asx: tar. competent person statement & disclaimer the information contained in this presentation...
TRANSCRIPT
ASX: TAR
Competent Person Statement & DisclaimerThe information contained in this presentation has been prepared by Taruga Gold Limited (Company).
The information in this Presentation that relates to exploration results and geological information is compiled by Mr Bernard Aylward. Mr Aylward is a full time employee of the Company and a member of the Australian Institute of Mining and Metallurgy. Mr Aylward has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Aylward consents to the inclusion in this Presentation of the information based on his work in the form and context in which it appears. To the maximum extent permitted by law, the Company and their related bodies corporate, affiliates and each of their respective directors, officers, partners, employees, advisers and agents and any other person involved in the preparation of the presentation disclaim all liability and responsibility (including without limitation any liability arising from fault or negligence) for any direct or indirect loss or damage which may arise or be suffered through use or reliance on anything contained in, or omitted from, the presentation. No representation or warranty, express or implied, is given as to the fairness, accuracy, completeness, likelihood of achievement or reasonableness of any assumptions, forecasts, prospective statements or returns contained in the presentation. Such assumptions, forecasts, prospective statements or returns are by their nature subject to significant uncertainties and contingencies, have been based on current expectations about future events and are subject to risks, uncertainties and assumptions that could cause actual results to differ materially from the expectations described. The Company has no responsibility or obligation to inform you of any matter arising or coming to their notice, after the date of this presentation document, which may affect any matter referred to in the presentation. You must not rely on the presentation provided but make your own independent assessment of the presentation and seek and rely upon your own independent taxation, legal, financial or other professional advice in relation to the presentation and any action taken on the basis of the presentation. All information in this presentation is current as at 1 February 2012.
Niger
Ghana
Coted’Ivoire
Taruga Gold - West African Gold Exploration
Why We Focus on West Africa
Highly experienced service providers
Pro-mining region with strong legal system
Exploration focus in previously untested regions
Leading discovery rate & development of new mines in last 15 years
One of the world’s greatest gold regions
?
Bernard Aylward BSc (Hons – Geol)
Board and Management
Executive Chairman and Managing Director
20 years Experience as Manager & Exploration Geologist across West Africa, Australia and Europe.
Ed Edwards BCom, ACA, FAICDNon-Executive Director
Accountant with over 30 years’ experience in the resources sector, Director of Athena Resources and a former director of Aztec, Fox, Matlock Mining & Scotgold
Peter Newcomb FCA (ICAEW)Executive Director, CFO and Company Secretary
Chartered Accountant with over 30 years’ experience in the resources & other industries in a number of countries, Company Secretary of Athena Resources and Scotgold Resources.
Niger
Ghana
Burkina Faso
Cote d’Ivoire
Kossa ProjectKossa Project
Tortiya ProjectTortiya Project
Mangkono ProjectMangkono Project
Ducie ProjectDucie Project
Niger
Ghana
Coted’Ivoire
All projects located within Birimian Greenstone Belts
NigerPro-mining country with world class Uranium mining industry
Recent peaceful elections
Under-explored for gold mineralisation
SEMAFO (TSX:SMF), capitalised at C$2.43b, developed & operated Samira Hill gold mine since 2004.
Large Canadian explorers are aggressive in Niger
?
$
Kossa Project – Niger970km2 granted licences developing gold district
Very encouraging grade and width with 1km of strike to date
Additional drilling and broad untested Geochemical anomalies
Adjacent to IAMGold’s 5Moz Essakane Gold Mine
Project originally explored by Orezone with highly encouraging results. Orezone sold Essakane and the Kossa exploration ground in Niger to IAMGOLD in late 2008
Kossa and other Niger exploration deemed non core by IAMGOLD
Niger
Ghana
Coted’Ivoire
Kossa ProjectKossa Project
Same geological sequence and structural setting as Essakane
Kossa licence joins the Essakane regional project with high grade results
Previous exploration activity has demonstrated high grade gold intersections returned
Kossa Project – Niger
Niger
Ghana
Coted’Ivoire
Kossa ProjectKossa Project
Surface Sample (Au ppb)Birimian Greenstone Granite
Essakane Gold Mine5Moz
Essakane Gold Mine5Moz
Kossa Project970km2 Granted
Licence
Kossa Project970km2 Granted
Licence
20km
Exploration•Previous exploration completed by Orezone has defined strong geochemical anomalies
•Geology masked by extensive areas of aeolian sand cover
•Initial RC drilling at the Kossa and Fatatako prospects confirms the presence of primary gold mineralisation
•Potential for Cu-Mo mineralisation to be evaluated as previous work highlights strong anomalism
100 to 200
200 to 5000
50 to 100
Surface Sample (Au ppb)
Birimian Greenstone
Granite
Sand cover
Essakane Gold Mine5Moz
Essakane Gold Mine5Moz
Immediate Drilling TargetsExploration drilling by Orezone at the Kossa Prospect has defined a +900m strike length of gold mineralisation with intersections including:
14m at 3.79g/t gold from 28m in drill hole KSC033
13m at 2.43g/t gold from 20m in drill hole KSC032
11m at 3.86g/t gold from 39m in drill hole KSC039
16m at 1.13g/t gold from 50m in drill hole KSC085
15m at 2.12g/t gold from 53m in drill hole KSC056
8m at 3.83g/t gold from 50m in drill hole KSC036
100 to 200200 to 5000
50 to 100
Surface Sample (Au ppb)
Birimian Greenstone
Tarkwaian Sediments
Kossa Prospect Kossa Prospect
Kossa Project – Immediate Drilling Targets
Gold mineralisation hosted in folded sedimentary sequence
Interpretation indicates 3 mineralised lodes remaining open along strike and depth
Targeting initial resource at Kossa by end-2012
500 Metres
N
OpenOpen
Open
Open Open
Open
1 - 5g/t Au
>5g/t Au
0.5 - 1g/t Au
Drill Hole– Max Gold ppm
14m @ 3.79g/t fr 28m14m @ 3.79g/t fr 28m
13m @ 1.92g/t fr 10m13m @ 1.92g/t fr 10m
14m @ 1.60g/t fr 35m14m @ 1.60g/t fr 35m
13m @ 2.43g/t fr 20m13m @ 2.43g/t fr 20m
16m @ 1.13g/t fr 50m16m @ 1.13g/t fr 50m
11m @ 2.16g/t fr 31m11m @ 2.16g/t fr 31m
5m @ 5.84g/t fr 32m5m @ 5.84g/t fr 32m
3m @ 21.17g/t fr 2m3m @ 21.17g/t fr 2m
7m @ 2.32g/t fr 70m7m @ 2.32g/t fr 70m
4m @ 4.41g/t fr 41m4m @ 4.41g/t fr 41m
8m @ 3.83g/t fr 50m8m @ 3.83g/t fr 50m
6m @ 2.07g/t fr 71m6m @ 2.07g/t fr 71m
6m @ 1.78g/t fr 70m6m @ 1.78g/t fr 70m
15m @ 2.12g/t fr 53m15m @ 2.12g/t fr 53m
6m @ 1.33g/t fr 24m6m @ 1.33g/t fr 24m
6m @ 1.51g/t fr 29m6m @ 1.51g/t fr 29m
6m @ 1.21g/t fr 80m6m @ 1.21g/t fr 80m
3m @ 1.14g/t fr 20m4m @ 7.45g/t fr 32m
3m @ 1.14g/t fr 20m4m @ 7.45g/t fr 32m
6m @ 2.82g/t fr 3m3m @ 7.46g/t fr 67m
6m @ 2.82g/t fr 3m3m @ 7.46g/t fr 67m
3m @ 1.17g/t fr 48m2m @ 8.51g/t fr 72m
3m @ 1.17g/t fr 48m2m @ 8.51g/t fr 72m
4m @ 3.07g/t fr 29m11m @ 3.86g/t fr 39m
4m @ 3.07g/t fr 29m11m @ 3.86g/t fr 39m
11m @ 1.84g/t fr 9m11m @ 1.84g/t fr 9m
Kossa Project – Immediate Drilling Targets
200m
180m
220m
240m
260m
OB 18OB 18 OB 18AOB 18A OB 17OB 17 OB 16OB 16
Interpreted Mineralisation
Drill Intercept
Open
48m
75m
90m
KSC0050KSC0039
KSC0049
Open
35m
60m
KSC0069KSC0068
Open
67m 75m
75m82m
100m
30m
74m68m
KSC0037
KSC0067
KSD0011KSC0038 KSD0012/10
KSC0033
KSC0015
90m
KSC0035
Open
75m
90m
65m
KSC0036 KSC0013KSC0014
11m @ 1.84g/t fr 9m11m @ 1.84g/t fr 9m
4m @ 4.41g/t fr 41m4m @ 4.41g/t fr 41m
3m @ 1.31g/t fr 8m9m @ 1.42g/t fr 14m3m @ 1.42g/t fr 33m
3m @ 1.31g/t fr 8m9m @ 1.42g/t fr 14m3m @ 1.42g/t fr 33m
4m @ 3.07g/t fr 29m11m @ 3.86g/t fr 39m
4m @ 3.07g/t fr 29m11m @ 3.86g/t fr 39m
7m @ 2.32g/t fr 70m7m @ 2.32g/t fr 70m
13m @ 1.92g/t fr 10m
13m @ 1.92g/t fr 10m
14m @ 3.79g/t fr 28m
14m @ 3.79g/t fr 28m
4m @ 1.32g/t fr 33m8m @ 2.33g/t fr 42m
4m @ 1.32g/t fr 33m8m @ 2.33g/t fr 42m
15m @ 2.15g/t fr 58m
15m @ 2.15g/t fr 58m 8m @ 0.86g/t fr 75m8m @ 0.86g/t fr 75m
14m @ 1.60g/t fr 35m
14m @ 1.60g/t fr 35m
6m @ 1.34g/t fr 24m6m @ 1.34g/t fr 24m
8m @ 3.83g/t fr 50m8m @ 3.83g/t fr 50m
Immediate Drilling Targets
At the Fatatako Prospect gold mineralisation includes:
8m at 3.06g/t gold from 17m in drill hole FKC0016
2m at 7.23g/t gold from 6m in drill hole FKC0036
10m at 1.52g/t gold from 64m in drill hole FKC0036
7m at 2.74g/t gold from 11m in drill hole FKC0055
5m at 8.34g/t gold from 76m in drill hole FKC0058
Kossa Prospect Kossa Prospect
Fatatako Prospect Fatatako Prospect
100 to 200200 to 5000
50 to 100
Surface Sample (Au ppb)
Birimian Greenstone
Tarkwaian Sediments
Interpreted Mineralisation
Drill Intercept
Kossa Project – Immediate Drilling Targets
FKC0045FKC0017 FKC0016 FKC0099 FKC0058
75m
75m
85m 85m90m
Fatatako Section 1603760
200m
180m
220m
240m
260m
3m @ 2.40g/t fr 42m3m @ 2.40g/t fr 42m
5m @ 8.43g/t fr 76m5m @ 8.43g/t fr 76m
Exploration drilling testing the Kossa and Fatako prospects to follow-up previously defined gold mineralisation – RC drill rig mobilising in February 2012
Exploration will target extensions to the Fatatako Prospect and potential links to the Kossa Prospect
Aircore drilling targeting extensions to north and south
Detailed aeromagnetic survey of Project area to advance understanding of geology
Detailed auger geochemical sampling of sand covered areas
Kossa Project – Exploration Program
Ghana
2nd
Long history of established mining, robust legal system & English speaking
Economy rapidly growing and developing
2nd largest African gold producer - +3Moz per year production. Major gold deposits in country, and many +10Moz gold discoveries
New mines developing in country i.e. Perseus
All major gold mining companies active in Ghana and many mid-tier and juniors.
Ducie Project – NW Ghana
Niger
Ghana
Coted’Ivoire
1,100km2 granted licences in exciting gold province
High-tenor geochemical anomalies
No previous drilling, artisanal workings
Ducie ProjectDucie Project
Ducie Project – NW GhanaUnder-explored region of NW Ghana – activity on neighboring ground is uncovering new gold discoveries (ASX – Castle Minerals Ltd, Azumah Resources Ltd)
Geochemical anomalies highlight major structures and targets remain open in all directions – No previous drill testing within licence
Licence area contains more than 75km strike of Birimian greenstone belt
Niger
Ghana
Coted’Ivoire
Ducie ProjectDucie Project
150ppb Au150ppb Au
924ppb Au924ppb Au
100ppb Au100ppb Au
50km of gold mineralised structure untested. Geo chemical anomalies remain open along strike
50km of gold mineralised structure untested. Geo chemical anomalies remain open along strike
Ducie Project – ExplorationAeromagnetic data highlights major structural control
Geochemical anomalies remain open along strike with wide-spaced sampling returning results up to 150ppbAu
Exploration required is geological mapping and anomaly definition to prepare for first pass drilling program
150ppb Au150ppb Au
924ppb Au924ppb Au
100ppb Au100ppb Au
50km of gold mineralised structure untested. Geo chemical anomalies remain open along strike
50km of gold mineralised structure untested. Geo chemical anomalies remain open along strike
50 - 100ppb Au
>100ppb Au
25 - 50ppb Au
Under-explored country with very high prospectivity
Returned to stable government following election in November 2010
Active gold mining in country with Randgold Tongon Mine, Newcrest Bonikro Mine, Cluff Mining Angovia Mine & La Mancha Ity Mine
Legal system strong and similar to other Francophone West African countries, eg Burkina Faso and Mali.
Cote d’Ivoire
?
Licence Application covering 1,000km2 of Birimian greenstone geology and major structures
Very limited modern exploration completed
No previous drill testing within licence area
Gold mineralised structures with artisanal workings highlight priority target area
Target strike length in excess of 35km
Mangkono Project – Cote d’Ivoire
Niger
GhanaCoted’Ivoire
Key Target AreaArtisanal working
associated with geological structure. Target open
along strike for over 20km
Key Target AreaArtisanal working
associated with geological structure. Target open
along strike for over 20km
ASX Code: TAR
IPO Raise: A$6.12M, 30,616,000 new shares issued
Shares on Issue: 85,616,000 (33,116,000 trading)
Market Cap: A$17M
Cash: A$6.25M
Capital Structure
Comparable Stock Market Capitalisation Enterprise Value
Taruga Gold (ASX:TAR) $17 million $11 million
Mt Isa Metals (ASX:MET) $46 million $33 million
Golden Rim (ASX:GMR) $61 million $52 million
Middle Island (ASX:MDI) $39 million $32 million
Canyon Resources (ASX:CAY) $35 million $29 million
Comparables
Contact:Bernard Aylward [email protected]