auburn bay school open house - calgary board of education · auburn bay school open house auburn...

7
Auburn Bay School Open House Auburn Bay Middle School Auburn Bay School Open House Alberta Education, Alberta Infrastructure and the Calgary Board of Education are working together to design and build a new school for the community of Auburn Bay. Tonight, we are sharing information on the design of the new middle school, including general project information, timelines, site planning, traffic considerations and building design. Alberta Infrastructure, CBE and Taff Architecture staff are here to answer any questions you may have about the preliminary design, or direct you to the information you are looking for.

Upload: others

Post on 29-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Auburn Bay School Open House - Calgary Board of Education · Auburn Bay School Open House Auburn Bay Middle School New School Timeline May 15, 2019: Representatives from the Com-munity

Auburn Bay School Open HouseAuburn Bay Middle School

Auburn Bay School Open HouseAlberta Education, Alberta Infrastructure and the Calgary Board of Education are working together to design and build a new school for the community of Auburn Bay. Tonight, we are sharing information on the design of the new middle school, including general project information, timelines, site planning, traffic considerations and building design.

Alberta Infrastructure, CBE and Taff Architecture staff are here to answer any questions you may have about the preliminary design, or direct you to the information you are looking for.

Page 2: Auburn Bay School Open House - Calgary Board of Education · Auburn Bay School Open House Auburn Bay Middle School New School Timeline May 15, 2019: Representatives from the Com-munity

Auburn Bay School Open HouseAuburn Bay Middle School

New School Timeline

May 15, 2019: Representatives from the Com-munity Association, Calgary Police Service, Cal-gary Board of Education, Alberta Infrastructure and consultants met to identify community is-sues or concerns

June 4, 2019: Community Open House (TONIGHT)

June 2019: Response to community open house feedback: report to community associa-tion; information posted on www.cbe.ab.ca/new-schools - Auburn Bay Middle

July 2019: Development permit application cir-culated to community association and to public at large for comment.

TBD: Funding Announced for Phase 2 – Con-struction

Note: School opening date will not be an-nounced until a contractor is hired and all per-mits are approved.

Project updates will be posted at www.cbe.ab.ca/newschools throughout the school design and construction phases. During the academic year prior to school open-ing, the following will occur: • Public open house will be held to share infor-mation on school designation area, walk zone and grade configuration• The Board of Trustees will announce the school name

Page 3: Auburn Bay School Open House - Calgary Board of Education · Auburn Bay School Open House Auburn Bay Middle School New School Timeline May 15, 2019: Representatives from the Com-munity

Auburn Bay School Open HouseAuburn Bay Middle School

Provide Feedback

Your feedback and input will be considered with respect to the planning of:

• Site access, parking and drop-off locations

• Traffic improvements

• General site configuration

• Other building design considerations

Your feedback and input is valuable to us.

New school construction decisions that cannot be influenced:

• The new school site

• The size and capacity of the school

• The location of the soccer field

• The total number of parking stalls provided for

staff

• The total number of designated spots for par-

ent drop-off and visitor parking

Page 4: Auburn Bay School Open House - Calgary Board of Education · Auburn Bay School Open House Auburn Bay Middle School New School Timeline May 15, 2019: Representatives from the Com-munity

Auburn Bay School Open HouseAuburn Bay Middle School

Project Information

Auburn Bay Middle School:

• Approved for Phase 1 - design only in June 2018• Construction not yet approved• Located at 430 Auburn Bay Drive SE• 900 student capacity school• Two-storey building • 8,071 m2 (86,875 ft2) of permanent construction – no modular classrooms• Sustainably designed | LEED Silver certification including roof-mounted solar panels

Stoney Trail

Deerfoot Trail

Auburn Bay Community Overview

Page 5: Auburn Bay School Open House - Calgary Board of Education · Auburn Bay School Open House Auburn Bay Middle School New School Timeline May 15, 2019: Representatives from the Com-munity

Auburn Bay School Open HouseAuburn Bay Middle School

We appreciate your feedback.

Please drop off your feedback forms in the box provided. You can also provide your feedback at [email protected] by June 14, 2019.

Thank you for joining us tonight!

Page 6: Auburn Bay School Open House - Calgary Board of Education · Auburn Bay School Open House Auburn Bay Middle School New School Timeline May 15, 2019: Representatives from the Com-munity

Auburn Bay School Open HouseAuburn Bay Middle School

Proposed Site Plan

Aubu

rn Ba

y Driv

e S.E.

Plan 111 2305Block 71Lot 1 MSRS-SPR

Auburn Glen Grove S.E.

Auburn Glen Heights S.E.

Auburn Glen Way S.E.

Aubu

rn Ba

y Driv

e S.E.

4123

46900

3100

Parent Drop off/Pick up - 7 Stalls

3100

1592

0

5350

1320

0

6670

3000

7200

3000

3100

5400

0

67006700 310

0

5400

2950

54007200

5800

15 EQ

. Stal

ls @ 26

00mm

3900

0

1500

7200

5400

9200900

17 EQ. Stalls @ 2600mm

44200

1500

20 EQ. Stalls @ 2600mm

52000

1500

2079

5

28236

6271

2 Bus

Drop

Off/P

ick up

Stall

s @ 18

.0m

3600

0

Bus D

rop of

f/Pick

up - 4

Stall

s

Bus D

rop of

f/Pick

up - 2

stall

s

Existing Play Fields

10m Play Field Boundary

Internal Construction Boundary

Internal Construction Boundary

10m

Play F

ield B

ound

ary

10m

Play F

ield B

ound

ary

Interna l Co nst ru ct ion B ound ary

Intern

al Co

nstru

ction

Boun

dary

Calgary Board of EducationAuburn Bay Middle SchoolMain Floor Arch Datum - 100.000Main Floor Geodetic - 10??,??

Outdoor Amenity Area for Students728 sq m

Property Line

3.0m ARW/Setback

Prop

erty L

ine3.5

m UR

W

Prop

erty L

ine3.5

m UR

W

Prop

erty L

ine

Prop

erty L

ine

0.6m OD R/W

Property Line

3.0m Setback1.0m ARW

Existi

ng 2.

5m Reg

ional P

athway

1196

913

985

1212

2

6754

3100

Exist

ing 1.

5m Si

dewa

lk

Exist

ing 1.

5m Si

dewa

lk

Proposed 2.0m Sidewalk

Parent Drop off/Pick up Stalls

1

1

2

2

2

1

1

19

4

8

7

4700

2400

2873

3

3

3

5

9

10

12

14

15

16

56 Units

1819

Exit Exit

Exit

Exit

Exit

Exit

19

2500

1634 Units

Symbol Legend - Site Plan

EXTENT OF PROPOSED BUILDING

PROPERTY LINE

EXTENT OF CONCRETE SIDEWALK

EXTENT OF HEAVY DUTY ASPHALT PAVING

EXTENT OF LIGHT DUTY ASPHALT PAVING

SETBACK LINE

UTILITY RIGHT OF WAY LINE

EXISTING FIRE HYDRANT LOCATION

PROPOSED TRANSFORMER LOCATION

EXTENT OF SOFT LANSCAPING

PROPOSED BIKE RACK LOCATION

EXISTING LIGHT STANDARD LOCATION

PAINTED PARKING LINE ON ASPHALT PAVING

PAINTED BARRIER FREE PARKING SYMBOLON ASPHALT PAVING

PROPOSED POST MOUNTED SIGNAGE

PROPOSED LIGHT STANDARD LOCATION

EXISTING TREES TO REMAIN

Site Plan Keynote Legend1 PROPOSED CONCRETE SIDEWALK

3 150mm CONCRETE CURB - REFER TO CITY OF CALGARY DESIGNSTANDARDS - REFER TO DETAIL ?

4 BARRIER FREE CONCRETE CURB RAMP - REFER TO CITY OF CALGARYDESIGN STANDARDS - REFER TO DETAIL ?

5 CONCRETE APRON - REFER TO CITY OF CALGARY DESIGN STANDARDS

2 EXISTING CITY OF CALGARY SIDEWALK

6 CONCRETE FILLED STEEL BOLLARDS - REFER TO DETAIL

7 WASTE & RECYCLING MOLOK BINS - REFER TO DRAWING A1.04

8 LOADING STALL

9 FIRE TRUCK ACCESS LANE

10 PROPOSED TRANSFORMER - REFER TO ELECTRICAL DRAWINGS

11 PROPOSED LIGHT STANDARD - REFER TO ELECTRICAL DRAWINGS

12 PROPOSED SIAMESE CONNECTION LOCATION

13 PROPOSED FIRE HYDRANT LOCATION - REFER TO CIVIL DRAWINGS

14 PROPOSED FIRE LOCK BOX LOCATION

15 PROPOSED FLAG POLE LOCATION - REFER TO DETAIL

16 U-STYLE BICYCLE RACKS - REFER TO DETAIL

17 CLASS #1 BICYCLE RACK LOCATION - REFER TO DETAIL

18 CORNER VISIBILTY TRIANGLE 7.5m FROM CURB INTERSECTION

19 PROPOSED ASPHALT PATHWAY

Site Plan General Notes1. REFER TO CIVIL DRAWINGS FOR SPECIFIC RELATED REQUIREMENTS

2. REFER TO ELECTRICAL SITE PLAN FOR ALL LIGHTING INFORMATION

3. REFER TO LANDSCAPE PLAN FOR SPECIFIC RELATED REQUIREMENTS

4. ALL EXISTING TREES TO REMAIN UNLESS NOTED OTHERWISE

PROJECT NAME

CLIENT DP1.02Project Number: 1828

CALGARY BOARD OF EDUCATION

Auburn Bay 5-9 School

ENLARGED SITE PLANREVISION DESCRIPTION DATE

DP1.02 SCALE: 1 : 4001 Design Site Plan - Enlarged

N

Page 7: Auburn Bay School Open House - Calgary Board of Education · Auburn Bay School Open House Auburn Bay Middle School New School Timeline May 15, 2019: Representatives from the Com-munity

Auburn Bay School Open HouseAuburn Bay Middle School

West Arial View - Looking East

North West Perspective - Looking Sout East North Perspective - Looking South