Who We Are
Assodivers Ltd. Is a Greek-owned and based company founded on 1976 and has been servicingClients for 40 years.Initially begun by offering diving services in the marine industry for a period of 10 years and laterwas involved and specialized in worldwide submarine utility installations and repairs.Operating a construction department since the beginning, Assodivers has been creating in-housedesign and along with years of scientific expertise has been continuously reaching the main goal;to provide a set of creative, continually innovative, reliable and cost-effective solutions fitted oncustomers needs worldwide.
Group
Organisation Structure
Part of a larger group of companies currently employing more than 260 high-qualifiedprofessionals, distributed on the different departments structuring and supporting eachposition, ensuring excellent project engineering, management and execution capabilities.Assodivers is all about people, both our people and the people for whom we work. Ouremployees, clients and partners are a richness not just a resource. Our onshore, offshore andmarine professionals are the foundation of our success. Without people, our business meansnothing.
Division Directors
Business
Support
Legal Department
Administration Department
IT Department
Resources DepartmentBusiness
Development
Financial Department
Purchasing Department
QHSE Department
Engineering Department
Business
ImplementationProject Operations
•R&D Department
•Construction Department
•Maintenance Department
•Project Management
Marine Operation
•Crew Department
•Technical Department
•Operations Department
Group
QHSE Certifications
The company employs an integrated Quality, Health & Safety andEnvironmental Protection Management System which is also certifiedagainst the requirements of international standards ISO 9001:2008(Quality Management), ISO 14001:2004 (Environmental Management) andQHSAS 18001:2007 (Occupational Health & Safety Management).Assodivers is also a contractor member of the Remote Systems & ROVDivision of International Maritime Contractor Association (IMCA) andmember of the Achilles global provider of integrated supplier managementand supply chain solutions.
Services
Field of Operations
Assodivers Group has forty years of experience in the provision of services to theunderwater industry.The long track record shows that the company has an extensive experience inoffshore works involving underwater operation related to flexible umbilicals,including both power and telecommunication.
Services
Services
Assodivers is capable of offering engineering services which along with complete qualityoriented project management services ensure the uneventful delivery of each project.Execution operations such as cable loading and transportation on site, pulling and landingonshore through pre-installed pipes, laying activities, sea trench excavation by means oftrenching and/or jetting techniques, offshore mattress installation etc. as well as provision ofdiving services, form regularly part of the company’s’ scope of work, where Assodivers iseither a turnkey solution provider or a subcontractor to major cable installation companies andmarine contractors.
Services
RFQ
Custom Solution
Package Proposal Engineering Study
Review & verification of engineering drawings. Analysis of customer needs. Production of procedures, risk assessment and preliminary time schedules Construction engineering & working procedures. Including QA/QC, Quality Plans, HSE plans, Risk Assessments, HAZID) Equipment utilization and resources planning
Services
Intensive Preparation
Seamless Execution
Total Project Quality Control
Execution Services
Loading – Transportation - Installation.
Route clearance.
Pre-installation survey.
Pre-installed utilities protection.
Services protection scheme (jetting – trenching)
Alternative protection schemes (articulated pipes – mattresses)
Multi terrain custom protection services
Cable laying – Shore-end / platform landings
Post installation survey and remedial actions
Services
Post-execution Services
As-built/ as-laid survey and drawings
Implementation reports and Manuals
QHSE Documentation
Post installation project support
Process analysis for necessary corrective future actions
As-Built Analytical Documentation
Quality Analysis
Detailed Feedback to R&D
Services
Post Installation support cable repairs
Working together with most of the cable manufacturers, cable repairshave been carried out abroad and in most of the Greek island power andoptical links.The company with its 29 years of experience in the underwater cablerepairs field, has the necessary equipment and the experiencedpersonnel to successfully perform such operations.
Fleet
FLEET
The vessels the company normally utilizes in the project execution are managed by an affiliatedspecialist company, S&O Ship Management Ltd and are manned on a rotational basis by circa 110 Greekseamen, including certified DP operators.S&O Ship Management Ltd is a Contractor Member of the Marine Division of IMCA and holdsDocuments of Compliance to the International Safety Management (ISM) code by the Greek and CypriotFlag Administrators.
Fleet
AethraConstruction Support Vessel
Built1999Upgraded: 2015, Greece
Length 94.10mBreadth 22.00Deadweight 4,500 MTThruster Power 5800 BHPDynamic Position System IMO Class IIAccommodation 87 personsFlag CyprusClassification ABSMax Draught 7.10m
Equipment
-1x AKTRO A-frame-1x KENZ Offshore Crane-1x TTS-Norlift ROV Crane-Helideck for Super Puma
Suitability
-Utility transportation-Shallow water utility installation-Cable repairs-General underwater project support
Fleet
Built2008Converted: 2010/2012/2014, Greece
Length 96.99mBreadth 31.46mDeadweight 5,613.5 MTThruster Power 7,400 BHPDynamic Position System IMO Class II
Cable Turntable1 x 4,500 MT (22m OD/6m ID)1 x 2500 MT )16m OD/6m ID)
Accommodation 77 personsFlag CyprusClassification American Bureau of ShippingMin Operational Depth 5m
Equipment
-2 x Spud cans for shallow water anchoring-4 point mooring with remote control-35T knuckle & 20 T telescopic boom cranes-ROV control room-Fixed 10T linear cable engine-Inbuilt underwater positioning-Power on deck for ROV & trenching equipment
Suitability
-Utility transportation-Shallow water utility installation-Cable repairs-General underwater project support
AtalantiCable Laying Barge
Fleet
AstreaMulti-purpose Support Vessel
Built1987Converted: 2008, Greece
Length 71.30mBreadth 17.5Deadweight 2,853 MTThruster Power 3,200 BHPDynamic Position System IMO Class IIAccommodation 55 personsFlag GreekClassification ABSMax Draught 6.10m
Equipment
-55T A-Frame on stern-2 x Sormec cranes covering all deck space-594m² free deck space with 10T/m² strength-Inbuilt underwater positioning
Suitability
-Utility transportation-Shallow water utility installation-Cable repairs-General underwater project support
Fleet
Argo Multi-purpose Support Vessel
Built1976 Converted 2001, Greece
Length 65.5m
Breadth 14m
Deadweight 1,701 MT
Thruster Power 2,650 BHP
Dynamic Position System IMO Class II
Accommodation 40 persons
Flag Greek
Classification ABS
Max Draught 4.98m
Equipped with
-35T A-Frame on stern
-2 x Sormec cranes covering all deck space
-460.20m2 free deck space with 10T/m2 strength
-Inbuilt underwater positioning
Suitable for
-Utility transportation
-Shallow water utility installation
-Cable repairs
-General underwater project support
Fleet
Built1984Upgraded: 2013-2015, Greece
Length 67.8m
Breadth 15.6m
Deadweight 2,250 MT
Power 13,300BHP
Thruster Power 2,400 BHP
Dynamic Position System IMO Class I
Bollard Pull 143 MT
Accommodation 30 persons
Flag Cyprus
Classification ABS
Max Draught 6.44m
ArtemisAnchor Handling Tug & Supply Vessel – DP1
Built 2000
Length 37m
Breadth 11.4m
Deadweight 364.5MT
Power 3,150 BHP
Bollard Pull 45MT
Accommodation 14 Persons
Flag Greek
Classification ABS
Max Draught 4.35m
AnteosOpen Sea Anchor Handling & Towing Tug
Equipment
EQUIPMENT
Most of the tools used for the execution of the various projects are designed and manufactured in-house using experience and knowledgegained during our almost 40 years of operation.2/3 of the employees are engaged on the equipment engineering, design and construction of a number of powerful jetting and mechanicaltrenching underwater vehicles, in addition to work-class and observation-class ROVs and other offshore support equipment.Each tool is modified according to each project individuality giving the advantage for custom made solutions and the realization of difficultprojects.
Equipment
Type Various soil mechanical trencher
Excavation Method Trenching
configuration Tracked vehicle
Additional Features Cutting chain & cutting wheel
Max Soil/kPa 60 MPa
Max Seafloor Gradient 25
Max Operational Depth 400m
Max product outer diameter
350mm
Jetting power 600kW
Max sea state WMO4
LARS system Yes
Utility type FOC, power cable
Assotrencher IVVarious Soil Trencher
Equipment
Assotrencher VVarious Soil Trencher
Type Various soil mechanical trencher
Excavation Method Trenching
configuration Tracked vehicle
Additional Features Cutting chain & cutting wheel
Max Soil/kPa 60 MPa
Max Seafloor Gradient 25
Max Operational Depth 50m
Max product outer diameter 350mm
Jetting power 300kW
Max sea state WMO4
LARS system Yes
Utility type FOC, power cable
Equipment
Type Various soil mechanical trencher
Excavation Method Trenching
configuration Tracked vehicle
Additional Features Cutting chain & cutting wheel
Max Soil/kPa 60 MPa
Max Seafloor Gradient 25
Max Operational Depth 50m
Max product outer diameter 350mm
Jetting power 300kW
Max sea state WMO4
LARS system Yes
Utility type FOC, power cable
Assotrencher VIIIVarious Soil Trencher
Equipment
AssoMultiTrencherVarious Soil Trencher
Name AssoMultiTrencher/ Assoplow
Type Various soil mechanical trencher
Excavation Method Trenching/plough
Configuration Tracked vehicle
Additional Features Cutting chain & Jetting arm
Max Soil/kPa 100 kPa
Max Seafloor Gradient 25
Max Operational Depth 500m
Max product outer diameter 350mm
Jetting power 600kW
Max sea state WMO4
LARS system Yes
Utility type FOC, power cable
Equipment
Excavation Method Jetting
Configuration Tracked vehicle
Additional Features TSS350 / TSS440
Max Soil/kPa 100 kPa
Max Seafloor Gradient 20
Max Operational Depth 150m
Max product outer diameter 250mm
Jetting power 230 KW
Max sea state WMO4
LARS system Yes
Utility type FOC, power cable, flexible pipes
Assojet IISoft Soil Trencher
Equipment
Assojet IIISoft Soil Trencher - (under construction)
Excavation Method Jetting
Configuration Skids or Tracks
Additional Features ROV Surveillance Mode
Max Soil/kPa 120 kPa
Max Seafloor Gradient 20
Max Operational Depth 3,000m
Max product outer diameter 900mm
Jetting power 1300 KW
Max sea state WMO6
LARS system Yes
Utility type FOC, power cable, umbilicals
Equipment
Assojet IVSoft Soil Trencher
Excavation Method Jetting
Configuration Skids or Tracks
Additional Features TSS350 / TSS440
Max Soil/kPa 100 kPa
Max Seafloor Gradient 15
Max Operational Depth 1,000m
Max product outer diameter 650mm
Jetting power 900 KW
Max sea state WMO4
LARS system Yes
Utility type FOC, power cables, pipelines
Equipment
Excavation Method Jetting
Configuration ROV trencher
Additional Features TSS350 / TSS440, HVC 100 cutter
Max Soil/kPa 100 kPa
Max Seafloor Gradient 15
Max Operational Depth 3,000m
Max product outer diameter 500mm
Jetting power 450 KW
Max sea state WMO4
LARS system Yes
Utility type FOC, power cable, flexible pipes
Venom 3k-600TSoft Soil Trencher
Equipment
HydroPlowJetting assisted plough
Excavation Method Jetting assisted plough
Configuration Vehicle with skids
Additional Features Jetting arm
Max Soil/kPa 100 kpa
Max Seafloor Gradient 15
Max Operational Depth 70m
Max product outer diameter 350mm
Jetting power Surface supplied
Max sea state WMO4
LARS system Yes
Utility type FOC, power cable
Projects
CLIENTSAssodivers Ltd has participated in a string of operations worldwide, working forsome of the leading players in the field.During the long presence in the offshore market, no Client had any dissatisfactionwhich is proved by the long record of the recommendation letters (availableonline).
Projects
Project InformationYear of Execution 2015-16
Area of Operation Shannon River – Ireland
Owner ESB
Contractor Prysmian Powerlink Services
Service Provided Installation
Maximum Operational Depth 65m
Cable Type 220KV + FO each cable
Number of Cables 7
Cable Diameter 158,6
Weight in Air 68 kg/m
Installation SLB laying and landing of 20682m
Subsea Protection SLB trenching @2and3m of 14500m
Additional Protectionabout 2800m pre-trenched by JUB with long reach excavator and backfilling
Survey N/A
Marine Means UsedCSV AethraAssodivers XV-XVI-XVII-XVIII workboatsSubcontracted Jack-up Barge
Equipment Used1500T TurnTableLaying SpreadModified Hydroplow
The project involves installation of a High Voltage Alternating Current (HVAC) 220 kV power cabledouble circuit connection, comprising of 21km submarine cable, i.e. seven (7) cables in total.Assodivers installed and protected these seven submarine cables. Services included loading fromPrysmian factory in Pikkala, transportation to site, 14 landings, 1040m of split pipes installation,Simultaneous laying and burial of the cable routes with the use of the Hydroplow in strong lateralcurrent conditions (reaching up to 4knots). Finally pre-trenching and post-lay backfilling operationswere performed in the landing sites.
Shannon Project
Projects
Project InformationYear of Execution 2015
Area of OperationLavrion, Agios Georgios, Saronic Gulf, Greece
Owner Terna Energy S.A.
Contractor Hellenic Cables S.A.
Service Provided Installation & Protection
Cable DetailsMaximum Operational Depth 325m
Cable Type 150 kV/FOC
Number of Cables 2/1
Cable Diameter 195mm/193mm/24mm
Weight in Air 66 kg/m / 68kg/m
Description of WorksInstallation 36,743m of cable laid
Subsea ProtectionPLB trenching at 0.5m DOB of 7,640mPLB jetting at 1.0 m DOB of 27,043m
Additional Protection Pre trenching of 1,500m
Survey As buried survey
Marine Means Used
CLB AtalantiAHTS ArtemisMPSV AstreaCB Assodiver VIITB Hydna
Equipment UsedAssotrencher IVAssotrencher VIIIVenom 3k-600T
The St. George Island wind farm project consists of a windfarm installed in St. George island whichwill be connected to the PPC Mainland Power Transmission System. Hellenic Cables awarded ASDGwith a subcontract for the submarine cable installation and protection activities for theinterconnection between the island’s substation to the busbars of 150kV Lavrion substation. TheSoW is including pull-in of the cables onshore, cable laying, protection of the cable offshore andsubmarine cable landfall protection on both sides of every link.
St. George IslandWind Farm Project
Projects
The Cyclades project consists of the interconnection of Syros, Tinos, Mykonos and Paros with themainland power grid through the Lavrio station, which will be operated by the Transmission SystemOperator of the Greek Electricity System. Hellenic Cables awarded ASDG with a subcontract for thesubmarine cable installation and protection activities for the islands interconnection. The SoWincluded pull-in of the cables onshore as well as cable laying and submarine cable landfall protectionon both sides of every link.
Project InformationYear of Execution 2015
Area of Operation South Aegean Cyclades Islands
Owner IPTO S.A.
Contractor Hellenic Cables S.A.
Service Provided Installation & Protection
Cable DetailsMaximum Operational Depth 300m
Cable Type 150 kV/FOC
Number of Cables 2/1
Cable Diameter 203mm/197mm/24mm
Weight in Air 61.2 kg/m / 49.9kg/m /0.79kg/m
Description of WorksInstallation 34,300m of cable laid
Subsea Protection2,706m of cable, protected by means of trenching at 2.0 m target burial depth
Additional ProtectionCast Iron Shell s, 638m and mattresses installation , 22m
SurveyPre Lay survey, as-buried survey on the total cable length protected
Marine Means UsedCLB Atalanti -AnteosCB Assodiver VII- TB Hydna
Equipment UsedAssoMultiTrencher
Assomat I
Cyclades Project
Projects
Western HVDC Link
Project InformationYear of Execution 2014
Area of Operation Wirral Peninsula, UK
Owner Western Link
Contractor Prysmian Powerlink Srl
Service Provided Simultaneous Installation and Protection
Cable DetailsMaximum Operational Depth 42m
Cable Type 600kV HVDC/FOC
Number of Cables 2/1
Cable Diameter 137mm/35mm
Weight in Air 57.7kg/m / 3.0kg/m
Description of WorksInstallation 36,200m of cable laid
Subsea Protection35,500m of cable, protected by means of simultaneous lay and burial at 2.0 m target burial depth
Additional Protection700m from HDD Conduit exitof post lay cable burial at shallow water.
SurveyPre Lay survey, as-buried survey on the total cable length protected
Marine Means Used CLB Atalanti
Equipment Used
Assoplow
Assojet II
Wilco Amphibious Excavator
The Western High Voltage Direct Current (HVDC) Link is a major electricity transmission project beingjointly developed by National grid Electricity Transmission and SP Transmission. The projectcomprises the installation of two HVDC submarine cables between Scotland and England for a totallength of the submarine route of approximately 385 km. The link connects England with the landfallof the Wirral Peninsula and Scotland at the Hunterston area. Prysmian has awarded ASDG with asubcontract for the submarine cable laying and protection for the Western HVDC Link project atWirral. ASDG’s SoW included cable loading of 2x36.2 km HVDC and 36.2 km FOC and simultaneouslaying and burial of bundled cable. The SoW also included assistance to cable pulling to shore up tothe sea-land joint position, pre-lay grapnel run, the performance of a visual pre-lay survey and theexecution of post-lay seabed survey.
Projects
Deka Development Project
Project InformationYear of Execution 2014
Area of Operation Offshore Egyptian Coast
Owner PETROBEL
Contractor Microperi Srl
Service Provided Umbilical Protection
Umbilicals DetailsMaximum Operational Depth 100m
Umbilical Diameter 140mm/140mm/122mm
Weight in Air 35.46 kg/m / 34.84 kg/m / 27.77 kg/m
Description of Works
Subsea Protection32,359m of cable, protected by means of jetting at 1.0 m cover burial depth
Additional Protection Mattresses Installation (Pre and Post lay)
Survey -
Marine Means Used SPS Astrea
Equipment UsedVenom 3k-600T
Assomat II
The project is targeting the development of both the Denise and Karawan fields in TemsahConcession located at offshore Egypt in order to add a Natural Gas production of about 210 MMScfd,with an estimated cost of 470 MM $. The Denise field is about 70 km off the Egyptian coast, whileKarawan field is about 60 km off the Egyptian coast. The Denise field exploitation mainly consists ofthree subsea wells and the Karawan field exploitation consists of one subsea well. Microperi awardedASDG a subcontract for the protection of the subsea umbilicals which were installed on the variousroutes. ASDG SoW also included the pre and post lay installation of bituminous mattresses over thecrossings locations
Projects
Assodivers had been awarded a contract for the simultaneous installation and burial activities ofone AC cable connecting the AC/DC offshore converter station ‘BorWin Beta’ with the offshorewind park ‘Global Tech 1’.Prysmian had also awarded Assodivers a contract for the provision of post-lay inspection andburial services to areas where the cables were not buried by the simultaneous laying and burialmethodology (eg. Crossings)
Helwin I Project
Project InformationYear of Execution 2012-2013
Area of Operation North German Coast
Owner TenneT Holding B.V.
Contractor Prysmian PowerLink SpA
Service Provided Simultaneous Installation & Protection
Cable DetailsMaximum Operational Depth 23 m
Cable Type 250kV HVAC / FO
Number of Cables 2/1
Cable Diameter 112 mm / 37 mm
Weight in Air 30 kg/m / 3.5 kg/m
Description of WorksInstallation 67,426 m of cable laid in bundle
Subsea Protection
20,292 m of cable protected by means of jetting simultaneously with laying at 1.50 m burial depth
46,691 m of cable protected by means of jetting simultaneously with laying at 1.70 m burial depth
443 m of cable protected by means of jetting on crossings at 1.55m burial depth
Jointing 3 rigid joints executed in 5m w.d.
SurveyAs-built survey on the total cable length installed and protected
Marine Means Used
CLB Atalanti
AHT Anteos
SPS Astrea
Projects
Assodivers was awarded a contract for the simultaneous installation and burial activities of oneAC cable connecting the AC/DC offshore converter station ‘BorWin Beta’ with the offshore windpark ‘Global Tech 1’.Prysmian had also awarded Assodivers a contract for the provision of post-lay inspection andburial services to areas where the cables were not buried by the simultaneous laying and burialmethodology (eg. Crossings)
Borwin II Project
Project InformationYear of Execution 2012-2013
Area of Operation North German Coast
Owner TenneT Holding B.V.
Contractor Prysmian PowerLink SpA
Service Provided Simultaneous Installation & Protection
Cable DetailsMaximum Operational Depth 38 m
Cable Type 155kV HVAC
Number of Cables 1
Cable Diameter 220 mm
Weight in Air 89 kg/m
Description of WorksInstallation 30,617 m of cable laid
Subsea Protection
28,099 m of cable protected by means of jetting simultaneously with laying at 1.55 m burial depth
4,579 m of cable protected by means of jetting on crossings or other sections at 1.55 m burial depth
SurveyAs-built survey on the total cable length installed
Marine Means Used
CLB Atalanti
AHT Anteos
SPS Astrea
Equipment UsedHydroplow
Venom 3k-600T
Projects
Assodivers protected the two 380 kV alternate current cable circuits between the VillafrancaTirrena (Sicily) and Scilla (Calabria) power stations. Six (6) power cables and the two (2) opticalcables laid in bundle with two power cables where buried in practice throughout the route. Eachroute was in average 38km and crossed 6 other previously installed services, two gas pipes andfour telecom cables. The installation work was divided between the two circuits (of three cableseach) and those were laid with about one year interval between each other. The first circuit onlywas further split in two campaigns.
Messina Project
Project InformationYear of Execution 2012-2013
Area of Operation Italy and Sicily
Owner Terna SpA
Contractor Prysmian PowerLink SpA
Service Provided Offshore Protection
Cable DetailsMaximum Operational Depth 376 m
Cable Type 380kV HVAC / FO
Number of Cables 6/2
Cable Diameter 144 mm / 37 mm
Weight in Air 61 kg/m / 3.5 kg/m
Description of Works
Subsea Protection
257,853 m of cable protected by multiple passes, using means of jetting at 1 m cover burial depth
5,182 m of cable protected by means of trenching at 0.5 m cover burial depth
Additional Protection1,313 m of cable protected by mattresses installation
SurveyAs-buried survey on the total cable length protected
Marine Means UsedSPS Argo I
SPS Astrea
Equipment Used
Venom 3k-600T
AssoTrencher IV
AssoMat II
Projects
The HVDC link was designed for power transmission between the converter stations in Morverde,close to Sagunto, in the Spanish peninsula and in Santa Ponça in Baleares Island (Mallorca).The submarine cable portion of the system included the following components:- Two (2) submarine HVDC cables (poles) at 250kV, approximately 240km in length each;- One (1) MV cable (laid in bundle with a FO cable) of approximately 240km length, with the samesubmarine and land sections with the pole cables.Each of the three cables (two poles, one bundle of MR and FO) was protected using the rock-cutting trenching technique by the post-installation method and sections which remainedunburied due to the morphology of the seabed, were protected by cement mattressesinstallation.
Cometa Project
Project InformationYear of Execution 2011
Area of Operation Spanish Mainland & Mallorca Island
Owner Red Electrica de Espana
ContractorNexans Norway SA & Prysmian Cavi e Systemi Energia Srl
Service Provided Offshore Protection
Cable DetailsMaximum Operational Depth 124m
Cable Type 250kV HVDC/MR Cable/FO
Number of Cables 2/1/1
Cable Diameter 88mm/84mm/12mm
Weight in Air 29kg/m / 29kg/m / 3.4kg/m
Description of Works
Subsea Protection36,632m of cable, protected by means of trenching at 1.0m and 0.5m target burial depth
Additional Protection1,925m of cable protected by mattresses installation
SurveyAs-buried survey on the total cable length protected
Marine Means Used SPS Argo I
Equipment Used
AssoTrencher IV
Argus MK III
AssoMat I
Projects
The submarine portion of the project consisted of the lay and burial on parallel routes of sixpower cables (two circuits of three cables each) between Ras Abu Aboud substation and WestBay Super 2 substation, with a length of approx. 6.2 km on each route. In addition to the powercables two fiber optic cables (FOC) containing 44 fibers each were also installed in bundleconfiguration with a power cable on the central route of each circuit.
Doha Bay Project
Project InformationYear of Execution 2010 - 2011
Area of Operation Doha bay
Owner KAHRAMAA
Contractor Prysmian Cavi e Sistemi Energia SrL
Service Provided Offshore Protection
Cable InformationMaximum Operational Depth 12 m
Cable Type 220kV HVAC / FO
Number of Cables 6/2
Cable Diameter 146.9 mm / 37 mm
Weight in Air 60.45 kg/m / 3.4 kg/m
Description of WorksInstallation 42,000 m of cable laid
Subsea Protection
26,400 m of cable protected by multiple passes, using means of trenching at 1.0 m cover burial depth
17,060 m of cable protected by means of jetting at 1.0 m cover burial depth
Additional Protection160 m of cable protected by mattresses installation
SurveyAs-built survey on the total cable length installed and protected
Marine Means UsedCLB Atalanti
AHT Anteos
Projects
The consortium of Nexans Norway AS and Prysmian Cavi e Sistemi SrL had appointed Assodiversas a subcontractor to execute the protection works of two circuits with totally six parallelsubmarine cables run from Al Jasra (Bahrain mainland) to Umm An Na’Asan (Bahraini island) andfrom Umm An Na’Asan (Bahraini island) to Ras Al Qurayyah (Saudi Arabia mainland). The cables’route distance between the Bahrain mainland and the Bahraini island is 3.5 km while between theBahraini island and the Saudi mainland the distance is 39 km.
GCCIA Project
Project InformationYear of Execution 2008-2009
Area of Operation Bahrain
Owner KAHRAMAA
ContractorNexans Norway SA & Prysmian Cavi e Systemi Energia Srl
Service Provided Offshore Protection
Cable DetailsMaximum Operational Depth 26m
Cable Type 400kV SCFF/FO
Number of Cables 6/2
Cable Diameter 139mm/36.4mm
Weight in Air 51kg/m / 3.4kg/m
Description of Works
Subsea Protection130,579m of cable, protected by multiple passes, using means of trenching at 0.6m cover burial depth
Additional Protection135m of cable protected by mattresses installation
SurveyAs-buried survey on the total cable length protected
Marine Means Used SPS Astrea
Equipment Used
AssoTrencher VIII
Assojet II
AssoTrencher VII
Projects
This project is a power link between Italy Mainland to Sardinia via a 500 KVAC circuit, consisting oftwo main cables Pole 1 and Pole 2 and respective anode and cathode cables at both ends of thelink. The execution carried out on two phases in 2008 and in 2010. The scope of work includedthe protection works of all cables from the landing points up to water depths of 680m. Despitethe deep water jetting operations, Assodivers had also performed the utilization of two supportvessels operating in parallel at a certain stage of the project in order to minimize the time that thecable was left unprotected between the laying and the final protection.
Project InformationYear of Execution 2008 - 2010
Area of Operation Sardinia and Italy mainland
Owner Terna SpA
Contractor Prysmian Cavi e Systemi Energia
Service Provided Offshore Protection
Cable DetailsMaximum Operational Depth 680m
Cable Type 500kV HVDC / Electrode
Number of Cables 2/2
Cable Diameter 118 mm / 86 mm
Weight in Air 35kg/m / 11 kg/m
Description of WorksInstallation 42,000m of cable laid
Subsea Protection
359,685 m of cable protected by means of jetting at 1 m cover burial depth
88,450 m of cable protected by means of trenching at 0.5 m cover burial depth
Additional Protection135 m of cable protected by mattresses installation
SurveyAs-buried survey on the total cable length protected
Marine Means UsedSPS Argo I
SPS Astrea
Equipment Used
Venom 3k-600T
AssoTrencher IV
AssoMat
SAPEI I & II Projects