atlu for aida high rate synchronous as well as asynchronous 21/11/2013david cussans, aida wp9.3,...

13
aTLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1

Upload: erika-jacobs

Post on 13-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY1

aTLU for AIDA

High RateSynchronous as well as Asynchronous

21/11/2013

Page 2: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY2

New Features (w.r.t. EUDET)• Synchronous (shared clocks) interface. – Allows higher trigger rate

• Interface by Gigabit Ethernet.– Readout PC can be remote.– IPBus protocol

• Higher rate discriminators ( ~ MHz count rate)– Threshold and constant-fraction– Thresholds remotely controllable.

• Timestamps on each scintillator input– More accurate timing.– Timestamp granularity increased from 3.2ns to 800ps21/11/2013

Page 3: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY3

Synchronous Interface

• Clock from TLU to DUT– Configurable frequency

• Trigger pulse only only clock cycle long– Trigger rate up to 40MHz ( though photo-

multipliers will limit this )• Busy from DUT to TLU• Check synchronization from time-stamp of

each trigger ( measured in clock cycles)

21/11/2013

Page 4: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY4

Synchronous Interface

21/11/2013

Page 5: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY5

Asynchronous Interface

• EUDET style asynchronous interface remains– Synchronous/Asynchronous interface switchable

by software• Maximum DUT_Clock frequency increases ( by

default to 20MHz ).– Can read out trigger numbers faster

21/11/2013

Page 6: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY6

Asynchronous Interface

21/11/2013

Page 7: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY7

Spill/Shutter signal

• Optional , programmable spill/shutter signal• In short term will be a fixed on/off period• Could extend to be on for a fixed number of

triggers, or a fixed time, or whichever comes first.

• Useful for a number of Linear Collider detectors / readout system.

21/11/2013

Page 8: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY8

Use for TimePix Telescope

• AIDA mini-TLU has only three DUT interfaces• Fan-out one interface to six using Uni Mainz

board.– Takes “or” of BUSY signals– VME format

• Allows AIDA mini-TLU to provide synchronization signals for TimePix telescope– Similar or identical firmware– Firmware developed by Alvaro Dosil, USC

21/11/2013

Page 9: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY9

Hardware Status

• Small run of prototype TLU made earlier this year. – Serious “bug” – incorrect connector rotation– Two boards fixed up so they can be used for

firmware/software development.

21/11/2013

Page 10: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY10

Hardware Status

• “bug-fixed” design has been submitted for manufacture ( Igor Rubinski, DESY).– Ten PCBs fabricated. Being shipped from China.– Will assemble components on three.

• If board works well, will ask other groups if they would like one.– Cost likely to be about €1500 (TBC)

21/11/2013

Page 11: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY11

Firmware/Software Status

• EUDAQ Producer for AIDA TLU being written by Francesco Crescioli, LPNHE/IN2P3

• Firmware being written by Alvaro Dosil, USC and D.Cussans, Bristol

• Integration/Development session planned 9-11 December at DESY

21/11/2013

Page 12: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY12

Common DAQ Interface

• A proposal for hardware timing and synchronization signals has been written and will be circulated.– Draft at

https://indico.cern.ch/getFile.py/access?resId=0&materialId=0&confId=284589

• Meeting to discuss common DAQ at DESY, December 10th 1400-1700. – Remote access via Vidyo– Please let me know if you want to attend and/or

contribute.21/11/2013

Page 13: ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1

David Cussans, AIDA WP9.3, DESY13

Summary

• New hardware synchronization scheme proposed for high-rate ( ~ MHz ) beams.

• New hardware prototype built.• Firmware/software being developed.• Common DAQ meeting next month.

21/11/2013