attachment to letter from m. l. marchi (wpsc) document ... · attachment 2 to letter from m. l....

19
ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment 159 Strike-Out TS Pages: TS iv TS 6.1-1 TS 6.2-1 TS 6.5-1 TS 6.5-2 TS 6.5-3 TS 6.5-4 TS 6.5-5 TS 6.5-6 TS 6.6-1 TS 6.7-1 9903020172 990215 PDR ADOCK 05000305 P PDR GBN1JCI N:\GROUP\NUCLEAR\WPFILES\LIC\NRCOPA159.WPD I

Upload: others

Post on 27-Sep-2019

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

ATTACHMENT 2

To

Letter from M. L. Marchi (WPSC)

to

Document Control Desk (NRC)

Dated

February 15, 1999

Proposed Amendment 159

Strike-Out TS Pages:

TS iv TS 6.1-1 TS 6.2-1 TS 6.5-1 TS 6.5-2 TS 6.5-3 TS 6.5-4 TS 6.5-5 TS 6.5-6 TS 6.6-1 TS 6.7-1

9903020172 990215 PDR ADOCK 05000305 P PDR

GBN1JCI N:\GROUP\NUCLEAR\WPFILES\LIC\NRCOPA159.WPDI

Page 2: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

0 * Section Title Rage

6.5 ee.wand-A.diteleted...................6.. .5

....... rutin ............... . .

G.5.a.2 Composition ............. 5.

... G eepon ibiliti ... .... ..... 5 1

.G .7 Authusit, . 4 4 . 4 . .... 0 Reco ds . . . . . . G. 2

...... 1 functio..R d . . . . . ....

G... .G.Q orum... .5 4. 0.....0 Adt s1t . . . . . .. G.5..

. . .0 Aut u.t ... . . ... . ..... . . . .8 G

.5 .0. Rec .d . . 4

6.6 ... prtbf.-Ee.tsDeleted........... . ........... 6.6-1 6.7 Safety Limit Violation ................. 6.7-1 6.8 Procedures. .. ...... .... . ................. 6.8-1 6.9 Reporting Requirments ........... . ... .......... . 6.9-1

6.9.a Routine Reports..... ..... ........ 6.9-1 6.9.a.1 Startup Report....... . . .6.9-1 6.9.a.2 Annual Reporting Requirements ... 6.9-1 6.9.a.3 Monthly Operating Report..........6.9-3

6.9.b Unique Reporting Requirements..... 6.9-3 6.9.b.1 Annual Radiological Environmental

Monitoring Report....... ...... 6.9-3 6.9.b.2 Radioactive Effluent Release Report 6.9-3 6.9.b.3 Special Reports. .......6.9-3

6.10 Record Retention.. ....6.10-1 6.11 Radiation Protection Program.................... 6.12 System Integrity.. 6.13 High Radiation Area...... ... 6.14 Post-Accident Sampling and Monitoring....... 6.15 Secondary Water Chemistry.......... 6.16 Radiological Effluents... 6.17 Process Control Program (PCP) .61

6.18 Offsite Dose Calculation Manual (ODCM) . .. 18.

6.19 Major Changes to Radioactive Liquid, Gaseous .. ~~~~~~~~ ~ ~ ~~ ..... .................. . . .. 6.. . 1 1 -1.

e.... ...6.19-1 ... ... . . ... ... ... .. .. ... ... . . . . . .. . . ... . . . . 6 . 3

.... .... ... .... ... .... ... .... ... .... ... .: ... ..... ........ ...6 . 1 5 .. ~~ . .. .... ......... 6 ..... ... .... ... .... ... ... . .. .... . . 6 . 8

7/8.0 Deleted

Amendment No. 1-7 TS iv 96/69/96

Page 3: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

0

6.0 ADMINISTRATIVE CONTROLS

6.1 RESPONSIBILITY

ai The Manager - Kewaune

this responsibility

Amendment No. 99 04/21/93TS 6.1-1

Page 4: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

6.2 ORGANIZATION

a. Off-Site Staff

The off-site organization for plant management and technical support shall be as described in the Operational Quality Assurance Program Description.

b. Facility Staff

The plant organization shall be as described in the Operational Quality Assurance Program Description.

1. Each on-duty shift complement shall consist of at least:

A. One Shift Supervisor (SRO) B. Two licensed Reactor Operators C. OeTwoNucler Auxiliary Operator" D. One Equpmeat-OpertheDeleted E. One Radiation Technologist

2. While above COLD SHUTDOWN, the on-duty shift complement shall consist of the personnel required by TS 6.2.b.1 and an additional SRO.

3. In the event that one of the shift members becomes incapacitated due to illness or injury or the Radiation Technologist has to accompany an injured person to the hospital, reactor operations may continue with the reduced complement until a replacement arrives. In all but severe weather conditions, a replacement is required within two hours.

4. At least one licensed operator shall be in the control room when fuel is in the reactor.

5. Two licensed operators, one of which shall be an SRO, shall be present in the control room when the unit is in an operational MODE other than COLD SHUTDOWN or REFUELING.

6. REFUELING OPERATIONS shall be directed by a licensed SRO assigned to the REFUELING OPERATION who has no other concurrent responsibilities during the REFUELING OPERATION.

7. When the reactor is above the COLD SHUTDOWN condition, a qualified Shift Technical Advisor shall be within 10 minutes of the control room.

Amendment No. 99 TS 6.2-1 94/21/93

Page 5: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

6.5 REVfEW-A-AUfFDel eted

1. Function

The PO1C shall funct on to ad;Iseth M6a.ager Kewaune Plansit o ..... e.s.....t ed...............t..

2. Cuou noitioun

4. t~1eetin~ FrequoncyTh .. .O~ . h~ t1 e ... t. ...to.e.e......... ojt a d s orv

......... y th ...ha........... ..an;i 4-4

............. ..u o......m

A ........... of...... the.. ....C shl consist of t ... ~ i h t7 i

(V Qr.nr;zThilitisaz

.. h....O.C...h... .~~r s b t 1m

............. e e~iV~d~4rmtt~ta afctncla

.. .. ... ... ..... .

.. R..wo...prpse....so.teTahfla &i~atos

D. :: ReiewoaitpseshiVmdiiain o ln yt

TS 6.5-1Amendment No. +*f

041/97/94

Page 6: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

0 0

f.~~~~ .......... .... ..........,~st~h~eu~t Pa, r .... .h e.. .s e t v ................. u i ~

......... ......~ a e u t d by t .. ... ........ t~ uc ea $~fety fl view .................ee.

.. ..... ... ................. .................

... R eco~ end to the ~1...............................ppro~ of ~ c~sided uderS ~ thru~h S C5.PA.E

13.~.... .ak .e .....a .s .... .ear t....t............h I .......... .n d .. ........ .....G .... ... .... ... ... ... a ! .. .. .. .. .. .. .. .. .. .. .. ...... ... ... .

.X.4 .................... ...... ..... .. ................. .. .. .... ... .... ........... .... .. ........................... .......... ............................................. ........ .................. . .............. ........................................................................... ............................ on i 6 A

................ P, r . u .:4: ...... ...... ....... .... ... . .......... .. ................

TS 6.5-2Amendment No. i-O-7

*&l'7/94

Page 7: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

SNuclear ....ty...vie...d ....t................C ... .... ... ...

.......... C....................................t..................~ ...... ...... ...... ...... ..... ...... ...... ...... .....

........ ....... ......

Th $A halb op&e f ~t:u.~j...k~jf mtdt

.. .. t ................~..om a~ a fli te tch ,I

...... ..... ..... .....

rah e be of te .S~ shal ....... aad.....~r ei~~~~in...... .........l.......fe l.........dit.....~l] hav

~ ~ wii of ive yeas .t~hica .e....ce f ....... ..... .. ... ...a ... ... .... ... .... .... .i. .. .. . .n .i .r .a ...... .n ..... ..... .....

3......... .... Alt.............. ate.s....

. ...... wl .i d ejl e x p er ..v c t. th &i~ RNS R A C. !

TS 6.5-3Amendment No. i-ff7

041'71O94

............... ................

Page 8: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

:::. .07 M el t ......................

........ ......liic a~1est oc ~.~~ ho h ...........

.. .jio u ................ .h l Z A .. i] ... n ....... .t ~ t. .h ..... ....................... .............. in lu i v t e l ta . N i g ................

the ~ ~ ~ ~ ~ ~ ~ ~ ~ ..u~u .hi] .ae1nrso~iit .oi ..h..> ......

.. . ...... . . ... .. ... .....

.............. view

.............. ~j) ~ d~es qpi~1 ~~y~te~~s! .............................eted.....t..

......... . .................. I .....5 . ~ . . . .. . . w .. s ~

.4.k rc1:e upag. irecna Spcfvain 1 ;;.uot-

.... ... ... a.. id e petd .. pe fr a ce o 1 n ..hat......t.........s.fe.y.

..... .eot ..ern ...CP~ADC rV N S

... Re iort ..o.......... any ....ca io .f .n .n n i e .............. .

:~ a~pe tof deign or peratin....s.et....at.d...u.....

.............. , .. ...... ....... ..... n t. I.~~~~~ ~~~~ Iwo~t Ii~ metn i ~ ueso h.O

TS 6.5-4Amendment No. WO

04 7e94

Page 9: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

......... .......... s. ssem~o~mthdofoortonta

.... ................l..... am. .~r:A Q ~t e~ area ......t.......................... I .. th

NA r te Zenor o nyof lr ~wh th N~ACre.......

... The... .....oic~ .........ta ...ioi 1 ... ~ .. d th e

~~~~ LI phoit

...... flet#d

Records ~ ~ ..... ..... ......~is hl e.~pre,4~tyJ~ ......... bu e ....... f.o..l l......o... w s.. ....... ....

......... .......... ... f. .....h ............... ..... f w r e d t h $ r i r ~ Offic .. to ihj . h ...... o~sw hi .. .... fl..ig a mee*U Iul Ogjft

B~~ ~eports of revi............by.................o gh TZ G I t1 foKss ote Sno opn ff h &A *..*t~ 14.ay~ ollow 1~ coplet...ofthe..... w

Amnmnro e ...... 6 .5 -5...........9.

Page 10: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

~nan psit~ns yesomsbleforthe arAmedted o wtIff2

IS 6.5-6 04/07/94

Page 11: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

6.6 RPRAL V~Seee T.... .... . 1. ..................................................

................. T ... 1 si h~l.en tfe rJ e ~ ur~ tcIp~ sa tt J ... ... ... ...... ........~7

Amendment No. 99 04/21i793IS 6.6-1

Page 12: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

0 *

6.7 SAFETY LIMIT VIOLATION

The following actions shall be taken in the event a safety limit is violated:

a. The reactor shall be shut down and operation shall not be resumed until authorized by the Commission.

b. The Report shall be prepared in accordance with T0 6-10 CFR 50.72 and 0 .CFR 50.73.

Amendment No. 99 TS 6.7-1 04/21/93

Page 13: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

ATTACHMENT 3

To

Letter from M. L. Marchi (WPSC)

to

Document Control Desk (NRC)

Dated

February 15, 1999

Proposed Amendment 159

Affected TS Pages:

TS iv TS 6.1-1 TS 6.2-1 TS 6.5-1 TS 6.5-2 TS 6.5-3 TS 6.5-4 TS 6.5-5 TS 6.5-6 TS 6.6-1 TS 6.7-1

GBNUCI N:\GROUP\NUCLEAR\WPFILES\LIC\NRC\PAl59.WPD

Page 14: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

Section

6.5 6.6 6.7 6.8 6.9

6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19

S Iift3_

Deleted . . . . . . . . . . . . . . . . . . . . . Deleted . . . . . . . . . . . . . . . . . . . ...... Safety Limit Violation . . . . . . . . . . Procedures . . . . . . . . . . . . . . . . . . . . . . . Reporting Requirements . . . . . . . . . . . . . . . . . 6.9.a Routine Reports . . . . . . . . . . . . . . . .

6.9.a.1 Startup Report . . . . . . . . . . . 6.9.a.2 Annual Reporting Requirements . . . 6.9.a.3 Monthly Operating Report . . . . . .

6.9.b Unique Reporting Requirements . . . 6.9.b.1 Annual Radiological Environmental

Monitoring Report . . . 6.9.b.2 Radioactive Effluent Release Report 6.9.b.3 Special Reports . . . .

Record Retention . Radiation Protection Program System Integrity High Radiation Area Post-Accident Sampling and Monitoring . . . . Secondary Water Chemistry Radiological Effluents Process Control Program (PCP) Offsite Dose Calculation Manual (ODCM) . . . Major Changes to Radioactive Liquid, Gaseous and Solid Waste Treatment Systems.

- 6.5-6 6.6-1 6.7-1 6.8-1 6.9-1 6.9-1 6.9-1 6.9-1 6.9-3 6.9-3

6.9-3 6.9-3 6.9-3

. . . . 6.10-1

. . . . 6.11-1

. . . . 6.12-1

. . . . 6.13-1

. . . . 6.14-1

. . . . 6.15-1

. . . . 6.16-1

. . . . 6.17-1

. . . . 6.18-1

6.19-1

7/8.0 Deleted

TS ivProposed Amendment No. 159

02/15/99

Page 15: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

S

6.0 ADMINISTRATIVE CONTROLS

6.1 RESPONSIBILITY

a. The Manager - Kewaunee Plant operation and shall dlelegat responsibility during his abse

b P. The Manager-Kewaunce Plant,

TS 6.1-1

)lant this

Proposed Amendment No. 159 02/15/99

I

Page 16: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

6.2 ORGANIZATION

a. Off-Site Staff

The off-site organization for plant management and technical support shall be as described in the Operational Quality Assurance Program Description.

b. Facility Staff

The plant organization shall be as described in the Operational Quality Assurance Program Description.

1. Each on-duty shift complement shall consist of at least:

A. One Shift Supervisor (SRO) B. Two licensed Reactor Operators C. Two Nuclear Auxiliary Operators D. Deleted E. One Radiation Technologist

2. While above COLD SHUTDOWN, the on-duty shift complement shall consist of the personnel required by TS 6.2.b.1 and an additional SRO.

3. In the event that one of the shift members becomes incapacitated due to illness or injury or the Radiation Technologist has to accompany an injured person to the hospital, reactor operations may continue with the reduced complement until a replacement arrives. In all but severe weather conditions, a replacement is required within two hours.

4. At least one licensed operator shall be in the control room when fuel is in the reactor.

5. Two licensed operators, one of which shall be an SRO, shall be present in the control room when the unit is in an operational MODE other than COLD SHUTDOWN or REFUELING.

6. REFUELING OPERATIONS shall be directed by a licensed SRO assigned to the REFUELING OPERATION who has no other concurrent responsibilities during the REFUELING OPERATION.

7. When the reactor is above the COLD SHUTDOWN condition, a qualified Shift Technical Advisor shall be within 10 minutes of the control room.

Proposed Amendment No. 159 TS 6.2-1 02/15/99

Page 17: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

0

6. 5 DELETED

TS 6.5-1 through TS 6.5-6Proposed Amendment No. 159

02/15/99

Page 18: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

6.6 DELETED

TS 6.6-1Proposed Amendment No. 159

02/15/99

Page 19: ATTACHMENT To Letter from M. L. Marchi (WPSC) Document ... · ATTACHMENT 2 To Letter from M. L. Marchi (WPSC) to Document Control Desk (NRC) Dated February 15, 1999 Proposed Amendment

0g g'

6.7 SAFETY LIMIT VIOLATION

The following actions shall be taken in the event a safety limit is violated:

a. The reactor shall be shut down and operation shall not be resumed until authorized by the Commission.

b. The Report shall be prepared in accordance with 10 CFR 50.72 and 10 CFR . 73.

Proposed Amendment No. 159 TS 6.7-1 02/15/99