assignment 1 5nrm
TRANSCRIPT
-
8/3/2019 Assignment 1 5NRM
1/5
Table of ContentsWebsite Development Brief .................................................................................................................. 2
About the Organisation..................................................................................................................... 2
Target audience ................................................................................................................................ 2
Project Management ............................................................................................................................ 2
Timeline ............................................................................................................................................ 2
Contents ............................................................................................................................................... 3
Content scope ................................................................................................................................... 3
Content maintenance ....................................................................................................................... 3
Functionality ......................................................................................................................................... 3
Budget .................................................................................................................................................. 4
Risk Management ................................................................................................................................. 5
-
8/3/2019 Assignment 1 5NRM
2/5
Website Development Brief
About the Organisation
Tempe Tyres is an Automotive Company selling wheels and tyres to customers with an extensive
range of wheels and tyres to choose from.
Established in 1970s Tempe Tyres has become legendary among car enthusiasts all over the world
Target audience
The target audience will be mostly looking at customers who are looking to buy rims and tyres and
even some car enthusiast.
Our target audience will be mostly male between the age group of 18 to 60, although the
organisation is base in Melbourne we will be aiming to not only sell products all around Australia.
Project Management
Timeline
Pre-Project Create outline design goals concepts
1st month Site structure and navigation
User interface design begins
UI design site map
2nd month Art production/Gif animation production
Begin HTML production
Continue HTML production
3rd month Beta Version of site
Internal Testing
Testing and QA
Any necessary modification
Final approval Launch
-
8/3/2019 Assignment 1 5NRM
3/5
Contents
Content scope
The site will be consisting of about 30 to 40 pages with approximately 50,000 words and over 400
graphics.
Content maintenance
After the launch of the site Tempe Tyres will be maintaining the Site using Macromedias
Dreamweaver so they will be able to change any details and add in new stocks.
Functionality
Feature Requirements for users
Search search the website for words, phrases and/or provide them with key topicsfrom which to choose. Result page to rank results and categorise according to
areas of the site.
Online order form Forms to be accompanied by instructions, forms to be saved and accessed atany time by the users.
Contact Us Users are to complete a form that qualifies their enquiry and sends it to adesignated staff member. FAQs will be part of this section of the site.
Subscription emaillists & newsletter
Users are to be able to subscribe and unsubscribe to email lists and e-
newsletter Downloadable files PDFs, images, audio files etc will be on the site and should be accompanied
with description of file type, size and estimated time to download Text only version of
the site
Users are to be offered the choice of only viewing the text on the site, (no
photos, diagrams etc)
Site map Link to site map to be available on every page. Email a friend e-mail a friend is to be available on relevant pages of the site eg information
pages Printer-friendly
function
available on every page of the site. Bookmarking Users are to be able to bookmark specific pages of the site. Links to other sites Links to other sites must enable users to return to this site Animations and
videos
Specify user interface and instructions.
-
8/3/2019 Assignment 1 5NRM
4/5
Budget
The Budget for this Project will be $100,000 provided by Tempe Types with a 15 percent over
overhead cost in case we go over budget.
Team Member $ Rate Est. Hours Subtotal
Project Manager $50.00 500 $25,000.00
Art Director $50.00 90 $4,500.00
Designer $40.00 90 $3,600.00
Art Production $35.00 120 $4,200.00
HTML Production $40.00 400 $16,000.00
Programming $60.00 300 $18,000.00
Copywriting $35.00 100 $3,500.00
QA / Proofing $25.00 40 $1,000.00
15% overhead TOTAL
$75,800.00 $11,370.00 $87,170.00
-
8/3/2019 Assignment 1 5NRM
5/5
Risk Management
All projects have some form of risk attached. This section should provide a list of high-level risks
that the project team has determined apply to this project.
The following risks for the Web Development project have been identified. The project manager willdetermine and employ the necessary risk mitigation/avoidance strategies as appropriate to
minimize the likelihood of these risks:
Risk Event Probability Consequence Priority Response Strategies Accountability Review
Inadequate Funding to
complete the Project
Low Budget blow out Low Re-scope the project time
and resourcing
Project Manager Review
budget
Regular Computer usage Low Staff may suffer from
eyestrains, headache or
strains of joints
Medium Works scheduled so that
staff have breaks from the
computer
Project manager,
Staff
Remind staff
to take break
and have
policies in
placeStress Medium Staff-from pressure of
work demands
Medium Stress Policy in Place Staff
Sensitive Information leak by
packet sniffers
High Significant Financial loss,
irreparable damage to
organisation
High Sensitive information
should be Encrypted using
128 bit Secure socket
layer SSL
Admin
Viruses and malware attacks Medium Information can be
leaked ,
Medium Using Anti viruses and
spyware software to
protect the network and
computer systems from
outside threats and
keeping them up to date
Admin Regular
Software
updates
Software Vulnerability Medium Malware can find holes
in software and cause
Data corruption
High Optimizing performance
and system protection by
maintaining compatibilitywith service and security
updates and patches
Admin Check entire
network for
vulnerabilitiesquarterly and
after new
software is
added
Hacker Getting into the sever High Important data may be
at risk from
Unauthorized or
unwanted activity
High Have a firewall in place to
eliminate unauthorized
activity and safeguard the
network and connections
from outside threats
Admin Frequently
test the
functionality
of security
Unauthorized access to
Customers Data
Medium Important Data can be
leaked by hackers and
finding out information
such as Visa or address
High Customers information
should be Encrypted or
masked in a secure
database on a server that
isnt directly connected to
the internet
Admin, Team
members
Back up Data risk Low Hard copies of sensitive
information can still be
read by unauthorized
users
Medium All hard copies of sensitive
information should be
securely stored and
locked in appropriate
storage rooms, file
cabinets, and desk
drawers, restrict all assess
to hard copy file on need
to know basis
Staff Create and
record an
audit trail of
all individual
access to data
and other
sensitive
information,
have audits at
least once
every 6
months