Stewart Paton Associates
AUDITING TEMPORARY
TRAFFIC MANAGEMENT
PRESENTED BY
KEVIN MCMAHON
Stewart Paton Associates Ltd
Consulting Engineers & Forensic Investigation Specialists
![Page 2: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/2.jpg)
Normal
traffic
route
Contra-flow
![Page 3: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/3.jpg)
![Page 4: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/4.jpg)
![Page 5: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/5.jpg)
What is being audited?
Hands up all who have audited TTMS?
Mostly related to a new road scheme or mostly
related to maintenance operations?
Mostly Motorway and Trunk Roads or local
schemes?
On average, how many TTMS Audits per year?
1 or 2 5 to 10 greater than 10
![Page 6: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/6.jpg)
What, when, who & how?
HD 19/03 ‘The standard is not generally required for
application to TTMS’
“Exceptional” “Considerable Period”
Guidance for Safer Temporary Traffic Management
Upon completion of the detailed design,..........
At this stage a Road Safety Audit should be
undertaken in accordance with the requirements of
the Design Manual for Roads and Bridges
Overall Project Designer or TM Contractor?
Full Audit to HD 19/03 or modified to suit circumstances?
![Page 7: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/7.jpg)
Differences
Safety of Workforce as well as Road Users
Lateral and longitudinal safety zones / no
obstructions in safety zones / width of work
areas / works accesses & exits
Are temporary safety barriers required
Type / Set back / Working width / No intrusion
of works into working width
Chapter 8 compliant?
Unusual and non-standard layouts
![Page 8: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/8.jpg)
Differences
Diversion Routes (official and unofficial) and
impact on local roads
Impact on regular users
Not just the drivers – Remember
Pedestrians –Barriers, ramps trips, gullies
Cyclists – Width, conflict points, gullies
Accessibility – Loss of facilities on a route
Equestrians – Noise, proximity to traffic,
containment
![Page 9: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/9.jpg)
QUALITY OF
INFORMATION / BRIEF
Stewart Paton Associates
![Page 10: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/10.jpg)
![Page 11: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/11.jpg)
![Page 12: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/12.jpg)
![Page 13: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/13.jpg)
![Page 14: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/14.jpg)
RELAXATIONS
&
ALTERNATIVES
Stewart Paton Associates
![Page 15: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/15.jpg)
Stewart Paton Associates
![Page 16: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/16.jpg)
Stewart Paton Associates
![Page 17: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/17.jpg)
Stewart Paton Associates
![Page 18: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/18.jpg)
Stewart Paton Associates
![Page 19: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/19.jpg)
![Page 20: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/20.jpg)
![Page 21: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/21.jpg)
Stewart Paton Associates
![Page 22: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/22.jpg)
TYPICAL PROBLEMS
Stewart Paton Associates
![Page 23: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/23.jpg)
Stewart Paton Associates
![Page 24: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/24.jpg)
Stewart Paton Associates
![Page 25: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/25.jpg)
Works traffic
Normal traffic
![Page 26: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/26.jpg)
Traffic
lane
Works exit
lane
Stewart Paton Associates
![Page 27: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/27.jpg)
Stewart Paton Associates
![Page 28: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/28.jpg)
Stewart Paton Associates
![Page 29: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/29.jpg)
![Page 30: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/30.jpg)
![Page 31: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/31.jpg)
![Page 32: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/32.jpg)
![Page 33: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/33.jpg)
![Page 34: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/34.jpg)
![Page 35: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/35.jpg)
![Page 36: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/36.jpg)
![Page 37: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/37.jpg)
![Page 38: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/38.jpg)
![Page 39: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/39.jpg)
![Page 40: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/40.jpg)
UNUSUAL LAYOUTS
&
SOLUTIONS
Stewart Paton Associates
![Page 41: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/41.jpg)
Stewart Paton Associates
![Page 42: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/42.jpg)
Stewart Paton Associates
![Page 43: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/43.jpg)
Stewart Paton Associates
![Page 44: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/44.jpg)
Stewart Paton Associates
![Page 45: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/45.jpg)
Stewart Paton Associates
![Page 46: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/46.jpg)
Stewart Paton Associates
![Page 47: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/47.jpg)
Stewart Paton Associates
![Page 48: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/48.jpg)
Stewart Paton Associates
![Page 49: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/49.jpg)
Stewart Paton Associates
![Page 50: AUDITING TEMPORARY TRAFFIC MANAGEMENT](https://reader030.vdocuments.us/reader030/viewer/2022012600/61970dac6409b152c509a654/html5/thumbnails/50.jpg)
CONCLUSIONS Process not transparent
Lack of consistency
TTMS often planned late in the day
Cut & paste from Chapter 8
Bespoke solutions sometimes required
All users need to be considered and, as
with permanent works, the Road Safety
Audit remains the one process that does
this.