-tors. The benefits of a computer simulation and planning tool for suchpurposes are obvious: a means of evaluating and optimizing systemperformance, from design to motion planning and control, as well

rights reserved.

as reduced development time and costs with fewer iterations of pro-totype construction and testing.

Our main technical contribution is a class of motion optimizationalgorithms for generating the fastest possible minimum torque mo-tions. As has been reported in some of our earlier work, [3], thatmotionoptimization taking into account the dynamics is, although seeminglystraightforward in principle, computationally and numerically highlychallenging in practice. For one thing, the availability of analytic gradi-ents of the objective function and constraints impacts numerical con-vergence in a significant way; finite difference approximations of thegradient often result in numerical instabilities and poor convergencebehavior. Moreover, the presence of closed loop constraints—the kine-matics of a typical excavator involves several closed loops and passivejoints that are not actuated—complicates the calculation of the dynam-ics and the gradients.

Drawing upon some of our previous work [3–5], we develop anoptimization algorithm that robustly and efficiently obtains the fastestpossible minimum torquemotion—that is, without violating any actua-tor saturation limits, or other constraints on cylinder velocities or accel-erations; we call such motions minimum torque/time motions—takinginto account the closed-loop structure of excavators, and the soil dy-namics during digging and dumping, i.e., in a way that reflects the influ-ence of soil–tool interaction forces during digging, and the effects of soilloads during lifting and dumping. Such motions avoid the undesirablebang-bang characteristics of typical minimum-time trajectories, whilebeing fast, smooth, and energy-efficient. The key to our algorithm liesin the ability to efficiently calculate analytic gradients (and if necessaryanalytic Hessians) of the objective function, all as a simple by-product ofthe recursive dynamics calculation—this is achieved by drawing uponthe geometric algorithms first derived in [5].

More broadly, our motion optimization algorithm is part of anoffline planning and simulation system that integrates disparate com-ponents, ranging from a dynamics simulation engine to methods forsoil model parameter identification, into a coherent and easy-to-useframework. We describe the basic elements of our overall motion

Page 2: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

LiftingDigging

DumpingReturning

Soil Parameter Estimation

Dynamics

Planning andOptimization

Boundary conditions

Optimal Trajectories

Measurementdata

Comparison resultsbetween simulationand measurement

Fig. 1. Architecture for our simulation and motion planning system.

569Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

planning and simulation architecture. In particular, using soil modelsbased on the fundamental earth moving equations (FEE) [6] and itsvariants [7], we describe a soil model parameter identification proce-dure that relies on measurements of digging forces in actual excava-tion tasks.

The optimal motions generated by our method are compared withthe actual excavation trajectories of experienced human operators.We find that the optimal digging motions, while for the most part sim-ilar to those performed by an experienced human operator, do showsome important qualitative differences, particularly in the dumpingand returning motions. These and other observations are discussed indetail.

The remainder of the paper is organized as follows. Section 2 pro-vides a high-level description of our simulation and motion planningarchitecture, together with a more detailed description of the maincomponents. Section 3 derives the excavator dynamics for the fourmain tasks involved in earthmoving, and also describes both the soilmodel used for the study and a procedure for estimating its parameters.Section 4 presents details of the algorithm for generating minimumtorque and minimum time motions. Section 5 presents a comparisonof the optimal motions generated by our planner with the actual exca-vation trajectories performed by experienced human operators. We

Fig. 2. Excavator in

conclude in Section 6 with a discussion of possible future extensionsto our simulator and planner.

2. Simulation and planning architecture

Fig. 1 depicts the overall architecture for our simulation and motionplanning system. The three basic functions are dynamics simulation,motion planning and optimization, and soil parameter estimation. Thedynamic simulation engine formulates the equations of motion for thefour basic excavator tasks (digging, lifting, dumping, and returning).Motions obtained from dynamic simulations can be compared withmeasurement data taken from field experiments; a direct comparisonbetween, e.g., the force profiles is onemeans of evaluating the accuracyand reliability of the dynamics simulation.

Digging simulation requires a computational model for the soildynamics, which in turn requires a method for estimating the soilmodel parameters. The soil parameter estimation module takes asinput measurement data (obtained from field experiments), and esti-mates the soil model parameters via an optimization procedure.Among the external forces exerted on the excavator, digging forcesare typically the largest, so that careful estimation of the soil modelparameters is essential for realistic dynamics simulation.

reduced form.

Page 3: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

Bucket angle

Vs

α i α f

Fig. 5. Dumping work.

λi

-λi

Fig. 3. Forces at i-th cut points.

570 Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

The planner invokes the dynamics simulation engine when gener-ating motions, and takes as input the boundary conditions, i.e., theinitial and final bucket pose and velocity, and produces optimal cylin-der trajectories for the minimum torque/time criterion. Embeddedwithin the planner are the requisite optimization algorithms, whichrequire analytic gradients; these gradients can be obtained as a by-product of the dynamics simulation as noted earlier.

3. Excavator dynamic modeling

For the purposes of this study we model only the rigid-bodydynamics of the excavator, without taking into account the hydraulicactuator dynamics. The methodology presented in this paper can bestraightforwardly extended to this case, although the governingequations of motion become more involved.

The dynamic modeling of the excavator is complicated by thepresence of four closed loops, and several passive joints. There aretwo main approaches to the dynamic modeling of such constrainedmultibody systems: (i) modeling the system by a set of differentialequations subject to algebraic constraints (the differential-algebraicapproach), and (ii) modeling the system exclusively by a set of differ-ential equations formulated in terms of an independent set of gener-alized coordinates. For purely dynamic simulation purposes there islittle difference between the two approaches. However, for motionoptimization purposes, where analytic gradients of the objectivefunction are extremely useful, the latter approach is computationallyadvantageous and more straightforward.

Assuming that the excavator mechanism consists of a total of mone degree-of-freedom joints, the first step in the dynamic modelingis to distinguish the n actuated joints, denoted qa∈Rn; from the m-npassive joints, denoted qp∈Rm−n (for typical excavators, n=4 andm=16). Define q ¼ qa; qp

� �∈Rm. The kinematic loop closure con-

straints can then be expressed in the following differential form(see, e.g., [8]):

_q ¼ Φ _qa ð1Þ

Φ ¼ I−J†pJa

� �ð2Þ

€q ¼ _Φ _qa þΦ€qa: ð3Þ

The matrices Ja∈R m−nð Þ�n and Jp∈R m−nð Þ� m−nð Þ above are obtainedby time-differentiating the m-n kinematic loop closure equationsg(qa,qp)=0. _q can be further differentiated to obtain €q; [8] describes

bucket-tip path

Ground

Vs

Fig. 4. Bucket-tip path.

an efficient screw-theoretic method for this differentiation. Belowwe shall have occasion to use the constraint Jacobian Jc, defined asJc ¼ Ja Jp

� �∈R m−nð Þ�m:

Having modeled the excavator kinematics in this form, we nowconvert the excavator into a topological tree structure (which wecall a reduced system) by appropriately cutting all closed loops inthe original system as shown in Fig. 2. For each cut point, we imaginea generalized force λi exerted at the passive joint that causes the re-duced system to undergo exactly the same movement as the originalsystem (see Fig. 3). Physically this generalized force can be identifiedwith the internal force and bending moment at the correspondingpoint of the original closed-loop system.

Denoting by the vector λ the collection of all the generalizedforces λi, the dynamics of the excavator can be expressed in the form

M qð Þ€q þ C q _; qð Þ _q þ V qð Þ ¼ τ þ JTcλ ð4Þ

whereM qð Þ∈Rm�m is themassmatrix,C q _; qð Þ∈Rm�m andV qð Þ∈Rm arethe terms associated with the Coriolis and gravitational forces of thereduced system, τ∈Rm is the vector of the torques, and λ∈Rm−n isthe vector of constraint forces. Explicit formulations of these matrices,as well as efficient recursive algorithms for the evaluation of thedynamic equations, are provided in [5]. Following [5], τ can then be cal-culated for the reduced system provided q _; q €; qð Þ are assumed given:

τ≜M qð Þ€q þ C q _; qð Þ _q þ V qð Þ ð5Þ

Measurementdata

Soil ParameterEstimation

Soil-ToolInteraction Model

Digging motiondata

Diggingforce

Fig. 6. Block diagram illustrating calculation of digging forces.

Page 4: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

fs

Rd

terrain surface

bucket blade

failure planecaLt

cLf

Q

Fig. 7. Modified FEE model: pseudo-static model of earthmoving at critical point justbefore failure. α is the slop of the terrain, Lt is length of the tool, Lf is the length ofthe surface along which the wedge slides, Q is the surcharge, or the displaced soilthat rests on the wedge, ca is the adhesion between the soil and blade, R is the forceof the soil resisting the movement of the wedge, and fs is the force exerted by thetool to cause failure. The material in the shaded region constitutes all of the materialsthat have passed over the top of the bucket tip during the bucket's motion, and is referredto as the swept volume, Vs [9].

Table 1Optimization constraint for each working tasks.

Working Equation number Pmax Qmax_Wmax Vsmin N.P.

Digging Eq. (12) ○ ○ ○ ○ ×Lifting Eq. (15) ○ ○ ○ × ○Dumping Eq. (16) ○ ○ ○ × ○Returning Eq. (4) ○ ○ ○ × ○

Table 2Minimum torque optimization algorithm.

571Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

τ ¼ τ−JTcλ: ð6Þ

τ here is the sum of the original torques τ with the constraint forces λ.Eq. (6) can be divided into two parts corresponding to the active

and passive joint torques:

τa ¼ τa−JTaλ ð7Þ

0 ¼ τp−JTpλ: ð8Þ

Note that the left-hand side of Eq. (8) is zero because the torques atpassive joints are zero. From Eqs. (7) and (8), λ and τa can be obtainedas follows:

λ ¼ J†Tp τp ð9Þ

τa ¼ τa−JaJ†Tp τp: ð10Þ

ΔF(t)

Simulation

Measurement

tfti

Digging force

Digging time

Fig. 8. Estimation of soil parameters.

The final remaining step is to compute τa (or λ) from the givenq; _qa; €qa. Here _q; €q can be obtained from Eqs. (1) and (3), from whichτa and λ are then obtained from (5), (9), and (10). Note that Eq. (4)does not account for the soil forces. Taking these into account, the exca-vator dynamics equations assume the form

M qð Þ€q þ C q _; qð Þ _q þ V qð Þ ¼ τ þ JTcλþ JTs f s þ JTk f k; ð11Þ

where Js is the soil–tool Jacobian, fs is the soil force exerted on the bucketduring the digging, Jk is the soil–bucket Jacobian and fk is the forceexerted on the bucket arising from soil weight during the lifting (detailsare given below).

Thus farwe have derived the rigid-body dynamics of the excavator inan independent context;we nowexamine the task-specific dynamics fortruck loading, which consists of digging, lifting, dumping, and returningto the original digging position. The next subsections describe, for eachsubtask, how to formulate the inverse dynamics, which is needed inthe motion optimization procedure.

3.1. Digging dynamics

During digging, the soil lifting force fk in Eq. (11) is not exerted(that is, fk should be zero). In this case the equations of motion canbe rewritten as follows:

M qð Þ€q þ C q _; qð Þ _q þ V qð Þ ¼ τ þ JTcλþ JTs f s: ð12Þ

The digging force fs can be calculated via the soil model, which wedescribe later in Section 3.5.

3.2. Lifting dynamics

During lifting, the bucket is assumed to be filled with the soilobtained during the digging phase. The volume of soil, Vs, is calculatedfrom the closed volume between the ground and bucket-tip path as

Minimun torque optimization

1 Input: Measurement data M, Motion script Φ=[Φdig,Φlift,Φdump,Φreturn], tf=[tf,dig,tf,lift,tf,dump,tf,return]

2 Soil parameter Ψ ← Soil parameter estimation(M) described in Section 3.5.3 (Pdig∗ ,soil volume Vs)← Digging motion minimum torque optimization (Φdig,Ψ,tf,dig)

3.1 Objective function is given in Eq. (27) with the dynamics specified inSection 3.1.

3.2 Constraints are given in Table 1.3.3 The soil volume Vs is the closed volume as shown in Fig. 4.

4 Plift∗ ← Lifting motion minimum torque optimization (Φlift,Vs,tf,lift)4.1 Objective function is given in Eq. (27) with the dynamics specified in

Section 3.2.4.2 Constraints are given in Table 1.

5 Pdump∗ ← Dumping motion minimum torque optimization (Φdump,tf,dump)5.1 Objective function is given in Eq. (27) with the dynamics specified in

Section 3.3.5.2 Constraints are given in Table 1.

6 Preturn∗ ← Returning motion minimum torque optimization (Φreturn,tf,return)6.1 Objective function is given in Eq. (27) with the dynamics specified in

Section 3.4.6.2 Constraints are given in Table 1.

Page 5: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

Table 3Minimum time optimization algorithm.

Minimun time optimization

1 Input: Measurement data M, Motion script Φ=[Φdig,Φlift,Φdump,Φreturn]2 Soil parameter Ψ← Soil parameter estimation(M) described in Section 3.5.3 (Pdig∗ ,tf,dig,soil volume Vs)← Digging motion minimum time optimization

(Φdig,Ψ)3.1 Objective function is given in Eqs. (28) and (29) with the dynamics spec-

ified in Section 3.1.3.2 Constraints are given in Table 1.3.3 The soil volume Vs is the closed volume as shown in Fig. 4.

4 (Plift,∗ tf,lift)← Lifting motion minimum time optimization (Φlift,Vs)4.1 Objective function is given in Eqs. (28) and (29) with the dynamics spec-

ified in Section 3.2.4.2 Constraints are given in Table 1.

5 (Pdump,∗ tf,dump)← Dumping motion minimum time optimization (Φdump)5.1 Objective function is given in Eqs. (28) and (29) with the dynamics spec-

ified in Section 3.3.5.2 Constraints are given in Table 1.

6 (Preturn,∗ tf,return)← Returning motion minimum time optimization (Φreturn)6.1 Objective function is given in Eqs. (28) and (29) with the dynamics spec-

ified in Section 3.4.6.2 Constraints are given in Table 1.

Table 4Specifications for the hydraulic excavator used in experiments.

Item Value

Operating weight 29,300 kgBoom length 6.25 mArm length 3.05 mBucket capacity 1.27 m3

572 Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

shown in Fig. 4. The soil carried in the bucket exerts a force fk on thebucket, whereas digging force fs should be zero during lifting phase. Ingeneral it is difficult to analytically calculate fk, since it depends on theinterior shape of bucket and the motion of the bucket. However, sincethe soil mass can be readily computed, one can augment the bucketmass with the soil mass for a reasonable approximation of fk. To de-rive the equations of motion when the soil mass is augmented tothe bucket mass in this form, the corresponding Euler–Lagrangeequations can be written as follows:

ddt

∂Lk∂ _q −∂Lk

∂q ¼ Mk qð Þ€q þ Ck q _; qð Þ _q þ Vk qð Þ ð13Þ

¼ JTk f k; ð14Þ

where Lk is the Lagrangian for the augmented soil. Using both Eqs.(11) and (14), the equations of motion for lifting can be written asfollows:

M qð Þ þMk qð Þð Þ€q þ C q; _qð Þ þ Ck q; _qð Þð Þ _q þ V qð Þ þ Vk qð Þ¼ M qð Þ€q þ C q; _qð Þ _q þ V qð Þ ¼ τ þ JTcλ: ð15Þ

Note the similarity between Eqs. (15) and (11).

3.3. Dumping dynamics

During dumping, the soil volume in the bucket Vs decreases as afunction of bucket angle α(q). As shown in Fig. 5, we assume thatthe soil volume Vs linearly decreases as the bucket angle α increases,in which case the equations of motion (16) can now be written

M q;αð Þ€q þ C q _; q;αð Þ _q þ V q;αð Þ ¼ τ þ JTcλ; ð16Þ

and the boundary conditions for each of terms in Eq. (16) are given asfollows:

M q;αð Þ ¼ M qð Þ þMk qð Þ at α qð Þ ¼ αiM qð Þ at α qð Þ ¼ αf

�ð17Þ

C q _; q;αð Þ ¼ C q _; qð Þ þ Ck q _; qð Þ at α qð Þ ¼ αiC q _; qð Þ at α qð Þ ¼ αf

�ð18Þ

V q;αð Þ ¼ V qð Þ þ Vk qð Þ at α qð Þ ¼ αiV qð Þ at α qð Þ ¼ αf

;

�ð19Þ

where αi,αf respectively denote the start and final angles for dump-ing. Note that each of the terms M , C and V in Eq. (16) depends onthe bucket angle α as well as the joint angle vector q.

3.4. Returning dynamics

If during the returning task no external forces other than gravityare exerted on the excavator, then the dynamic equations in thiscase are given by Eq. (4).

3.5. Soil modeling and identification

In general, calculating soil digging forces is complicated by the dif-ficulty in constructing accurate models that capture the static and dy-namic properties of the soil. The choice of soil–tool interaction modelcrucially affects the accuracy and performance of digging simulation.The soil–tool interaction process is summarized in Fig. 6.

Recent contributions to soil–tool interaction modeling include thefundamental earth-moving equation (FEE) [6], learning based models[10], spring-damper models [11], and energy-dissipation models [12].For our purposes we choose a modified version of the FEE model

proposed in [7], illustrated in Fig. 7. This model specifies the soil–tool dynamic interaction in terms of the five soil parameters δ, ϕ, β,γ, and c:

• δ: the angle between bucket blade and soil force fs exerted on buck-et blade as shown in Fig. 7

• ϕ: the angle between the failure plane and resistance force R asshown in Fig. 7

• β: the angle between the terrain surface and the failure plane asshown in Fig. 7

• γ: the mass density of the soil• c: soil cohesion parameter with the same unit as pressure.

The soil force fs can be calculated as a function of five parameters,

f s ¼ d2wγgNw þ cwdNc þ VsγgNq ð20Þ

Nw ¼ cotβ−tanαð Þ cosα þ sinαcot β þ ϕð Þð Þ2 cos ρþ δð Þ þ sin ρþ δð Þcot β þ ϕð Þ½ � ð21Þ

Nc ¼1þ cotβcot β þ ϕð Þ

cos ρþ δð Þ þ sin ρþ δð Þcot β þ ϕð Þ ð22Þ

Nq ¼cosα þ sinαcot β þ ϕð Þ

cos ρþ δð Þ þ sin ρþ δð Þcot β þ ϕð Þ ð23Þ

where Γ=(d,w,α,ρ,Vs) is a set of additional geometric parameterswhich correspond to the depth of the bucket tip, the width of thebucket, the terrain slope, rake angle, and swept volume. Γ can be cal-culated once bucket pose, bucket shape and terrain shape are known.The derivation of fs is given in [9].

We note that this model describes the static force-displacement rela-tion between the soil and tool; while for our purposes this model is suffi-cient for the most part, for fast, highly dynamic movements of the bucketthe accuracy of the dynamic simulation can be expected to degrade.

Page 6: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

Fig. 9. Displacement and pressure sensors installed on the hydraulic excavator.

573Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

Wenow address the estimation of the soil model parameters. In thisstudy we formulate this as an optimization problem, in which the fol-lowing objective function is minimized:

soil parameters ¼ arg minδ;Φ;β;γ;c

∫tftiΔF tð Þj j dt; ð24Þ

where ti is the time at which digging starts, tf is the time at which dig-ging ends, and ΔF(t) is the difference between the measured force andthe force calculated from the soil model. The optimization variablesare the soil model parameters, and the objective function ∫tf

tiΔF tð Þj j dt

is taken to be the integral of the absolute value of the force difference(which, as shown in Fig. 8, corresponds to the area between the twoindicated curves).

4. Minimum torque/time optimization

4.1. Formulation

The generation of minimum torque/time trajectories for excava-tors can be approached in a number of ways. One possible optimalcontrol formulation involves augmenting the minimum torque func-tional with a penalty term for the final time tf, i.e.,

minτ tð Þ

ϕ tf� �

þ 12∫tf0 jjτ tð Þjj2dt ð25Þ

subject to boundary conditions and various physical constraints assummarized in Table 1.

In [13] a local solution to the optimal control problem is found byassuming that the joint trajectories q(t) are parametrized in terms ofB-splines:

q t; Pð Þ ¼Xmi¼1

Bi tð Þpi; ð26Þ

where Bi(t) is a B-spline basis function and P=[p1,p2,⋯,pm] is the set ofcontrol points. The cost functional then reduces to a parameter optimi-zation problem of the form

minP

ϕ tf� �

þ 12∫tf0 jjτ P; tð Þjj2dt ð27Þ

• Equation number: governing dynamics equation number• Pmax: maximum pressure

• Qmax: maximum flow rate• _Wmax: maximum power• Vsmin: minimum amount of soil volume• N.P. (No Penetration): whether penetration between ground andbucket is allowed (×) or not (○)

subject to the same constraints as described in Table 1. The basis functionsmust be chosen so as to satisfy all the terminal boundary conditions.

For the minimum torque problem in which the final time tf isgiven, it is intuitively clear that for larger values of tf, the minimumtorque profiles become increasingly flatter. If tf is allowed to vary,the first term ϕ(tf) acts as a penalty function to prevent the finaltime from becoming arbitrarily large in order to decrease torque con-sumption. The functional ϕ(tf) should be a monotonically increasingfunction of tf, and should be appropriately weighted for balancing be-tween final time and torque consumption.

Penaltymethods are highly sensitive toweighting parameters, and inthis paper we adopt an approach initially developed for open chain armsinitially described in [14]. Specifically, we minimize the peak torque

maxtf

τ P�; t

�� ���� ��∞ ð28Þ

P� ¼ argminP

∫tf0 jjτ P; tð Þjj2 dt ð29Þ

where ||⋅ ||∞ denotes the L∞ norm, and subject to the same constraintsgiven in Table 1. This formulation is based on the observation that thepeak torque attained by the minimum torque trajectory decreasesmonotonically as tf is increased. A specific algorithm for solving thisproblem is described in Section 4.2.

4.2. Algorithms

Numerical procedures for solving the minimum torque problemand minimum time problem are described in Tables 2 and 3. HereM denotes the measurement data containing the cylinder trajectoriesand corresponding cylinder forces for several digging motion trials, Φis the motion script which contains the initial and final configurationsof digging, lifting, dumping and returning motions specified by theuser, and tf is the duration time for each motion.

For the minimum time problem described in Table 3, the motionoptimization procedure is as follows

1. Optimize theminimum torque for a fixed tf and check all constraints.2. Using an appropriate line search algorithm, decrease the final time

tf if all constraints are satisfied, otherwise increase tf.

Page 7: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

574 Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

3. Repeat the routine from step 1 to step 2 until some terminationcondition is satisfied.

The final time tf can be determined via a standard line search pro-cedure, e.g., golden section search, with an upper bound on admissi-ble values of tf.

To handle the constraints specified in Table 1, it is desirable toenforce hard constraints as much as possible, and to convert someconstraints into soft constraints as required.

5. Experimental results

In this section we present experimental results verifying the fidelityof our dynamics simulations, and a comparison of the trajectories

0 10 20 30−5

0

5

10Boom cy

tim

forc

e (K

GF

)

0 10 20 30−2

−1.5

−1

−0.5

0

0.5

1Arm cyl

tim

forc

e (K

GF

)

0 10 20 30−1

−0.5

0

0.5

1Bucket c

tim

forc

e (K

GF

)

0 10 20 30−5

0

5

10x 104

x 104

x 104

x 104

Swin

tim

torq

ue (

KG

F−

m)

Fig. 10. A comparison of simulated and measured

produced by our planner with those produced by an experiencedhuman operator.

Physical specifications for the excavator used in the experimentsare listed in Table 4.

Displacement sensors and pressure sensors attached each of thecylinders at the boom, arm, and bucket measure the correspondingcylinder displacement and force (Fig. 9).

5.1. Verification of excavator dynamics simulation

We first compare the cylinder force trajectories produced by ourdynamic simulation with actual measurements. The cylinder force tra-jectories are measured for the two cases: (1) without soil–tool interac-tion, and (2) with soil–tool interaction. Fig. 10 compares the simulated

40 50 60 70 80

linder force

e (s)

measuresimulation

40 50 60 70 80

inder force

e (s)

measuresimulation

40 50 60 70 80

ylinder force

e (s)

measuresimulation

40 50 60 70 80

g torque

e (s)

measuresimulation

cylinder forces without soil–tool interaction.

Page 8: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

0

5

10Boom cylinder force

time (s)

forc

e (K

GF

)

measuresimulation

Arm cylinder force

time (s)

forc

e (K

GF

)

Bucket cylinder force

time (s)

forc

e (K

GF

)

−5

0

5

10x 104

x 104

x 104

x 104

Swing torque

time (s)

torq

ue (

KG

F−

m)

0 20 40 60 80 100 120 140

0 20 40 60 80 100 120 140

0 20 40 60 80 100 120 140

0 20 40 60 80 100 120 140

measuresimulation

−5

−4

−2

0

2

4

6

−1

0

1

2

3

4

measuresimulation

measuresimulation

measuresimulation

Fig. 11. A comparison of simulated and measured cylinder forces with soil–tool interaction.

575Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

and measured forces for repeated trials of a circular reference bucketmotion in three dimensions, performed by a human operator. The sim-ulated forces show good agreementwith themeasurements; the offsetsin arm and bucket forces can be traced to small discrepancies in themodel parameters (i.e., masses and inertias of the links), as well asunmodelled dynamic effects such as friction, bending, and hysteresis.

For the case with soil–tool interactions, we first estimate the five pa-rameters in the modified FEE soil model using the procedure describedearlier. Measurement data has been obtained for eight excavation cycles,in which each cycle consists of digging–lifting–dumping–returning. Weuse the first digging cycle to estimate the soil parameters, and then com-pare the predicted and measured cylinder forces over the remainingseven cycles; the results are shown in Figs. 11 and 12.

5.2. Optimized motion versus operator motion

We now generate optimal motions using the models and algo-rithms described earlier, and compare them to the motions generatedby an experienced human operator. Minimum torque/time motionsare obtained for initial and final times that correspond to those ofthe human operator motion. Table 5 compares the task executiontimes and average torque sums of the human operator motion, theminimum-time motion (using a minimum-time motion planner), andthe minimum torque/time motions generated by our planner (Figs. 15and 16). The results suggest that the operator uses excessive torquescompared to our planner's motions. Note that the minimum-timemotion only results in a small improvement in task execution time

Page 9: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

0 5 10 15−5

0

5

10x 104 Boom cylinder force

time (s)

forc

e (K

GF

)measuresimulation

0 5 10 15−3

−2

−1

0

1

2

3

4

5x 104 Arm cylinder force

time (s)

forc

e (K

GF

)

measuresimulation

0 5 10 15−1

−0.5

0

0.5

1

1.5

2

2.5

3x 104 Bucket cylinder force

time (s)

forc

e (K

GF

)

measuresimulation

0 5 10 15−3

−2

−1

0

1

2

3

4x 104 Swing torque

time (s)

torq

ue (

KG

F−

m)

measuresimulation

Fig. 12. Cylinder forces over a single cycle. Dotted lines separate digging, lifting, dumping, and returning periods from left to right.

576 Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

compared to our planner's motion, while requiring larger torques. Theresulting force profiles are shown in Figs. 13 and 14.

6. Conclusions

As a prelude to the realization of fully unmanned excavators, thisstudy has attempted to determine, based on dynamic models of theexcavator as well as soil–tool interaction models, excavator motionsthat are fast, power-efficient, and smooth. Themain technical contribu-tion of our paper is a set of analytic gradient-basedmotion optimizationalgorithms, specialized to earthmoving excavators, for generating thefastest possible minimum torque motions —that is, without violatingany actuator saturation limits, or other constraints on cylinder velocitiesor accelerations; we call suchmotionsminimum torque/timemotions—taking into account the closed-loop structure of excavators, the soildynamics during digging and dumping, and any collision avoidance con-straints that arise during typical excavation tasks. Such motions avoidthe undesirable bang-bang characteristics of typical minimum-time tra-jectories, while being fast, smooth, and energy-efficient. The optimalmotions generated by the planner are also compared with the actualexcavation trajectories of experienced human operators.

Table 5Comparison of motions.

Criteria Measurement Min time Min torque

tf 14.9 12.6 14.9Average ||τ(t)||2 1.0145 0.61483 0.61128

One of the interesting findings of our experiments is that there isnotable difference between the generated optimal motion and actualexcavation trajectories performed by a human operator, particularlyduring the arm return motion. We suspect that these differencescan be mitigated somewhat by imposing more physically realisticconstraints on the hydraulics, and taking into account collision avoid-ance between the excavator and truck.

At a higher level, this paper has also presented an offline simula-tion and planning system for unmanned excavators, that integratesan excavator dynamic simulation engine with our optimal motionplanner. One of the key elements in both the planning and simulationphases is the use of a soil model. In this paper we have described anonlinear least-squares soil model parameter identification proce-dure that relies on measurements of digging forces in actual excava-tion tasks.

The presented work can be extended in a number of ways. Takinginto account the dynamics of the hydraulic actuators is clearly useful,in particular considerations on, e.g., hydraulic actuator limits and heatloss considerations. Although [4] presents one realization of such amodel, accurate hydraulic actuator dynamic modeling is a highlycomplicated task, and it may be profitable to examine hierarchicalmodels that capture features of the dynamics at different resolutionscales. Improved soil models, as well as excavation tasks in moreextreme unstructured environments, are also being examined in thecurrent context, as well as taking into account ground collision avoid-ance constraints that arise during typical excavation tasks.

There are also several means of bootstrapping the above procedureinto a class ofmethods for generating real-time suboptimal trajectories;one particular method is described in [14] that involves principal com-ponent analysis of a dataset of optimally generated motions.

Page 10: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

0 5 10 152400

2500

2600

2700

2800

2900

3000

3100

3200

3300Boom cylinder trajectory

time (s)

disp

lace

men

t (m

m)

measuremin timemin torque

0 5 10 152300

2400

2500

2600

2700

2800

2900

3000

3100

3200Arm cylinder trajectory

time (s)

disp

lace

men

t (m

m)

measuremin timemin torque

0 5 10 151800

2000

2200

2400

2600

2800

3000Bucket cylinder trajectory

time (s)

disp

lace

men

t (m

m)

measuremin timemin torque

0 5 10 150

10

20

30

40

50

60

70

80Swing trajectory

time (s)

disp

lace

men

t (de

gree

)

measuremin timemin torque

Fig. 13. Cylinder trajectories.

0 5 10 15−1.5

−1

−0.5

0

0.5

1

1.5x 105 Boom cylinder force

time (s)

forc

e (K

GF

)

measuremin timemin torque

0 5 10 15−8

−6

−4

−2

0

2

4

6

8x 104 Arm cylinder force

time (s)

forc

e (K

GF

)

measuremin timemin torque

0 5 10 15−6

−4

−2

0

2

4

6x 104 Bucket cylinder force

time (s)

forc

e (K

GF

)

measuremin timemin torque

0 5 10 15−1

−0.5

0

0.5

1x 104 Swing torque

time (s)

torq

ue (

KG

F−

m)

measuremin timemin torque

Fig. 14. Cylinder forces.

577Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

Page 11: Automation in Constructionrobotics.snu.ac.kr/fcp/files/_pdf_files_publications/201311_Dynamically optimal.pdfBlock diagram illustrating calculation of digging forces. 570 Y.B. Kim

Fig. 15. Minimum time solution. Red curve shows the bucket-tip path of the optimal motion; the blue curve shows the human operator's motion.

Fig. 16. Minimum torque solution. Red curve shows the bucket-tip path of the optimal motion; the blue curve shows the human operator's motion.

578 Y.B. Kim et al. / Automation in Construction 35 (2013) 568–578

Acknowledgment

This researchwas supported by a research grant fromHyundai HeavyIndustries, with further partial support from the AIM Center, ROSAEC-ERC, SNU-IAMD, and the SNU-BK21 Program inMechanical Engineering.

References

[1] A.T. Stentz, J. Bares, S. Singh, P. Rowe, A robotic excavator for autonomous truckloading, Autonomous Robots 7 (1999) 175–186.

[2] H. Yamamoto, M. Moteki, H. Shao, T. Ootuki, H. Kanazawa, Y. Tanaka, Basic technologytoward autonomous hydraulic excavator, International Symposium on Automationand Robotics in Construction, 2009, pp. 288–295.

[3] S.H. Lee, J. Kim, F.C. Park, M. Kim, J.E. Bobrow, Newton-type algorithms fordynamics-based robot movement optimization, IEEE Transactions on Robotics21 (2005) 657–667.

[4] S. Yoo, C.G. Park, B. Lim, K.I. Lee, F.C. Park, Bandwidth maximizing design forhydraulically actuated excavators, Journal of Vibration and Control 16 (2010)2109–2130.

[5] F.C. Park, J.E. Bobrow, S.R. Ploen, A lie group formulation of robot dynamics,International Journal Of Robotics Research 14 (1995) 609–618.

[6] A.R. Recee, The fundamental equation of earth-moving mechanics, Proceedings ofthe Institution of Mechanical Engineers, 179, 1964, pp. 16–22.

[7] O. Luengo, S. Singh, H. Cannon, Modeling and identification of soil-tool interaction inautomated excavation, IEEE/RSJ International Conference on Intelligent Robotic Sys-tems, 1998, pp. 1900–1906.

[8] F.C. Park, J. Choi, S. Ploen, Symbolic formulation of closed chain dynamics inindependent coordinates, Mechanism and Machine Theory 34 (1999) 731–751.

[9] H. Cannon, S. Singh, Models for automated earthmoving, Experimental Robotics VI,Lecture Notes in Control and Information Sciences, Springer Verlag, 1999, pp. 183–192.

[10] S. Singh, Learning to predict resistive forces during robotic excavation, InternationalConference on Robotics and Automation, 1995, pp. 2102–2107.

[11] S.P. DiMaio, S.E. Salcudean, C. Reboulet, A virtual environment for the simulationand programming of excavation trajectories, presence: teleoper, Virtual Environment10 (2001) 465–476.

[12] S.M. Vahed, X. Song, J.S. Dai, H.K. Lam, L.D. Seneviratne, K. Althoefer, Soil estimationbased on dissipation energy during autonomous excavation, The International Federa-tion of Automatic Control, 2008, pp. 13821–13826.

[13] J.E. Bobrow, B. Martin, G. Sohl, E.C. Wang, J. Kim, F.C. Park, Optimal robot motionsfor physical criteria, Journal of Robotic Systems 18 (2001) 785–795.

[14] S. Kim, F.C. Park, Fast robot motion generation using principal components:framework and algorithms, IEEE Transactions on Industrial Electronics 55 (2008)2506–2516.