![Page 1: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/1.jpg)
Automated construction of steel tanks Mechanical montage of steel tanks, steel sheet
assembling (ongrowing) method
![Page 2: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/2.jpg)
Steel tank construction in Russia: History and experience
1
![Page 3: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/3.jpg)
Applied construction methods:Traditional 1 (steel sheet assembling)
• Separate steel sheets produced at the steel plant are transported to the construction site
• Assembling of each ring with application of heavy lifting vehicles
Each sheet is lifted and assembled by manual welding
Application of building frames and heavy lifting vehicles
2
![Page 4: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/4.jpg)
• Pieces of the future tank wall are welded throughout the tank height at the steel plant
• Basically – 2 wall pieces (1/2 of the tank wall)
• Half-wall is rolled for transportation to the construction site
• Special heavy transport vehicles applied
Delivered steel rolls are unfolded by heavy construction vehicles up to the required geometry and installed to the prepared bottom
Unfolded half-wall constructions are assembled
Applied construction methods:Traditional 2 (steel roll assembling)
3
![Page 5: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/5.jpg)
Technology of Hard Top LLC
YouTube link: https://www.youtube.com/watch?v=8pJ4fRm9KXQ
![Page 6: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/6.jpg)
Profiling
machine
Welding
equipmentInstallation
frame
Control
system
Welding
Steel coil
Tank wallBlack steel, Stainless steel
Mechanical montage of steel tanks, steel sheet assembling (ongrowing) method
Metal profile and
welding seam / joint
5
![Page 7: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/7.jpg)
Pilot tank project: Day 1
Equipment installation 6
![Page 8: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/8.jpg)
Pilot tank project: Day 2
Growing of 2-3 belts 7
![Page 9: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/9.jpg)
Pilot tank project: Day 5
Roof installation 8
![Page 10: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/10.jpg)
Pilot tank project: Day 8
Growing of 8 belts 9
![Page 11: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/11.jpg)
Pilot tank project: Day 11
Growing of 12 belts 10
![Page 12: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/12.jpg)
Pilot tank project: Day 14
Completion: Placement on the basement11
![Page 13: Automated construction of steel tankshardtoptank.ru/wp-content/uploads/filebase/presentation_eng.pdf · • Pieces of the future tank wall are welded throughout the tank height at](https://reader033.vdocuments.us/reader033/viewer/2022042123/5e9e17a0865026645e40d1f5/html5/thumbnails/13.jpg)