assignment 1 5nrm

Upload: david-lam

Post on 07-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Assignment 1 5NRM

    1/5

    Table of ContentsWebsite Development Brief .................................................................................................................. 2

    About the Organisation..................................................................................................................... 2

    Target audience ................................................................................................................................ 2

    Project Management ............................................................................................................................ 2

    Timeline ............................................................................................................................................ 2

    Contents ............................................................................................................................................... 3

    Content scope ................................................................................................................................... 3

    Content maintenance ....................................................................................................................... 3

    Functionality ......................................................................................................................................... 3

    Budget .................................................................................................................................................. 4

    Risk Management ................................................................................................................................. 5

  • 8/3/2019 Assignment 1 5NRM

    2/5

    Website Development Brief

    About the Organisation

    Tempe Tyres is an Automotive Company selling wheels and tyres to customers with an extensive

    range of wheels and tyres to choose from.

    Established in 1970s Tempe Tyres has become legendary among car enthusiasts all over the world

    Target audience

    The target audience will be mostly looking at customers who are looking to buy rims and tyres and

    even some car enthusiast.

    Our target audience will be mostly male between the age group of 18 to 60, although the

    organisation is base in Melbourne we will be aiming to not only sell products all around Australia.

    Project Management

    Timeline

    Pre-Project Create outline design goals concepts

    1st month Site structure and navigation

    User interface design begins

    UI design site map

    2nd month Art production/Gif animation production

    Begin HTML production

    Continue HTML production

    3rd month Beta Version of site

    Internal Testing

    Testing and QA

    Any necessary modification

    Final approval Launch

  • 8/3/2019 Assignment 1 5NRM

    3/5

    Contents

    Content scope

    The site will be consisting of about 30 to 40 pages with approximately 50,000 words and over 400

    graphics.

    Content maintenance

    After the launch of the site Tempe Tyres will be maintaining the Site using Macromedias

    Dreamweaver so they will be able to change any details and add in new stocks.

    Functionality

    Feature Requirements for users

    Search search the website for words, phrases and/or provide them with key topicsfrom which to choose. Result page to rank results and categorise according to

    areas of the site.

    Online order form Forms to be accompanied by instructions, forms to be saved and accessed atany time by the users.

    Contact Us Users are to complete a form that qualifies their enquiry and sends it to adesignated staff member. FAQs will be part of this section of the site.

    Subscription emaillists & newsletter

    Users are to be able to subscribe and unsubscribe to email lists and e-

    newsletter Downloadable files PDFs, images, audio files etc will be on the site and should be accompanied

    with description of file type, size and estimated time to download Text only version of

    the site

    Users are to be offered the choice of only viewing the text on the site, (no

    photos, diagrams etc)

    Site map Link to site map to be available on every page. Email a friend e-mail a friend is to be available on relevant pages of the site eg information

    pages Printer-friendly

    function

    available on every page of the site. Bookmarking Users are to be able to bookmark specific pages of the site. Links to other sites Links to other sites must enable users to return to this site Animations and

    videos

    Specify user interface and instructions.

  • 8/3/2019 Assignment 1 5NRM

    4/5

    Budget

    The Budget for this Project will be $100,000 provided by Tempe Types with a 15 percent over

    overhead cost in case we go over budget.

    Team Member $ Rate Est. Hours Subtotal

    Project Manager $50.00 500 $25,000.00

    Art Director $50.00 90 $4,500.00

    Designer $40.00 90 $3,600.00

    Art Production $35.00 120 $4,200.00

    HTML Production $40.00 400 $16,000.00

    Programming $60.00 300 $18,000.00

    Copywriting $35.00 100 $3,500.00

    QA / Proofing $25.00 40 $1,000.00

    15% overhead TOTAL

    $75,800.00 $11,370.00 $87,170.00

  • 8/3/2019 Assignment 1 5NRM

    5/5

    Risk Management

    All projects have some form of risk attached. This section should provide a list of high-level risks

    that the project team has determined apply to this project.

    The following risks for the Web Development project have been identified. The project manager willdetermine and employ the necessary risk mitigation/avoidance strategies as appropriate to

    minimize the likelihood of these risks:

    Risk Event Probability Consequence Priority Response Strategies Accountability Review

    Inadequate Funding to

    complete the Project

    Low Budget blow out Low Re-scope the project time

    and resourcing

    Project Manager Review

    budget

    Regular Computer usage Low Staff may suffer from

    eyestrains, headache or

    strains of joints

    Medium Works scheduled so that

    staff have breaks from the

    computer

    Project manager,

    Staff

    Remind staff

    to take break

    and have

    policies in

    placeStress Medium Staff-from pressure of

    work demands

    Medium Stress Policy in Place Staff

    Sensitive Information leak by

    packet sniffers

    High Significant Financial loss,

    irreparable damage to

    organisation

    High Sensitive information

    should be Encrypted using

    128 bit Secure socket

    layer SSL

    Admin

    Viruses and malware attacks Medium Information can be

    leaked ,

    Medium Using Anti viruses and

    spyware software to

    protect the network and

    computer systems from

    outside threats and

    keeping them up to date

    Admin Regular

    Software

    updates

    Software Vulnerability Medium Malware can find holes

    in software and cause

    Data corruption

    High Optimizing performance

    and system protection by

    maintaining compatibilitywith service and security

    updates and patches

    Admin Check entire

    network for

    vulnerabilitiesquarterly and

    after new

    software is

    added

    Hacker Getting into the sever High Important data may be

    at risk from

    Unauthorized or

    unwanted activity

    High Have a firewall in place to

    eliminate unauthorized

    activity and safeguard the

    network and connections

    from outside threats

    Admin Frequently

    test the

    functionality

    of security

    Unauthorized access to

    Customers Data

    Medium Important Data can be

    leaked by hackers and

    finding out information

    such as Visa or address

    High Customers information

    should be Encrypted or

    masked in a secure

    database on a server that

    isnt directly connected to

    the internet

    Admin, Team

    members

    Back up Data risk Low Hard copies of sensitive

    information can still be

    read by unauthorized

    users

    Medium All hard copies of sensitive

    information should be

    securely stored and

    locked in appropriate

    storage rooms, file

    cabinets, and desk

    drawers, restrict all assess

    to hard copy file on need

    to know basis

    Staff Create and

    record an

    audit trail of

    all individual

    access to data

    and other

    sensitive

    information,

    have audits at

    least once

    every 6

    months