  • 8/3/2019 Auditora Mantenimiento de Gras

    1/43

    Maintenance Engineering & Asset Management

    Module M06

    MAINTENANCE AUDITING SYSTEMS

    MAJOR ASSIGNMENT

    Name: Hernn Quiroz

    Company: Ternium Siderar

    The completed assignment must be received at the Programme Office by23.59 on

    Friday 30th May 2011

    Late assignments will be penalised.

  • 8/3/2019 Auditora Mantenimiento de Gras

    2/43

    2

    Table of Contents

    I. EXECUTIVE SUMMARY.................................................................................................................3

    II. ACKNOWLEDGEMENTS................................................................................................................4

    III INTRODUCTION.......................... ..................... ...................... .................. ........................ ................5

    A. BACKGROUND ....................................................................................................................................5B. THE BRIEF .........................................................................................................................................6C. REPORT FORMAT ...............................................................................................................................6

    IV. OBJECTIVES AND SCOPE................... ..................... ................... ..................... ........................ ......7

    A. OBJECTIVES.......................................................................................................................................7B. SCOPE ...............................................................................................................................................7

    V. METHODOLOGY ................ ..................... ................... ......................... .................. ....................... ...9

    A. DIFFERENT WAYS OF ACCUMULATING EVIDENCE...............................................................................9B. STRUCTURED INTERVIEWING ............................................................................................................9C. DATA ANALYSIS ................................................................................................................................9D. COLLATION OF INFORMATION, RATING METHOD AND RECOMMENDATIONS..................................10E. PRESENTATION AND REPORT WRITING ..........................................................................................10

    VI. RESULT OF THE PERFORMANCE REVIEW.................... ................... ....................... ............... 11

    A. GENERAL .........................................................................................................................................11B. STRATEGY AND POLICY (RATING 0,9 OUT OF 5)...........................................................................11C. ORGANISATION (RATING 1,4 OUT OF 5).......................................................................................13D. COMMUNICATION (RATING 2,5 OUT OF 5) ....................................................................................15E. EMPLOYEE INVOLVEMENT (RATING 1,8 OUT OF 5)........................................................................16F. WORKLOAD MANAGEMENT (RATING 2,6 OUT OF 5)......................................................................17G. MAINTENANCE REGIME (RATING 0,5 OUT OF 5) ...........................................................................19H. SAFETY, HEALTH AND ENVIRONMENT (RATING 2,5 OUT OF 5).....................................................20I. MATERIALS MANAGEMENT (RATING 0,6 OUT OF 5) .....................................................................21

    J. VALUE FOCUS (RATING 1,5 OUT OF 5)...............................................................................................23K. MEASURE OF PERFORMANCE (RATING 1 OUT OF 5) ......................................................................24

    VII. RECOMMENDATIONS.................... ................... ....................... ................... ................... ...............26

    VIII. CONCLUSIONS ................... ...................... .................. ...................... ..................... ................... .......32

    IX. APPENDICES............... ..................... ................... ........................ .................. ....................... ............33

    X. REFERENCES..................................................................................................................................43

  • 8/3/2019 Auditora Mantenimiento de Gras

    3/43

    3

    I. Executive Summary

    An audit of the maintenance activities of the Ternium Siderar Cranes Steel Shop

    has identified that the actual performance is not aligned with the business

    requirements.

    The most positive finding is the supervisors and technicians empowerment. The

    other strengths are the Workload Management, Safety, Communication and

    Employee Involvement. But they are in the level where the need for

    improvement and change has been recognised.

    Nevertheless, along the audit I couldnt find any improvement programme. In

    addition to this, there are some topics like Strategy & Policy, measure of

    performance, materials management and maintenance regime where the needfor improvement and changes has not been identified.

    An improvement programme managed by a senior management is

    recommended in order to improve the actual maintenance systems

    performance. This programme is based on:

    - Review of Maintenance Policy

    - Review of Maintenance Strategy (procedures, process, workload, KPIs

    and standards)

    - Review the CMMS process

    - Review the Control of the Maintenance Systems (1st, 2nd, 3rd and 4th order

    control viii)

    - Develop a Benchmark with other crane steel shop maintenance

    organisation.

  • 8/3/2019 Auditora Mantenimiento de Gras

    4/43

    4

    II. Acknowledgements

    Hernn would like to express its grateful to the whole Ternium Siderar Steel

    Shop Cranes staff who gives their time and effort to make it possible this

    analysis.

    I want to thank to Paul Wheelhouse for having trained me in this modality to

    audit maintenance systems.

    This audit is made in the spirit of continuous improvement.

  • 8/3/2019 Auditora Mantenimiento de Gras

    5/43

    5

    III. Introduction

    A. Back g r ou n d

    1. Ternium Siderar Steel Shop Cranes

    Ternium Siderar Steel Shop has 31 cranes that transport all the Converters andContinuous Casting raw material and final products. As a consequence the

    cranes availability problems directly affect the Continuous Casting Machine

    (CCM) performances. It is important to highlight that the CCM is the Ternium

    Siderar bottle neck.

    In addition to this, these cranes are the most criticality Ternium Siderar assets

    from the safety points of view. They lift and transport 12 tons slabs and ladles

    with 180 tons of liquid steel at 1600 C. There are a lot of crane equipment

    failures modes that produces fatality consequences. There are examples in the

    steel industry like the Qinghe Special Steel Corporation disaster where thirty two

    people died and six were injured when a crane used to transport molten steel

    failed iii.

    a) Figure 3: Qinghe Special Steel Corporation Disaster

    What is more, in Ternium Siderar during the last five years there were 6

    different maintenance steel shop cranes managers. As a consequence there is

    no medium or large maintenance continuous improvement program.

    To sum up, the steel shop cranes are criticality from production and safety point

    of view. After these organizational changes it is crucial to audit the steel shop

  • 8/3/2019 Auditora Mantenimiento de Gras

    6/43

    6

    cranes maintenance systems in order to determine where each one of the ten

    elements of Good Practices1 is ranked. It will be the base for the continuous

    improvement program.

    B. Th e Br i ef

    The brief of this analysis was as follow:

    Asses the maintenance requirements in the business context.

    Determine the actual maintenance performance with an audit.

    Suggest the follow steps in order to improve the actual maintenance

    performance.

    Propone the continuous improvement program in order to align the

    maintenance systems with the business requirements and the safety

    policy.

    C. Re po r t Fo r m a t

    This report describes the work that was performed during the audit and finally

    presents the improvement recommendations. It is organized as follows:

    Section IV: Determine the Objectives and Scope for this work

    Section V: Describe the Methodology used for the analysis

    Section VI: Present the maintenance audit results according to the 10

    elements of good practices

    Section VII: Propone the recommendations for improvement.

    Section VIII: Cover the Conclusions of this analysis

    Section IX: Contains the Appendices

    Section X: Contains the References

    1

    The Audit is based on EFQM (European Foundation for Quality Management) business excellent model and

    Manchester University Maintenance audit model

  • 8/3/2019 Auditora Mantenimiento de Gras

    7/43

    7

    IV. Objectives and Scope

    A. Ob j ect ives

    The main objective of auditing the Cranes maintenance group is about

    discovering opportunities where the continuous improvement can be apply in

    order to assure safety operations and make better maintenance performance,

    cost-effectiveness, efficiency and service delivery.

    As it is known, the role of Maintenance in the modern business is to satisfy the

    operational demand for the long term at the lowest total life cycle cost of the

    equipment.

    Operational demands include:

    - Safe operation

    - Environment issue

    - Availability of equipment (MTBF, MTTR)

    - Throughput rates

    - Service Delivery Management (SDM)

    - Product Quality

    - Cost

    - Regulatory Requirements

    The role of Maintenance Auditing is to confirm how well these responsibilities are

    being fulfilled and to recognize areas where the continuous improvement can be

    implemented.

    In this assessment particular attention was taken about safety operations and

    every aspect of maintenance systems that could affect it.

    B. Scope

    This analysis focused on evaluating Steel Shop Cranes Group. It was evaluated

    all kind of maintenance activities related with steel shop cranes. In order to

    obtain how well this group is carrying out maintenance, it was assessed the

    following points:

    Strategy and Policy Maintenance Regime

    Organisation Materials Management

  • 8/3/2019 Auditora Mantenimiento de Gras

    8/43

    8

    Communication Value Focus

    Employee involvement Safety, Health and Environmental

    considerations

    Workload Management Measure of Performance

  • 8/3/2019 Auditora Mantenimiento de Gras

    9/43

  • 8/3/2019 Auditora Mantenimiento de Gras

    10/43

    10

    What is more, I have examined the data of failure rates, cost, work backlogs

    and the other KPIs that are available in the Ternium Siderar intranet

    maintenance site.

    D . Co ll at i on o f I n f o r m at i on , Ra t in g Me t ho d an d

    Recommenda t ions

    The information obtain was used to score the ten elements of maintenance best

    practice (see section IV-B: Scope) based on:

    - EFQM (European Foundation for Quality Management) business excellentmodel.

    - M06 Maintenance Audit Systems, from Manchester University.

    - A step by step guide to Maintenance Audit, by Paul Wheelhouse

    I used a simple scoring scheme which gives a rating from zero to five against

    each one of the ten elements.

    0. The need for improvement and change has not been recognised.

    1. The need for improvement and change has been recognised.

    2. A change programme has begun.

    3. Barriers to achieving World Class performance have been identified.

    4. Significant improvements have been achieved and the improvementprogramme is well underway

    5. World Class performance has been attained when compared to the

    recognised benchmarks.The results were plot in the spider web diagram in order to create a composite

    picture of the organisation in a simple snapshot. The key advantage is that it is

    possible to compare strengths and weaknesses of maintenance approach at a

    glance.

    Taking into account the result of the audit, benchmarking, the world class

    companies and the Ternium Siderar business objectives, I have develop a list of

    continuous improvement recommendation (Section VII)

    E. Pr esen t at i on an d Rep or t W r i t in g

    The results of the audit were presented to Ternium Siderar Maintenance Staff

    and constructive feedback and suggestions were produced. This writing

    document is the final report.

  • 8/3/2019 Auditora Mantenimiento de Gras

    11/43

    11

    VI. Result of the performance review

    A. Gen er a l

    The results of the audit are shown below. Taking in combination, the ten

    elements of good practices, reflects an overall picture of how well an

    organisation is carrying out maintenance.

    From the information review from the systems, interview with key persons,

    observation of work activities, plant tours and attendance at meeting; I

    summarize the analysis result in a simple snap shot in order to create a

    composite picture of the organisation.

    Audit Result

    0,0

    1,0

    2,0

    3,0

    4,0

    5,0STRATEGY & POLICY

    ORGANISATION

    COMMUNICATION

    EMPLOYEE INVOLVEMENT

    WORKLOAD MANAGEMENT

    MAINTENANCE REGIME

    SAFETY HEALTH & ENVIRONMENT

    MATERIALS MANAGEMENT

    VALUE FOCUS

    MEASURES OF PERFORMANCE

    B. St r at eg y an d Po li cy ( Rat i ng 0,9 o ut o f 5 )

    1.Alignment between Maintenance and Business Objectives (0,1)

    There is no overall maintenance policy. There is an informal strategy related to

    schedule turnaround but they are not aligned with the actual business

    requirements. The planner (technician) is the responsible to determine the

    turnaround strategy. He decides the opportunity for each shutdown according

  • 8/3/2019 Auditora Mantenimiento de Gras

    12/43

    12

    with his notes and memory. Nobody remember when the last strategy revision

    was performed? The actual maintenance engineers that are related with these

    cranes have no participated or reviewed the actual informal strategy. Operations

    managers claim that the actual strategy effectiveness is so far from their actual

    business requirements.

    Furthermore there is no formal communication to the supervision, technician

    and workforce about the actual Ternium Siderar business performance,

    requirements and the future maintenance and company plans.

    There are no formal standards of maintenance required. Every person has its

    own feeling.

    2.Resources matched to objectives and strategy (0,2)

    There is a deficiency of electricians to support the actual informal maintenance

    plans. So the technicians produce work orders according the actual capacity

    instead of their necessity to guarantee the business required reliability.

    What is more the electricians have poor capabilities because they are new in this

    job and they do not have proper technical training. As a consequence, there is

    an unacceptable child mortality rate.

    Furthermore, the engineering improvement support (In Siderar it is called IAME

    area), is practically absent. The IAME (applied engineering improvement

    department) area that gives the centralized engineering support to study the

    chronic or major outages practically does not give service to the crane area.

    3.Constraints understood - initiatives in place. (0,2)

    Constraints are followed but not completed understood because they are not

    proper communication between the management and the

    supervision/technicians.

    There are initiatives in place for some critical equipment but they are promoting

    for individual intentions. They are not part of an overall plan.

    There is no evidence of 5Ss implementations. There is a big opportunity in this

    topic. (see appendix 6)

  • 8/3/2019 Auditora Mantenimiento de Gras

    13/43

    13

    4.Vision, objectives, shared goals owned by all (0,3)

    As I said, there is no formal strategy or objectives. In addition to this there is no

    formal vertical communications about the business strategy. So there cannot be

    shared goals although many personnel are working to maintain the cranes

    working. The supervision, technicians and workforce have a common goal. Theiraim is to avoid failures in lift systems. What is more, their second objective is to

    maintain al the crane working, which represent a big personal effort because

    there is a 30% of emergencies. There is a culture of reactive maintenance.

    Every morning there is a meeting between the supervision, technician and the

    workforce. The objective of this meeting is to share the goals for the day and

    how to concentrate the resources according to the news. There is no medium or

    large term goals. There are no weekly or monthly meetings in order to review

    the performance and compare it against the goals.

    There is reasonable spend allowed by the site engineering function but there is

    no control about it. Technicians do not know the budget and the real spends.

    5.The strategy and policy is subject to continuous review andupdating. ? (0,1)

    Without a formal strategy it cannot be reviewed or updated but every morning

    they are reviewing the work that they are currently doing.

    C. Or gan isat ion ( Rat in g 1 ,4 ou t of 5 )

    Certain positive aspects were identified:

    - Teamwork between all technicians

    - Good technician competence

    - Technicians commitment

    - Ownership

    However, I think that there are opportunities to improve in the following points:

    1.Are there clearly defined responsibilities and accountabilities?(0,2)

    There are clearly defined roles and responsibilities for staff and for the shop

    floor. They are not written, but everybody now it informally. There R&R for staff

    has not been developed on site. Along the last five years there were 6 different

    maintenance steel shop cranes managers. As a consequence this function has

    not been performed properly. An evidence of this is that there isnt any medium

  • 8/3/2019 Auditora Mantenimiento de Gras

    14/43

    14

    or large plan in every management aspects. All the management actions are

    associated to solve a day to day problem (from the technical or managerial point

    of view). The management is working as a firefighting.

    Furthermore, there are so limited engineering resources (internal or external) to

    perform continuous improvement and it is very difficult to obtain this resources.

    2.Flexible work-process based organization (0,4)

    There are some flexible processes, with team work on the shop floor. Flexibility

    is derived from people and relationships rather than processes.

    There is no provision for sickness and holiday cover.

    3.Job accountabilities are linked to personal performance measures.(0,2)

    On the one hand managers and supervisors are evaluated according with the

    Ternium Siderar Human Resources policy. They should have aims aligned with

    their performance measures. But as a consequence of the management

    changes, during the last 6 years, each personal performance appraisal has

    begun with a manager (and his objective) but was evaluated with a different

    boss. Most of these periods there werent supervision feedback meeting after the

    performance appraisal.

    On the other hand, according with the RRHH policy and the trade union

    intention, the shop floor do not has personal performance measures.

    4.Multi-skilling spans craft and production disciplines. (0,4)

    Some electricians do limited amounts of fitting work. There is an intention to

    train fitters or contractors to isolate there own equipment but this is not in place

    yet.

    5.Needs and skills dynamically matched through training. (0,2)

    Training matrices are available and development needs identified. HHRR

    department has organised the annual training fixture. At this moment the crane

    department does not have programmed or schedule the training for the shop

    floor, supervision or staff personnel. Furthermore, the contractors work force is

    not included in the Ternium Siderar training programme. In the electrician case

    there are some repairs carried out by unqualified personnel.

  • 8/3/2019 Auditora Mantenimiento de Gras

    15/43

    15

    D. Com m u nicat ion ( Rat in g 2 ,5 ou t of 5 )

    Certain positive aspects were identified:

    - Nextel communication very useful.

    - The technician, supervisors and engineers has their nextel available at

    home 24 hours. They are also available by Nextel during the weekend for

    any emergency.

    - Intranet site

    - Corporate magazine

    - Newsletters

    However, I think that there are opportunities to improve in the following points:

    1.Effective vertical and lateral two-way communication (0,5)

    There are a number of methods of communications, intranet site, corporate

    magazines, newsletters, emails. These appear to work, but they are only

    available for staff, supervision and technician. The workforce could not access to

    the intranet communications because their do not use computers.

    The top down communication is working but an opportunity area is the bottom

    up communication that is so few performed.

    2.Mission statement interpreted/owned by all. (0,7)

    The company mission, vision and values statement are available on various

    notice boards and the intranet site. But it has not been communicated down to

    the shop floor.

    3.Cascade communications are more effective than rumours. (0,4)

    Cascade communications is working but rumours do precede formal information

    processes, especially when emergencies or production changes are happening

    on site. These operational rumours produce uncertainty in the supervision,

    technician and workforce.

    What is more, as cranes are considered as a secondary facility like fluids

    (services), sometimes there are some suddenly production windows decisions

    that are not properly cascade communicated to the crane staff.

  • 8/3/2019 Auditora Mantenimiento de Gras

    16/43

    16

    4.High visibility communication and feedback. (0,3)

    As a consequence of the last management changes along of the last 6 years,

    there werent supervision feedback meeting after the performance appraisal.

    What is more, change initiatives are developed and issued but not always

    properly communicated to the shop floor.What is more, there is a good communications between production and

    maintenance staff. There is a daily meeting. Some operators reports problems

    by e-mail. The supervisor of every shift reports the equipments failures news by

    the QNX frame.

    After every work is performed by the contractors, there is no formally feedback

    face to face; neither by SAP systems.

    Finally there is an important improvement area in the communication w hen

    an operational mistake occurs (feedback). When this communication fails,it is increased the equipment failure probability with safety consequences.

    5.Communications by intranet and CMMS (0,6)

    Information systems help communications but not everyone reads everything

    because not everybody from the shop floor can access to it. SAP CMMS is used

    by supervisors and technicians in order to request repairs, services,

    enhancements, spare parts and work orders.

    E. Em p loy ee I n vo lv em en t ( Rat in g 1 ,8 ou t o f 5)

    Certain positive aspects were identified:

    - Technicians and Supervisors empowerment

    - Technicians autonomy

    - Technicians commitment

    However, I believe that there is scope for improvement:

    1.Individuals genuinely empowered to take decisions. (1)

    I consider that the most important asset of the crane maintenance systems is

    their supervisors and technician empowerment. May be this empowerment has

    born as a consequence of the last management changes (6 boss in 5 years).

    They are very autonomous and their usually take their own decision. They

    decide if a crane must be stopped. If they realize that there is a possibility of

    failure in critical equipment (safety point of view), the stop the crane and take

    action in order to solve it.

  • 8/3/2019 Auditora Mantenimiento de Gras

    17/43

    17

    2.Effective team-working/problem-solving/shared goals/recognition(0,1)

    No operator maintenance, little responsibility taken by the operators for

    housekeeping. Informal system used for the operator task required, in the

    reactive way trough the trade union representatives.

    3.Everyone's talents are known and harnessed for continuousperformance improvement (0,2)

    On the one hand, there is a limited involvement of operators/engineering in site

    improvement.

    On the other hand, there is a big involvement of maintenance shop floor in order

    to improve the equipment performance. They required the management support

    in order to emphasize the continuous improvement.

    4.All share cost responsibility/information is provided to all. (0,1)

    At the moment of the audit, the supervisors do not know how much money they

    are spending and what the budget is? After investigation I realize that the

    budget is overspending in 50%.

    What is more, very little information is passed down about costs so

    responsibilities cannot be shared.

    5.Continuous appraisal/training/development of all individuals. (0,4)

    Appraisal systems was implemented for staff but have not been developed toshop floor level.

    F. W or k load Man ag em en t ( Rat in g 2 ,6 ou t o f 5)

    Certain positive aspects were identified:

    - Daily workforce programme

    - Steady workforce (The same people works all days in the crane with the

    same supervision)

    However, I think that there are opportunities to improve in the following points:

    1.Flexible scheduling exploits opportunities and is based aroundplant need. (1)

    Apart from the steel shop monthly turnaround, the rest of maintenance

    shutdowns are planned the day before, according to:

    - A major shutdown plan which determine the opportunity for each crane

  • 8/3/2019 Auditora Mantenimiento de Gras

    18/43

    18

    - Production windows opportunity

    - Criticality malfunction news derives from previous technician inspections.

    There are two kinds of shutdowns according with the criticality of each crane.

    The most critical cranes stop for maintenance ones a month in concordance with

    the steel shop turnaround.The less critical cranes have their shutdown when the steel shop is producing

    because they have a redundancy. In addition to this if the redundancy has an

    unexpected outage; it is possible to repair it, with out affecting the continuous

    casting speed.

    2.Job execution is to plan and best practice whilst under constantreview (0,5)

    There is a daily program for the day after. All the resources are program in the

    day before. There is not formally revision for the best practices.

    Maintenance is very reactive (30% of emergences). Engineering adopting

    firefighting strategy.

    3.Appropriate use of technology for fault diagnosis, planning,scheduling, condition monitoring and maintenance management.(0,4)

    I consider that actual planning and scheduling resources are according with the

    necessity.

    There is a big opportunity improvement with fault diagnosis (mainly notpracticed). There is informal reporting of machine problems and faults.

    Considering condition monitoring, there is a set of accelerometer installed in

    only one crane but there is no measurement performed. Furthermore there is no

    oil analysis. Finally, thermography is limited.

    4.Maintenance controlled against agreed performance measures. (0)

    There is a sheet to control the maintenance workload but it is not review. The

    information is available but nobody used it to detect problems and solve them.

    There are some standards but nobody contrast the real length against with the

    objective. What is more, I saw contractors that finished their job 2 ours before

    the end of the shift and they use the time to rest. Nobody gave them another

    work order neither nobody realize the situation.

    There isnt a culture of workload control.

  • 8/3/2019 Auditora Mantenimiento de Gras

    19/43

    19

    5.Rational priority setting procedures utilised with feedback. (0,7)

    In a day to day basis, the program can be modifying for emergencies. Every

    morning before to begin the program work, the workforce supervisor check the

    news of the shift before. If there is an emergency, he changes the program in

    order to solve it.

    G. Mai nt en an ce Reg im e ( Rat in g 0 ,5 o ut of 5 )

    Certain positive aspects were identified:

    - Teamwork between all technicians

    - Good technician competence

    - Technicians commitment

    - Ownership

    However, I think that there are opportunities to improve in the following points:

    1.Maintenance regime matched dynamically with the businessneeds. (0,1)

    On the one hand, there is a maintenance regime that is determined into the SAP

    systems, which generate work orders. It is base on five cense inspection and

    preventive replacement. In theory there is a maintenance regime.

    On the other hand, there is the reality which is completely different from the

    SAP systems. The inspectors do not follow the SAP. They usually inspect the

    cranes according with their memory, not following a procedure of maintenance

    plan. In reality, there is no maintenance regime. The efficacious of the actual

    maintenance regime is 63% (see appendix 5). 30% of the contractors man

    hours are apply to crane emergences.

    Considering condition monitoring, thermography is the only technique that

    actually is performed.

    Practically there is no maintenance regime; neither will it be matched with the

    business requirement.

    2.Best current practice figures are achieved for un-planned outages.(0,1)

    There is some evidence of identification of downtime best practice and programs

    to improve are in place. But I consider that it is an important improvement area,

    because not all downtime are analysed, few of them has improvement plan and

    less few are implemented.

  • 8/3/2019 Auditora Mantenimiento de Gras

    20/43

    20

    3.Maintenance tasks and methods determined through logical /auditable processes (Criticality Analysis, RCM etc.) (0)

    There is no evidence of maintenance task derived from logical processes like

    RCM or Criticality Analysis. What is more, they do not known RCM when I ask

    them.

    4.Through-life maintenance prevention and maintainabilityimprovement established. (0,1)

    At the moment there is no maintenance engineer working in order to improve

    the life maintenance prevention or maintainability. The technicians are

    performing so few improvement but they are limited (with few economic

    resources and when they have time to do it.)

    5.Contractors, specialists, support services and equipment / spares

    vendors are an integral part of the maintenance regime. (0,2)

    The cranes are been manufactured by MORGAN or IPH factories. All of them are

    so far from Argentina in order to deliver assistance. (10000 to 12000 km)

    There is some evidence of Argentinean specialist, like Hillman, that assisted to

    Siderar in particular cases. For example in the last year, Hillman supervised a lift

    gear changes that took 5 days.

    H. Saf et y , Heal th an d En v ir on m en t ( Rat in g 2 ,5 o ut of 5)

    1.Clear leadership and policy communicated effectively and ownedby all. (1)

    There is clear safety and environment policy. The company has put the security

    in the upper level of interest, beginning from the CEO. It is a top-down initiative

    extended to all levels. This new program had been communicated by different

    sources (intranet, visual factory, flash, internal newspaper). This is a recent but

    the company has progressed very well.

    2.Safety always comes first. Safety critical tasks identifiable /

    auditable by the maintenance management system. (1)The new safety policy considers the security in the first place over the rest of

    management issue. In this new plan, there is a topic that we call: procedure of

    critical task (PTC). It consist in determine the ten most critical task from the

    safety point of view for each department. This PTC required a particular analysis,

    review process and audit program.

  • 8/3/2019 Auditora Mantenimiento de Gras

    21/43

    21

    3.Routine audits. Safety competition. Statutory work is continuallychallenged. (1)

    There is a regular safety audit. Every Monday, Wednesday and Friday, at eleven

    oclock, all the supervisors and engineers has to stop their activities and go out

    to the floor in order to audit the work of their own responsibility. Every

    observation detected, has to be inform in the safety system in order to generate

    a plan to solve it.

    4. Incidents and near misses are recorded and reviewed so thatlessons can be learned. (1)

    All accidents and high criticality incident must be investigated. There is a formal

    method to analysis these events. The most critical events are monthly presented

    in a company meeting. In this opportunity, the Industrial Director form part of

    this presentation.

    5.Best current practices are used for safety, health andenvironmental management systems (0,8)

    The most critical events are analysed, review for safety department and then

    communicated to all supervisors in the company. Then they communicate the

    same information to their dependant. The object is to learn from previous

    experiences.

    On the one hand there is a very good policy as it was indicated in the previous

    five points. From the policy point of view, safety could be mark as 4,8 out of

    five.

    On the other hand, I think that the risk awareness to work at high levels is the

    weakness safety point. One mistake can produce fatality consequences. I saw

    people working at 30 meters with risk to fall without safety harness! This

    point reduces the safety mark for this audit. In my opinion it coudnt receive no

    more than 2,5.

    I . Mat er ia ls Man agem en t ( Rat in g 0 ,6 ou t o f 5)

    Certain positive aspects were identified:

    - There is a system that identify all the Siderar spare parts

    - There is a central warehouse that preserves the spare parts.

    However, I think that there are opportunities to improve in the following points:

  • 8/3/2019 Auditora Mantenimiento de Gras

    22/43

    22

    1.Stock levels are matched dynamically to the business needs -balancing cost and risk. (0,1)

    At the audit moment, in the crane department there is no stock strategy. Some

    equipment has stocks, it can be overestimated or underestimated, but nobody

    review it. In addition to this there are some components that must be in the

    warehouse with it correspondent stock. In reality this elements are distributed

    along of the steel shop without any sense. (See spare parts pictures in appendix

    6). There are unidentified components in the steel shop area.

    The warehouse policy is to continuously reduce the stocks without consider focus

    for value. Their internal policy is to make so difficult the devolution process. So,

    elements like an electric motor of 200 HP that has been repaired in a workshop

    will stay in the plant. (See appendix 7)

    2.Criticality analysis linked to JIT objective for minimum cost. (0)

    There is no analysis related to cost optimization, neither Just in Time analysis.

    All the technician audits, expresses that the main problem is the spare part

    issue. They do not have place to store the spare parts. There is no policy about

    it. It is very difficult to return a spare part to the warehouse because there is a

    very difficult procedure to do it. The reason of this difficult procedure is because

    the objective of the warehouse management is to reduce the inventory. This aim

    it is over any other reason. As a consequence, there is no place to store the

    critical equipment.

    3.Materials categorised / consumables / common plant spares /insurance items and managed appropriately. (0,2)

    There is a categorisation but it required a review because nobody agrees the

    classification that it is in the SAP system.

    4.Alliances and partnerships with suppliers to minimise stocks.(0)

    At this moment there are no alliances with suppliers in order to minimise the

    stocks levels.

  • 8/3/2019 Auditora Mantenimiento de Gras

    23/43

    23

    5.Appropriate use of technology is made in the maintenancemanagement system to aid materials management. (0,3)

    The SAP is the system that manages the materials and all the maintenance

    management issue. The system was softly customized, so I consider that the

    technology is not given the properly help to manage the materials management.

    J. Value Focus (Rating 1,5 out of 5)

    Certain positive aspects were identified:

    - Continuous improvement is part of the company culture

    - Maintenance Site to show the KPIs

    However, I think that there are opportunities to improve in the following points:

    1.Continuous performance improvement is truly embedded in theorganisation. (0,4)

    Continuous improvement is part of the company culture. But in this case, there

    are so few examples of it. I consider that it could be because there is no

    engineer in the area. What is more, the management is based in operational

    issue with focus in solve the short term problems.

    2.Value for money analysis is carried out by comparing downtimeand maintenance performance. (0,4)

    In the maintenance SITE, there are some KPIs that measure the downtime andmaintenance performance. At the moment the KPIs exist but nobody analyse

    them in order to generate value for money. The cost of breakdowns is

    misunderstood by the supervisors and the work floor.

    3.Differentiation of chronic / sporadic problems and correctiveinitiative in place. (0,2)

    I consider that the information is available; it can be improving its quality. But it

    is no generate corrective initiative in place.

    4.Continuous review / feedback on methods, tools, techniques,procedures, organisation, strategy etc. (0,1)

    The management control and feedback it is no performed. There is a lack of

    management that maintains the continuous improvement process working

    (apart of the technique used)

  • 8/3/2019 Auditora Mantenimiento de Gras

    24/43

    24

    5.Suggestions encouraged / consistently evaluated / actioned /successes recognised / publicised. Optimum use of self-managingteams. (0,4)

    The crane group takes the suggestions from different sources. A more formal

    suggestion process could be analysed.

    K. Measu re of Per fo r m an ce ( Rat in g 1 ou t of 5 )

    Certain positive aspects were identified:

    - In Ternium Siderar there is a culture of KPIs

    - Intranet maintenance performance reports which contain the following KPIs:

    Budget vs. Real Cost reporting

    % Work orders completed on time

    % Work orders delayed

    % Improvement Work orders

    Work Orders Backlog

    Downtime

    Condition Based Maintenance Alarms

    However, I believe that there are some opportunities improvements:

    1.Simple performance measures linked to business needs andshared goals are displayed and understood / owned by all. (0,4)

    There are useful KPIs but nobody is using them. This KPIs are aligned with

    the business objective but not properly understood.

    2.Regular performance benchmarking exercises are carried out.(Internal and external.) (0)

    There is no information from others companies in order to make comparisons.

    3.A comprehensive / accurate plant history file is available andutilised. (0,2)

    The information is not properly fulfilled into the SAP system. So there is no

    accurate history. It is very difficult to represent the cranes reliability from the

    information of the systems. The shop floor people do not know the intranet SITE

    information.

  • 8/3/2019 Auditora Mantenimiento de Gras

    25/43

    25

    4.Trends in maintenance performance are recognised and rootcauses are sought. (0)

    Considering the medium management, nobody control the result and neither

    follows the tendency. There are no plans associated with the KPIs performance

    in order to improve actual performance.

    5.Timely exception reporting tailored to individual requirements isthe norm. (Not mountains of un-read paper.) (0,4)

    The cranes department is not reporting every breakdown with its consequences.

    This is because not every cranes fault produces losses of the continuous

    casting machine.

  • 8/3/2019 Auditora Mantenimiento de Gras

    26/43

    26

    VII. Recommendations

    As Paul Wheelhouse said: The main objective of the maintenance Audit is about

    discovering opportunities where the continuous improvement can be apply in

    order to make better the maintenance performance, cost-effectiveness,efficiency and service delivery.

    The following analysis refers to the recommendations aligned with the audit

    finding:

    1.Propose Performance Improvement Programme

    a) Strategy and Policy

    - Define the Maintenance Policy

    - Define the Steel Shop Maintenance Policy

    - Define the Crane Steel Shop Maintenance Policy. Include the technicians

    and supervisors in the definition. Top down and Bottom up approach.

    - Review and write the Crane Maintenance Strategy. Include the technicians

    and supervisors in the definition. In order to develop it iv, consider:

    Vision

    Mission

    Objectives

    Roles and Responsibilities

    Equipment scope and organisational arrangements

    Key process and procedures to be followed.

    Questions that must be answered:

    What do we want to achieve?

    Why is this important?

    How are we going to do it?

    - Develop an electrician training program for the contractors (ASSAsupplier)

    - Communicate the maintenance policy, strategy, vision and goals.

    - Determine and formalize the scheduling meeting, include the objective for

    each one. (take into account the monthly meeting)

  • 8/3/2019 Auditora Mantenimiento de Gras

    27/43

    27

    - Schedule the annual strategy and policy review

    b) Organisation

    - Define Roles and Responsibilities. Write and communicate to all the

    persons who works for maintenance crane department (Engineers,supervisor, technicians, workshop, work floor, contractors)

    - Determine how the Engineers (IAME) will support the crane department.

    - Develop a sickness and holiday cover, considering the contractors

    candidates for technician position. Close this policy with RRHH department

    and with the trade union.

    - Compliance the performance appraisal process determine by the RRHH

    department, including the feedback meeting.

    - Implement the performance appraisal for the contractors people in order

    to identify the future Siderar technicians.

    - Identify the training matrices needed for our person. Determine a training

    programme.

    - Determine the contractors training requirements and coordinate the

    resources to train them.

    c) Communication

    - Generate a periodic meeting in order to receive bottom up

    recommendations. Generate the environment to make it possible. Include

    the contractors.

    - Communicate to crane staff including the shop floor, the Ternium Siderar

    Mission, Vision and Values. Inform where this information in the intranet

    is?

    - Define the communication procedure for production changes which

    generates production windows.

    - Use the monthly meeting to communicate the last company news.

    - Generate a non bureaucracy method to assure the contractor feedback

    after each turnaround.

  • 8/3/2019 Auditora Mantenimiento de Gras

    28/43

    28

    - Develop a brain storming with operation and maintenance crew in order

    to increase the operation feedback, specially after one mistake or

    accident.

    d) Employee Involvement

    - Empower a continuous improvement team with topics like: Reduce the

    fall down probability at high levels working (over the cranes and

    everything related).

    - Develop for each crane a list of:

    o Mechanical continuous improvement necessity

    o Electrical continuous improvement necessity

    o Workshop continuous improvement necessity

    o Contractors continuous improvement necessity

    o Safety continuous improvement necessity

    o Drawing and redesign necessity

    o New products continuous improvement necessity

    - Communicate the budget and programme task for this year. Take it into

    account for the followings budget.

    - In the monthly meeting, communicate how the real budget is going.

    e) Workload management

    - Review the actual Turnaround strategy for the cranes number 190-191.

    They are not satisfying the business requirement.

    - Develop a process in the SAP system in order to identify the emergencies,

    their cause reason and a plan in order to reduce them from 30% to fewer

    than 5%.

    - Implement the performance review after each crane turnaround.

    f) Maintenance regime

    - Develop a plan in order to review the maintenance regime for each crane.

    Consider to implement Condition Based Maintenance every time that it is

    possible. The implementation must be performed with the technicians.

    - Train to supervisors and technicians in RCMII method.

  • 8/3/2019 Auditora Mantenimiento de Gras

    29/43

    29

    - Implement RCMII in the lift systems for every crane, in order to increase

    the lift systems reliability (safety reason)

    - Review how the outages are informing in the SAP system. Assure that all

    the Outages are considered and that the Siderar outage procedure is

    implemented.

    - Generate the ABC problem for each crane in order to create a reliability

    programme with the objective of increase the MTBF. Develop a list of

    work for the IAME sector. (applied engineering improvement department)

    - Make a contract with Hillman in order to review the state of the main lift

    gears.

    - Contract to Desk Norsk Veritas in order to audit the situation of the

    cranes. (technical point of view)

    - Consult to Morgan cranes company the maintenance regime

    recommended for Morgan lift systems (the most critically from the safety

    point of view)

    - Arrange a training program in Morgan company for the Engineer how is in

    charge of the mechanical part of the cranes.

    g) Safety, Health and Environment

    For this topic, the main issue is the fall dawn risk while the people are going,

    working or returning to each crane. In order to improve, the proposal is the

    same that I have presented for employee involvement.

    - Empower a continuous improvement team with topics like: Reduce the

    fall down probability at high levels working (over the cranes and

    everything related).

    h) Materials Management

    - Review the warehouse devolutions equipment process, in order to avoid

    the bureaucracy.

    - Determine the list of stock control for the most critical equipment

    (insurance spares) It is necessary to identify the key components and

  • 8/3/2019 Auditora Mantenimiento de Gras

    30/43

    30

    review its situation ones a month in the monthly crane management

    meeting.

    - Review the warehouse stocks applying the Manchester University

    Inventory Management concepts v. The idea is to justify the stocks and

    determine the ideal total cost of spares stocked in the warehouse.

    (Considering the downtime cost and the holding cost). I recommend to

    review the case study example about how a paper mill reduce in Scotland

    went to reducing its inventory vi.

    In addition to this, I suggest to implement the Microsoft Excel

    spreadsheet Spares Analysis.xls for the insurance stock vii. If you prefer,

    another alternative is to apply the SKF software Spare Part Optimizerviii.

    - According with the analysis recommended in the previous point,determine the elements required to stock in the plant. The idea is to

    eliminate them. If it no possible, determine their localisation and who the

    responsibly will be.

    - Determine the alliances and partnerships with suppliers possibilities in

    order to minimise the stocks.

    - Develop a sap transaction in order to detect the under desire stocks for

    the insurance spares. What is more, this information must be available in

    the maintenance intranet site.

    i) Value Focus

    - Review the SAP process related with the downtime and redefines the

    registration method for the cranes equipments malfunction. The idea is to

    explode the potential of the actual intranet ABC downtime equipment

    malfunctions. For this analysis, include the advice of the maintenance

    engineering specialist (Eduardo Villagra).

    - After this, include the following points in the monthly management

    meeting:

    Downtime ABC equipments and evolution. Work plans.

    Differentiate between chronic and sporadic events.

    Emergency level, ABC and tendency. Work plans

  • 8/3/2019 Auditora Mantenimiento de Gras

    31/43

    31

    - Daily review of the quality registered information about downtime

    problems, related equipment and it consequences. Every problem must be

    properly registered.

    - Determine the unavailability level that required the Continuous

    Improvement Report

    j) Measure of Performance

    - Review all the KPIs in the monthly management meeting. The KPIs

    exist and they are very useful and well designed. There is a lack of

    leadership in order to keep these KPIs working, followed, analyzed with

    its correspondent work plans.

    - Develop a professional net in order to built benchmark with other

    companies. I recommend two ways of work

    Companies from the same Techint group Holding, like

    Ternium Hylsa, Terniym Hymsa and Tenaris Siderca

    Siderurgical Companies from others holding like Usiminas, or

    Arcelor Mital Acindar.

  • 8/3/2019 Auditora Mantenimiento de Gras

    32/43

    32

    VIII. Conclusions

    An audit of the maintenance activities of the Ternium Siderar Cranes Steel Shop

    confirmed that performances are not aligned with the business requirements and

    Ternium Siderar policy.

    On the one hand, it is important to highlight that the most positive audit finding

    is the supervisors and technicians empowerment.

    On the other hand, the best audit marks are associated with Workload

    Management, Safety, Communication and Employee Involvement. Nevertheless,

    they are in the level where the need for improvement and change has been

    recognised. What is more when the audit was performed I couldnt find any

    change programme. I consider that the cause reason for this lack ofimprovement programme is the poor leadership as a consequence of the high

    rotations of the maintenance steel shop cranes managers. (6 managers in 5

    years). In addition to this, there are some topics like Strategy & Policy, measure

    of performance, materials management and maintenance regime where the

    need for improvement and changes has not been identify.

    In my opinion with a continuous improvement programme and its appropriate

    leadership it would be possible to achieve the business requirements. These

    recommendations are based on revision of maintenance policy, maintenance

    strategy, its process and its control through a new meeting schedule. (1st, 2nd,

    3rd and 4th order control viii)

  • 8/3/2019 Auditora Mantenimiento de Gras

    33/43

    33

    IX. Appendices

    1. Appendix 1: Ternium

    Ternium is a manufacturer of flat and long steel product. Ternium consolidates

    the operations of the steel companies in Argentina, Mexico, Guatemala and

    United States. It is one of the leading steel companies in Latin American with an

    annual finished steel production of 9 million tons i.

    Ternium Siderar is the most important Argentinean Steel Factory. It produces

    2,8 million tons a year. It manufactures slabs, hot rolled, cold rolled, hot dip

    galvanized, prepainted and tinplate steel sheet products. It has 9 production

    centres throughout the Argentina.

    2. Appendix 2: Ternium Siderar Steel Process

    Ternium Siderar is an integrated steel factory. The figure 1 shows the basic

    scheme of Ternium Siderar Steel Process.

    a) Figure 1: Ternium Siderar Steel Process

    3. Appendix 3: Steel Shop

    The Steel Shop is the facility where the pig iron is transformed into slabs, which

    is the row material for the Hot Street Mill. It has two main processes, The

    Converter area and the Continuous Casting Machine. The cranes are the

    equipments that feed up and evacuate these productions units.

  • 8/3/2019 Auditora Mantenimiento de Gras

    34/43

    34

    a) Figure 2: Converter charging

    The Converters is a batch process that feed the continuous casting machine. The

    batch process takes 30 minutes in which the Converter produces 180 tons of

    liquid steel at 1600 C. If one converter or their cranes has an operational or

    maintenance problem, then the continuous casting machine has to reduce the

    speed affecting its productivity. If two converters or/and two cranes have

    simultaneous problems for more than 25 minutes, then the continuous casting

    has to cut the sequence producing a downtime for more than 2 hours2.

    The Continuous Casting is the production facility where the liquid steel is

    transform into slabs. It has 2 strands of 200 mm of slab thickness.

    4. Appendix 3: Production Scenario - Ternium Siderar BottleNeck

    Actually, the Continuous Casting Machine (CCM) is the Ternium Siderar bottle

    neck. The actual CCM downtime cost is U$S 1100 / minute ii ( 41250/hour).

    The following chart shows the capacity of the primaries areas:

    PlantDealy Capacity

    [Ton]

    Minimum Dealy

    Capacity [Ton]

    Blust Furnace 10500 7900

    Continuous

    Casting 8500

    Hot Street Mill 9500

    (1) Table 1: Daily Capacity

    2

    Two hours is the minimum time required for Continuous Casting Machine to restart the sequence. Apart from

    the time required to solve the Cranes and/or Converters problem

  • 8/3/2019 Auditora Mantenimiento de Gras

    35/43

    35

    Today, the Blast Furnace N1 and 2 are working at their minimum technical

    capacity. They couldnt produce less pick iron than 7900 Ton/day, otherwise

    they become unsteady (permeability- thermal -chemical process problems).

    What is more, the Hot Street Mill has an average capacity3 of 9500 Ton/day.

    Nowadays, the Hot Street Mill has 90 free hours a month. These hours have not

    been program because there are no available slabs to feed it up.

    Furthermore the company cant import slabs from another company since there

    is no profit margin. (The market cost and sells price make it not possible to

    import slabs in order to transform into coils.)

    In addition to this, the Argentinean market is demanding more downstream

    products that do not have been produced because of the slabs limitation.

    To conclude, the actual scenario generate the CCM bottle neck with excess of

    pick iron (it is stocking as a solid pick iron) and free hours in the Hot Street Mill.

    Every slab that is not produced at Siderar must be import as a final product

    from other companies. In this cases Siderar act as a trader. To sum up, it is

    crucial to improve the CCM availability (downtime and low speed failures) which

    is influenced by the Steel Shop Cranes performances.

    3

    Its depends of the production mix (chemical composition, thickness and width). The same considerations

    apply for the CCM.

  • 8/3/2019 Auditora Mantenimiento de Gras

    36/43

    36

    5. Appendix 5: Efficacious of the actual crane MaintenanceRegime

    6. Appendix 6: Spare Parts not properly stocked.

  • 8/3/2019 Auditora Mantenimiento de Gras

    37/43

    37

    7. Appendix 7 Repaired Motors not allocated into thewarehouse (bureaucracy policy)

  • 8/3/2019 Auditora Mantenimiento de Gras

    38/43

    38

    8. Appendix 8: Cranes Steel Shop Lay Out

  • 8/3/2019 Auditora Mantenimiento de Gras

    39/43

    39

    9. Appendix 9: KPIs

    To continuous it is presented examples of other lines, like continuous casting, in order to

    exemplify what it is possible to obtain from the actual CMMS if the registration process is

    follow. (the CMMS for the cranes do not have information)

    a) Direct Maintenance Cost

    10. Diary Plant Downtime

    a) Diary Plant Downtime

    LabourMaterials

    Contracts

    Services

    Others

    Month Year

    Dif. Dif.

    MAINTENANCE DIRECT COST

    BUDGET BUDGETReal Real

    LabourMaterials

    Contracts

    Services

    Others

    Month Year

    Dif. Dif.

    MAINTENANCE DIRECT COST

    BUDGET BUDGETReal Real

    Cool Mill

    DOWNTIM

    E(HoursFrequency)

    TotalMonth

    Frequency Last Month DowntimeTotal Last Month

    Frequency Month SAPTotal Month IGO

    Frequency Month IGOFrequencyDowntime Last Month

    Maintenance Downtime

    Cool Mill

    DOWNTIM

    E(HoursFrequency)

    TotalMonth

    Frequency Last Month DowntimeTotal Last Month

    Frequency Month SAPTotal Month IGO

    Frequency Month IGOFrequencyDowntime Last Month

    Maintenance Downtime

  • 8/3/2019 Auditora Mantenimiento de Gras

    40/43

    40

    b) Pareto Downtime (6 month)

    c) Efficacy-N Job Completed/Month

    PARETO DOWNTIME (6 Months)

    Hours

    SAP Equipment Number

    PARETO DOWNTIME (6 Months)

    Hours

    SAP Equipment Number

  • 8/3/2019 Auditora Mantenimiento de Gras

    41/43

    41

    d) Workshop Backlog

    e) Turnover of spare parts

    Workshop Backlog

    WorkOrders

    Months

    Workshop Backlog

    WorkOrders

    Months

  • 8/3/2019 Auditora Mantenimiento de Gras

    42/43

    42

    f) Frequency Index (FI), Gravity Index (GI)

  • 8/3/2019 Auditora Mantenimiento de Gras

    43/43

    X. References

    i Ternium Siderar, http://www.ternium.com/sp/default.asp . Part of this introduction wasdeveloped for others major assignments of Maintenance Engineering and AssetManagement Topics, like M13 or M04.

    ii Ternium Siderar Industrial Engineering Department (January 2011)

    iii Qinghe Special Steel Corporation disaster, available from:http://www.timesonline.co.uk/tol/news/world/article1671455.ece

    ivManchester University, Maintenance Engineering and Asset Management, M01-

    Maintenance Strategy, Section 10 .2: Strategy Guide.

    vManchester University, Maintenance Engineering and Asset Management, M02-

    Maintenance Organisation, Section 10.1: Balancing Dow ntime and Risk.

    vi

    Manchester University, Maintenance Engineering and Asset Management, M02-Maintenance Organisation, Section 10.6: Inventory Reduction Methodo logy.

    viiMicrosoft Excel spreadsheet Spare Analysis.xls develops by Paul Wheelhouse.

    Manchester University, Maintenance Engineering and Asset Management, M02-Maintenance Organisation, Section 10.3.2: Factors affecting spares needed .

    viiSKF Aptitude Exchange, Spare Part Optimizer, Available from

    http://www.skf.com/portal/skf/home/aptitudexchange?contentId=0.237932.237939.238021.238023.238755 [Accessed 16/4/2010]

    viiiManchester University, Maintenance Engineering and Asset Management, M03-

    Maintenance Systems, Section 1, figure 1.2 Maintenance Systems process model.