AURORA-RIETVLEI SOLAR POWER (PTY) LTD.
NERSA Public Hearing on the Application for a Generation License for Renewable Energy Power Plants
13 AUGUST 2012
![Page 2: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/2.jpg)
Contents
1. Background and Project Company Structure
2. Corporate Background
3. Project Description
4. Technical
5. General (non-confidential) Financial and Funding
6. Community Trust, BBBEE & Economic Development
![Page 3: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/3.jpg)
Background and Project Company Structure
![Page 4: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/4.jpg)
Background and Project Company Structure
• Solar Photovoltaic – Fixed Frame
• 10.350 MWp Installed Capacity
• Located 180km north of Cape Town
• 100% Locally Manufactured Modules
• 196 jobs created during construction
• 36 jobs created during operation
![Page 5: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/5.jpg)
Background and Project Company Structure
Jay & Jayendra (Pty) Ltd.(Black Enterprise
Members)
SDSA(Lead member)
Aurora Solar Community Trust
Aurora-Rietvlei Solar Power (Pty) Ltd.
![Page 6: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/6.jpg)
Corporate Background
• Lead Member
• 100% Owned by SolaireDirect –Largest Solar IPP in France
• 300 employees worldwide –offices in 6 countries
• Local subsidiary started in 2009 currently employing 12 people
![Page 7: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/7.jpg)
Corporate Background
Fully Integrated Business Model
![Page 8: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/8.jpg)
Corporate Background
Solairedirect has installed over 120MW to date. Another 135MW is currently under construction and120MW under development.
![Page 9: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/9.jpg)
Corporate Background
• A state-of-the-art, purpose built, PV Module production unit in CAPE TOWN
• Plant Commissioned in Feb 2009.
• Current capacity of 50MW per year
• 110 employees
• R50million investment
- Local Manufacturing Facility
![Page 10: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/10.jpg)
Corporate Background
• Local Partner
• Black owned investment holding and management company
• J & J shareholding is broad-based extending to 200,000 individuals
• Current investments span various industries and sectors including rail, energy, bio-fuels and property
![Page 11: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/11.jpg)
Project Description
![Page 12: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/12.jpg)
Project Description
![Page 13: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/13.jpg)
Project Description
![Page 14: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/14.jpg)
Project Description
- Site Photos
PHOTOGRAPHS LOOKING EAST AND SOUTH
![Page 15: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/15.jpg)
Project Description
- Site Photos
PHOTOGRAPHS LOOKING WEST AND NORTH
![Page 16: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/16.jpg)
Project Description
PARAMETER UNIT VALUE
Site area Ha 65Solar park area Ha 19.9
Park perimeter measurement M 800 (length) x 300 (width)Latitude * 32°38’28.84” SouthLongitude * 18˚29’50.24” EastTemperature (min/max) Degrees Celsius -10/+45Altitude m (a.m.s.l.) 135Average rainfall mm per annum 271Relative humidity % 90
Electrical Information
Total Contracted capacity MW (peak) 9.00Total quantity of PV modules Pcs 42 240
Number of inverter/transformer stations Pcs 8Inverter station capacity MW 1.260Grid ConnectionConnection Voltage kV 22Transmission Line Length km 11Eskom Substation * Vredelust
![Page 17: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/17.jpg)
Technical – Generation Forecast
![Page 18: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/18.jpg)
Technical – Permits & Consents
![Page 19: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/19.jpg)
General (non-confidential) Financial and
Funding – Project Financing Structure
Jay & Jayendra (Pty) Ltd.(Black Enterprise Members)
SD France(Parent Company)
SDSA(Lead member)
Aurora Solar Community Trust
Aurora-Rietvlei Solar Power (Pty) Ltd.
Equity 31%Snr Debt 62%Pref Shares 7%
57.5%
100%
“free carry”
SOLAR CONTRACTING
SDSA J&J
90% 10%
SolaireDirectTechnologies
(Primary Equipment Supplier)
DBOContract
SHAREHOLDING (SH)
CONTRACT
40% 2.5%
EXTERNAL DEBT
RMB(Senior Debt)
RMB(Pref. Shares)
62% 7%
![Page 20: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/20.jpg)
General (non-confidential) Financial and
Funding
• Total estimated project cost R212 million
• Funding structure:– Senior Debt: 62%– Mezzanine finance: 7% (preference shares)– Equity: 31%
• Cash flow positive from first year of operations (before equity participation)
• Comprehensive O&M program in place
• Comprehensive insurance program in place
• Decommissioning provision provided for at 10% of cost
![Page 21: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/21.jpg)
Community Trust, BBBEE & Economic
Development
Group Description Target Commitment
Job Creation
RSA Based Employees – Citizens 80% 80%
RSA Based Employees – Black Citizens 50% 50%
Skilled Employees – Skilled Black Citizens 30% 30%
RSA Based Employees – Local Citizens 20% 20%
Local Content % of Local Content Spend 60% 54.3%
Ownership
Project Company – Black shareholding 30% 30%
Project Company – Local Community 2.5% 2.5%
EPC Contractor – Black shareholding 8% 10%
O&M Contractor – Black shareholding 8% 10%
Management
ControlBlack Top Management 40% 40%
Preferential
Procurement
BEE Procurement Spend 60% 60%
EME & QSE Procurement Spend 10% 5%
Woman Owned Vendor Spend 5% 2.5%
Enterprise
DevelopmentEnterprise Development Contributions 0.6% 0.5%
Socio-Economic
Development
Socio-Economic Development
Contributions1.5% 1.2%
![Page 22: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/22.jpg)
Community Trust, BBBEE & Economic
Development
Local Ownership & BBBEE
• South African Ownership = 41.42%
• Project Company = Level 4
• Contractor = Level 4
![Page 23: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/23.jpg)
Community Trust, BBBEE & Economic
Development
Community Trust
• 2.5% ownership in Project Co. (shares gifted)
• 1.2% of revenue committed to socio-economic development
• A Broad-based trust benefitting the communities of Aurora, Piketberg & possibly others in the vicinity.
• Trustees will consist of members of the Project Co, independent members and members from the community represented by NGO’s and other organisations active in the area.
• Beneficiaries of the Trust identified through projects and initiatives undertaken by NGO’s.
• Projects will cover the healthcare, welfare, housing & education sectors
![Page 24: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. - NERSA€¦ · · 2012-08-15AURORA-RIETVLEI SOLAR POWER (PTY) LTD. ... Total Contracted capacity MW (peak) 9.00 Total quantity of PV modules](https://reader030.vdocuments.us/reader030/viewer/2022020303/5af0927b7f8b9aa9168dfca5/html5/thumbnails/24.jpg)
CONCLUSION