atcmtd—smart spines
TRANSCRIPT
Pittsburgh Department of Mobility and Infrastructure 1/29/2021
In 2016 the United States Department of Transportation awarded the City of Pittsburgh an Advanced Transportation and Congestion Management Technologies Deployment (ATCMTD) grant to create an advanced signal system along eight priority corridors, or “Smart Spines”. These corridors provide connectivity between the City’s eastern and southern neighborhoods and the downtown central business district. This project seeks to leverage existing and emerging technologies to create a multi-modal advanced signal system which will be able to detect several different roadway users and prioritize their movements based on corridor context and real-time traffic patterns. The Smart Spines project will consist of the following eight corridors and will be divided into two separate phases. See attached location maps for more location information.
Smart Spines Phase 1:Fifth Avenue/Washington BoulevardForbes AvenueSmart Spines Phase 2:Bigelow Boulevard Centre Avenue Second Avenue Saw Mill Run Boulevard West Liberty AvenuePenn Avenue
Fifth Avenue and Forbes Avenue will be completed during Phase 1 to allow the new traffic signals along these corridors to be updated in advance of the completion of the Port Authority’s Bus Rapid Transit Project.
Project Timeline
Winter 2021 – Phase 1 Design Begins
Summer 2022 – Phase 1 Construction Begins
Project Partners
Federal Highway Administration , PennDOT, Port Authority of Allegheny County
Project Funding
Construction - $ 28.8 million
Funding Source
Federal (38%) City (38%) State (24%)
Project Contact
Project Manager: Mike Maloch, P.E.
Title: Senior Project Manager
Email address:
Photo – City of Pittsburgh Smart Spines Concept of Operations Report
ATCMTD—Smart Spines
Pittsburgh Department of Mobility and Infrastructure 1/29/2021
ATCMTD—Smart Spines
The Smart Spines project will build a Traffic Management Center (TMC) which will house technology responsible for managing hundreds of traffic signals across Pittsburgh. City staff will use CCTV and video detection feeds to observe real time traffic conditions, which will be displayed on a high resolution video board. Staff will have the ability to remotely adjust traffic signal timing plans in response to incidents or events and adjust corridor modal priority based on real time data and observations.
The City of Pittsburgh TMC will interface with similar facilities in the Western Pennsylvania region including PennDOT’s Regional Traffic Management Center and Port Authority’s Operations Center.
The City of Pittsburgh Department of Mobility and Infrastructure (DOMI) manages a fiber optic and radio communication network which will support operations at the TMC. DOMI will continue to work with local partners to seek opportunities to expand the existing network or share communication infrastructure with third parties. This communication network and the TMC together will serve as the hub for future City of Pittsburgh Smart City Initiatives.
Project Timeline
Winter 2021 – Phase 1 Design Begins
Summer 2022 – Phase 1 Construction Begins
Project Partners
Federal Highway Administration , PennDOT, Port Authority of Allegheny County
Project Funding
Construction - $ 28.8 million
Funding Source
Federal (38%) City (38%) State (24%)
Project Contact
Project Manager: Mike Maloch, P.E.
Title: Senior Project Manager
Email address:
Photo – City of Austin Mobility Management Center
Pittsburgh Department of Mobility and Infrastructure 1/29/2021
ATCMTD—Smart Spines
Washington Pl
Fifth Avenue: Washington Place to College Street (Phase 1)
Fifth Avenue: Highland Avenue/Woodland Road to Allegheny River Boulevard (Phase 1)
Pittsburgh Department of Mobility and Infrastructure 1/29/2021
ATCMTD—Smart Spines
Forbes Ave
Forbes Avenue: Armstrong Tunnel to Braddock Avenue (Phase 1)
Washington Pl
Bigelow Boulevard: Washington Place to Baum Boulevard/North Craig Street (Phase 2)
Pittsburgh Department of Mobility and Infrastructure 1/29/2021
ATCMTD—Smart Spines
Centre Avenue: Washington Place to North Craig Street (Phase 2)
Washington Pl
Centre Ave
Second Ave
Secondd Avenue: Ross Street to Glenwood Avenue (Phase 2)
Pittsburgh Department of Mobility and Infrastructure 1/29/2021
ATCMTD—Smart Spines
Saw Mill Run Boulevard: Woodruff Street to SR0088/Library Road (Phase 2)
Saw Mill Run Blvd
Pittsburgh Department of Mobility and Infrastructure 1/29/2021
ATCMTD—Smart Spines
Blvd of the Allies
West Liberty Avenue: Boulevard of the Allies to Wenzell Avenue/Brookline Boulevard (Phase 2)
Penn Avenue: Linden Avenue to Braddock Avenue (Phase 2)