DESCRIPTION

Asset Management Tool. Terry Brown Public Transportation Programs Administrator. Overview. Topics →Brief History of PROGGRES →Walk Thru of PROGGRES →Discussion of Future Enhancements. State Match - Capital. General Asset Needs. Filter Options. Rolling Stock Needs. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Asset Management Tool

www.drpt.virginia.gov

Asset Management Tool

Terry Brown

Public Transportation Programs Administrator

Page 2: Asset Management Tool

Overview

Topics

→Brief History of PROGGRES

→Walk Thru of PROGGRES

→Discussion of Future Enhancements

Page 3: Asset Management Tool

State Match - Capital

State Share of Non-Federal Capital Expenses

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

2004 2005 2006 2007 2008 2009 2010 2011 2012

Fiscal Year

Actual State Share of Non-federal Cost

Target State Match for Rolling Stock

Page 4: Asset Management Tool

General Asset Needs

Page 5: Asset Management Tool

Filter Options

Page 6: Asset Management Tool

Rolling Stock Needs

Page 7: Asset Management Tool

Transit and TDM Investment Themes

Four themes for evaluating investment scenarios – Transit State of Good Repair (SGR)– Transit Capacity Enhancements– TDM Capacity Enhancements– Transit Major Capital Projects

Page 8: Asset Management Tool

Low Investment– Addresses SGR for existing vehicles– Maintains existing service levels plus TDP commitments, escalates costs for inflation

(3%) – Assumes Major Capital Projects currently under development

Moderate Investment– Addresses SGR for existing and future growth vehicles– Increases service levels

• TDPs through 2018• Service level growth consistent with area population growth 2019 through 2040

– Assumes Lower Level of Major Capital Project Investment

High Investment– Addresses SGR for existing and future growth vehicles– Increases service levels

• Moderate Growth plus – 3% service hour growth / year – Top quartile performers– 2% service hour growth / year – 2nd quartile performers

– Assumes High Level of Major Capital Project Investment

Transit Investment Scenarios

Page 9: Asset Management Tool

Investment Scenario

Funding Needs/Revenues Capital Funds

(Millions YOE$)

O&M Funds

(Millions YOE$)

Transit TDM

Low

Investment

Total Funding Needs $15,892 $43,668 $739

Moderate Investment

Total Funding Needs $42,515 $61,293 $897

High

Investment

Total Funding Needs $55,028 $67,606 $1,637

Transit and TDM Investment Scenarios

Page 10: Asset Management Tool

Tiering of Capital Projects

TSDAC is charged with recommending funding tiers within the capital program

For the past four years, DRPT has had two tiers:– 80% for replacement rolling stock– 50-60% for all other capital

Possible tiers for fy15 funding:– Replacement rolling stock / other maintenance – Expansion rolling stock– Bus Stops / Facilities– Other capital