1.Course - NCP 222.Course Title - Construction personnel Management3.Assignment No. - One4.Last dateofreceipt -
OfAssignment at CODE office
ASSIGNMENT
You are a Project Manager on site where work for 3K.m. long
Tunnel has beenundertaken. Thesite isremote and takes about 2
-
7/23/2019 Assignment NCP 22
2/25
days travel to nearest town. Supervisors, Technicians & Skilled
Workers areengaged in dangerous / hazardous work. Absenteeism
due to sickness, quarrels, drinking are adding to less output of
workand chancesofaccidentsonsite are increasing. Management
hasurged to do something so that time targets can be achieved.
Discuss how will you tackle the problem and increase theoutput of
the work.
SOLUTION
Introduction of Main Problem: -
1.Absenteeism Due To Sickness2.Absenteeism Due To Quarrels & Drinking3.Accidents at site4.Technical problems
Reasons of Various Problems: -
y LackofManpowerManagement (or)Planning
-
7/23/2019 Assignment NCP 22
3/25
y Un-Hygienicsurroundings & Temporary Accommodationy LackofMedicationy ConsumptionofAlcoholy Availability ofAlcoholy Storageofmaterialsy RoofSpallingy Waterseepage
Needs and Their Fulfillment on Site: -
y Lack of Manpower Management (or) Planning: -
Prepare a properscheduleof theProject and AssignResources
to each Task i.e. each Activity, Assigning Resources means
Identify manpower required for each Task and what is the
availability ofmanpowerand how much workhas been done till
date and how much work is to be done. Identify Type of
-
7/23/2019 Assignment NCP 22
4/25
manpowerrequired i.e. Skilled (or)unskilled .Ifmanpower is in
adequate try to get moremanpowerorTry touse the available
manpowerFully so that maximum amount ofwork tocomplete
and try tocomplete the Urgent wokssuch that it dosenot effect
our project duration, reschedule the project and updated
schedule to head office and inform them weekly work progress
so that they can help you toovercome themanpower problem
(or) try to motivate the available manpower by giving extra
benefits if they complete the project in time. (or) ifmanpoweris
very less thanrequired then immediately inform head officeso
that they cansend somemoremanpowerso that the project can
runsmoothly
y Suggestion & Recommendation to Management onManpower Management (or) Planning: -
Manpower planning involved someof steps if
themanagement and project manager follow these steps there
will beno problem due to themanpower in the project, because
-
7/23/2019 Assignment NCP 22
5/25
the Tunnel project is a large project morenumberofmanpower
is involved in the project and they are at different levels and
management hasmonitorall are working properly arenot, ifnot
they have to have dosomeotherarrangement are try tomotivate
themanpowerso that the project progresssmoothly.
y Understand the project in all respects and get all detailsoftheprojects i.e.
Site condition, contract conditions, technical specifications,
construction techniques, and timeframe.
yWorking out the labourcomponent in various parametersof
the project .by using constants to workout labourrequirement
y Classifying and categorising labourrequirement and variousjobs by level ofskill,responsibility,natureofworketc.
y Determine the durationofeach job or task at every stageofproject.
-
7/23/2019 Assignment NCP 22
6/25
y Estimate thenumberofmanpower required in view of theanticipated of absenteeism and labour turnover and the
stability factor.
Manpower management has
some principles to follow that should beknown by the project
managerand also themanagement ofthecompany.
The principles are as follows:
Care and skill should beexercised in theselectionofemployees.
Introduction to thejob should befriendly skillful and adequate.
Each employeeshould bemade tofeel that hisefforts arereally
appreciated.
Consideration should be given to the effect that each rule and
instructionmay haveon thefeelingsofemployees.
Employees should have apart in planning those things that
affect theirworking conditions.
Management should be absolutely fair inevery policy and every
practice.
-
7/23/2019 Assignment NCP 22
7/25
Each employee should have a feeling of pride in the
worthwhilenessofhis workand hiscompany.
Based on theconstruction programme and various
other norms, the administrative set up is worked out for
completion of project. It is proposed to have two Chief
Engineers (Level-1),onefor head works and otherforcanal &
canal structures headed by the Project Manager. Under the
ChiefEngineer(Head work)fourcircleoffices will be proposed
and under theChiefEngineer (Canal & Canal Structures) three
Circleoffices will be proposed. There will also beone Director
(Administration),one Director (Finance),one Director (Quality
Control) and one
Director(Technical)undertheProject Manager. There will also
be attached
Superintending Engineer (Mechanical) under the each Chief
Engineer. All theseoffices will besuitably located foreffective
-
7/23/2019 Assignment NCP 22
8/25
monitoring and control over the execution of project. A chart
showing the administrativeset up isshown below
y Un-Hygienic surroundings & TemporaryAccommodation: -
Before Starting of the project Management has to well plan
because this project is long durationsomanpower involved
will bemore it is theoneof the preliminary need for the
employees & workers.
ySuggestion Methods for Hygiene Factors: - Management
has to well planfor the temporary shelters insuch a way that
numberof workers will be involved in the project and how
many shelters are required and for different category of
employees will be working at site and different types of
sheltersshould beconstructed with different facility what all
materials required for construction any how much time
required to construct it so that all those thing should be
-
7/23/2019 Assignment NCP 22
9/25
completed before starting of project, Management should
built temporary sheltersfor the workers who will be working
at site because the site is at remote area workerscannot be
able to say at there home and come for work it is the
preliminary requirement for the workerssomanagement has
to takeextra precautions, A siteoffice also be built with all
necessary requirements, dinking water should be good
because most of diseases are spread by water so it is
important step to takencare by management.
yLack of Medication: -
Management should send a medical
team to site and they should stay there till completion of
project. They should besupplied necessary equipments and
medical kits so that they can manage any hazardous
situation i.e. any sudden accidents they can handle the
situation, any epidemic occurred they can over come that
situation. By this work will be smoothly progressed and
-
7/23/2019 Assignment NCP 22
10/25
number of workers absenteeism will be reduced. Worker
who issickwill be takencare by medical team he will be
recovered quickly and hecan start doing the work so that
manpowerproblem issolved.
y Consumption and Availability of Alcohol: -This is themajor
problem with labourbecause they drinkdaily afterworkso
that they get some relief from whole day work and body
pains, but management should try to avoid drinking alcohol
or try to get them in limited doseso that they have it njust
go forsleep if they get it inexcess quantities they will be
drinking wholenight and next day they will be absenteeism
and also afterexcess drinking they start quarreling between
themselves its a big problemfor the project managerwhile
quarreling they may be any accidents that leads to more
absenteeism that will also indirectly effects the progressof
project. If this quarreling happens regularly then
-
7/23/2019 Assignment NCP 22
11/25
management has to take some precaution steps to handle
that problem. Such as try to avoid the availability ofalcohol
near the site so that the labour cannot consume much
alcohol and this problem is solved and the project may
continuesmoothly
y Storage of Materials: -This is also a majorproblemforsuch
a big project and at remote placematerials will be at site well
beforestart ofproject sostoreroomsshould be properly built
well in advance so that it will not create a problem while
executionof work for that what all employees required and
how many numberrequired should be planned beforeso that
materials are properly handled by thisonly thecost ofproject
depends.
y Roof Spalling: -
-
7/23/2019 Assignment NCP 22
12/25
The management should have complete
knowledgeof what all technical problemmay occurs while
executionofproject and it has to take properprecautions and
it should be well planned before so that it would not effect
the project duration, what are causes of the problems and
how toovercome the problems.
Thecauseofroofspalling is typeofformationof
rock,rockwith excessof foliations,joint & poorrockmass
leads to therockspalling.
ySuggestion & Methods to over come Roof Spalling
Problem: -
Tunnel should be properly scaling toremove looserockmass
& cement grouting should be doneso that the rock will get
someextra strength so that it can hold properly it cannot be
fallen downeasily
-
7/23/2019 Assignment NCP 22
13/25
Tunnel should be properly provision of
steel ribs immediately so that it will besupport on thesteel
rids and workcan be progresssmoothly and project manager
should have all thismaterials well in advance because these
materials arerequired suddenly.
y Water Seepage: -The management should have complete
knowledgeof what all technical problemmay occurs while
executionofproject and it has to take properprecautions and
it should be well planned before so that it would not effect
the project duration, what are causes of the problems and
how toovercome the problems.
Thecauseof water seepage ismanly due
to the discontinuous rock formation, Ground water table
height etc.
-
7/23/2019 Assignment NCP 22
14/25
y Suggestion & Methods to over come Water SeepageProblem: -
While designing the tunnel they should provide proper
drainage system so that if the water is accumulating in the
tunnel it will affect the progressofwork,so drainagesystem
should be such that water accumulated should be quickly
drained any from working spaceso that it dosenot affect the
workprogress. Orpropergrouting should be doneso that the
rock will get more strength so that it can stop the water
seepage into the tunnel. This is theeasy method toovercome
the seepage problem, the other method to overcome the
seepage problem covering the tunnel section with water
proofing membranes it will also not allow the water to
seepage into the tunnel so that work can be progress
smoothly.
y Recommendation to Management: -
-
7/23/2019 Assignment NCP 22
15/25
Top Management
should be more responsible and it should have to properly
monitor the progressof work and if any urgent needs at site
should befulfilled as quickly as possible and it should see that
the lowerand middlemanagement is working properly arenot.
If any accidents are hazardoussituation then top management
has tourge to dosome help to lowerand middlemanagement
so that they canovercome thesituation they must send some
team so that will help them and work will be progress
smoothly.
Tunnel project is a very large project it will take lot of time to
complete the whole project so management has to be well
prepared ofall theforecoming situations i.e. labors problems,
absenteeismetc.
Management has to determine the
functionsofeach level ofmanagement it should beclearforall
-
7/23/2019 Assignment NCP 22
16/25
theemployees and management has tomonitorsuch that each
employee is doing his duty properly arenot.
FUNCTIONS OF TOP MANAGEMENT:
1.Determining theobjectives2.Framing policies & making plans to carryout the
objectives & policies.
3.Setting up the organizational framework to conduct theoperation as perplans.
4.Gathering theresourcesneeded to put the plans intoeffect.5.Controlling theoperations through theorganization.
Middlemanagement is concerned with the task of implementing
the policies & planschalked out by the top management. Middle
management consists of departmental heads exercise the usual
functions of management in respect of their own departments.
They have top plan the operations, issue instructions to their
-
7/23/2019 Assignment NCP 22
17/25
assistants;collect theresourcesrequired & control the workof the
menunderthem.
FUNCTIONS OF MIDDLE MANAGEMENT:
1.Understanding the policiesframed by top management.2.Preparing theorganizational set-up in theirdepartment.3.Finding out thesuitableoperative & supervisory personnel
& fixing duties & responsibilities to them.
4.Arranging & issuing instructions to the assistants &operatives.
5.Motivating the personnel forhigherproductivity.6.Co-operating with other departments for smooth
functioning oforganizations.
7.Collecting reports, statistical information & other recordsabout the work turned out in therespective departments &
forwarding thesame to the top management.
8.Recommending to the top management new or revisedpoliciesfortheirdepartments toobtain betterperformance.
-
7/23/2019 Assignment NCP 22
18/25
LOWER LEVEL MANAGEMENT: -
It is the lowest level in the
administrativeframework& actual operations are performed here.
Foremensupervisors assisted by a noofworkers & clerkscarryout
the actual operations as per schedule. Their authority &
responsibility is limited & they have tofollow the lines drawn by
the higher levelsofmanagement. The foremenorsupervisors are
responsibleforcarrying out workorders allotted to theirrespective
departments. They passon the instructionsofmiddlemanagement
to the workers. The quality ofthe workmanship & quality ofoutput
will depend upon the hard labor, discipline & loyalty of the
operating personnel.
Motivation of Employees in Construction Project: -
Motivation
is the driving force within individuals that drive them
physiologically and psychologically to pursueoneormore goals to
-
7/23/2019 Assignment NCP 22
19/25
fulfill theirneedsorexpectations. Motivatorsmay be intrinsicor
extrinsic. An example of an intrinsic motivator is the self-
fulfillment ofa workeras a result ofperforming a taskwell.
Motivation oflabor in Construction Project: -
Construction labor
can be motivated. This is important because dwindlingproductivity is a major problem confronting construction today.
Productivity has decreased every yearfor the past decade, in part
because of increasing design complexity, more rigorous federal
and state regulations and socio-economic changes affecting the
work force. Our findings indicate that a highly motivated
workforceenhances productivity and project effectiveness.
In construction, the work itself
that is, the building of a structure for all to behold is a key
motivator for all levels of management and the work force.
Therefore, a well-planned project seems to be thefirst and most
-
7/23/2019 Assignment NCP 22
20/25
important step to achieve good productivity. Unfortunately,on
large industrial projects, craftsmen often receive only minimal
amounts of information about their work. Duplication of effort,
numerousmodifications to plans, and schedules that consistently
slip makes it difficult tomaintain a motivated workforce. On large
powerplant projects,changes in design and problems with material
availability are considered the major demotivating factors. With
effective pre-planning, the availability ofmaterials will bechecked
before workers are assigned to an area so workers donot start in
one locationonly to have to beshifted to another location. Care in
this respect should improve worker motivation and productivity
and help promote a high level of accomplishment. Most foremen
and craftsmen takeconsiderable pride in the work they do. Having
torip out theirworkand redo it can beextremely discomforting. In
fact, if it isextensive,redoing partsof a project may be the worst
demotivator of all. Craftsmen view overcrowded conditions and
crew interference due toextensivereworkas demotivating. Worse,
such problems can create hostile feelings as a result of the
-
7/23/2019 Assignment NCP 22
21/25
frustration. Design standardization can help to minimize rework
and improvemorale.
Motivational programs: -
Although some unique motivational
programs were found, the vast majority can be grouped into five
primary categories: goal setting, incentives, positivereinforcement
(i.e., recognition for a job well done), worker participation, and
workfacilitation. Thefollowing presents a dissertationoneach of
thefivecategories discussing first theiruse inother industries and
then theirapplication toconstruction.
Absenteeism and Turnover: -
The Department of Energy study
indicated that the absenteeism and turnover are a relatively minor
concern to workmen. Still, they can have a major impact on total
project productivity. High rates of absenteeism are a concern,
-
7/23/2019 Assignment NCP 22
22/25
however, to individuals who had to carry extra workloads to
compensateformissing crewmembers.
The low job satisfaction resulted in high absence
from work and high turnover. Thus absenteeism and turnovercan
be viewed as effectsofmotivational Activitiesor demotivational
concerns. Thecost ofmotivational programs isoften justified by
thereduced absenteeism and turnover.
For example, the cost of M2 group
Engineering Pvt Ltd. Big Designing & ConstructionCompany On
eight projects has been more than paid for by the reduction in
absenteeism and the reduced costs associated with hiring fewer
workmen. Director indicated that it required some amount per
employee to process paperwork plus two to three weeksofeach
new employee's time to learn the job. Again, the figures on
attendance and turnover measure the motivational effort that is
financially justified. Moreover, awards for good records are
perhaps themost effectivemethod to decrease absenteeism.
-
7/23/2019 Assignment NCP 22
23/25
Bibliography: -
Management in organization by Koontz and Odoneal, MacGraw
Hill Publicatio
-
7/23/2019 Assignment NCP 22
24/25
Managing
Director
Co-
OrdinationChief
AccountantMarketingManager
PurchaseManager
ProjectManage
Personal
Officer
WelfareSupervisor
WelfarePersonalSuperviso
-