RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 1
ATTACHMENT 3 Regional Pricing Workbook / Sheets
For each of the three respective JCC Regions, the following Excel pricing workbook(s) have been issued. PDF’s of these workbooks are provided with this Attachment 3:
• Bay Area / Northern California Region: “BANCRO – Pricing Workbook V1.2 JCC” • Northern / Central Region: “NCRO – Pricing Workbook V1.2 JCC” • Southern Region: “SRO – Pricing Workbook V1.2 JCC”
Each workbook is comprised of a series of tabs.
• “BANCRO – Pricing Workbook V1.2 JCC” - One (1) Summary Sheet plus forty (40) Facility Sheets, total of forty-one (41) sheets
• “NCRO – Pricing Workbook V1.2 JCC” - One (1) Summary Sheet plus thirty-five (35) Facility Sheets, total of thirty-six (36) sheets
• “SRO – Pricing Workbook V1.2 JCC” - One (1) Summary Sheet plus seventy-six (76) Facility Sheets, total of seventy-seven (77) sheets
The first sheet in each workbook is the “Summary Pricing Sheet”. When you open the file, disable macros (if applicable), enable the content as coming from a trusted source (if applicable). In field B2 of the Summary Pricing Sheet, replace “Firm Name TBD” with your firm’s name. This will populate the Proposer name in all sheets within the workbook. Save the file using the naming convention in the RFP instructions, Section 8.6. The Summary Pricing Sheet retrieves information that is entered in each of the respective facility sheets. Each sheet is named with the unique JCC ID for the respective facility. The Summary Pricing Sheet populates the information for each facility in rows. The “Total Annual Cost” from the facility tabs is entered in columns “I” through “AK” for each System ID on the Facility Sheet. Further detail on the facility tabs is provided below. The Proposer must fill in their lump sum price for Phase-In and Phase-Out services in the bottom left of the Summary Pricing Sheet. The calculated total is the “Year One Firm Fixed Price” which become the basis for the “Total Evaluated Price” calculation in Attachment 10. These calculations are included below the rows of facilities by Region. The Facility sheets are all structured identically. The only fields that the proposers have to complete are their all-inclusive cost to perform single tasks by equipment. The relevant equipment for each respective facility is identified with white cells. The total number of each “cost” items is multiplied by the relevant “quantity” and these are totaled to calculate the “Annual Cost” for a single asset/item. The Annual Cost is multiplied by the number of asset/items for the facility, to calculate the “Total Annual Cost”.
RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 2
On each facility sheet, there are a series of pricing elements that must be completed for each facility by the proposer: S1: Snow Removal – (crew hourly rate) – this is the proposer’s hourly rate on-site for a snow removal crew, including travel, equipment, deicer, etc. to perform snow removal, if applicable at the facility. I1: Unclogging Blocked Toilet – In-custody cell (labor only) – this is the proposer’s flat rate to unclog a blocked toilet in a custody cell, if applicable, in the facility. Any additional repairs and materials will be treated as work-orders. I2: Unclogging Blocked Toilet – Public/Court Staff (labor only) - this is the proposer’s flat rate to unclog a blocked toilet in a public restroom or court staff restroom, in the facility. Any additional repairs and materials will be treated as work-orders. Hr 1: Hourly Rate (All Labor Categories) – this is the working hourly rate for any category of personnel required to perform a task at the facility, including travel. M1: Markup on Materials (Percentage) – This is the proposers only markup on the agreed cost of materials. Sub 1: Markup on Subcontractors/Third Parties (Percentage) - This is the proposers only markup on the agreed cost for subcontractors or other third parties.
RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 3
BANCRO – PRICING WORKBOOK V1.2 JCC One (1) Summary Sheet plus forty (40) Facility Sheets, total of forty-one (41) sheets
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - Summary Pricing Sheet Print Date - 9/24/2019
RFP #
Proposer System
Subsystem
Acc
ess
Doo
rs, G
ates
, S
ally
Por
t
Air
Coo
led
DX
(P
acka
ge /
Spl
it S
yste
m)
Air
Han
dlin
g U
nit (
Air-
cool
ed D
X)
Air-
Coo
led
Chi
ller
Cen
trifu
gal C
hille
r
Coo
ling
Tow
er (
Indu
ced
Dra
ft)
Ice
Chi
ller
Mul
tiSta
ck (
Geo
ther
mal
)
Wat
er S
ourc
e H
eat P
ump
Fan
Coi
l Sys
tem
Exh
aust
Fan
HV
AC
Uni
que
Sys
tem
Ele
ctric
al P
anel
s
Em
erge
ncy
Gen
erat
or
Mot
or C
ontr
ol C
ente
r
Prim
ary
Sw
itch
(Hig
h)
Prim
ary
Sw
itch
(Low
)
Tra
nsfo
rmer
(D
ry-T
ype)
Uni
nter
rupt
ible
Pow
er
Sup
ply
(UP
S)
Ele
ctric
al U
niqu
e S
yste
m
Life
Saf
ety
Bac
kflo
w P
reve
ntor
Hot
Wat
er B
oile
r
Con
dens
ing
Wat
er H
eate
r
Ele
ctric
Wat
er H
eate
r
Plu
mbi
ng U
niqu
e S
yste
m
Ste
am S
yste
m
Pne
umat
ic C
ompr
esso
r
Rou
nds
and
Rea
ding
s
Ver
tical
Tra
nspo
rtat
ion
Wat
er T
reat
men
t
Bui
ldin
g E
xter
ior
/ H
ards
cape
(M
onth
ly)
Fou
ntai
n M
aint
enan
ce
(Mon
thly
)
Fue
l Sto
rage
Tan
ks
(Qua
rter
ly)
If ap
plic
able
Lan
dsca
pe M
aint
enan
ce *
Acc
ount
Man
agem
ent a
nd
Sup
ervi
sion
(M
onth
ly)
Fee
(M
onth
ly)
Sno
w R
emov
al -
(cr
ew
hour
ly r
ate)
Unc
logg
ing
Blo
cked
Toi
let -
In
-cus
tody
hol
ding
cel
l (la
bor)
Unc
logg
ing
Blo
cked
Toi
let -
P
ublic
/Cou
rt S
taff
(labo
r)
Hou
rly R
ate
Mar
kup
on M
ater
ials
Mar
kup
on
Sub
cont
ract
ors/
Thi
rd-
Par
ties
JCC ID Facility Name Address City / Town Zip Code County System ID A1 H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 E1 E2 E3 E4 E5 E6 E7 E8 L1 L2 P1 P2 P3 P4 P5 P6 R1 V1 W1 B1 F1 F2 G1 C1 C2 S1 I1 I2 Hr 1 M1 Sub1
01-B3 Wiley W. Manuel Courthouse 661 Washington St. Oakland 94607 Alameda $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
01-D1 Hayward Hall of Justice 24405 Amador St. Hayward 94544 Alameda $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
01-F1 George E. McDonald Hall of Justice 2233 Shoreline Drive Alameda 94501 Alameda $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
01-G1 Berkeley Courthouse 2120 Martin Luther King, Jr. Way Berkeley 94704 Alameda $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
01-H1 Fremont Hall of Justice 39439 Paseo Padre Pkwy. Fremont 94538 Alameda $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
01-J1 New East County Hall of Justice 5151 Gleason Drive Dublin 94568 Alameda $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
07-A14 Family Law Center 751 Pine Street Martinez 94553Contra Costa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
07-A2 Wakefield Taylor Courthouse 725 Court St. Martinez 94553Contra Costa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
07-A3 Bray Courts 1020 Ward St. Martinez 94553Contra Costa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
07-C1 Walnut Creek Courthouse 640 Ygnacio Valley Rd. Walnut Creek 94596Contra Costa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
07-E3 Richard E. Arnason Justice Center 1000 Center Drive Pittsburg 94565Contra Costa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
07-F1 George D. Carroll Courthouse 100 37th St. Richmond 94805Contra Costa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
08-A1 Del Norte County Superior Court 450 'H' St. Crescent City 95531Del Norte $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
17-B1 South Civic Center 7000A S. Center Dr. Clearlake 95422 Lake $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
23-A1 County Courthouse 100 N. State St. Ukiah 95482Mendocino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
27-A1 Salinas Courthouse- North Wing 240 Church St. Salinas 93901Monterey $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
27-B1 Marina Courthouse 3180 Del Monte Blvd. Marina 93933Monterey $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
28-A1 Criminal Court Building 1111 Third St. Napa 94559 Napa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
28-B1 Historic Courthouse 825 Brown St. Napa 94559 Napa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
28-C1 Napa Juvenile Court 2350 Old Sonoma Rd. Napa 94559 Napa $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
35-C1 New Hollister Courthouse 450 Fourth Street Hollister 95023San Benito $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
38-A1 Civic Center Courthouse 400 McAllister St. San Francisco 94102
San Francisco $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
38-C2 Family Justice Center Woodside Ave. and Portola San Francisco 94127
San Francisco $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
38-C3 Family Justice Center Site - Bldg 1 375 Woodside Avenue San Francisco 94127
San Francisco $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
38-C4 Family Justice Center Site - Bldg 2 375 Woodside Avenue San Francisco 94127
San Francisco $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
38-C5 Family Justice Center Site - Bldg 3 375 Woodside Avenue San Francisco 94127
San Francisco $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
41-A2 Traffic/ Small Claims Annex 500 County Center Redwood City 94063San Mateo $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
41-B1 Central Branch 800 North Humboldt St. San Mateo 94401San Mateo $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
41-C1 Northern Branch Courthouse 1050 Mission Rd.South San Francisco 94080
San Mateo $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
43-A1 Hall of Justice (East) 190 W. Hedding San Jose 95110Santa Clara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
43-A2 Hall of Justice (West) 200 W. Hedding San Jose 95110Santa Clara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
43-B1 Downtown Superior Court 191 N. First St. San Jose 95113Santa Clara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
43-B2 Historic Courthouse 161 N. First St. San Jose 95113Santa Clara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
43-B5 New Santa Clara Family Justice Center 201 N. First Street San Jose 95113Santa Clara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
43-D1 Palo Alto Courthouse 270 Grant St. Palo Alto 94306Santa Clara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
43-G1 Santa Clara Courthouse 1095 Homestead Rd. Santa Clara 95050Santa Clara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
44-A3 Jury Assembly Room 701 Ocean Street Santa Cruz 95060Santa Cruz $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
44-B2 Watsonville Courthouse 1 Second Street Watsonville 95076Santa Cruz $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
48-A1 Hall of Justice 600 Union Ave. Fairfield 94533 Solano $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
48-A3 Old Solano Courthouse 580 Texas Street Fairfield 94533 Solano $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
-$ -$ -$ -$ -$ 0% 0%
Number of Facilities in Region 401 Year One Firm Fixed Price $ - 2 Evaluated Hourly Cost $ - 3 Mark-up On Materials Value $ -
4
Mark-up On Subcontractor/Third-Parties Value $ -
5 Snow Removal $ -
6Unclogging Blocked Toilet – In-custody holding cell $ -
7Unclogging Blocked Toilet – Public / Court Staff $ -
8 Phase-In Costs $ - 9 Phase-Out Costs $ -
10 Total Evaluated Price $ -
JCC- Facility Operation and Maintenance Service Provider - Summary Pricing Sheet and Systems Matrix
RFP-FS-SP-2019-03-JP
Firm Name TBD
HVAC Electrical
Fixed Price - Facility Total Annual Cost
Year 1
1. Year One Firm Fixed Price Total2. Average Hourly Rate for all facilities within a region: total of Hourly Rates proposed in cost proposal, divided by the Number of Facilities in Region, equals Average Hourly Rate. The Average Hourly Rate will be multiplied by the Number of Facilities in Region and then multiplied by 1,000 to provide an Evaluated Hourly Cost value for the Region.3. Markup on Materials will be calculated by taking the Evaluated Hourly Cost value, multiplying that value by 0.3 to establish the Materials value and multiplying the proposed percentage value to establish the Markup on Materials value.
Plumbing Building Systems Corporate
9. Phase-Out Costs - Lump Sum Amount at end of Contract Term
10. Each of the values for items 1 through 9 above will be calculated and added together to establish the Total Evaluated Price value.
4. Markup on Subcontractor/Third-Parties will be calculated by taking the Evaluated Hourly Cost value, multiplying that value by 0.25 to establish the Materials value and multiplying the proposed Percentage value to establish the Markup on Subcontractor/Third-Parties value.
5. Snow Removal (crew hourly rate) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by four (4) events per facility, to establish the Snow Removal evaluation value.
6. Unclogging Blocked Toilet – In-custody holding cell (labor only) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by twenty-six (26) events per facility, to establish the Unclogging Blocked Toilet – In-custody holding cell evaluation value.
7. Unclogging Blocked Toilet – Public / Court Staff (labor only) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by one hundred and four (104) events per facility, to establish the Unclogging Blocked Toilet – Public / Court Staff evaluation value.
8. Phase-In Costs - Lump Sum Amount
JCC - RFP Facility Operations and Maintenance 1 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 01-B3 Print Date - 9/24/2019
JCC ID Facility Name
01-B3 Wiley W. Manuel Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 6 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 01-B3 $ -
S1 Snow Removal - (crew hourly rate) $ - 125
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
661 Washington St. Oakland 94607 Alameda BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 2 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 01-D1 Print Date - 9/24/2019
JCC ID Facility Name
01-D1 Hayward Hall of Justice
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 7 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 01-D1 $ -
S1 Snow Removal - (crew hourly rate) $ - 165
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
24405 Amador St. Hayward 94544 Alameda BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 3 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 01-F1 Print Date - 9/24/2019
JCC ID Facility Name
01-F1 George E. McDonald Hall of Justice
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 01-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 146
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
2233 Shoreline Drive Alameda 94501 Alameda BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 4 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 01-G1 Print Date - 9/24/2019
JCC ID Facility Name
01-G1 Berkeley Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 01-G1 $ -
S1 Snow Removal - (crew hourly rate) $ - 130
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
2120 Martin Luther King, Jr. Way Berkeley 94704 Alameda BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 5 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 01-H1 Print Date - 9/24/2019
JCC ID Facility Name
01-H1 Fremont Hall of Justice
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 13 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 01-H1 $ -
S1 Snow Removal - (crew hourly rate) $ - 153
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
39439 Paseo Padre Pkwy. Fremont 94538 Alameda BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 6 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 01-J1 Print Date - 9/24/2019
JCC ID Facility Name
01-J1 New East County Hall of Justice
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 20 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 20 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 9 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 01-J1 $ -
S1 Snow Removal - (crew hourly rate) $ - 153
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
5151 Gleason Drive Dublin 94568 Alameda BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 7 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 07-A14 Print Date - 9/24/2019
JCC ID Facility Name
07-A14 Family Law Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 07-A14 $ -
S1 Snow Removal - (crew hourly rate) $ - 126
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
751 Pine Street Martinez 94553 Contra Costa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 8 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 07-A2 Print Date - 9/24/2019
JCC ID Facility Name
07-A2 Wakefield Taylor Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 07-A2 $ -
S1 Snow Removal - (crew hourly rate) $ - 165
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
725 Court St. Martinez 94553 Contra Costa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 9 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 07-A3 Print Date - 9/24/2019
JCC ID Facility Name
07-A3 Bray Courts
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 07-A3 $ -
S1 Snow Removal - (crew hourly rate) $ - 129
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
1020 Ward St. Martinez 94553 Contra Costa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 10 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 07-C1 Print Date - 9/24/2019
JCC ID Facility Name
07-C1 Walnut Creek Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 07-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 128
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
640 Ygnacio Valley Rd. Walnut Creek 94596 Contra Costa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 11 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 07-E3 Print Date - 9/24/2019
JCC ID Facility Name
07-E3 Richard E. Arnason Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 11 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 07-E3 $ -
S1 Snow Removal - (crew hourly rate) $ - 174
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
1000 Center Drive Pittsburg 94565 Contra Costa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 12 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 07-F1 Print Date - 9/24/2019
JCC ID Facility Name
07-F1 George D. Carroll Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 14 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 07-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 137
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
100 37th St. Richmond 94805 Contra Costa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 13 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 08-A1 Print Date - 9/24/2019
JCC ID Facility Name
08-A1 Del Norte County Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 08-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 101
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
450 'H' St. Crescent City 95531 Del Norte BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 14 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 17-B1 Print Date - 9/24/2019
JCC ID Facility Name
17-B1 South Civic Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 17-B1 $ -
S1 Snow Removal - (crew hourly rate) $ - 89
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
7000A S. Center Dr. Clearlake 95422 Lake BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 15 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 23-A1 Print Date - 9/24/2019
JCC ID Facility Name
23-A1 County Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 23-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 130
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
100 N. State St. Ukiah 95482 Mendocino BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 16 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 27-A1 Print Date - 9/24/2019
JCC ID Facility Name
27-A1 Salinas Courthouse- North Wing
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 17 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 9 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 8 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 27-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 177
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
240 Church St. Salinas 93901 Monterey BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 17 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 27-B1 Print Date - 9/24/2019
JCC ID Facility Name
27-B1 Marina Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 27-B1 $ -
S1 Snow Removal - (crew hourly rate) $ - 106
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
3180 Del Monte Blvd. Marina 93933 Monterey BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 18 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 28-A1 Print Date - 9/24/2019
JCC ID Facility Name
28-A1 Criminal Court Building
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 12 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 28-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 130
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
1111 Third St. Napa 94559 Napa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 19 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 28-B1 Print Date - 9/24/2019
JCC ID Facility Name
28-B1 Historic Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 28-B1 $ -
S1 Snow Removal - (crew hourly rate) $ - 142
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
825 Brown St. Napa 94559 Napa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 20 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 28-C1 Print Date - 9/24/2019
JCC ID Facility Name
28-C1 Napa Juvenile Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 28-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 106
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
2350 Old Sonoma Rd. Napa 94559 Napa BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 21 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 35-C1 Print Date - 9/24/2019
JCC ID Facility Name
35-C1 New Hollister Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 8 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 35-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 130
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
450 Fourth Street Hollister 95023 San Benito BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 22 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 38-A1 Print Date - 9/24/2019
JCC ID Facility Name
38-A1 Civic Center Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 15 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 15 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 41 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 38-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 173
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
400 McAllister St. San Francisco 94102 San Francisco BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 23 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 38-C2 Print Date - 9/24/2019
JCC ID Facility Name
38-C2 Family Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 38-C2 $ -
S1 Snow Removal - (crew hourly rate) $ - 80
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
Woodside Ave. and Portola San Francisco 94127 San Francisco BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 24 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 38-C3 Print Date - 9/24/2019
JCC ID Facility Name
38-C3 Family Justice Center Site - Bldg 1
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 38-C3 $ -
S1 Snow Removal - (crew hourly rate) $ - 80
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
375 Woodside Avenue San Francisco 94127 San Francisco BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 25 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 38-C4 Print Date - 9/24/2019
JCC ID Facility Name
38-C4 Family Justice Center Site - Bldg 2
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 38-C4 $ -
S1 Snow Removal - (crew hourly rate) $ - 80
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
375 Woodside Avenue San Francisco 94127 San Francisco BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 26 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 38-C5 Print Date - 9/24/2019
JCC ID Facility Name
38-C5 Family Justice Center Site - Bldg 3
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 38-C5 $ -
S1 Snow Removal - (crew hourly rate) $ - 80
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
375 Woodside Avenue San Francisco 94127 San Francisco BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 27 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 41-A2 Print Date - 9/24/2019
JCC ID Facility Name
41-A2 Traffic/ Small Claims Annex
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 41-A2 $ -
S1 Snow Removal - (crew hourly rate) $ - 122
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
500 County Center Redwood City 94063 San Mateo BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 28 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 41-B1 Print Date - 9/24/2019
JCC ID Facility Name
41-B1 Central Branch
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 41-B1 $ -
S1 Snow Removal - (crew hourly rate) $ - 130
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
800 North Humboldt St. San Mateo 94401 San Mateo BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 29 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 41-C1 Print Date - 9/24/2019
JCC ID Facility Name
41-C1 Northern Branch Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 41-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 162
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
1050 Mission Rd. South San Francisco 94080 San Mateo BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 30 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 43-A1 Print Date - 9/24/2019
JCC ID Facility Name
43-A1 Hall of Justice (East)
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 25 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 43-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 166
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
190 W. Hedding San Jose 95110 Santa Clara BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 31 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 43-A2 Print Date - 9/24/2019
JCC ID Facility Name
43-A2 Hall of Justice (West)
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 43-A2 $ -
S1 Snow Removal - (crew hourly rate) $ - 158
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
200 W. Hedding San Jose 95110 Santa Clara BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 32 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 43-B1 Print Date - 9/24/2019
JCC ID Facility Name
43-B1 Downtown Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 35 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 13 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 43-B1 $ -
S1 Snow Removal - (crew hourly rate) $ - 170
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
191 N. First St. San Jose 95113 Santa Clara BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 33 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 43-B2 Print Date - 9/24/2019
JCC ID Facility Name
43-B2 Historic Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 43-B2 $ -
S1 Snow Removal - (crew hourly rate) $ - 149
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
161 N. First St. San Jose 95113 Santa Clara BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 34 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 43-B5 Print Date - 9/24/2019
JCC ID Facility Name
43-B5 New Santa Clara Family Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 12 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 8 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 43-B5 $ -
S1 Snow Removal - (crew hourly rate) $ - 141
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
201 N. First Street San Jose 95113 Santa Clara BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 35 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 43-D1 Print Date - 9/24/2019
JCC ID Facility Name
43-D1 Palo Alto Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 3 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 43-D1 $ -
S1 Snow Removal - (crew hourly rate) $ - 158
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
270 Grant St. Palo Alto 94306 Santa Clara BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 36 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 43-G1 Print Date - 9/24/2019
JCC ID Facility Name
43-G1 Santa Clara Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 43-G1 $ -
S1 Snow Removal - (crew hourly rate) $ - 154
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
1095 Homestead Rd. Santa Clara 95050 Santa Clara BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 37 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 44-A3 Print Date - 9/24/2019
JCC ID Facility Name
44-A3 Jury Assembly Room
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 44-A3 $ -
S1 Snow Removal - (crew hourly rate) $ - 89
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
701 Ocean Street Santa Cruz 95060 Santa Cruz BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 38 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 44-B2 Print Date - 9/24/2019
JCC ID Facility Name
44-B2 Watsonville Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 44-B2 $ -
S1 Snow Removal - (crew hourly rate) $ - 97
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
1 Second Street Watsonville 95076 Santa Cruz BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 39 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 48-A1 Print Date - 9/24/2019
JCC ID Facility Name
48-A1 Hall of Justice
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 7 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 48-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 105
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
600 Union Ave. Fairfield 94533 Solano BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 40 of 41
BANCRO - JCC - Template Master v1.3 - Pricing Workbook - 48-A3 Print Date - 9/24/2019
JCC ID Facility Name
48-A3 Old Solano Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 48-A3 $ -
S1 Snow Removal - (crew hourly rate) $ - 145
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Proposer
580 Texas Street Fairfield 94533 Solano BANCRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity
Total
Total # of PM's
Summary
JCC - RFP Facility Operations and Maintenance 41 of 41
RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 4
This Page Intentionally Left Blank for Duplexing
RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 5
NCRO – PRICING WORKBOOK V1.2 JCC One (1) Summary Sheet plus thirty-five (35) Facility Sheets, total of thirty-six (36) sheets
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - Summary Pricing Sheet Print Date - 9/24/2019
RFP #
Proposer System
Subsystem
Acc
ess
Doo
rs, G
ates
, S
ally
Por
t
Air
Coo
led
DX
(P
acka
ge /
Spl
it S
yste
m)
Air
Han
dlin
g U
nit (
Air-
cool
ed D
X)
Air-
Coo
led
Chi
ller
Cen
trifu
gal C
hille
r
Coo
ling
Tow
er (
Indu
ced
Dra
ft)
Ice
Chi
ller
Mul
tiSta
ck (
Geo
ther
mal
)
Wat
er S
ourc
e H
eat P
ump
Fan
Coi
l Sys
tem
Exh
aust
Fan
HV
AC
Uni
que
Sys
tem
Ele
ctric
al P
anel
s
Em
erge
ncy
Gen
erat
or
Mot
or C
ontr
ol C
ente
r
Prim
ary
Sw
itch
(Hig
h)
Prim
ary
Sw
itch
(Low
)
Tra
nsfo
rmer
(D
ry-T
ype)
Uni
nter
rupt
ible
Pow
er
Sup
ply
(UP
S)
Ele
ctric
al U
niqu
e S
yste
m
Life
Saf
ety
Bac
kflo
w P
reve
ntor
Hot
Wat
er B
oile
r
Con
dens
ing
Wat
er H
eate
r
Ele
ctric
Wat
er H
eate
r
Plu
mbi
ng U
niqu
e S
yste
m
Ste
am S
yste
m
Pne
umat
ic C
ompr
esso
r
Rou
nds
and
Rea
ding
s
Ver
tical
Tra
nspo
rtat
ion
Wat
er T
reat
men
t
Bui
ldin
g E
xter
ior
/ H
ards
cape
(M
onth
ly)
Fou
ntai
n M
aint
enan
ce
(Mon
thly
)
Fue
l Sto
rage
Tan
ks
(Qua
rter
ly)
If ap
plic
able
Lan
dsca
pe M
aint
enan
ce *
Acc
ount
Man
agem
ent a
nd
Sup
ervi
sion
(M
onth
ly)
Fee
(M
onth
ly)
Sno
w R
emov
al -
(cr
ew
hour
ly r
ate)
Unc
logg
ing
Blo
cked
Toi
let -
In
-cus
tody
hol
ding
cel
l (la
bor)
Unc
logg
ing
Blo
cked
Toi
let -
P
ublic
/Cou
rt S
taff
(labo
r)
Hou
rly R
ate
Mar
kup
on M
ater
ials
Mar
kup
on
Sub
cont
ract
ors/
Thi
rd-
Par
ties
JCC ID Facility Name Address City / Town Zip Code County System ID A1 H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 E1 E2 E3 E4 E5 E6 E7 E8 L1 L2 P1 P2 P3 P4 P5 P6 R1 V1 W1 B1 F1 F2 G1 C1 C2 S1 I1 I2 Hr 1 M1 Sub103-C1 Amador Superior Court 500 Argonaut Lane Jackson 95642 Amador $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
04-A1 Butte County Courthouse 1 Court St. Oroville 95965 Butte $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
04-F1 North Butte County Courthouse 1775 Concord Avenue Chico 95928 Butte $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
05-C1 Calaveras Superior Court 400 Government Center Drive San Andreas 95249Calaveras $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
09-A1 Main St. Courthouse 495 Main St. Placerville 95667El Dorado $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
10-A1 Fresno County Courthouse 1100 Van Ness Ave. Fresno 93724 Fresno $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
10-O1 B.F. Sisk Courthouse 1130 O Street Fresno 93721 Fresno $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
16-A5 Hanford Courthouse 1640 Kings County Drive Hanford 93230 Kings $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
18-C1 Hall of Justice 2610 Riverside Drive Susanville 96130 Lassen $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
20-F1 Main Courthouse 200 South G Street Madera 93637 Madera $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
20-F2 Main Courthouse Parking Garage 220/224 and 228 South G Street Madera 93637 Madera $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
24-A1 Old Court 627 W. 21st Street Merced 95340 Merced $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
24-A8 Main Merced Courthouse 2260 N Street Merced 95340 Merced $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
24-G1 Robert M. Falasco Justice Center 1159 G Street Los Banos 93635 Merced $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
25-A1 Barclay Justice Center 205 S. East Street Alturas 96101 Modoc $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
26-B2 Mammoth Lakes Courthouse 100 Thompsons Way Mammoth Lakes 93546 Mono $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
31-H1 Hon. Howard G. Gibson Courthouse 10820 Justice Center Drive Roseville 95678 Placer $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
34-A1 Gordon Schaber Sacramento Superior Court 720 Ninth St. Sacramento 95814Sacramento $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
34-C2 Juvenile Courthouse 9605 Kiefer Road Sacramento 95827Sacramento $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
34-D1 Carol Miller Justice Center Court Facility 301 Bicentennial Circle Sacramento 95826Sacramento $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
39-C1 Manteca Branch Court 315 E. Center St. Manteca 95336San Joaquin $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
39-D2 Lodi Branch Dept. 2 315 W. Elm St. Lodi 95240San Joaquin $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
39-F1 Stockton Courthouse 180 East Weber Avenue Stockton 95202San Joaquin $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
45-A1 Main Courthouse 1500 Court St. Redding 96001 Shasta $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
45-A7 Courthouse Annex 1500 Court St. Redding 96001 Shasta $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
50-A1 Modesto Main Courthouse 800 11th Street Modesto 95354Stanislaus $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
50-A2 Hall of Records 1100 I Street Modesto 95353Stanislaus $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
50-C1 Ceres Superior Court 2744 Second St. Ceres 95307Stanislaus $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
50-D1 Turlock Superior Court 300 Starr Ave. Turlock 95380Stanislaus $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
51-C1 Sutter County Superior Courthouse 1175 Civic Center Blvd. Yuba City 95993 Sutter $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
52-E1 Tehama County Courthouse 1740 Walnut Street Red Bluff 96080 Tehama $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
54-I1 South County Justice Center 300 East Olive Avenue Porterville 93257 Tulare $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
57-A10 Yolo Superior Court 1000 Main Street Woodland 95695 Yolo $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
65-A2 2424 Ventura Street - 5 DCA 2424 Ventura Street Fresno 93721 Fresno $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
-$ -$ -$ -$ -$ 0% 0%
Number of Facilities in Region 341 Year One Firm Fixed Price $ - 2 Evaluated Hourly Cost $ - 3 Mark-up On Materials Value $ -
4
Mark-up On Subcontractor/Third-Parties Value $ -
5 Snow Removal $ -
6Unclogging Blocked Toilet – In-custody holding cell $ -
7Unclogging Blocked Toilet – Public / Court Staff $ -
8 Phase-In Costs $ - 9 Phase-Out Costs $ -
10 Total Evaluated Price $ -
JCC- Facility Operation and Maintenance Service Provider - Summary Pricing Sheet and Systems Matrix
RFP-FS-SP-2019-03-JP
Hensel Phelps Pricing 9-24-2019HVAC Electrical
Fixed Price - Facility Total Annual Cost
Year 1
1. Year One Firm Fixed Price Total2. Average Hourly Rate for all facilities within a region: total of Hourly Rates proposed in cost proposal, divided by the Number of Facilities in Region, equals Average Hourly Rate. The Average Hourly Rate will be multiplied by the Number of Facilities in Region and then multiplied by 1,000 to provide an Evaluated Hourly Cost value for the Region.3. Markup on Materials will be calculated by taking the Evaluated Hourly Cost value, multiplying that value by 0.3 to establish the Materials value and multiplying the proposed percentage value to establish the Markup on Materials value.
Plumbing Building Systems Corporate
9. Phase-Out Costs - Lump Sum Amount at end of Contract Term
10. Each of the values for items 1 through 9 above will be calculated and added together to establish the Total Evaluated Price value.
4. Markup on Subcontractor/Third-Parties will be calculated by taking the Evaluated Hourly Cost value, multiplying that value by 0.25 to establish the Materials value and multiplying the proposed Percentage value to establish the Markup on Subcontractor/Third-Parties value.
5. Snow Removal (crew hourly rate) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by four (4) events per facility, to establish the Snow Removal evaluation value.
6. Unclogging Blocked Toilet – In-custody holding cell (labor only) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by twenty-six (26) events per facility, to establish the Unclogging Blocked Toilet – In-custody holding cell evaluation value.
7. Unclogging Blocked Toilet – Public / Court Staff (labor only) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by one hundred and four (104) events per facility, to establish the Unclogging Blocked Toilet – Public / Court Staff evaluation value.
8. Phase-In Costs - Lump Sum Amount
JCC - RFP Facility Operations and Maintenance 1 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 03-C1 Print Date - 9/24/2019
JCC ID Facility Name
03-C1 Amador Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 15 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 18 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 03-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 99
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
500 Argonaut Lane Jackson 95642 Amador NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 2 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 04-A1 Print Date - 9/24/2019
JCC ID Facility Name
04-A1 Butte County Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 8 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 12 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 04-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 139
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1 Court St. Oroville 95965 Butte NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 3 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 04-F1 Print Date - 9/24/2019
JCC ID Facility Name
04-F1 North Butte County Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 13 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 6 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 04-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 142
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1775 Concord Avenue Chico 95928 Butte NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 4 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 05-C1 Print Date - 9/24/2019
JCC ID Facility Name
05-C1 Calaveras Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 6 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 05-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 153
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
400 Government Center Drive San Andreas 95249 Calaveras NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 5 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 09-A1 Print Date - 9/24/2019
JCC ID Facility Name
09-A1 Main St. Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 09-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 118
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
495 Main St. Placerville 95667 El Dorado NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 6 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 10-A1 Print Date - 9/24/2019
JCC ID Facility Name
10-A1 Fresno County Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 14 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 11 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 10-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 154
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1100 Van Ness Ave. Fresno 93724 Fresno NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 7 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 10-O1 Print Date - 9/24/2019
JCC ID Facility Name
10-O1 B.F. Sisk Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 15 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 29 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 8 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 10-O1 $ -
S1 Snow Removal - (crew hourly rate) $ - 162
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1130 O Street Fresno 93721 Fresno NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 8 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 16-A5 Print Date - 9/24/2019
JCC ID Facility Name
16-A5 Hanford Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 29 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 11 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 17 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 8 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 14 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 16-A5 $ -
S1 Snow Removal - (crew hourly rate) $ - 178
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1640 Kings County Drive Hanford 93230 Kings NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 9 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 18-C1 Print Date - 9/24/2019
JCC ID Facility Name
18-C1 Hall of Justice
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 18-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 135
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2610 Riverside Drive Susanville 96130 Lassen NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 10 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 20-F1 Print Date - 9/24/2019
JCC ID Facility Name
20-F1 Main Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 22 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 19 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 17 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 8 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 20-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 146
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
200 South G Street Madera 93637 Madera NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 11 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 20-F2 Print Date - 9/24/2019
JCC ID Facility Name
20-F2 Main Courthouse Parking Garage
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 20-F2 $ -
S1 Snow Removal - (crew hourly rate) $ - 113
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
220/224 and 228 South G Street Madera 93637 Madera NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 12 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 24-A1 Print Date - 9/24/2019
JCC ID Facility Name
24-A1 Old Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 24-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 90
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
627 W. 21st Street Merced 95340 Merced NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 13 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 24-A8 Print Date - 9/24/2019
JCC ID Facility Name
24-A8 Main Merced Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 24-A8 $ -
S1 Snow Removal - (crew hourly rate) $ - 129
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2260 N Street Merced 95340 Merced NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 14 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 24-G1 Print Date - 9/24/2019
JCC ID Facility Name
24-G1 Robert M. Falasco Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 24-G1 $ -
S1 Snow Removal - (crew hourly rate) $ - 133
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1159 G Street Los Banos 93635 Merced NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 15 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 25-A1 Print Date - 9/24/2019
JCC ID Facility Name
25-A1 Barclay Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 25-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 89
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
205 S. East Street Alturas 96101 Modoc NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 16 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 26-B2 Print Date - 9/24/2019
JCC ID Facility Name
26-B2 Mammoth Lakes Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 26-B2 $ -
S1 Snow Removal - (crew hourly rate) $ - 118
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
100 Thompsons Way Mammoth Lakes 93546 Mono NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 17 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 31-H1 Print Date - 9/24/2019
JCC ID Facility Name
31-H1 Hon. Howard G. Gibson Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 7 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 31-H1 $ -
S1 Snow Removal - (crew hourly rate) $ - 129
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
10820 Justice Center Drive Roseville 95678 Placer NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 18 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 34-A1 Print Date - 9/24/2019
JCC ID Facility Name
34-A1 Gordon Schaber Sacramento Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 15 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 26 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 34-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 145
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
720 Ninth St. Sacramento 95814 Sacramento NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 19 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 34-C2 Print Date - 9/24/2019
JCC ID Facility Name
34-C2 Juvenile Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 16 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 16 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 12 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 34-C2 $ -
S1 Snow Removal - (crew hourly rate) $ - 163
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
9605 Kiefer Road Sacramento 95827 Sacramento NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 20 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 34-D1 Print Date - 9/24/2019
JCC ID Facility Name
34-D1 Carol Miller Justice Center Court Facility
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 34-D1 $ -
S1 Snow Removal - (crew hourly rate) $ - 159
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
301 Bicentennial Circle Sacramento 95826 Sacramento NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 21 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 39-C1 Print Date - 9/24/2019
JCC ID Facility Name
39-C1 Manteca Branch Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 11 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 39-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 107
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
315 E. Center St. Manteca 95336 San Joaquin NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 22 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 39-D2 Print Date - 9/24/2019
JCC ID Facility Name
39-D2 Lodi Branch Dept. 2
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 39-D2 $ -
S1 Snow Removal - (crew hourly rate) $ - 94
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
315 W. Elm St. Lodi 95240 San Joaquin NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 23 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 39-F1 Print Date - 9/24/2019
JCC ID Facility Name
39-F1 Stockton Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 31 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 44 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 44 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 21 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 12 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 18 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 39-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 170
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
180 East Weber Avenue Stockton 95202 San Joaquin NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 24 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 45-A1 Print Date - 9/24/2019
JCC ID Facility Name
45-A1 Main Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 45-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 154
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1500 Court St. Redding 96001 Shasta NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 25 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 45-A7 Print Date - 9/24/2019
JCC ID Facility Name
45-A7 Courthouse Annex
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 45-A7 $ -
S1 Snow Removal - (crew hourly rate) $ - 142
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1500 Court St. Redding 96001 Shasta NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 26 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 50-A1 Print Date - 9/24/2019
JCC ID Facility Name
50-A1 Modesto Main Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 50-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 162
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
800 11th Street Modesto 95354 Stanislaus NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 27 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 50-A2 Print Date - 9/24/2019
JCC ID Facility Name
50-A2 Hall of Records
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 50-A2 $ -
S1 Snow Removal - (crew hourly rate) $ - 144
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1100 I Street Modesto 95353 Stanislaus NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 28 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 50-C1 Print Date - 9/24/2019
JCC ID Facility Name
50-C1 Ceres Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 50-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 85
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2744 Second St. Ceres 95307 Stanislaus NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 29 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 50-D1 Print Date - 9/24/2019
JCC ID Facility Name
50-D1 Turlock Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 50-D1 $ -
S1 Snow Removal - (crew hourly rate) $ - 94
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
300 Starr Ave. Turlock 95380 Stanislaus NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 30 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 51-C1 Print Date - 9/24/2019
JCC ID Facility Name
51-C1 Sutter County Superior Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 51-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 158
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1175 Civic Center Blvd. Yuba City 95993 Sutter NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 31 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 52-E1 Print Date - 9/24/2019
JCC ID Facility Name
52-E1 Tehama County Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 52-E1 $ -
S1 Snow Removal - (crew hourly rate) $ - 117
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1740 Walnut Street Red Bluff 96080 Tehama NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 32 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 54-I1 Print Date - 9/24/2019
JCC ID Facility Name
54-I1 South County Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 22 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 16 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 7 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 54-I1 $ -
S1 Snow Removal - (crew hourly rate) $ - 163
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
300 East Olive Avenue Porterville 93257 Tulare NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 33 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 57-A10 Print Date - 9/24/2019
JCC ID Facility Name
57-A10 Yolo Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 14 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 16 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 8 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 8 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 57-A10 $ -
S1 Snow Removal - (crew hourly rate) $ - 167
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1000 Main Street Woodland 95695 Yolo NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 34 of 35
NCRO - Pricing Workbook V1.3 JCC - Hensel Phelps - 65-A2 Print Date - 9/24/2019
JCC ID Facility Name
65-A2 2424 Ventura Street - 5 DCA
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 65-A2 $ -
S1 Snow Removal - (crew hourly rate) $ - 130
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2424 Ventura Street Fresno 93721 Fresno NCRO RFP-FS-SP-2019-03-JP Hensel Phelps Pricing 9-24-2019
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 35 of 35
RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 6
This Page Intentionally Left Blank for Duplexing
RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 7
SRO – PRICING WORKBOOK V1.2 JCC One (1) Summary Sheet plus seventy-six (76) Facility Sheets, total of seventy-seven (77) sheets
SRO - JCC - Template Master v1.3 - Pricing Workbook - Summary Pricing Sheet Print Date - 9/24/2019
RFP #
Proposer System
Subsystem
Acc
ess
Doo
rs, G
ates
, S
ally
Por
t
Air
Coo
led
DX
(P
acka
ge /
Spl
it S
yste
m)
Air
Han
dlin
g U
nit (
Air-
cool
ed D
X)
Air-
Coo
led
Chi
ller
Cen
trifu
gal C
hille
r
Coo
ling
Tow
er (
Indu
ced
Dra
ft)
Ice
Chi
ller
Mul
tiSta
ck (
Geo
ther
mal
)
Wat
er S
ourc
e H
eat P
ump
Fan
Coi
l Sys
tem
Exh
aust
Fan
HV
AC
Uni
que
Sys
tem
Ele
ctric
al P
anel
s
Em
erge
ncy
Gen
erat
or
Mot
or C
ontr
ol C
ente
r
Prim
ary
Sw
itch
(Hig
h)
Prim
ary
Sw
itch
(Low
)
Tra
nsfo
rmer
(D
ry-T
ype)
Uni
nter
rupt
ible
Pow
er
Sup
ply
(UP
S)
Ele
ctric
al U
niqu
e S
yste
m
Life
Saf
ety
Bac
kflo
w P
reve
ntor
Hot
Wat
er B
oile
r
Con
dens
ing
Wat
er H
eate
r
Ele
ctric
Wat
er H
eate
r
Plu
mbi
ng U
niqu
e S
yste
m
Ste
am S
yste
m
Pne
umat
ic C
ompr
esso
r
Rou
nds
and
Rea
ding
s
Ver
tical
Tra
nspo
rtat
ion
Wat
er T
reat
men
t
Bui
ldin
g E
xter
ior
/ H
ards
cape
(M
onth
ly)
Fou
ntai
n M
aint
enan
ce
(Mon
thly
)
Fue
l Sto
rage
Tan
ks
(Qua
rter
ly)
If ap
plic
able
Lan
dsca
pe M
aint
enan
ce *
Acc
ount
Man
agem
ent a
nd
Sup
ervi
sion
(M
onth
ly)
Fee
(M
onth
ly)
Sno
w R
emov
al -
(cr
ew
hour
ly r
ate)
Unc
logg
ing
Blo
cked
Toi
let -
In
-cus
tody
hol
ding
cel
l (la
bor)
Unc
logg
ing
Blo
cked
Toi
let -
P
ublic
/Cou
rt S
taff
(labo
r)
Hou
rly R
ate
Mar
kup
on M
ater
ials
Mar
kup
on
Sub
cont
ract
ors/
Thi
rd-
Par
ties
JCC ID Facility Name Address City / Town Zip Code County System ID A1 H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 E1 E2 E3 E4 E5 E6 E7 E8 L1 L2 P1 P2 P3 P4 P5 P6 R1 V1 W1 B1 F1 F2 G1 C1 C2 S1 I1 I2 Hr 1 M1 Sub115-A1 Bakersfield Superior Court 1315 Truxtun Ave, 1661 L Street Bakersfield 93301 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-A2 Bakersfield Superior Court Modular 1415 Truxtun Avenue Bakersfield 93301 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-C1 Bakersfield Juvenile Center 2100 College Ave. Bakersfield 93305 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-D1 Delano/North Kern Court 1122 Jefferson St. Delano 93215 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-E1 Shafter/Wasco Courts Bldg. 325 Central Valley Hwy Shafter 93263 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-F1 Taft Courts Bldg. 311 N Lincoln St. Taft 93268 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-F2 Taft Superior Court Modular 311 N Lincoln Street Taft 93268 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-H1 Arvin/ Lamont Branch 12022 Main St. Lamont 93241 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
15-J2 Ridgecrest - Division B Courtroom 420 N China Lake Blvd. Ridgecrest 93555 Kern $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AC1 San Fernando Courthouse 900 Third Street San Fernando 91340Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AG1 Compton Courthouse 200 West Compton Boulevard Compton 90220Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AK1 Norwalk Courthouse 12720 Norwalk Boulevard Norwalk 90650Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AL1 Bellflower Courthouse 10025 East Flower Street Bellflower 90706Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AM1 Downey Courthouse 7500 East Imperial Highway Downey `Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AO1 Whittier Courthouse 7339 Painter Avenue Whittier 90602Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AP1 Santa Monica Courthouse 1725 Main Street Santa Monica 90401Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AP3 Santa Monica Court Annex 1725 Main St. Santa Monica 90401 Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AQ1 Beverly Hills Courthouse 9355 Burton Way Beverly Hills 90210Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AU1 Airport Courthouse 11701 South La Cienega Boulevard Los Angeles 90045Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AX1 Van Nuys Courthouse East 6230 Sylmar Avenue Van Nuys 91401Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AX2 Van Nuys Courthouse West 14400 Erwin Street Mall Van Nuys 91401Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AY1 Chatsworth Courthouse 9425 Penfield Avenue Chatsworth 91311Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-AZ1Michael D. Antonovich Antelope Valley Courthouse 42011 4th Street West Lancaster 93534
Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-C1 Torrance Courthouse 825 Maple Avenue Torrance 90503Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-C2 Torrance Annex 3221 Torrance Boulevard Torrance 90503Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-C3 S. Bay Muni Court Jury Assembly Trailer 825 Maple Dr. Torrance 90503Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-C4 S. Bay Municipal Traffic Court Trailer 825 Maple Dr. Torrance 90503Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-E1 Inglewood Juvenile Court 110 Regent Street Inglewood 90301Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-F1 Inglewood Courthouse One Regent Street Inglewood 90301Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-G1 Burbank Courthouse 300 East Olive Burbank 91502Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-H1 Glendale Courthouse 600 East Broadway Glendale 91206Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-I1 Alhambra Courthouse 150 West Commonwealth Avenue Alhambra 91801Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-J1 Pasadena Courthouse 300 East Walnut Street Pasadena 91101Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-K1 Stanley Mosk Courthouse 111 North Hill Street Los Angeles 90012Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-L1 Clara Shortridge Foltz Criminal Justice Center 210 West Temple Street Los Angeles 90012Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-N1 Monrovia Training Center 300 W. Maple Ave. Monrovia 91016Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-O1 El Monte Courthouse 11234 East Valley Boulevard El Monte 91731Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-P1 Mental Health Court 1150 North San Fernando Road Los Angeles 90065Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-S1 Hollywood Courthouse 5925 Hollywood Boulevard Los Angeles 90028Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-T1 Metropolitan Courthouse 1945 South Hill Street Los Angeles 90007Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-V1 East Los Angeles Courthouse 4848 E. Civic Center Way East Los Angeles 90022Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-W1 Pomona Courthouse South 400 Civic Center Plaza Pomona 91766Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
19-W2 Pomona Courthouse North 350 West Mission Boulevard Pomona 91766Los Angeles $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
36-A1 Central Courthouse 351 N. Arrowhead Ave San Bernardino 92415
San Bernardino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
36-A2 San Bernardino Courthouse - Annex 351 N. Arrowhead Ave San Bernardino 92415
San Bernardino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
36-C1 Fontana Courthouse 17780 Arrow Blvd. Fontana 92335
San Bernardino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
36-C3 Fontana Jury Assembly Building 17782 Arrow Blvd. Fontana 92335
San Bernardino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
36-J1 Barstow Courthouse 235 East Mountain View Street Barstow 92311
San Bernardino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
36-P1 Juvenile Dependency Courthouse 860 E. Gilbert Street San Bernardino 92415
San Bernardino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
36-R1 San Bernardino Justice Center 247 West Third Street San Bernardino 92415
San Bernardino $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-C1 Kearny Mesa Court 8950 Clairemont Mesa Blvd. San Diego 92123San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-C2 Kearny Mesa Traffic Court KM3 Trailer 8950 Clairemont Mesa Blvd. San Diego 92123San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-C3 Kearny Mesa Traffic Court KM4 Trailer 8950 Clairemont Mesa Blvd. San Diego 92123San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-C4 Kearny Mesa Traffic Court KM5 & KM6 Trailer 8950 Clairemont Mesa Blvd. San Diego 92123San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-E1 Juvenile Court 2851 Meadow Lark Dr. San Diego 92123San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-E3 Department 9 Trailer 2851 Meadow Lark Dr. San Diego 92123San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-E4 Department 10 Trailer 2851 Meadow Lark Dr. San Diego 92123San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-F2 North County Regional Center - North 325 South Melrose Drive Vista 92081San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-F3 North County Regional Center - Annex 325 South Melrose Drive Vista 92081San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-F4 Trailer - Dept 34 325 South Melrose Drive Vista 92081San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-F5 Trailer - Dept 35 325 South Melrose Drive Vista 92081San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-F6 Trailer - Storage A 325 South Melrose Drive Vista 92081San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-F7 Trailer - Family Support 325 South Melrose Drive Vista 92081San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-I1 East County Regional Center 250 E. Main St. El Cajon 92020San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
37-L1 Central Courthouse 1100 Union Street San Diego 92101San Diego $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
42-B1 Figueroa Division 118 E. Figueroa St. Santa Barbara 93101Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
Plumbing Building Systems Corporate
JCC- Facility Operation and Maintenance Service Provider - Summary Pricing Sheet and Systems Matrix
RFP-FS-SP-2019-03-JP
Firm Name TBD
HVAC Electrical
Fixed Price - Facility Total Annual Cost
Year 1
JCC - RFP Facility Operations and Maintenance 1 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - Summary Pricing Sheet Print Date - 9/24/2019
RFP #
Proposer System
Subsystem
Acc
ess
Doo
rs, G
ates
, S
ally
Por
t
Air
Coo
led
DX
(P
acka
ge /
Spl
it S
yste
m)
Air
Han
dlin
g U
nit (
Air-
cool
ed D
X)
Air-
Coo
led
Chi
ller
Cen
trifu
gal C
hille
r
Coo
ling
Tow
er (
Indu
ced
Dra
ft)
Ice
Chi
ller
Mul
tiSta
ck (
Geo
ther
mal
)
Wat
er S
ourc
e H
eat P
ump
Fan
Coi
l Sys
tem
Exh
aust
Fan
HV
AC
Uni
que
Sys
tem
Ele
ctric
al P
anel
s
Em
erge
ncy
Gen
erat
or
Mot
or C
ontr
ol C
ente
r
Prim
ary
Sw
itch
(Hig
h)
Prim
ary
Sw
itch
(Low
)
Tra
nsfo
rmer
(D
ry-T
ype)
Uni
nter
rupt
ible
Pow
er
Sup
ply
(UP
S)
Ele
ctric
al U
niqu
e S
yste
m
Life
Saf
ety
Bac
kflo
w P
reve
ntor
Hot
Wat
er B
oile
r
Con
dens
ing
Wat
er H
eate
r
Ele
ctric
Wat
er H
eate
r
Plu
mbi
ng U
niqu
e S
yste
m
Ste
am S
yste
m
Pne
umat
ic C
ompr
esso
r
Rou
nds
and
Rea
ding
s
Ver
tical
Tra
nspo
rtat
ion
Wat
er T
reat
men
t
Bui
ldin
g E
xter
ior
/ H
ards
cape
(M
onth
ly)
Fou
ntai
n M
aint
enan
ce
(Mon
thly
)
Fue
l Sto
rage
Tan
ks
(Qua
rter
ly)
If ap
plic
able
Lan
dsca
pe M
aint
enan
ce *
Acc
ount
Man
agem
ent a
nd
Sup
ervi
sion
(M
onth
ly)
Fee
(M
onth
ly)
Sno
w R
emov
al -
(cr
ew
hour
ly r
ate)
Unc
logg
ing
Blo
cked
Toi
let -
In
-cus
tody
hol
ding
cel
l (la
bor)
Unc
logg
ing
Blo
cked
Toi
let -
P
ublic
/Cou
rt S
taff
(labo
r)
Hou
rly R
ate
Mar
kup
on M
ater
ials
Mar
kup
on
Sub
cont
ract
ors/
Thi
rd-
Par
ties
JCC ID Facility Name Address City / Town Zip Code County System ID A1 H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 E1 E2 E3 E4 E5 E6 E7 E8 L1 L2 P1 P2 P3 P4 P5 P6 R1 V1 W1 B1 F1 F2 G1 C1 C2 S1 I1 I2 Hr 1 M1 Sub1
Plumbing Building Systems Corporate
JCC- Facility Operation and Maintenance Service Provider - Summary Pricing Sheet and Systems Matrix
RFP-FS-SP-2019-03-JP
Firm Name TBD
HVAC Electrical
Fixed Price - Facility Total Annual Cost
Year 1
42-F1 Santa Maria Courts Bldgs C + D 312 E. Cook St. Santa Maria 93454Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
42-F3 Santa Maria Courts, Bldgs. A + B 312 E. Cook St. Santa Maria 93454Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
42-F4 Santa Maria Courts, Bldg F 312 E. Cook St. Santa Maria 93454Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
42-F5 Santa Maria Courts, Bldg G 312 E. Cook St. Santa Maria 93454Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
42-F7 Santa Maria Clerks, Bldg E 312 E. Cook St. Santa Maria 93454Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
42-G1 Santa Barbara Jury Assembly Bldg. 1108 Santa Barbara Santa Barbara 93101Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
42-H1 Santa Maria Juvenile Court (new) 4285 California Blvd. Santa Maria 93455Santa Barbara $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
56-B1 East County Courthouse 3855 Alamo Street Simi Valley 93063 Ventura $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
56-F1 Juvenile Courthouse 4353 Vineyard Ave. Oxnard 93036 Ventura $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
64-E1 601 W. Santa Ana Blvd - 4 DCA 3 601 W. Santa Ana Blvd Santa Ana 92701 Orange $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0%
-$ -$ -$ -$ -$ 0% 0%
Number of Facilities in Region 761 Year One Firm Fixed Price $ - 2 Evaluated Hourly Cost $ - 3 Mark-up On Materials Value $ -
4
Mark-up On Subcontractor/Third-Parties Value $ -
5 Snow Removal $ -
6Unclogging Blocked Toilet – In-custody holding cell $ -
7Unclogging Blocked Toilet – Public / Court Staff $ -
8 Phase-In Costs $ - 9 Phase-Out Costs $ -
10 Total Evaluated Price $ -
9. Phase-Out Costs - Lump Sum Amount at end of Contract Term
10. Each of the values for items 1 through 9 above will be calculated and added together to establish the Total Evaluated Price value.
4. Markup on Subcontractor/Third-Parties will be calculated by taking the Evaluated Hourly Cost value, multiplying that value by 0.25 to establish the Materials value and multiplying the proposed Percentage value to establish the Markup on Subcontractor/Third-Parties value.
5. Snow Removal (crew hourly rate) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by four (4) events per facility, to establish the Snow Removal evaluation value.
6. Unclogging Blocked Toilet – In-custody holding cell (labor only) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by twenty-six (26) events per facility, to establish the Unclogging Blocked Toilet – In-custody holding cell evaluation value.
7. Unclogging Blocked Toilet – Public / Court Staff (labor only) average costs throughout the Region, multiplied by the Number of Facilities in Region, multiplied by one hundred and four (104) events per facility, to establish the Unclogging Blocked Toilet – Public / Court Staff evaluation value.
8. Phase-In Costs - Lump Sum Amount
1. Year One Firm Fixed Price Total2. Average Hourly Rate for all facilities within a region: total of Hourly Rates proposed in cost proposal, divided by the Number of Facilities in Region, equals Average Hourly Rate. The Average Hourly Rate will be multiplied by the Number of Facilities in Region and then multiplied by 1,000 to provide an Evaluated Hourly Cost value for the Region.3. Markup on Materials will be calculated by taking the Evaluated Hourly Cost value, multiplying that value by 0.3 to establish the Materials value and multiplying the proposed percentage value to establish the Markup on Materials value.
JCC - RFP Facility Operations and Maintenance 2 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-A1 Print Date - 9/24/2019
JCC ID Facility Name
15-A1 Bakersfield Superior Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 14 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 113
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1315 Truxtun Ave, 1661 L Street Bakersfield 93301 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 3 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-A2 Print Date - 9/24/2019
JCC ID Facility Name
15-A2 Bakersfield Superior Court Modular
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-A2 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1415 Truxtun Avenue Bakersfield 93301 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 4 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-C1 Print Date - 9/24/2019
JCC ID Facility Name
15-C1 Bakersfield Juvenile Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 158
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2100 College Ave. Bakersfield 93305 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 5 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-D1 Print Date - 9/24/2019
JCC ID Facility Name
15-D1 Delano/North Kern Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-D1 $ -
S1 Snow Removal - (crew hourly rate) $ - 101
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1122 Jefferson St. Delano 93215 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 6 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-E1 Print Date - 9/24/2019
JCC ID Facility Name
15-E1 Shafter/Wasco Courts Bldg.
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 14 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-E1 $ -
S1 Snow Removal - (crew hourly rate) $ - 105
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
325 Central Valley Hwy Shafter 93263 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 7 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-F1 Print Date - 9/24/2019
JCC ID Facility Name
15-F1 Taft Courts Bldg.
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 104
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
311 N Lincoln St. Taft 93268 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 8 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-F2 Print Date - 9/24/2019
JCC ID Facility Name
15-F2 Taft Superior Court Modular
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-F2 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
311 N Lincoln Street Taft 93268 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 9 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-H1 Print Date - 9/24/2019
JCC ID Facility Name
15-H1 Arvin/ Lamont Branch
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 17 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-H1 $ -
S1 Snow Removal - (crew hourly rate) $ - 104
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
12022 Main St. Lamont 93241 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 10 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 15-J2 Print Date - 9/24/2019
JCC ID Facility Name
15-J2 Ridgecrest - Division B Courtroom
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 15-J2 $ -
S1 Snow Removal - (crew hourly rate) $ - 86
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
420 N China Lake Blvd. Ridgecrest 93555 Kern SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 11 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AC1 Print Date - 9/24/2019
JCC ID Facility Name
19-AC1 San Fernando Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 19 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 9 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AC1 $ -
S1 Snow Removal - (crew hourly rate) $ - 162
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
900 Third Street San Fernando 91340 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 12 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AG1 Print Date - 9/24/2019
JCC ID Facility Name
19-AG1 Compton Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 15 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 15 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 15 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 14 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 5 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 14 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AG1 $ -
S1 Snow Removal - (crew hourly rate) $ - 166
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
200 West Compton Boulevard Compton 90220 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 13 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AK1 Print Date - 9/24/2019
JCC ID Facility Name
19-AK1 Norwalk Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 2 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 12 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 7 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AK1 $ -
S1 Snow Removal - (crew hourly rate) $ - 166
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
12720 Norwalk Boulevard Norwalk 90650 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 14 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AL1 Print Date - 9/24/2019
JCC ID Facility Name
19-AL1 Bellflower Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 3 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 8 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 11 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AL1 $ -
S1 Snow Removal - (crew hourly rate) $ - 166
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
10025 East Flower Street Bellflower 90706 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 15 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AM1 Print Date - 9/24/2019
JCC ID Facility Name
19-AM1 Downey Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 13 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 4 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 13 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AM1 $ -
S1 Snow Removal - (crew hourly rate) $ - 170
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
7500 East Imperial Highway Downey ` Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 16 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AO1 Print Date - 9/24/2019
JCC ID Facility Name
19-AO1 Whittier Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 4 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 6 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AO1 $ -
S1 Snow Removal - (crew hourly rate) $ - 179
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
7339 Painter Avenue Whittier 90602 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 17 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AP1 Print Date - 9/24/2019
JCC ID Facility Name
19-AP1 Santa Monica Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 2 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 8 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AP1 $ -
S1 Snow Removal - (crew hourly rate) $ - 177
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1725 Main Street Santa Monica 90401 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 18 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AP3 Print Date - 9/24/2019
JCC ID Facility Name
19-AP3 Santa Monica Court Annex
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AP3 $ -
S1 Snow Removal - (crew hourly rate) $ - 123
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1725 Main St. Santa Monica 90401 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 19 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AQ1 Print Date - 9/24/2019
JCC ID Facility Name
19-AQ1 Beverly Hills Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AQ1 $ -
S1 Snow Removal - (crew hourly rate) $ - 174
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
9355 Burton Way Beverly Hills 90210 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 20 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AU1 Print Date - 9/24/2019
JCC ID Facility Name
19-AU1 Airport Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 32 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 2 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 27 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 26 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AU1 $ -
S1 Snow Removal - (crew hourly rate) $ - 186
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
11701 South La Cienega Boulevard Los Angeles 90045 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 21 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AX1 Print Date - 9/24/2019
JCC ID Facility Name
19-AX1 Van Nuys Courthouse East
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 5 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 8 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AX1 $ -
S1 Snow Removal - (crew hourly rate) $ - 149
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
6230 Sylmar Avenue Van Nuys 91401 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 22 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AX2 Print Date - 9/24/2019
JCC ID Facility Name
19-AX2 Van Nuys Courthouse West
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 38 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 25 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 12 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 11 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 4 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 36 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AX2 $ -
S1 Snow Removal - (crew hourly rate) $ - 185
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
14400 Erwin Street Mall Van Nuys 91401 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 23 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AY1 Print Date - 9/24/2019
JCC ID Facility Name
19-AY1 Chatsworth Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 20 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AY1 $ -
S1 Snow Removal - (crew hourly rate) $ - 167
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
9425 Penfield Avenue Chatsworth 91311 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 24 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-AZ1 Print Date - 9/24/2019
JCC ID Facility Name
19-AZ1 Michael D. Antonovich Antelope Valley Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 15 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 19 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 5 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 13 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-AZ1 $ -
S1 Snow Removal - (crew hourly rate) $ - 175
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
42011 4th Street West Lancaster 93534 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 25 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-C1 Print Date - 9/24/2019
JCC ID Facility Name
19-C1 Torrance Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 13 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 2 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 170
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
825 Maple Avenue Torrance 90503 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 26 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-C2 Print Date - 9/24/2019
JCC ID Facility Name
19-C2 Torrance Annex
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-C2 $ -
S1 Snow Removal - (crew hourly rate) $ - 108
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
3221 Torrance Boulevard Torrance 90503 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 27 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-C3 Print Date - 9/24/2019
JCC ID Facility Name
19-C3 S. Bay Muni Court Jury Assembly Trailer
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-C3 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
825 Maple Dr. Torrance 90503 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 28 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-C4 Print Date - 9/24/2019
JCC ID Facility Name
19-C4 S. Bay Municipal Traffic Court Trailer
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-C4 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
825 Maple Dr. Torrance 90503 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 29 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-E1 Print Date - 9/24/2019
JCC ID Facility Name
19-E1 Inglewood Juvenile Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-E1 $ -
S1 Snow Removal - (crew hourly rate) $ - 146
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
110 Regent Street Inglewood 90301 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 30 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-F1 Print Date - 9/24/2019
JCC ID Facility Name
19-F1 Inglewood Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 9 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 4 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 8 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 178
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
One Regent Street Inglewood 90301 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 31 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-G1 Print Date - 9/24/2019
JCC ID Facility Name
19-G1 Burbank Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 8 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-G1 $ -
S1 Snow Removal - (crew hourly rate) $ - 194
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
300 East Olive Burbank 91502 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 32 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-H1 Print Date - 9/24/2019
JCC ID Facility Name
19-H1 Glendale Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 5 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 4 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-H1 $ -
S1 Snow Removal - (crew hourly rate) $ - 147
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
600 East Broadway Glendale 91206 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 33 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-I1 Print Date - 9/24/2019
JCC ID Facility Name
19-I1 Alhambra Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 4 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 5 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 10 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-I1 $ -
S1 Snow Removal - (crew hourly rate) $ - 177
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
150 West Commonwealth Avenue Alhambra 91801 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 34 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-J1 Print Date - 9/24/2019
JCC ID Facility Name
19-J1 Pasadena Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 15 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 5 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 5 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 9 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-J1 $ -
S1 Snow Removal - (crew hourly rate) $ - 186
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
300 East Walnut Street Pasadena 91101 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 35 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-K1 Print Date - 9/24/2019
JCC ID Facility Name
19-K1 Stanley Mosk Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 56 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 24 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 24 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 20 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 15 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 35 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-K1 $ -
S1 Snow Removal - (crew hourly rate) $ - 153
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
111 North Hill Street Los Angeles 90012 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 36 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-L1 Print Date - 9/24/2019
JCC ID Facility Name
19-L1 Clara Shortridge Foltz Criminal Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 44 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 22 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 4 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 10 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 21 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-L1 $ -
S1 Snow Removal - (crew hourly rate) $ - 153
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
210 West Temple Street Los Angeles 90012 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 37 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-N1 Print Date - 9/24/2019
JCC ID Facility Name
19-N1 Monrovia Training Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-N1 $ -
S1 Snow Removal - (crew hourly rate) $ - 134
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
300 W. Maple Ave. Monrovia 91016 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 38 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-O1 Print Date - 9/24/2019
JCC ID Facility Name
19-O1 El Monte Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 2 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-O1 $ -
S1 Snow Removal - (crew hourly rate) $ - 174
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
11234 East Valley Boulevard El Monte 91731 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 39 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-P1 Print Date - 9/24/2019
JCC ID Facility Name
19-P1 Mental Health Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 3 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-P1 $ -
S1 Snow Removal - (crew hourly rate) $ - 142
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1150 North San Fernando Road Los Angeles 90065 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 40 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-S1 Print Date - 9/24/2019
JCC ID Facility Name
19-S1 Hollywood Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-S1 $ -
S1 Snow Removal - (crew hourly rate) $ - 154
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
5925 Hollywood Boulevard Los Angeles 90028 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 41 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-T1 Print Date - 9/24/2019
JCC ID Facility Name
19-T1 Metropolitan Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 9 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 28 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 4 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 4 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 15 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-T1 $ -
S1 Snow Removal - (crew hourly rate) $ - 178
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1945 South Hill Street Los Angeles 90007 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 42 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-V1 Print Date - 9/24/2019
JCC ID Facility Name
19-V1 East Los Angeles Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 4 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 12 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-V1 $ -
S1 Snow Removal - (crew hourly rate) $ - 181
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
4848 E. Civic Center Way East Los Angeles 90022 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 43 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-W1 Print Date - 9/24/2019
JCC ID Facility Name
19-W1 Pomona Courthouse South
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 2 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 9 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 6 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 12 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-W1 $ -
S1 Snow Removal - (crew hourly rate) $ - 181
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
400 Civic Center Plaza Pomona 91766 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 44 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 19-W2 Print Date - 9/24/2019
JCC ID Facility Name
19-W2 Pomona Courthouse North
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 4 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 5 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 19-W2 $ -
S1 Snow Removal - (crew hourly rate) $ - 150
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
350 West Mission Boulevard Pomona 91766 Los Angeles SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 45 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 36-A1 Print Date - 9/24/2019
JCC ID Facility Name
36-A1 Central Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 11 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 36-A1 $ -
S1 Snow Removal - (crew hourly rate) $ - 122
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
351 N. Arrowhead Ave San Bernardino 92415 San Bernardino SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 46 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 36-A2 Print Date - 9/24/2019
JCC ID Facility Name
36-A2 San Bernardino Courthouse - Annex
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 36-A2 $ -
S1 Snow Removal - (crew hourly rate) $ - 121
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
351 N. Arrowhead Ave San Bernardino 92415 San Bernardino SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 47 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 36-C1 Print Date - 9/24/2019
JCC ID Facility Name
36-C1 Fontana Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 36-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 106
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
17780 Arrow Blvd. Fontana 92335 San Bernardino SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 48 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 36-C3 Print Date - 9/24/2019
JCC ID Facility Name
36-C3 Fontana Jury Assembly Building
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 36-C3 $ -
S1 Snow Removal - (crew hourly rate) $ - 93
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
17782 Arrow Blvd. Fontana 92335 San Bernardino SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 49 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 36-J1 Print Date - 9/24/2019
JCC ID Facility Name
36-J1 Barstow Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 36-J1 $ -
S1 Snow Removal - (crew hourly rate) $ - 150
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
235 East Mountain View Street Barstow 92311 San Bernardino SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 50 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 36-P1 Print Date - 9/24/2019
JCC ID Facility Name
36-P1 Juvenile Dependency Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 20 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 36-P1 $ -
S1 Snow Removal - (crew hourly rate) $ - 110
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
860 E. Gilbert Street San Bernardino 92415 San Bernardino SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 51 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 36-R1 Print Date - 9/24/2019
JCC ID Facility Name
36-R1 San Bernardino Justice Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 57 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 3 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 49 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 33 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 9 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 13 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 36-R1 $ -
S1 Snow Removal - (crew hourly rate) $ - 159
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
247 West Third Street San Bernardino 92415 San Bernardino SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 52 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-C1 Print Date - 9/24/2019
JCC ID Facility Name
37-C1 Kearny Mesa Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 16 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-C1 $ -
S1 Snow Removal - (crew hourly rate) $ - 109
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
8950 Clairemont Mesa Blvd. San Diego 92123 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 53 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-C2 Print Date - 9/24/2019
JCC ID Facility Name
37-C2 Kearny Mesa Traffic Court KM3 Trailer
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-C2 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
8950 Clairemont Mesa Blvd. San Diego 92123 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 54 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-C3 Print Date - 9/24/2019
JCC ID Facility Name
37-C3 Kearny Mesa Traffic Court KM4 Trailer
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-C3 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
8950 Clairemont Mesa Blvd. San Diego 92123 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 55 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-C4 Print Date - 9/24/2019
JCC ID Facility Name
37-C4 Kearny Mesa Traffic Court KM5 & KM6 Trailer
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-C4 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
8950 Clairemont Mesa Blvd. San Diego 92123 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 56 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-E1 Print Date - 9/24/2019
JCC ID Facility Name
37-E1 Juvenile Court
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-E1 $ -
S1 Snow Removal - (crew hourly rate) $ - 134
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2851 Meadow Lark Dr. San Diego 92123 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 57 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-E3 Print Date - 9/24/2019
JCC ID Facility Name
37-E3 Department 9 Trailer
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-E3 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2851 Meadow Lark Dr. San Diego 92123 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 58 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-E4 Print Date - 9/24/2019
JCC ID Facility Name
37-E4 Department 10 Trailer
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-E4 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
2851 Meadow Lark Dr. San Diego 92123 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 59 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-F2 Print Date - 9/24/2019
JCC ID Facility Name
37-F2 North County Regional Center - North
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 14 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-F2 $ -
S1 Snow Removal - (crew hourly rate) $ - 104
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
325 South Melrose Drive Vista 92081 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 60 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-F3 Print Date - 9/24/2019
JCC ID Facility Name
37-F3 North County Regional Center - Annex
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 6 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-F3 $ -
S1 Snow Removal - (crew hourly rate) $ - 117
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
325 South Melrose Drive Vista 92081 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 61 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-F4 Print Date - 9/24/2019
JCC ID Facility Name
37-F4 Trailer - Dept 34
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-F4 $ -
S1 Snow Removal - (crew hourly rate) $ - 85
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
325 South Melrose Drive Vista 92081 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 62 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-F5 Print Date - 9/24/2019
JCC ID Facility Name
37-F5 Trailer - Dept 35
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-F5 $ -
S1 Snow Removal - (crew hourly rate) $ - 85
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
325 South Melrose Drive Vista 92081 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 63 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-F6 Print Date - 9/24/2019
JCC ID Facility Name
37-F6 Trailer - Storage A
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-F6 $ -
S1 Snow Removal - (crew hourly rate) $ - 81
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
325 South Melrose Drive Vista 92081 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 64 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-F7 Print Date - 9/24/2019
JCC ID Facility Name
37-F7 Trailer - Family Support
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-F7 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
325 South Melrose Drive Vista 92081 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 65 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-I1 Print Date - 9/24/2019
JCC ID Facility Name
37-I1 East County Regional Center
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 25 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 25 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 3 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 5 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 15 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-I1 $ -
S1 Snow Removal - (crew hourly rate) $ - 178
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
250 E. Main St. El Cajon 92020 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 66 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 37-L1 Print Date - 9/24/2019
JCC ID Facility Name
37-L1 Central Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 101 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 83 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 35 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 6 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 47 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 46 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 32 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 37-L1 $ -
S1 Snow Removal - (crew hourly rate) $ - 138
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1100 Union Street San Diego 92101 San Diego SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 67 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-B1 Print Date - 9/24/2019
JCC ID Facility Name
42-B1 Figueroa Division
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-B1 $ -
S1 Snow Removal - (crew hourly rate) $ - 142
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
118 E. Figueroa St. Santa Barbara 93101 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 68 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-F1 Print Date - 9/24/2019
JCC ID Facility Name
42-F1 Santa Maria Courts Bldgs C + D
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 10 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 2 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 118
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
312 E. Cook St. Santa Maria 93454 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 69 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-F3 Print Date - 9/24/2019
JCC ID Facility Name
42-F3 Santa Maria Courts, Bldgs. A + B
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-F3 $ -
S1 Snow Removal - (crew hourly rate) $ - 84
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
312 E. Cook St. Santa Maria 93454 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 70 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-F4 Print Date - 9/24/2019
JCC ID Facility Name
42-F4 Santa Maria Courts, Bldg F
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 5 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-F4 $ -
S1 Snow Removal - (crew hourly rate) $ - 98
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
312 E. Cook St. Santa Maria 93454 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 71 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-F5 Print Date - 9/24/2019
JCC ID Facility Name
42-F5 Santa Maria Courts, Bldg G
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 13 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 12 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-F5 $ -
S1 Snow Removal - (crew hourly rate) $ - 125
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
312 E. Cook St. Santa Maria 93454 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 72 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-F7 Print Date - 9/24/2019
JCC ID Facility Name
42-F7 Santa Maria Clerks, Bldg E
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 10 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-F7 $ -
S1 Snow Removal - (crew hourly rate) $ - 114
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
312 E. Cook St. Santa Maria 93454 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 73 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-G1 Print Date - 9/24/2019
JCC ID Facility Name
42-G1 Santa Barbara Jury Assembly Bldg.
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 4 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-G1 $ -
S1 Snow Removal - (crew hourly rate) $ - 114
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
1108 Santa Barbara Santa Barbara 93101 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 74 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 42-H1 Print Date - 9/24/2019
JCC ID Facility Name
42-H1 Santa Maria Juvenile Court (new)
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 9 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 5 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 4 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 7 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 42-H1 $ -
S1 Snow Removal - (crew hourly rate) $ - 102
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
4285 California Blvd. Santa Maria 93455 Santa Barbara SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 75 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 56-B1 Print Date - 9/24/2019
JCC ID Facility Name
56-B1 East County Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 8 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 3 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 2 $ -
R1 Rounds and Readings 248 $ - $ - 0 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 260 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 56-B1 $ -
S1 Snow Removal - (crew hourly rate) $ - 161
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
3855 Alamo Street Simi Valley 93063 Ventura SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 76 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 56-F1 Print Date - 9/24/2019
JCC ID Facility Name
56-F1 Juvenile Courthouse
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 3 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 4 $ - 1 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 1 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 1 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 4 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 56-F1 $ -
S1 Snow Removal - (crew hourly rate) $ - 137
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
4353 Vineyard Ave. Oxnard 93036 Ventura SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 77 of 78
SRO - JCC - Template Master v1.3 - Pricing Workbook - 64-E1 Print Date - 9/24/2019
JCC ID Facility Name
64-E1 601 W. Santa Ana Blvd - 4 DCA 3
System ID Subsystem Quantity Cost Daily Total Quantity Cost Weekly Total Monthly Quantity Cost Monthly Total Quarterly Quantity Cost Quarterly Total Annual Quantity Cost Annual PM Total Number of PM's Annual Cost Quantity Total Annual Cost
A1 Access Doors, Gates, Sally Port 11 $ - $ - 0 $ - $ - 1 $ - $ - 12 $ - 1 $ -
H1 Air Cooled DX (Package / Split System) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 7 $ -
H2 Air Handling Unit (Air-cooled DX) 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H3 Air-Cooled Chiller 40 $ - $ - 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H4 Centrifugal Chiller 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H5 Cooling Tower (Induced Draft) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H6 Ice Chiller 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H7 MultiStack (Geothermal) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H8 Water Source Heat Pump 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H9 Fan Coil System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
H10 Exhaust Fan 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
H11 HVAC Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E1 Electrical Panels 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 2 $ -
E2 Emergency Generator 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E3 Motor Control Center 0 $ - $ - 4 $ - $ - 0 $ - $ - 0 $ - 0 $ -
E4 Primary Switch (High) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E5 Primary Switch (Low) 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E6 Transformer (Dry-Type) 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E7 Uninterruptible Power Supply (UPS) 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
E8 Electrical Unique System 8 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
L1 Life Safety 0 $ - $ - 3 $ - $ - 1 $ - $ - 4 $ - 1 $ -
L2 Backflow Preventor(s) 0 $ - $ - 0 $ - $ - 1 $ - $ - 1 $ - 6 $ -
P1 Hot Water Boiler 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
P2 Condensing Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P3 Electric Water Heater 0 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P4 Plumbing Unique System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P5 Steam System 0 $ - $ - 3 $ - $ - 1 $ - $ - 0 $ - 0 $ -
P6 Pneumatic Compressor 11 $ - $ - 0 $ - $ - 1 $ - $ - 0 $ - 0 $ -
R1 Rounds and Readings 0 $ - $ - 40 $ - $ - 12 $ - $ - 12 $ - 1 $ -
V1 Vertical Transportation 8 $ - $ - 3 $ - $ - 1 $ - $ - 12 $ - 2 $ -
W1 Water Treatment 0 $ - $ - 0 $ - 1 $ -
B1 Building Exterior / Hardscape (Monthly) 12 $ - $ - 12 $ - 1 $ -
F1 Fountain Maintenance (Monthly) 12 $ - $ - 12 $ - 1 $ -
F2 Fuel Storage Tanks (Quarterly) If applicable 4 $ - $ - 4 $ - 1 $ -
G1 Landscape Maintenance * 40 $ - $ - 0 $ - 1 $ -
C1 Account Management and Supervision (Monthly) 12 $ - $ - 12 $ - 1 $ -
C2 Fee (Monthly) 12 $ - $ - 12 $ - 1 $ -
JCC ID 64-E1 $ -
S1 Snow Removal - (crew hourly rate) $ - 121
I1 Unclogging Blocked Toilet - In-custody cell (labor-only) $ -
I2 Unclogging Blocked Toilet - Public/Court Staff (labor-only) $ -
Hr 1 Hourly Rate (All Labor categories) $ -
M1 Markup on Materials (Percentage) 0%
Sub1 Markup on Subcontractors/Third-Parties (Percentage) 0%
* Landscape Maintenance varies by location on the number of weeks per year it can be preformed. For the purpose of the RFP, all facilities are pre-established at 40 weeks of service. The actual amount paid by facility will be based upon the actual weeks that service has been performed, validated and invoiced.
Total
Total # of PM's
Daily Activity Weekly Activity Monthly Activity Quarterly Activity Annual Activity Summary
Proposer
601 W. Santa Ana Blvd Santa Ana 92701 Orange SRO RFP-FS-SP-2019-03-JP Firm Name TBD
Address City / Town Zip Code County Region RFP
JCC - RFP Facility Operations and Maintenance 78 of 78
RFP-FS-SP-2019-03-JP Statewide O&M Facility Maintenance Services
Page 8
This Page Intentionally Left Blank for Duplexing