Auburn Bay School Open HouseAuburn Bay Middle School
Auburn Bay School Open HouseAlberta Education, Alberta Infrastructure and the Calgary Board of Education are working together to design and build a new school for the community of Auburn Bay. Tonight, we are sharing information on the design of the new middle school, including general project information, timelines, site planning, traffic considerations and building design.
Alberta Infrastructure, CBE and Taff Architecture staff are here to answer any questions you may have about the preliminary design, or direct you to the information you are looking for.
Auburn Bay School Open HouseAuburn Bay Middle School
New School Timeline
May 15, 2019: Representatives from the Com-munity Association, Calgary Police Service, Cal-gary Board of Education, Alberta Infrastructure and consultants met to identify community is-sues or concerns
June 4, 2019: Community Open House (TONIGHT)
June 2019: Response to community open house feedback: report to community associa-tion; information posted on www.cbe.ab.ca/new-schools - Auburn Bay Middle
July 2019: Development permit application cir-culated to community association and to public at large for comment.
TBD: Funding Announced for Phase 2 – Con-struction
Note: School opening date will not be an-nounced until a contractor is hired and all per-mits are approved.
Project updates will be posted at www.cbe.ab.ca/newschools throughout the school design and construction phases. During the academic year prior to school open-ing, the following will occur: • Public open house will be held to share infor-mation on school designation area, walk zone and grade configuration• The Board of Trustees will announce the school name
Auburn Bay School Open HouseAuburn Bay Middle School
Provide Feedback
Your feedback and input will be considered with respect to the planning of:
• Site access, parking and drop-off locations
• Traffic improvements
• General site configuration
• Other building design considerations
Your feedback and input is valuable to us.
New school construction decisions that cannot be influenced:
• The new school site
• The size and capacity of the school
• The location of the soccer field
• The total number of parking stalls provided for
staff
• The total number of designated spots for par-
ent drop-off and visitor parking
Auburn Bay School Open HouseAuburn Bay Middle School
Project Information
Auburn Bay Middle School:
• Approved for Phase 1 - design only in June 2018• Construction not yet approved• Located at 430 Auburn Bay Drive SE• 900 student capacity school• Two-storey building • 8,071 m2 (86,875 ft2) of permanent construction – no modular classrooms• Sustainably designed | LEED Silver certification including roof-mounted solar panels
Stoney Trail
Deerfoot Trail
Auburn Bay Community Overview
Auburn Bay School Open HouseAuburn Bay Middle School
We appreciate your feedback.
Please drop off your feedback forms in the box provided. You can also provide your feedback at [email protected] by June 14, 2019.
Thank you for joining us tonight!
Auburn Bay School Open HouseAuburn Bay Middle School
Proposed Site Plan
Aubu
rn Ba
y Driv
e S.E.
Plan 111 2305Block 71Lot 1 MSRS-SPR
Auburn Glen Grove S.E.
Auburn Glen Heights S.E.
Auburn Glen Way S.E.
Aubu
rn Ba
y Driv
e S.E.
4123
46900
3100
Parent Drop off/Pick up - 7 Stalls
3100
1592
0
5350
1320
0
6670
3000
7200
3000
3100
5400
0
67006700 310
0
5400
2950
54007200
5800
15 EQ
. Stal
ls @ 26
00mm
3900
0
1500
7200
5400
9200900
17 EQ. Stalls @ 2600mm
44200
1500
20 EQ. Stalls @ 2600mm
52000
1500
2079
5
28236
6271
2 Bus
Drop
Off/P
ick up
Stall
s @ 18
.0m
3600
0
Bus D
rop of
f/Pick
up - 4
Stall
s
Bus D
rop of
f/Pick
up - 2
stall
s
Existing Play Fields
10m Play Field Boundary
Internal Construction Boundary
Internal Construction Boundary
10m
Play F
ield B
ound
ary
10m
Play F
ield B
ound
ary
Interna l Co nst ru ct ion B ound ary
Intern
al Co
nstru
ction
Boun
dary
Calgary Board of EducationAuburn Bay Middle SchoolMain Floor Arch Datum - 100.000Main Floor Geodetic - 10??,??
Outdoor Amenity Area for Students728 sq m
Property Line
3.0m ARW/Setback
Prop
erty L
ine3.5
m UR
W
Prop
erty L
ine3.5
m UR
W
Prop
erty L
ine
Prop
erty L
ine
0.6m OD R/W
Property Line
3.0m Setback1.0m ARW
Existi
ng 2.
5m Reg
ional P
athway
1196
913
985
1212
2
6754
3100
Exist
ing 1.
5m Si
dewa
lk
Exist
ing 1.
5m Si
dewa
lk
Proposed 2.0m Sidewalk
Parent Drop off/Pick up Stalls
1
1
2
2
2
1
1
19
4
8
7
4700
2400
2873
3
3
3
5
9
10
12
14
15
16
56 Units
1819
Exit Exit
Exit
Exit
Exit
Exit
19
2500
1634 Units
Symbol Legend - Site Plan
EXTENT OF PROPOSED BUILDING
PROPERTY LINE
EXTENT OF CONCRETE SIDEWALK
EXTENT OF HEAVY DUTY ASPHALT PAVING
EXTENT OF LIGHT DUTY ASPHALT PAVING
SETBACK LINE
UTILITY RIGHT OF WAY LINE
EXISTING FIRE HYDRANT LOCATION
PROPOSED TRANSFORMER LOCATION
EXTENT OF SOFT LANSCAPING
PROPOSED BIKE RACK LOCATION
EXISTING LIGHT STANDARD LOCATION
PAINTED PARKING LINE ON ASPHALT PAVING
PAINTED BARRIER FREE PARKING SYMBOLON ASPHALT PAVING
PROPOSED POST MOUNTED SIGNAGE
PROPOSED LIGHT STANDARD LOCATION
EXISTING TREES TO REMAIN
Site Plan Keynote Legend1 PROPOSED CONCRETE SIDEWALK
3 150mm CONCRETE CURB - REFER TO CITY OF CALGARY DESIGNSTANDARDS - REFER TO DETAIL ?
4 BARRIER FREE CONCRETE CURB RAMP - REFER TO CITY OF CALGARYDESIGN STANDARDS - REFER TO DETAIL ?
5 CONCRETE APRON - REFER TO CITY OF CALGARY DESIGN STANDARDS
2 EXISTING CITY OF CALGARY SIDEWALK
6 CONCRETE FILLED STEEL BOLLARDS - REFER TO DETAIL
7 WASTE & RECYCLING MOLOK BINS - REFER TO DRAWING A1.04
8 LOADING STALL
9 FIRE TRUCK ACCESS LANE
10 PROPOSED TRANSFORMER - REFER TO ELECTRICAL DRAWINGS
11 PROPOSED LIGHT STANDARD - REFER TO ELECTRICAL DRAWINGS
12 PROPOSED SIAMESE CONNECTION LOCATION
13 PROPOSED FIRE HYDRANT LOCATION - REFER TO CIVIL DRAWINGS
14 PROPOSED FIRE LOCK BOX LOCATION
15 PROPOSED FLAG POLE LOCATION - REFER TO DETAIL
16 U-STYLE BICYCLE RACKS - REFER TO DETAIL
17 CLASS #1 BICYCLE RACK LOCATION - REFER TO DETAIL
18 CORNER VISIBILTY TRIANGLE 7.5m FROM CURB INTERSECTION
19 PROPOSED ASPHALT PATHWAY
Site Plan General Notes1. REFER TO CIVIL DRAWINGS FOR SPECIFIC RELATED REQUIREMENTS
2. REFER TO ELECTRICAL SITE PLAN FOR ALL LIGHTING INFORMATION
3. REFER TO LANDSCAPE PLAN FOR SPECIFIC RELATED REQUIREMENTS
4. ALL EXISTING TREES TO REMAIN UNLESS NOTED OTHERWISE
PROJECT NAME
CLIENT DP1.02Project Number: 1828
CALGARY BOARD OF EDUCATION
Auburn Bay 5-9 School
ENLARGED SITE PLANREVISION DESCRIPTION DATE
DP1.02 SCALE: 1 : 4001 Design Site Plan - Enlarged
N
Auburn Bay School Open HouseAuburn Bay Middle School
West Arial View - Looking East
North West Perspective - Looking Sout East North Perspective - Looking South