assignment on extension

Upload: anirban-ghosh

Post on 03-Jun-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Assignment on extension

    1/24

    1.INTRODUCTION

    Growth, recognized as an un-ignorable engine for expanding incomes and

    employment necessary for social uplift, remains a pre-requisite for development.

    With the objective of ensuring that growth is widely spread so that its benefits areadequately shared by the poor and weaker sections of the society, theGovernment has geared up for meeting the challenges during the 11th Five YearPlan duly manoeuvring its resources as Agriculture growth continues to besluggish and was of the order of 2.1 percent during the 10th Plan, despite a targetof 4% growth.

    11th Five Year Plan (2007-2012)- heralding future growth :

    Remarkable transition to a high growth path during the 10th Five Year Plan period

    reinforced the underlying strength of the fundamentals of the economy and

    eventually resulted in evolving strategies for 11th Five Year Plan. The Government

    of India has adopted rapid and inclusive growthas its core theme in the 11thFive Year Plan. The main emphasis is on the Social sector and delivery of services

    therein. Education, in particular, has been accorded utmost priority during the

    11th Five Year Plan period.

    The Approach Paper to the Eleventh Five Year Plan prepared by the Planning

    Commission, suggested a road map for 9% per annum growth for the economy as

    a whole, and an agricultural growth target of 4% per annum during the plan

    period. Agriculture is not only an important driver of macro-economic

    performance; it is an essential element of the strategy to make growth more

    inclusive.Eleventh Plan was intended to improve the growth rate of agriculture from

    2.13% re-alized in the 10th Plan to 4%. With this backdrop of an impressive record

    of economic growth coupled with an assured positive upsurge in the living

    standards of the people, the Nation is approaching culmination of the Eleventh

    Five Year Plan on an optimistic note. Rapid and inclusive growth was the core

    theme of the 11th Five Year Plan with one of the main emphasis on agricultural

    growth target of 4% per annum.

    2.OBJECTIVESOFTHEASSIGNMENT

    A series of flagship programmes have been chalked out and a farmer friendly

    initiatives have been taken through these flagship programmes to attain the goal

    of agricultural growth target of 4% per annum.

    Central Ministries and state government departments are implementing various

    rural development programmes through a set of guidelines and by separate set of

    administrative and institutional mechanisms. The objective of this assignment is

  • 8/12/2019 Assignment on extension

    2/24

  • 8/12/2019 Assignment on extension

    3/24

    (a).Revitalization of extension system focusing on

    known technologies.

    (b)Improvement of research-extension linkages.

    (c).Convergence of schemes of Ministry of Agriculture.

    (d)Encouragement of partnership between civil society

    organization and Government / Panchyat Raj Institutions (PRIs)

    (e). Mainstreaming gender concerns.

    3.4 Objectives of different Flagship Programmes

    The ultimate objective behind the Flagship programs is to achieve broad-basedimprovement in the living standards of all our people and to ensure that growth iswidely spread so that its benefits, in terms of income and employment, areadequately shared by the poor and weaker sections of the society, especially theScheduled Castes (SCs), Scheduled Tribes (STs), Other Backward Classes (OBCs)and Minorities.

    The following seven major flagship programmes are operating in rural areas.(1) Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA)(2) National Rural Livelihood Mission (NRLM)(3) Indira Awas Yojana (IAY)(4) National Rural Drinking Water Programme(NRDWP) and Total SanitationCampaign (TSP)(5) Integrated Watershed Development Programme (IWDP)(6) Pradhan Mantri Grameen Sadak Yojana (PMGSY)(7) Rural electrification, including separation of agricultural feeders andRajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY).

    The Government of India is involved in a large number of programmesin sectors/area such as education, health, labour, skill development etc.that are in the State List through operation of Centrally SponsoredSchemes (CSS) and provision of Central Assistance to StateGovernments. These programmes essentially arose from the abovenational objectives and cut across State boundaries. The CentrallySponsored Schemes (CSS) are operationalized by Central Ministriesbased on scheme specific guidelines and are implemented by State

    Governments or their designated agencies.The Centrally Sponsored Schemes (CSS) are implemented to achieve

    social objectives like poverty reduction, improving health services,raising food production etc.

    3.5 Some important Centrally Sponsored Schemes (CSS) under the umbrella ofdifferent Flagship Programmes

  • 8/12/2019 Assignment on extension

    4/24

    A brief list of some important Centrally Sponsored Schemes (CSS)and nodal departments are enlisted below-

    (i).DEPARTMENT OF AGRICULTURE AND COOPERATION

    1 National Food Security Mission2 National Horticulture Mission3 National Mission on Sustainable Agriculture4 National Oilseed and Oil Palm Mission5 National Mission on Agriculture Extension and Technology6 Rashtriya Krishi Vikas Yojana (RKVY) (ACA)

    (ii).DEPARTMENT OF ANIMAL HUSBANDRY DAIRYING & FISHERIES

    1 National Livestock Management Programme

    2 National Livestock Health and Disease Control Programme3 National Plan for Dairy Development

    (iii). DEPARTMENT OF COMMERCE

    1 Assistance to States for Infrastructure Development for Exports (ASIDE)

    (iv). MINISTRY OF DRINKING WATER SUPPLY

    1 National Rural Drinking Water Programme2 Nirmal Bharat Abhiyan

    (v). MINISTRY OF ENVIRONMENT AND FORESTS

    1 National River Conservation Programme (NRCP)2 National Afforestation Programme (National Mission for a Green India)3 Conservation of Natural Resources and Ecosystems4 Integrated Development of Wild Life Habitats5 Project Tiger

    (vi). DEPARTMENT OF HEALTH AND FAMILY WELFARE1 National Health Mission including NRHM

    2 Human Resources in Health and Medical Education

    (vii). DEPARTMENT OF AYUSH

    1 National Mission on Ayush including Mission on Medicinal Plants

  • 8/12/2019 Assignment on extension

    5/24

  • 8/12/2019 Assignment on extension

    6/24

    1 Multi Sectoral Development Programme for Minorities

    (xvii).MINISTRY OF PANCHAYATI RAJ

    1. Backward Regions Grant Fund (District Component) (ACA) (M/oPR/M/o Finance.

    2. Rajiv Gandhi Panchayat Sashastrikaran Yojana(xviii). DEPARTMENT OF RURAL DEVELOPMENT

    1.National Rural Employment Guarantee Scheme (MGNREGA)2.Pradhan Mantri Gram Sadak Yojana (PMGSY)3.Indira Awaas Yojana (IAY)4.National Rural Livelihood Mission (NRLM)5.National Social Assistance Programme (NSAP) (M/o RD / M/o Finance)

    (xix).DEPARTMENT OF LAND RESOURCES

    1.Integrated Watershed Management Programme (IWMP)

    2.National Land Record Management Programme (NLRMP)(xx).MINISTRY OF SOCIAL JUSTICE AND EMPOWERMENT & DISABILITY AFFAIRS

    1.Scheme for Development of Scheduled Castes

    2.Scheme for Development of Other Backward Classes and denotified,nomadic and semi-nomadic Tribes.

    3.Scheme for development of Economically backward Classes (EBCs)

    4.Pradhan Mantri Adarsh Gram Yojana (PMAGY)

    (xxi).DEPARTMENT OF DISABILITY AFFAIRS

    1 National Programme for Persons with Disabilities

    (xxii).MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION

    1 Support for Statistical Strengthening

    (xxiii).MINISTRY OF TEXTILES

    1.National Handloom Development Programme

    2.Catalytic Development programme under Sericulture

    (xxiv).MINISTRY OF TOURISM

    1.Infrastructure Development for Destinations and Circuits

    (xxv)MINISTRY OF TRIBAL AFFAIRS

    1.Umbrella scheme for Education of ST students.

  • 8/12/2019 Assignment on extension

    7/24

    (xxvi)MINISTRY OF WOMEN AND CHILD DEVELOPMENT

    1.Integrated Child Development Services (ICDS)

    2.National Mission for Empowerment of Women including Indira GandhiMattritav Sahyog Yojana

    3.Integrated Child Protection Scheme (ICPS)

    4.Rajiv Gandhi Scheme for Empowerment of Adolescent Girls (SABLA)

    (xxvii)MINISTRY OF WATER RESOURCES / MINISTRY OF FINANCE

    1.Accelerated Irrigation Benefit & Flood Management Programme (mergingAIBP and other programmes of water resources such as CAD, FMP etc.)

    (ACA)

    (xxviii)DEPARTMENT OF SPORTS

    1.Panchayat Yuva Krida aur Khel Abhiyan (PYKKA)

    (xxix)DEPARTMENT OF FOOD PROCESSING INDUSTRIES

    1.National Mission on Food Processing

    (xxx)MINISTRY OF URBAN DEVELOPMENT / MINISTRY OF FINANCE

    1.Jawaharlal Nehru National Urban Renewal Mission (JNNURM) (ACA)

    (xxxi)PLANNING COMMISSION / MINISTRY OF FINANCE

    1.Backward Regions Grant Fund (BRGF) (State Component) (ACA)

    (xxxii)MINISTRY OF YOUTH AFFAIRS AND SPORTS

    1.National Service Scheme (NSS)

    3.6 Different Major Flagship Programmes in Agriculture and allied sectors-

    a) Rashtriya Krishi Vikas Yojana (RKVY):

    RKVY is a State Plan Scheme of Additional Central Assistance,launched inAugust 2007 as a part of the 11th Five Year Plan by theGovernment of India.Launched under the aegis of theNational Development Council,it seeks to

    achieve 4% annual growth in agriculture through development of Agriculture andits allied sectors (as defined by thePlanning Commission of India) during theperiod under the 11th Five Year Plan (200711)Concerned by the slow growth in the Agriculture and allied sectors,the National Development Council (NDC) in its meeting held on 29th May,2007 resolved that a special Additional Central Assistance SchemeRashtriya Krishi Vikas Yojana (RKVY) be launched. The NDC resolvedthat agricultural development strategies must be reoriented to meet the

    http://en.wikipedia.org/wiki/Government_of_Indiahttp://en.wikipedia.org/wiki/National_Development_Council_(India)http://en.wikipedia.org/wiki/Planning_Commission_(India)http://en.wikipedia.org/wiki/Planning_Commission_(India)http://en.wikipedia.org/wiki/National_Development_Council_(India)http://en.wikipedia.org/wiki/Government_of_India
  • 8/12/2019 Assignment on extension

    8/24

    needs of farmers and called upon the Central and State Governments toevolve a strategy to rejuvenate agriculture. The NDC reaffirmed itscommitment to achieve 4 percent annual growth in the agricultural sectorduring the XIth Plan. RKVY is to incentives States to draw up plans fortheir agriculture sector more comprehensively, taking agro-climatic

    conditions, natural resource issues and technology into account, andintegrating livestock, poultry and fisheries more fully.

    Basic Features of the RKVY

    The RKVY aims at achieving 4% annual growth in the agriculture sectorduring the XIth Plan period, by ensuring a holistic development of Agriculture andallied sectors. The main objectives of the scheme are :(i) To incentivise the states so as to increase public investment in Agriculture

    and allied sectors.(ii) To provide flexibility and autonomy to states in the process of planning and

    executing Agriculture and allied sector schemes.(iii) To ensure the preparation of agriculture plans for the districts and the

    States based on agro-climatic conditions, availability of technology andNatural resources.

    (iv) To ensure that the local needs/crops/priorities are better reflected inThe agricultural plans of the states.

    (v) To achieve the goal of reducing the yield gaps in important crops, throughfocussed interventions.

    (vi) To maximize returns to the farmers in Agriculture and allied sectors.(vii) To bring about quantifiable changes in the production and productivity of

    various components of Agriculture and allied sectors by addressing them ina holistic manner.

    Importance of RKVY in rural developmentSince the RKVY is applicable to the entire State Plan for Agriculture and alliedsectors, and seeks to encourage convergence with schemes like NREGS, SGSY andBRGF, the Planning Commission and the Ministry of Agriculture will togetherexamine the Statesoverall Plan proposals for Agriculture and allied sectors aspart of the Annual Plan approval exercise. At this stage, in consultation with theMinistry of Panchayati Raj it will also be decided if the requirements with respectto the District Development Plans have been met or not. Advice may also betaken from DAHD &F, Ministry of Water Resources, MoRD, DARE, and NRAA, ifthe convergence has been appropriately factored in.

    Areas of focus under the RKVY

    The Department of Agriculture, and in consultation with the Planning

    Commission, has prepared the guidelines for the RKVY scheme. The RKVY is aState Plan Scheme. The eligibility for assistance under the scheme depends uponthe amount provided in State Plan Budgets for Agriculture and allied sectors, overand above the base line percentage expenditure incurred by the StateGovernments on Agriculture and allied sectors. The list of allied sectors asindicated by the Planning Commission are the basis for determining the sectoralexpenditure, i.e Crop Husbandry (including Horticulture), Animal Husbandry andFisheries, Dairy Development, Agricultural Research and Education, Forestry andWildlife, Plantation and Agricultural Marketing, Food Storage and

  • 8/12/2019 Assignment on extension

    9/24

    Warehousing, Soil and Water Conservation, Agricultural Financial Institutions,other Agricultural Programmes and Cooperation.

    Components of RKVY

    The components for the RKVY briefly cover the following:(a)Integrated development of major food crops such as wheat, paddy, coarse

    cereals, minor millets, pulses, oilseeds:(b) Agriculture mechanization:(c) Activities related to enhancement of soil health:(d) Development of rainfed farming systems in and outside watershed areas, as

    also Integrated development of watershed areas, wastelands, river valleys(e) Support to State seed farms(f) Integrated Pest Management schemes(g) Encouraging non-farm activities(h) Strengthening of Market Infrastructure and marketing development(i) Strengthening of Infrastructure to promote Extension Services(j) Activities relating to enhancement of horticultural production and

    popularization of micro irrigation systems(k) Animal husbandry and fisheries development activities(l) Special schemes for beneficiaries of land reforms(m ) Undertaking concept to completion projects(n) Grant support to the State Government institutions that promote

    agriculture/horticulture(o) Study tours of farmers(p) Organic and bio-fertilizers(q) Innovative schemes

    This is an indicative list; the states may choose other components/activities,but those should be reflected adequately in the State Agricultural Plan and the

    District Agricultural Plan. The scheme(s) administered by the Departments ofAgriculture and Cooperation, and Animal Husbandry, Dairying and Fisheriescovering if any, may be worked out in consultation with the State LevelSanctioning Committee.

    b) National Rural Livelihood Mission (NRLM):National Rural Livelihood Mission (NRLM) is apoverty alleviation projectimplemented byMinistry of Rural Development,Government of India. Thisscheme is focused on promoting self-employment and organization of rural poor.The basic idea behind this programme is to organize the poor into SHG (Self Help

    Groups) groups and make them capable for self-employment. In 1999 afterrestructuringIntegrated Rural Development Programme(IRDP), Ministry of RuralDevelopment (MoRD) launched Swarnajayanti Grameen Swarojgar Yojana (SGSY)to focus on promoting self-employment among rural poor. SGSY is nowremodeled to form NRLM thereby plugging the shortfalls of SGSY programme.This scheme was launched in 2011 and is one of the flagship programme ofMinistry of Rural Development. This is one of the worlds largest initiative toimprove the livelihood of poor. This programme is supported by World Bank.

    http://www.aajeevika.gov.in/http://en.wikipedia.org/wiki/Poverty_in_Indiahttp://rural.nic.in/http://en.wikipedia.org/wiki/Integrated_Rural_Development_Programmehttp://en.wikipedia.org/wiki/Swarnajayanti_Gram_Swarozgar_Yojanahttp://en.wikipedia.org/wiki/Swarnajayanti_Gram_Swarozgar_Yojanahttp://en.wikipedia.org/wiki/Integrated_Rural_Development_Programmehttp://rural.nic.in/http://en.wikipedia.org/wiki/Poverty_in_Indiahttp://www.aajeevika.gov.in/
  • 8/12/2019 Assignment on extension

    10/24

    The core belief of National Rural Livelihood Mission (NRLM) is that the poor haveinnate capabilities and a strong desire to come out of poverty. They areentrepreneurial, an essential coping mechanism to survive under conditions ofpoverty. The challenge is to unleash their capabilities to generate meaningfullivelihoods and enable them to come out of poverty.

    MissionMission of NRLM is to reduce poverty by enabling the poor households to accessgainful self- employment and skilled wage employment opportunities resulting inappreciable improvement in their livelihoods on a sustainable basis, throughbuilding strong and sustainable grassroots institutions of the poor.

    Guiding Principles

    Poor have a strong desire to come out of poverty, and they have innate

    capabilities .

    An external dedicated and sensitive support structure is required to induce the

    social mobilization, institution building and empowerment process.

    Facilitating knowledge dissemination, skill building, access to credit, access to

    marketing, and access to other livelihoods services enables them to enjoy a

    portfolio of sustainable livelihoods.Values

    The core values which guide all the activities under NRLM are as follows:

    Inclusion of the poorest, and meaningful role to the poorest in all the

    processes

    Transparency and accountability of all processes and institutions.

    Ownership and key role of the poor and their institutions in all stages

    planning, implementation, and, monitoring

    Community self-reliance and self-dependence

    NRLM will be implemented in a mission mode. This enables:

    (a) shift from the present allocation based strategy to a demand driven

    strategy, enabling the states to formulate their own livelihoods-based poverty

    reduction action plans.

    (b) focus on targets, outcomes and time bound delivery.

    (c) continuous capacity building, imparting requisite skills and creating linkages

    with livelihoods opportunities for the poor, including those emerging in the

    organized sector.

    (d) monitoring against targets of poverty outcomes.

  • 8/12/2019 Assignment on extension

    11/24

    As NRLM follows a demand driven strategy, the States have the flexibility to

    develop their own livelihoods-based perspective plans and annual action plans for

    poverty reduction. The overall plans would be within the allocation for the state

    based on inter-se poverty ratios.

    The second dimension of demand driven strategy implies that the ultimate

    objective is that the poor will drive the agenda, through participatory planning at

    grassroots level, implementation of their own plans, reviewing and generating

    further plans based on their experiences. The plans will not only be demand

    driven, they will also be dynamic.

    c)Integrated Wasteland Development Projects scheme (IWDP)

    The Integrated Wasteland Development Projects scheme (IWDP) taken up by

    the National Wasteland Development Board in 1989 also aimed at developing

    wastelands on a watershed basis. This programme has now been brought underthe administrative jurisdiction of the Department of Wastelands Development in

    the Ministry of Rural Development. The fourth major programme based on the

    watershed concept is the National Watershed Development Programme in Rain

    fed Areas (NWDPRA) under the Ministry of Agriculture. Watershed Development

    Projects have been taken up under different programmes launched by the

    Government of India. The Drought Prone Area Programme (DPAP) and the Desert

    Development Programme (DDP) adopted the watershed approach in 1987.

    Mission

    So far, these programmes have laid down their own separate guidelines,

    norms, funding patterns and technical components based on their respective and

    specific aims. While the Desert Development Programme focused on

    reforestation to arrest the growth of hot and cold deserts, the Drought Prone

    Areas Programme concentrated on non-arable lands and drainage lines for in-situ

    soil and moisture conservation, agro-forestry, pasture development, horticulture

    and alternate land uses. The Integrated Wasteland Development Projects, on the

    other hand, made silvipasture, soil and moisture conservation on wastelands

    under government or community or private control as their predominant activity.

    The NWDPRA combines the features of all these three programmes with the

    additional dimension of improving arable lands through better crop management

    technologies.

  • 8/12/2019 Assignment on extension

    12/24

    Guiding Principles

    The Watershed Development Programme in Drought Prone/Desert/Non-forest

    wasteland Areas are implemented by taking up projects for development of

    watersheds of 500 hectares each (approximately) in every village in a phased

    manner. The aims of any project or activity comprise of a set of purposes or goalsdescribing the benefit that would flow out of the project and the likely groups of

    people who would benefit and end result in concrete physical terms that would

    be achieved by the end of the project, and a set of norms or criteria which are

    measurable and quantifiable to assess whether the end result has successfully

    achieved the purposes or not .

    Activities

    The major activities taken up under the scheme are:

    In situ soil and moisture conservation measures like terracing, bunding,

    trenching, vegetative barriers and drainage line treatment.

    Planting and sowing of multi-purpose trees, shrubs, grasses, legumes and

    pasture land development.

    Encouraging natural regeneration.

    Promotion of agro-forestry & horticulture.

    Wood substitution and fuel wood conservation measures.

    Awareness raising, training & extension.

    Encouraging people's participation through community organization andcapacity building.

    Drainage Line treatment by vegetative and engineering structures

    Development of small water Harvesting Structures.

    Afforestation of degraded forest and non forest wasteland.

    Development and conservation of common Property Resources.

    4.REVIEW OF LITERATURE

    According to previous official poverty estimates, the per centage of thepopulation living below the poverty line had declined by 8.5 per centage points

    between 1993-04 and 2004-05. Since the appropriateness of the poverty line was

    questioned in some quarters, the Government appointed an Expert Committee

    under the Chairmanship of the late Prof. Suresh Tendulkar.The Tendulkar

    Committee recommendeda recalibration of the rural poverty line to make it

    more comparable with the urban poverty line, which it found to be appropriate.

  • 8/12/2019 Assignment on extension

    13/24

    The application of the Tendulkar Committee poverty line provides a higher

    estimate of rural poverty and therefore also of total poverty, but if the new

    method is applied to the earlier years, as it should be, it shows that the per

    centage of the population in poverty declined from 45 per cent in 1993-94 to 37

    per cent in 2004-05. Thus, poverty declined at roughly 0.8 per centage points peryear during the 11 year period before the Eleventh Plan.

    The specific problems of Indian agriculture, and concerns relating to farmers

    welfare, have been addressed in the five Reports of the National Farmers

    Commission under chairmanship of Prof. M.S. Swaminathan. These problems and

    concerns have subsequently been considered by other Committees, most

    prominently the NDC Sub-Committee on Agriculture and Related Issueswhich was

    chaired by the Agriculture Minister and had eight Working Groups. The Planning

    Commission had also set up twelve 11th

    Plan Working Groups on agriculture. Based

    on all these inputs, the Steering Committee on Agriculture for the 11th

    Five Year

    Plan has in its conclusions and recommendations taken an overview on the broad

    direction of policies needed for agriculture in the 11th

    Plan.

    According to XIth Plan Working Groups: Crops, Horticulture, NRM, Marketing,

    Research, Agro-climatic Zonal Planning, Animal Husbandry, Fisheries, Agri

    Extension, Gender, Risk Management, Credit ,A particular area of concern is

    foodgrains, whose production during 10th plan was less than during 9th plan. Per

    capita annual production of cereals has declined from 192 kg in 1991/1995 to

    only 174 kg in 2004/2007 and of pulses from 15 kg to 12 kg. This means that per

    capita foodgrains production is now at 1970s levels. Although offset to some

    extent by increase in per capita availability of other food products this raises valid

    concerns on food security. We must ensure growth in foodgrain production of at

    least 2 percent per annum in the 11th Plan.

    Regarding Convergence in planning and implementation of Major flagship

    Programmes,a Sub-Committee of National Advisory-cum-Review Committee on

    BRGFhas been constituted to study the approval systems for flagship

    programmes and with the following mandate and also prepare a draft paper to

    Identify the major flagship programmes for local area development and

  • 8/12/2019 Assignment on extension

    14/24

  • 8/12/2019 Assignment on extension

    15/24

    Diseases Diagnostic Laboratories) as well as ERDDL to look after disease

    diagnostics, facilitate physical surveillance for prevention, control and

    containment of epidemics & highly pathogenic diseases. Essential vaccines for

    prevention of critical animal diseases are being produced by the IAH & VB.

    The Directorate is required to implement schemes/programme under State Plan

    and Centrally Sponsored Schemes for (i) development and genetic upgradation of

    animal resources, (ii) extensive breeding and rearing of small ruminants, pigs,

    cattle and poultry as livelihood related activity in the backyard, (iii)

    entrepreneurship development in animal husbandry, (iv) conservation and

    breeding of threatened breeds, (v) mass awareness, sensitization and training in

    modern and bio-secure farm management and preventive

    vaccination/medication, (vi) health camps and immunization programme for

    preventive vaccination/medication and supportive mineral mixture, vitamins etc.to mitigate deficiencies; (vii) distribution of mini-kits for fodder cultivation as

    inter-cropping or on sparable land or in the backyard, (viii) rearing and breeding

    of Black Bengal Goat, Garole and Bonpala Sheep, Ghungroo, Yorkshire Pigs and

    cattle, Poultry Birds, Duck, Rabbit, Quail etc. in the State Livestock Farms for

    distribution under various livelihood related schemes and conservation of

    threatened breeds etc.

    The Directorate also implements various Centrally Sponsored Schemes(i) RKVY,

    (ii) Assistance to State for Control of Animal Diseases (ASCAD), (iii) Assistance to

    State Poultry/Duck Farms, (iv) Development of Rural Backyard Poultry Farms, (v)

    FMD/PPR Controlled Programme and Vaccination, (vi) Fodder Development &

    Distribution of Minikits, (vii) Livestock Census, (viii) Conservation & Breeding of

    Threatened Breeds, (ix) Eastern Regional Disease Diagnostic Laboratory, (x)

    Prevention, Control, Containment & Combat of Avian Influenza. The funding

    under these programmes is in various percentages, e.g. 100%, 70:30, 50:50 etc.

    Under RKVY segment following schemes are being implemented to alleviate

    poverty and keeping ultimate mission of achieving 4% growth rate in agriculture

    and allied animal husbandry sector,as targeted by planning commission of

    India,during eleventh plan.

  • 8/12/2019 Assignment on extension

    16/24

    1. Modernization of Additional Block Animal Health CentreImpact of the Project

    Modern treatment facilities for ailing livestock & birds and preventive

    measures may be extended by each Additional Block Animal Health Centres.

    Mortality of livestock and birds will be controlled and production oflivestock products like Meat, Milk & Egg will be augmented.

    2. Modernization of Cold Chain System for execution of Prophylactic

    activities from State level to field level

    Impact of the project

    1. Maintenance of cold chain towards vaccination of livestock and birds.

    2. Titre level after vaccination will be maintained properly.

    3. Disease epidemic will be controlled.

    4. Production of milk, meat and egg will be augmented by way of checking

    mortality of livestock and birds.

    3. Augmentation of Milk production by better utilization of genetic

    potentialities of production cows grown out of AI

    Impact of the project

    1. To increase milk production of already existing productive female cows, grown

    out of A.I.

    2. To boost up the economic condition of the farmer.

    3. Dissemination of technology through the demonstration method.

    4. Distribution of Chicks / Ducklings involving women SHGsImpact of the project

  • 8/12/2019 Assignment on extension

    17/24

    1. To generate supplementary income to the rural women and to reduce the

    gender inequality.

    2. To enhance the Poultry production particularly eggs & meat.

    3. To promote poultry farming in scientific way with special attention to the

    bio-security in the backyard farming.4. Employment generation.

    5. To reduce the malnutrition.

    6. To improve quality of life.

    5.Development of Pig Breeding Unit involving SHGs

    Impact of the project

    1. Strengthening of Ghoongroo pig production potentiality of the State.

    2. To ensure supply of primary inputs to small & marginal farmers

    predominately tribal / under developed people.3. Employment generation involving SHGs.

    4. Nutritional security specially animal protein.

    5. Capacity building of unemployed youths / tribal people.

    6. Modernization of Training Institute / Centre

    Impact of the project

    Modern training facilities will be developed in district level and will also be

    helpful for capacity building of Departmental officials as well as farmers

    attached with Animal Husbandry activities.

    7.Development of Pasture Land and Cultivation of Fodder

    Impact of the project

    1. Produced green fodder at the Stated pasture land may be utilized to fed the

    animals

    2. Produced fodder will be the cheap source of animal feeds to enhance

    animal production.

    3. Produced excess fodder and bio-mass will minimize the gap of fodder

    requirement.

  • 8/12/2019 Assignment on extension

    18/24

    4. The forage which will be obtained from this land shall be utilized for

    establishment of fodder banks that may be used during lean seasons.

    5. Sufficient green fodder will be produced.

    6. Grazing land will be developed.

    7. Inputs may be supplied to the interested sheep farmers.

    8. Employment will be generated.

    8. Modernisation of Pig Breeding Station, Haringhata FarmImpact of the project

    1. To maintain pure stock of Exotic Breed like Large White Yorkshire and

    improve deshi breed like Ghoongroo.

    2. To distribute breeding animals to the farmers in the state, specially to the

    tribal people and also to the people of underdeveloped area.

    3. To under take trials on various aspects of Swine Husbandry specially to

    standardize management practices.

    4. To impart training to the farmers.

    5. To supply more live animals to the attached meat plant with the optimum

    production of pork and pork-products.

    6. To organize a marketing channel.

    7. To provide breeding pigs to neighboring states.

    9. Organization of Fertility Camps(implemented by --- PBGSBS)

    Impact of the project

    The objective of this programme is to organize Fertility Camps in each block in

    the State so that the conception rate through A.I. with Frozen Semen Technoligy

  • 8/12/2019 Assignment on extension

    19/24

    increases to the desired target. It has been decided to organize 2 (two) such

    Camps in each Block in a year.

    10. Establishment of Vermicompost Unit (implemented by --- PBGSBS)

    Impact of the project

    1. Effective use of cow dung and farm waste produced daily in the farm

    2. use of organic manure in form of vermicompost in fodder field to

    a) Increase the productivity of fodder

    b) Reduce the weeds percentage in fodder

    3. Generation of additional income

    4. Human Resource Development through training of farmers on value addition in

    dairy sector

    11. Livestock Insurance Support to poor farmers(implemented by --- PBGSBS)

    Impact of the project

    Initially the scheme was stated as pilot project in the year 2005-06 in Nadia &

    North 24-Parganas. As per administrative approval of Govt. of India vide no.

    26/106-(1)/2008-LI-AHS dt. 20/11/2008 this centrally sponsored scheme for live

    stock insurance will be continued during XIth plan period in the same format as it

    was implemented during 2005-06, 2006-07, 2007-08 & 2008-09 in the hundred

    districts of the country. During the year 2009-10 two districts namely Jalpaiguri &

    Hooghly will be brought under this scheme and 10,000 nos. of live stock insurance

    support to poor farmers specially SC / ST / OBC / BPL families will be included.

    12. Modernization of Ashram Dairy Farm under Lok Siksha Parishad,

    Ramkrishna Mission, Narendrapur

    Impact of the project

  • 8/12/2019 Assignment on extension

    20/24

    1. Transfer of technology on modern dairy farming to the youth.

    2. Training on Dairy farming in modern technique.

    3. Establishment of dairy farms in farmers houses.

    4. Farming system with bio-security measures.

    Stream I Project under Rashtriya Krishi Vikas Yojana ~

    2009-2010

    SYNOPSIS OF RKVY SCHEMES PROJECTS Animal Resources Dev. Dept.)

    Sl.

    No.

    Name of the Project / Schemes Proposed

    outlay

    (Rs. in lakh)

    1 Modernization of Additional Block Animal Health Centre 279.000

    2 Modernization of Cold Chain System for execution of Prophylactic

    activities from State level to field level

    180.000

    3 Augmentation of Milk production by better utilization of geneticpotentialities of production cows grown out of AI

    160.000

    4 Distribution of Chicks / Ducklings involving women SHGs 665.200

    5 Development of Pig Breeding Unit involving SHGs 148.500

    6 Upgradation / Modernization of Gazole Feed Plant 110.000

    7 Modernization of Training Institute / Centre 24.000

    8Development of Pasture Land at Kalyani Garole Sheep Farm

    40.000

    9 Modernisation of Pig Breeding Station, Haringhata Farm 150.000

    10 Modernisation of manufacturing unit at Bhagirathi Feeder Dairy 120.000

    11 Establishment of Bulk Milk Cooler Unit (25 KLPD) 150.000

  • 8/12/2019 Assignment on extension

    21/24

  • 8/12/2019 Assignment on extension

    22/24

    3

    Escalation of cost for provision of additional work necessary for the

    Project, Infrastructural Development & Modernization of Existing Feed

    Milling Plant at Salboni during 2008-09 5.000

    4Up-gradation / Modernization of Salboni Feed Plant-Phase-II (Ongoing

    Scheme)80.000

    5

    Establishment of Disease Diagnostic Laboratory

    (BSL-III level) -2ndphase.

    (Ongoing Scheme)

    250.000

    Grand Total 499.193

    6.SUMMERY AND CONCLUSION

    In order to achieve4% growth rate in agriculture and allied animal husbandry

    sector,as targeted by planning commission of India,during eleventh plan

    convergence in implementation of rural development programmes, the following

    measures may be taken.

    1. The number of CSSs should be limited and only those schemeswhich are required as a part of the convergence process as a broaderscheme have large outlays so as to make impact across the states to be

    implemented, the rest to be weeded out and to be converged with otherschemes.2. The existing CSSs should be categorised into Flagship schemes that have largeoutlays and address major national issues; major sub-sectoral schemes toaddress developmental problems of major sectors like agriculture, education andhealth and Sector-umbrella schemes which deal with the range of problems ofconcerned sector.

    3. Distribution of CSSs funds among States should be based on transparent notifiedguidelines which should be put on the website of the concerned Ministries. The Statesmay be incentivised to provide larger outlay in certain sectors like health, education, skilldevelopment and rural infrastructure. The incentives could be by provisions ofadditional funds based on the States own efforts to increase outlays for the sector.

    4. The physical and financial norms for the Schemes may be varied depending on

    the requirement of the State. A mechanism for developing flexibility in

  • 8/12/2019 Assignment on extension

    23/24

    such norms as against the normal CSS prescription has been suggested.

    5.All CSS must have 20 per cent flexi funds (10 per cent for Flagship schemes).

    These should be utilised by the States to prepare schemes which areespecially suited for the requirement of that State.

    6. Each Flagship programme should provide a flexible pool of financial resources to beused to facilitate and incentivise innovative practices that blaze a trail forothers to follow during the Twelfth Plan period.

    7.There should be a concurrent monitoring and evaluation of the CSS. Thisshould be done by independent monitors. This assessment could bedone by professional institutions, visit of experts to major project-implementing States or assessment by individual experts by visits to the field.8.PRIs as Centre point: Recently, the Government of India has issued guidelines on

    SAKSHARA BHARATHI (on Adult Education) bringing the Panchayat Raj Institutions as

    central point in implementation of the programme. In the long run, all the Ministries

    should use this type of well established Institutional Platform to achieve convergence.

    9.Integrated and comprehensive Training: The guidelines of different ministries have

    provision for orgainising training programmes for the functionaries. This

    compartmentalized system of training does not recognize the vital link between different

    programmes. Hence the training should be designed in such a way that the functionaries

    equipped with necessary skills to achieve convergence in implementation of the

    programmes by mobilizing man power and resources of related departments. Training

    fund of different programmes needs to be pooled for the integrated and holistic trainingprogrammes.

    10.Accounting system and recording of works: Appropriate monitoring mechanism

    should be put in place to avoid double recording work in different programmes for the

    same work. Accounting system should also be modified accordingly.

    11.Participatory planning from the grassroots level upwards led by local governments will

    lead to a strong sense of ownership and achieve much of better results in local

    development.

    To summarise, achievement of the target of 4% growth is technically feasible

    but requires concerted action on several fronts with the states taking

    responsibility for holistic planning of agriculture based on a farming system

    centred on the prevailing agro-climatic conditions. The Centre also has a major

    role to play in providing additional resources in critical areas and incentivising and

    supporting the efforts of the States.

  • 8/12/2019 Assignment on extension

    24/24

    7.BIBLIOGRAPHY

    1. http://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdf

    2.http://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdf

    3.http://rohtak.nic.in/pdf/iwdp_guidline.pdf

    4.http://planningcommission.nic.in/plans/planrel/fiveyr/10th/volume2/v2_ch5_2.pdf

    5.http://www.wbard.gov.in/pages/display/99-directorate-of-animal-resources-and-animal-health

    6.http://www.sameti.org/RKVY/Presentation/fnal%20Animal%20Husb%20presentation%20for%204.09.09.pdf

    7.http://darahwb.org/scheme_doc/sc21.doc

    8.http://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdf

    9.http://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdf

    10.http://pib.nic.in/archieve/flagship/english/st33.pdf

    http://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdfhttp://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://rohtak.nic.in/pdf/iwdp_guidline.pdfhttp://planningcommission.nic.in/plans/planrel/fiveyr/10th/volume2/v2_ch5_2.pdfhttp://www.wbard.gov.in/pages/display/99-directorate-of-animal-resources-and-animal-healthhttp://www.sameti.org/RKVY/Presentation/fnal%20Animal%20Husb%20presentation%20for%204.09.09.pdfhttp://darahwb.org/scheme_doc/sc21.dochttp://darahwb.org/scheme_doc/sc21.dochttp://darahwb.org/scheme_doc/sc21.dochttp://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdfhttp://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdfhttp://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://pib.nic.in/archieve/flagship/english/st33.pdfhttp://pib.nic.in/archieve/flagship/english/st33.pdfhttp://pib.nic.in/archieve/flagship/english/st33.pdfhttp://pib.nic.in/archieve/flagship/english/st33.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdfhttp://darahwb.org/scheme_doc/sc21.dochttp://www.sameti.org/RKVY/Presentation/fnal%20Animal%20Husb%20presentation%20for%204.09.09.pdfhttp://www.wbard.gov.in/pages/display/99-directorate-of-animal-resources-and-animal-healthhttp://planningcommission.nic.in/plans/planrel/fiveyr/10th/volume2/v2_ch5_2.pdfhttp://rohtak.nic.in/pdf/iwdp_guidline.pdfhttp://164.100.47.134/intranet/Centrally_Sponsored_Schemes.pdfhttp://planningcommission.gov.in/plans/planrel/12appdrft/appraoch_12plan.pdf