asset management plan part a - general … ranges shire council asset management plan – part a –...
TRANSCRIPT
MACEDON RANGES SHIRE COUNCIL
ASSET MANAGEMENT PLAN
PART A - GENERAL INFORMATION
Adopted – 27 June 2012
Revision History
Issue Date Details By
A March 2012 Draft for comment from Asset Management Committee TG, AM
B May 2012 Draft for comment from Council Staff AM
C May 2012 For Councillor Briefing AM
D 27 June 2012 Adopted Council
CONTENTS
1 EXECUTIVE SUMMARY ............................................................................................... 1
2 INTRODUCTION.......................................................................................................... 2
2.1 Background ............................................................................................................. 3
2.1.1 Plan Format ...................................................................................................... 3
2.1.2 Purpose of the plan .......................................................................................... 3
2.1.3 Relationship with other planning documents ................................................... 4
2.1.4 Assets Included in the Plan ............................................................................... 6
2.1.5 Key Stakeholders .............................................................................................. 7
2.1.6 Organisation structure ..................................................................................... 7
2.2 Goals & Objectives of Asset Ownership ................................................................... 9
2.2.1 Reasons and justification for Asset Ownership ................................................. 9
2.2.2 Links to organisation vision, mission, goals and objectives ............................... 9
2.3 Plan framework ..................................................................................................... 11
2.3.1 Key Elements to the Plan ................................................................................ 11
3 LEVELS OF SERVICE ................................................................................................... 12
3.1 Community Engagement and Expectations ........................................................... 12
3.1.1 Background and Customer Engagement Undertaken ..................................... 12
3.1.2 Customer Service Charter ............................................................................... 13
3.1.3 Community Satisfaction Survey ...................................................................... 13
3.1.1 Pathway - CRM ............................................................................................... 14
3.1.2 Consultation Process ...................................................................................... 14
3.2 Legislative Requirements ....................................................................................... 14
3.3 Community and Technical Levels of Service ........................................................... 15
4 FUTURE DEMAND .................................................................................................... 16
4.1 Demand Forecast .................................................................................................. 16
4.1.1 Municipal Population Forecasts ...................................................................... 16
4.1.2 Population Density along Growth Corridors ................................................... 19
4.1.3 Development Contribution Plans .................................................................... 19
5 RISK MANAGEMENT................................................................................................. 21
5.1 Introduction .......................................................................................................... 21
5.2 Risk Assessment Procedure ................................................................................... 22
5.2.1 Risk Context ................................................................................................... 23
5.2.2 Risk Identification ........................................................................................... 23
5.2.3 Risk Analysis and Evaluation ........................................................................... 23
5.2.4 Risk Treatment ............................................................................................... 23
5.2.5 Consult and Communicate ............................................................................. 23
5.2.6 Monitor and Review Risk ................................................................................ 24
5.3 Risk Register .......................................................................................................... 24
5.4 Risk Management Policy ........................................................................................ 24
5.5 Roles and Responsibilities ..................................................................................... 25
6 LIFECYCLE MANAGEMENT PLANS ............................................................................. 26
6.1 Introduction .......................................................................................................... 26
6.2 Work Category Definitions .................................................................................... 27
6.2.1 Operations ..................................................................................................... 27
6.2.2 Routine Maintenance ..................................................................................... 27
6.2.3 Renewals ........................................................................................................ 28
6.2.4 Upgrades ........................................................................................................ 29
6.2.5 New Works ..................................................................................................... 29
6.2.6 Asset Disposal ................................................................................................ 29
6.3 Asset Hierarchy ..................................................................................................... 30
7 FINANCIAL PLAN ...................................................................................................... 31
7.1 Financial Statements and Projections .................................................................... 31
7.2 Funding Strategy ................................................................................................... 31
7.3 Key Assumptions Made in Financial Forecast ......................................................... 31
8 ASSET MANAGEMENT PRACTICES ............................................................................. 32
9 MONITORING AND REVIEW PROCEDURES ................................................................ 33
10 APPENDICES ............................................................................................................. 34
Appendix A - Organisational Chart ....................................................................................... 34
Appendix B - Consultation Matrix ........................................................................................ 35
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 1
1 EXECUTIVE SUMMARY
The Macedon Ranges Shire Council is responsible for the provision of many community
focussed services and, in doing so, must ensure that its infrastructure assets and community
facilities are maintained in accordance with well-developed asset management programs
and strategic forward plans to enable these services to meet the community needs. Asset
management is seen as a practical and financially responsible means of managing council’s
assets by ensuring that the assets continue to provide a specified level of service delivery to
defined standards over their entire life.
Asset Management Plans (AMP’s) form the centrepiece of council’s business planning
framework. The aim of an asset management plan is to set out how the Council delivers
services to the community on a long term sustainable basis and the infrastructure required
underpinning the service delivery.
The Asset Management Plan is the best place to capture and document corporate
knowledge about assets and importantly service delivery. It influences the future
Operational, Maintenance, Renewal and Capital Investment requirements which in turn
influences the future service delivery. This document addresses high level strategic
objectives facing Council and is a key document to the sustainable management of
community infrastructure.
The Plan has been broken into several parts.
• Part A - General Information - Information common to all assets (this plan)
• Part B - Roads
• Part C - Buildings
• Part D - Drainage
• Part E - Open Space
Part A, this document, covers what would otherwise be repetitive content in the asset
specific plans.
Each of these parts will have their own Executive Summary highlighting issues specific to that
asset group. Most importantly the AMP’s are intended to provide advice to Council on the
financial requirements for long-term sustainability of each asset group. This means
understanding the impact of any funding gap and a plan to manage that gap where it exists.
In addition each part will provide outcomes of financial modelling used to determine long-
term funding requirements for asset renewal and maintenance.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 2
2 INTRODUCTION
Macedon Ranges Shire is located approximately an hour’s drive north of Melbourne’s
Central Business District. It is renowned for its semi-rural lifestyle, unique natural features
such as Hanging Rock, and for the character and heritage of the local townships. An
estimated 38,3601 people were living in the Shire as recorded in 2006 and this is growing.
The Shire has a diverse economic base. Townships in the Shire’s south, including Gisborne,
New Gisborne, Riddells Creek, Romsey, Woodend, Macedon and Mt Macedon, are a focus
for commuters to Melbourne.
In the north, the townships of Kyneton, Lancefield, Malmsbury and Tylden are characterised
by agricultural and manufacturing enterprises. These are based around the Shire’s many
wineries and speciality farms, as well as sheep and cattle grazing, and broad acre cropping.
Other significant industries include light industrial manufacturing, specialty service industries
and tourism-associated enterprises.
Tourism is a growing industry in the Macedon Ranges. Key features include gourmet food,
fine wine, art, major events, natural attractions, the gardens of Mt Macedon, historic
townships and special places to stay. A map of the Shire is provided in Figure 1.
Figure 1: Macedon Ranges Shire Map
Council's main administration centres are located at Kyneton and Gisborne with two service
centres located at Romsey and Woodend and an Operations Centre (Depot) at Woodend.
12006 Census of Population and Housing, Basic Community Profile for Macedon Ranges (Local Government
Area) which remains the copyright of the Australian Bureau of Statistics (ABS)
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 3
2.1 Background
2.1.1 Plan Format
The plan is sectioned into separate parts based on Asset Class:
• Part A - General Information - Information common to all assets (this plan).
• Part B - Roads
• Part C - Buildings
• Part D - Drainage
• Part E - Open Space
2.1.2 Purpose of the plan
Council’s infrastructure represents a significant investment by the community and is vital to
its health and well-being. Stewardship of infrastructure is a core Council function. Sound
asset management is necessary to enable Council to meet its responsibilities to:
• Provide services to current and future generations;
• Provide and maintain community infrastructure within the Shire, and;
• Encourage and support the economic and social development of the Shire.
Outputs provided by the management and development of the Council Infrastructure
contribute to the economy and health and safety of the community. This enables orderly and
safe use of roads, buildings, parks and supporting infrastructure throughout the Shire.
The overall objective of Asset Management (AM) is:
“The efficient management of infrastructure assets in a sustainable and planned manner
that supports the delivery of services to the community and its visitors”
The specific purpose of this plan is to:
• Demonstrate responsible stewardship;
• Define and articulate how the infrastructure is and will be managed to achieve Council’s
objectives;
• Provide a basis for customer consultation to determine the appropriate levels of service;
• Manage risk of asset failure;
• Achieve savings by optimising whole of life costs; and
• Support long term financial planning.
The outcomes of the plan will identify the future funding requirements for service delivery
accounting for the following factors:
• Adopted Levels of Service;
• Future demand for infrastructure;
• Current asset performance;
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 4
• Asset Failure;
• Risk;
• Required works; and
• Funding constraints.
This Asset Management Plans are living documents that will be formally reviewed and
improved every three years.
2.1.3 Relationship with other planning documents
The relationship of this plan to other plans and policies is outlined in Table 1. This asset
management plan has strong linkages particularly with Councils Vision 2025, Council Plan
2009-2013, Strategic Resource Plan, Annual Report, Asset Management Policy and Asset
Management Strategy.
Table 1: Relationship with Other Plans
Plan Description
Vision 2025
The Macedon Ranges Vision 2025 is a plan for how we want our community to be in 2025. It has been developed over a two-year-period with input from a range of people through a variety of forums and activities. It expresses the fundamental values and beliefs of our citizens in relation to their community and environment and sets out a vision for what our community wants and needs, projected well into the future.
Council Plan 2009-2013
The Council Plan outlines many of the major activities that the Macedon Ranges Shire Council will undertake to ensure that the work and priorities set by Council align with the Macedon Ranges 2025 Vision Statement. This Asset Management Plan review process is a key action identified in Outcome 3.2. Sustainable Asset Management.
Strategic Resource Plan The Strategic Resource Plan describes the resources and long-term financial strategies that Council needs to achieve its Vision, Goals and Outcomes that are defined in the Council Plan.
Long Term Financial Plan
The Long Term Financial Plan sets the high level financial parameters that guide the development of service levels, revenue levels and budgets in line with long term strategies and objectives in a financially sustainable manner.
Annual Report The Annual Report outlines the specific actions to which Council has committed to in the coming financial year and performance statements for the current financial year.
Asset Management Policy Broadly outlines the relevance of asset management to Council and provides the framework for which Council will undertake the long-term management of its assets.
Asset Management Strategy
Outlines Council’s strategic approach to asset management and discusses the future direction of Council through identification of asset management goals and initiatives. Also identifies the actions required to improve asset management within Council over a five-year-period.
Risk Management Policy This policy was updated in September 2011, it defines risk, sets the policy statement and outlines risk responsibilities across the organisation.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 5
Plan Description
Risk Management Strategy The purpose of this document is to set out the strategy ensuring that Risk Management is incorporated both within the corporate planning framework and day-to-day operations of the Council.
Capital Investment Guidelines
This document provides a framework by which Macedon Ranges evaluates its list of proposed capital projects. The guidelines assess the risk of doing/not doing the work as well as allowing users to detail the benefits and the ongoing annualised service and operating cost of specific projects. The project list is then prioritised based on the outcomes of business case evaluation.
Asset Handover procedure for Infrastructure Assets
The purpose of this document is to ensure that all Council infrastructure assets, whether gifted from private developers, Council Capital Works or Development Contribution Plan works, are handed over to Council and maintenance activities commence promptly after completion of works.
Asset Responsibility Matrix This matrix identifies the general responsibilities for various stages of the asset life cycle at an asset sub-class level.
Occupational, Health and Safety (OH&S) Policy
Outlines the objectives, responsibilities and application of this policy, directed at providing a safe and healthy work environment for all.
Settlement Strategy
The Settlement Strategy responds to Macedon Ranges Shire Council’s identified need for an integrated long term plan to manage the growth and development of the Shire. The Strategy provides the overall direction for urban growth – consistent with environmental constraints, community aspirations and government policy – until 2036.
Information & Communications Technology
Strategy
This outlines the utilisation of technology to assist Departments within Council to operate more efficiently. The use of the Asset Management System and the Infra-Active system are central to Council’s I.T. strategy for assets.
Community Infrastructure Contribution Policy
To ensure the community’s social wellbeing and health, economy and environment through provision of infrastructure, Council in partnership with the development industry has a responsibility to ensure adequate resources are provided. This policy is therefore written to achieve a shared responsibility for our community’s future between Council and the development industry.
Engineering Requirements for Infrastructure
Construction
These guidelines detail the engineering requirements associated with infrastructure construction resulting from development within the Shire. Key areas for consideration include requirements for roads and drainage, landscaping, street lighting, developer contributions to infrastructure and community infrastructure levy, and property owner contributions towards road and footpath construction in unconstructed or partially constructed road reserves.
Customer Service Charter This document has been developed in consultation with all staff and reflects the standards of customer service that have been adopted by Council and accepted by its staff.
Community Plans Developed on a town-by-town basis each community action plan identifies priority actions that are in line with the town’s direction: “Where does the town want to be?”.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 6
Plan Description
Small Town Strategy
The study was prepared in conjunction with local communities, Council and key service authorities. It attempts to balance the aspirations of the community against any physical or servicing constraints to identify what aspirations can be realised. The Study looks at land use planning issues in:
• Carlsruhe;
• Darraweit Guim;
• Lancefield;
• Lauriston;
• Macedon;
• Malmsbury;
• Monegeetta – Bolinda;
• Mount Macedon;
• Newham; and
• Tylden.
Other documents with a direct relationship to specific assets are listed in that specific Asset
Management Plan.
2.1.4 Assets Included in the Plan
Council’s asset classification is described in Table 2.
Table 2: Assets Included in the Plan
Part Asset Class Assets Groups
A General Information All Asset Groups
B Roads
Road Pavement
Paths
Kerb & Channel
Bridges & Major Culverts
Road Furniture
C Buildings
Community Facilities
Recreation, Leisure and Cultural
Tourism
Municipal
Open Space
D Drainage
Underground Drainage
Surface Drainage
Water Quality Devices
Flood Prevention
E Open Space
Open Space Infrastructure
Sportsgrounds
Playgrounds
Trees
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 7
2.1.5 Key Stakeholders
Assets are provided to support the services Council delivers to the community. Table 3
shows the key stakeholders with an interest in infrastructure service and performance.
Table 3: Key Stakeholders
Government
Victorian Government having responsibility for Local
Government. Victorian and Australian Governments fund
infrastructure developments.
Councillors As stewards of Council’s assets.
Ratepayers/Residents Value for money, standards, levels of service. Expect to be
provided with efficient, reliable and safe services that meet
agreed levels of service. Visitors Having expectations as temporary users of Council services.
Council Staff Having responsibility for the implementation of asset
management strategies to ensure effective and efficient
management of assets.
Contractors/Suppliers As providers of services required to undertake management
activities.
Insurers Integral to risk management strategies that require sound
AM practice.
User Groups Having expectations as temporary users.
Committees of Management (CoM)
As providers of services required to undertake management
activities.
Stakeholders with an involvement with specific assets are detailed in each AMP.
2.1.6 Organisation structure
2.1.6.1 Organisational Chart
The organizational chart details the relationship and lines of authority within Council. This
chart is included in Appendix A.
2.1.6.2 Roles & Responsibilities
Council has set out general responsibilities for various stages of the asset life-cycle at an
Asset Sub-Class Level. The responsibilities and allocation of the roles are listed in the Asset
Responsibility Matrix which forms part of the Asset Management Strategy. Table 4 shows
the various stages of the asset life-cycle. For the roles allocated under the Asset
Responsibility Matrix refer to the Asset Management Strategy.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 8
Table 4: Various Stages of Asset Life-cycle
Element Description
OWNER The Asset Owner is a Director who is ultimately responsible for the asset.
CLIENT The Client is a Manager or Director who requires the asset to deliver
services.
PLANNING Asset Planners are responsible for planning to meet the needs of the
community through the use of specific assets. Asset planning covers the
following items:
Consultation with users
Identifying users' needs
Setting service levels
Identifying future demand
Risk identification
DESIGN Asset design covers the preparation of concept, preliminary and
construction drawings. Where asset designs are prepared by external
entities the officer responsible for Asset Design is responsible for their
specification and procurement.
CONSTRUCTION Construction deals with the physical acquisition of an asset, either by
construction or purchase. The Asset Constructor is responsible for
managing the acquisition and ensuring that the Council Tendering and
Purchasing Guidelines are adhered to during that process.
OPERATION Asset operation covers the day-to-day use of the asset. The officer
responsible for Asset Operations uses the asset to provide a service to the
community. Actions by asset operators could include:
Setting and managing lease arrangements
Monitoring and reviewing service levels
Responding to Citizen/user enquiries
Requesting additional capital works to increase the level of service
MAINTENANCE The Maintenance Manager is responsible for maintenance of the asset.
This includes contact with citizens when requests for maintenance are
received from users.
RENEWAL The Manager responsible for Asset Renewal plans and executes major
works to the asset that either result in a significant extension of its
operating life or replacement of the asset at the end of its life.
DISPOSAL The Manager responsible for Disposal of an asset arranges for its disposal
according to Council policy and statutory requirements.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 9
2.2 Goals & Objectives of Asset Ownership
2.2.1 Reasons and justification for Asset Ownership
The Local Government Act 1989 prescribes the objectives and functions of a municipal
council. Section 3C(1) of the Act states:
“The primary objective of a Council is to endeavour to achieve the best
outcomes for the local community having regard to the long term and
cumulative effects of decisions.”
Section 3C(2) of the Act then adds more substance to the primary objective by specifying a
number of facilitating objectives such as:
a. To promote the social, economic and environmental viability and
sustainability of the municipal district;
b. To ensure that resources are used efficiently and effectively and services are
provided in accordance with the best value principles to meet the needs of
the community;
c. To improve the overall quality of life of people in the community;
d. To ensure that services and facilities provided by Council are accessible and
equitable.
Section 3E(1) of the Act prescribes a number of council functions, the ones particularly
relevant to asset management being:
a. Planning for and providing services and facilities for the local community; and
b. Providing and maintaining community infrastructure in the municipal district.
The objectives and functions set out in the Local Government Act 1989 also closely accord
with the overall goals and principles of asset management. This plan will therefore seek to
establish a balance between meeting the level of service required by the community with
the level of funding available to operate and maintain the infrastructure.
2.2.2 Links to organisation vision, mission, goals and objectives
The operation and development of the Council owned infrastructure will be guided by and
consistent with Council’s vision and key objectives as stated in the Council Plan, Asset
Management Policy and Asset Management Strategy.
Council’s key strategic goal that overarches this asset management plan is ‘Sustainable
Environment and Infrastructure’. As stated in the Council Plan 2009-2013 this goal is defined
below and outlines Councils intentions in regard to Macedon Ranges Shire’s built and natural
environments:
“Safe, functional assets and a protected natural environment.”
“To promote responsible and sustainable planning, open space and environmental
practices when developing and maintaining community and natural assets.”
The four outcomes supporting this goal are set out in Table 5.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 10
Table 5: Outcomes supporting Council’s Strategic Infrastructure Goal
No. Outcome Details
1 Enhanced and Protected
Natural Environment
Protect the area’s natural environment through strategies and actions that address roadsides, waterways, remnant
vegetation, fire prevention, volunteer/land care initiatives, recycling and waste minimisation.
2 Effective and Sustainable
Maintenance of Assets and Open Space
Ensure that asset management strategies for our built environment are sustainable and funding is reflective of our objective to reduce the asset renewal and maintenance gap
whilst meeting current and future community needs.
3 Sustainable Asset
Management
Ensure that our infrastructure assets are maintained in a manner that is sustainable whilst minimising risk and our open
space is presented in a safe condition that encourages participation.
4 Infrastructure that meets
Community Needs
Ensure infrastructure Planning and Major Project delivery is co-ordinated and driven by clear strategic planning and
sustainable funding.
This asset management plan is supported by Council’s vision, mission and goals as identified
in the Asset Management Policy:
Council’s vision is to:
“Provide leadership in this inspired region by providing the opportunity for all to live a
fulfilling life, whilst protecting our heritage, environment and a sense of community
through our shared commitment to a sustainable Macedon Ranges.”
One of Council’s missions is to:
“Provide physical assets such as roads, footpaths, drains, buildings and public
amenities which are the fundamental infrastructure of a community and facilitate
safe, healthy and equitable access and service delivery for our community and
visitors.”
The goals as identified in the Asset Management policy are:
• To maintain an accurate, consistent and consolidated register, which records all of our
assets, purchases, sales, as well as depleted or redundant assets;
• To undertake a life cycle approach to the management of infrastructure assets and
utilise asset management tools to assist in life cycle modelling;
• To regularly maintain and renew assets to assist in the delivery of the required level of
service and to ensure assets continue to function as built, for their full life; and
• To prioritise funding for the maintenance, operation and renewal of existing assets
above the funding of new assets.
• To develop and implement guidelines for the allocation of financial resources, both
Capital and Recurrent, over short and long term timelines to meet projected growth due
to new development. New development includes Development Contribution Plan
works, Council Capital Works and gifted works from private developers.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 11
2.3 Plan framework
2.3.1 Key Elements to the Plan
The plan format is consistent with that recommended in the International Infrastructure
Management Manual (IIMM) developed jointly by the NZ National Asset management
Steering Group and the Institute of Public Works Engineering of Australia.
The key elements of the Asset Management Plan are:
• Levels of Service
This outlines the levels of service required based on customer research and
expectations, statutory requirements and strategic and corporate goals. It also
contains tables detailing expected and current performance measures.
• Future Demand
This section details the future growth trends, the impact of these trends on
infrastructure and demand management strategies to deal with the projected
growth.
• Risk
This section outlines Council’s risk management framework. It also contains tables of
risk events, their severity and consequence.
• Lifecycle Management
This gives an overview of the whole life management of each asset type. For each
asset type it details (where applicable) it’s current performance, maintenance plan,
renewal plan, replacement plan, disposal plan, creation plan and development plan.
• Financial Summary
This section details the 20 year financial forecast with its associated assumptions and
sensitivity analysis. It contains an asset valuation for each asset type and their
associated confidence levels. It also outlines the Council’s funding strategy.
• Plan Monitoring & Improvement
This section deals with methods of monitoring performance by detailing asset
management processes, systems and data. It outlines an asset management
improvement plan and details procedures for monitoring and review.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 12
3 LEVELS OF SERVICE
The levels of service will be refined over a period of time to respond to the expectations of
customers (users and other stakeholders). This will require a clear understanding of
customers’ needs, expectations and preferences, and their willingness to pay for any
increase in levels of service.
The levels of service (LOS) defined in this section will be used to:
• Inform customers of the level of service offered by assets;
• Formulate life cycle asset management strategies to deliver these defined levels of
service;
• Measure performance of the asset management strategies; and
• Enable customers to assess suitability, affordability and equity of the services offered.
The LOS reflects Council’s current service delivery and are based on:
• Customer Research and Expectations.
Information gained from customers on expected quality and price of services.
• Strategic and corporate goals.
Provide guidance for the scope of current and future services offered, the manner of
service delivery and defines the specific levels of service, which the organisation wishes
to achieve.
• Legislative Requirements.
Legislation, regulations, environmental standards and Council Local Laws that impact on
the way assets are managed (e.g. regulations, health and safety legislation etc.). These
requirements set the minimum level of service to be provided.
• Australian Standards for design and construction of infrastructure.
In providing infrastructure, the Professional Engineer is required to take into account the
relevant standards developed by the profession. These standards will set the minimum
design parameters for infrastructure delivery.
3.1 Community Engagement and Expectations
3.1.1 Background and Customer Engagement Undertaken
Council’s customer research into infrastructure needs and satisfaction includes:
• One-on-one contact (letters, phone calls etc.);
• Annual community satisfaction survey; and
• Implementation of the Pathway – CRM (customer request system).
The annual customer survey measures satisfaction with the overall service. These give a
broad understanding of current customer satisfaction and do not attempt to determine LOS
desired by customers or the reasons behind various satisfaction levels.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 13
Council’s annual customer survey outputs can be used as a tool for:
• Giving a broad view of user demographics;
• Targeting broad areas of asset performance; and
• Targeting focus groups.
3.1.2 Customer Service Charter
Council’s Customer Service Charter expresses Council’s commitment to providing a high
standard of service and ensuring consistency and sustainability in service delivery.
With a commitment to partnering with the community through extensive consultation and
participation, the community is invited to:
• Attend Council meetings and other formal decision making meetings;
• Attend other consultative and community forums involving council to meet and talk
with Councillors and Shire staff and hear about our projects and programs;
• Contact your local Councillor;
• Contact our staff to discuss Council services and projects; and
• Participate in processes that will assist us to measure, evaluate and improve our
customer service performance.
3.1.3 Community Satisfaction Survey
The community satisfaction survey is an independent state-wide survey of local Councils
which measures residents’ satisfaction with the service and performance of their local
Councils. The community satisfaction survey is undertaken annually and the latest results
are for 2011. For each measure, residents indicated their level of satisfaction by means of a
five-point-scale as shown in Table 6:
Table 6: Survey Scoring System
Score Scale Results
5 Excellent – outstanding performance
4 Good – a high standard
3 Adequate – an acceptable standard
2 Needs some improvement
1 Needs a lot of improvement
A number of areas were measured including:
• Overall performance generally of the Council;
• Council’s advocacy and community representation on key local issues;
• Council’s engagement in decision-making on key local issues.
• Council’s interaction and responsiveness in dealing with the public; and
• Overall performance in key service areas and responsibilities.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 14
3.1.1 Pathway - CRM
All customer complaints, requests and enquiries, whether in person, by phone or by mail, are
logged in Pathway – CRM, Council’s customer request system. The request is categorised by
asset type and location, automatically assigned to a department and sends an e-mail
notification to the appropriate actioning officer. An appropriate response time for
responding to the customer and dealing with the issue is built into the system for escalation
and reporting purposes.
This system has been in operation since November 2011 when it replaced the previous Infra-
Active Customer Request System. Reports on Customer Request information can be
extracted for some asset groups.
3.1.2 Consultation Process
Public consultation is undertaken in accordance with Council’s Community Consultation
Framework and associated consultation matrix.
The Community Consultation Framework provides clear guidelines for both the community
and Council on how and when the community will be consulted on matters being considered
by Council.
The consultation matrix looks at the consultation methods against the consultation type as
detailed in Appendix B.
The outcomes of public consultation are used to identify issues of concern to the community
and to assess the satisfaction of the community with the performance of Council.
3.2 Legislative Requirements
Background legislation of regulations which impacts on the asset operation and performance
or specifies a certain level of service are listed in the asset specific plans and include a brief
explanation of the requirement.
Legislation or regulations which may impact on all assets includes:
• Local Government Act, 1989
• Local Government (Best Value Principles) Act 1999
• Occupational Health and Safety Act 2004
• Equal Opportunity Act 1995
• Environment Protection Act 1970
• Emergency Management Act 1986
• Planning and Environment Act 1987
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 15
3.3 Community and Technical Levels of Service
There are two types of service levels required:
• Community based; and
• Technical based.
Council has acknowledged and recognised results from Community Satisfaction Surveys and
requests within Council’s Pathway System and used these to established Community Levels
of Service.
The next step for Council in defining the Community Levels of Service is to have a good
understanding of the cost to deliver the ‘current’ Levels of Service. This will enable Council
to undertake Community Consultation and negotiate the agreed level of service targets.
Technical based service levels define the measures and targets in place to allow Council to
manage its infrastructure to a standard ensuring satisfactory achievement of the community
levels of service. The technical levels of service support the processes engaged to meet
community expectations.
Council has a commitment to establishing individual Service Plans for the services it provides.
Customer Levels of Service and the Technical Levels which support them, will be stated in
the relevant Service Plans.
Council’s current levels of service for asset based indicators will be detailed in asset specific
plans and will be developed further as Service Plans are completed.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 16
4 FUTURE DEMAND
4.1 Demand Forecast
Demand management is all about understanding the changes occurring within the Shire and
managing these changes into the future. Such changes can be population, demographic,
industry, climate change, technological etc.
With this in mind MRSC plans for future infrastructure requirements by considering:
• Population Growth;
• Proposed Township Development Programs; and
• Demographic profiles.
By understanding the growth trends and demographic changes occurring within the Shire,
Council can make decisions that address demand and support the need to undertake
improvement works or to build a new asset.
Improvement works or new infrastructure may be funded by:
• Council;
• Developers; or
• Committees of Management through Government grants.
Understanding population growth and demographic profiles allows the need for
improvement works and new infrastructure to be predicted. MRSC in turn considers the
impact of demand on existing infrastructure as well as the need for new facilities to support
changes in demand.
The impact of trends on infrastructure is examined and demand management strategies are
available, if required, as a technique to manage demand without compromising customer
expectations.
This section provides details of municipal population and growth forecasts which may affect
the management and utilization of assets.
4.1.1 Municipal Population Forecasts
The population of Macedon Ranges Shire is growing. An estimated 38,3602 people were
living in the Macedon Ranges Shire in 2006. This is an increase of 2,103 persons from 2001.
Gisborne is the largest township in the Macedon Ranges Shire with a 2006 population of
6,248 in the core town and 8,900 if surrounding Rural Living Zone land is included.
22006 Census of Population and Housing, Basic Community Profile for Macedon Ranges (Local Government Area) which remains the
copyright of the Australian Bureau of Statistics (ABS)
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 17
Population growth for each major town within Macedon Ranges Shire is identified in Table 7.
The data is taken from the Settlement Strategy 2011 and portrays the growth areas within
the municipality. Note that these figures relate to a town and its rural living surrounds.
Table 7: Macedon Ranges Settlement Strategy - Recommended Population Projections for Macedon Ranges Shire 3
2006
Population Recommended population 2036
Increase in population 2006
to 2036
Est. lot supply required to
accommodate 2036 population
Theoretical vacant lot supply
(lower) @ 85% take-up 4
Larg
er S
ettle
men
ts &
S
urro
unds
Gisborne 5 8,900 14,700 5,800 2,200 3,320
Kyneton 5,700 8,600 2,900 1,310 1,3106
Lancefield 2,000 3,000 1,000 480 590
Macedon 1,400 1,400 0 0 n/a
Malmsbury 700 900 200 90 230
Mt Macedon 1,100 1,100 0 n/a n/a
Riddells Creek 3,500 6,100 2,600 950 520
Romsey 4,100 6,000 1,900 760 760
Woodend 3,700 5,000 1,300 530 520
Rur
al S
ettle
men
ts
Ashbourne 320 320 0 0 0
Benloch 430 430 0 0 0
Bullengarook 710 710 0 n/a n/a
Carlsruhe 7 460 460 0 n/a n/a
Clarkefield 8 0 50 50 20 20
Darraweit Guim 700 720 20 10 10
Tylden 360 500 140 60 60
Newham 590 600 10 5 5
Lauriston 4 560 560 0 0 0 Balance 4,770 4,770 0 0 0 Total 40,000 55,920 15,920 6,415 7,345
3 Project figures subject to change depending on the outcome of Planning Scheme Amendment C84
4For assumption refer to Appendix 4 of the Settlement Strategy
5This generally represents 12,100 people within the Gisborne ODP area, as projected by the ODP, plus the surrounding rural living
population
6Includes increased density in-fill opportunities within 400m of the town centre
7Theoretically land supply could accommodate growth however Coliban Water has indicated that no additional population growth
should be accommodated. Some development subject to resolution of waste water and other constraints
8Refer p. 24 for discussion of issues relating to Clarkefield
Note: Numbers subject to rounding
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 18
Source: Macedon Ranges Settlement Strategy 2011 page 6
The population expectations between 2006 and 2036 show Gisborne, Kyneton and Riddells
Creek as the primary growth areas. Macedon, Mount Macedon, Ashbourne, Benloch,
Bullengarook, Carlsruhe and Lauriston show no change in population.
Based on the recommended change for 2036 the townships experiencing significant growth
are expected to be, in order of magnitude:
• Gisborne;
• Kyneton;
• Riddells Creek;
• Romsey;
• Woodend and
• Lancefield.
For this reason it is likely that the most improvement to or additional facilities will be
required in these areas. Gisborne is proposed to almost double in size and will most likely
need additional assets to cater for this increase in population.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 19
4.1.2 Population Density along Growth Corridors
The population density information is taken from ‘Macedon Ranges Shire Demographic
Profile October 2008’ and identifies that the population of Macedon Ranges Shire is
concentrated in towns along two corridors as identified in Figure 2:
Figure 2: Population Density within the Shire of Macedon Ranges
Macedon Ranges Shire Council have prepared Outline Development Plans (ODP’s) or
structure plans for two of the shire’s major urban centres, Gisborne and Romsey. The aim of
an ODP is to prepare a detailed plan that provides for the future residential, commercial and
industrial growth within each township. It includes a range of information such as location of
community facilities, road networks, indicative development patterns and issues to consider
when assessing new developments. Objectives for infrastructure are stated at a high level
indicating the growth and needs of the township. Similar structure planning will be
undertaken for Kyneton Riddells Creek and Woodend in the 2012-2014 period.
4.1.3 Development Contribution Plans
To ensure the protection and enhancement of the community’s social wellbeing and health,
economy and environment through provision of infrastructure, Council in partnership with
the development industry, has a responsibility to ensure adequate resources and
infrastructure are provided.
As a general planning principal it is considered reasonable that new developments
contribute to the establishment of facilities and services that result from new community
growth.
It is planned that Development Contributions Plans (DCP’s) will be produced to articulate
future infrastructure requirements and financial contributions to be paid at the time of
development. When the DCP becomes a formal and legally operative part of Macedon
Ranges planning scheme this will provide a particular legal mechanism that may be used to
raise (by levy) funds from landowners/developers towards the planned infrastructure
needed by the future community.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 20
A number of Councils have incorporated legally operative DCP’s into their planning schemes
and have been able to levy several thousand dollars per residential lot in the particular
subdivision towards the provision of community facilities and open space.
To have the DCP approved and incorporated into the Macedon Ranges Planning Scheme
detailed strategic planning work is required. The DCP must include a clear time horizon and
detailed justification and apportionment methods. Macedon Ranges Shire Council will
progressively develop full Development Contribution Plans.
DCP’s are being prepared for Gisborne and Romsey with the DCP for Romsey well advanced
and submitted to the Minister for Planning for final approval in April 2012.
At the time of writing, the Development Contribution Plans are not yet complete and are as
yet not operative. At present developers do not contribute a levy for community
infrastructure.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 21
5 RISK MANAGEMENT
5.1 Introduction
The risk management process is consistent with the Australian Standards AS/NZS ISO
31000:2009, which defines the risk assessment and management process. This is shown in
Figure 3.
Figure 3: Risk Management Process (AS/NZS:ISO 31000:2009)
Co
mm
un
ica
tio
n &
Co
nsu
lta
tio
n
Establish the Context
Risk Identification
Risk Treatment
Risk Evaluation
Risk Analysis
Mo
nit
ori
ng
& R
ev
iew
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 22
The major elements of the risk process are:
• Establishing the context – Agreeing and articulating the organisations risk management
objectives and setting the scope and risk criteria.
• Risk assessment – Risk assessment is the overall process of risk identification, analysis
and evaluation.
• Risk identification – The aim of risk identification is to generate a comprehensive list of
risk based on those events that might create, enhance, prevent, degrade, accelerate or
delay the achievement of objectives.
• Risk analysis – Risk analysis involves identifying the likelihood and consequences of an
event and assessing the existing controls to provide a sound basis for evaluation.
• Risk evaluation – Risk evaluation is the rating of risks on a hierarchy of low to very high
to enable informed decisions to be made on the priority of the risk and the risk
treatments required.
• Risk treatment – Risk treatment involves selecting appropriate methods to reduce the
risk to a tolerable level. This may include actions to reduce the likelihood of events,
mitigate the consequences, eliminate the risk or reduce exposure through insurance.
• Communication and consultation – Internal and external stakeholders need to be
informed of the process, consulted and engaged in the identification and mitigation of
risks if Council is to achieve its risk management objectives.
• Monitoring and review – Monitoring and review are essential in risk management to
ensure that controls are effective, changes to risks are identified and controls adjusted
accordingly and new emerging risks are identified.
5.2 Risk Assessment Procedure
At present Council have not yet undertaken significant work in the five steps of risk
assessment, however work is currently being undertaken to develop these. In this process
Council intends to make its staff more aware of risk management issues.
The Macedon Ranges Shire Council’s Risk Management Strategy was approved by the Risk
Management Committee and signed off by Council’s Chief Executive Officer in March 2006.
The Strategy outlines Councils strategic risk approach. The strategic approach taken by
Council to manage risk is to approach it from three levels:
• Proactive staff involvement;
• High level management focus; and
• Independent 3rd
party assessments.
The Risk Management Strategy also outlines the risk management process, via the
incorporation of seven steps undertaken in Risk Management. Each of these steps and
Council’s associated progress are described in the following sub-sections.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 23
5.2.1 Risk Context
The establishment of risk management criteria is one of the most important steps in the risk
management process as it sets the framework for consistent risk decision making.
The key criteria for assessing the consequences of identified risks, adopted by Macedon
Ranges Shire Council, are:
• Direct Repair Cost – cost to repair failure;
• Ecological Impact – cost to rectify damage;
• Safety and Health – payout resulting from injury to people;
• Public Image – cost to rectify bad publicity;
• Liability or Property Damage – cost to repair damaged property;
• Community Service– cost of impact to utilities; and
• Loss of Service – cost of disruption to customers.
5.2.2 Risk Identification
Council are in the process of compiling a list of all infrastructure assets in the appropriate
asset classifications and apply a criticality scoring to each based on a number of relevant
criteria. Once the list of critical assets has been compiled, risk assessments will then be
undertaken and input to Council’s risk register for ongoing monitoring.
5.2.3 Risk Analysis and Evaluation
The risk analysis considers both the likelihood and consequence of events and asset risks.
The risks to be identified by Council in Step 2 above will be evaluated.
5.2.4 Risk Treatment
Once the risks have been assessed and rated, action plans for these risks will be determined
based on the level of risk. This may involve the treatment or control, acceptance or
transference of the risk. The actions will be documented and reported on through the Risk
Management Committee.
This process is currently being developed by Council with roll out and implementation
occurring over the next 2 years.
5.2.5 Consult and Communicate
Internal and external stakeholders need to be informed and consulted if an organisation is to
be responsible for its own risks. Council have a consultation procedure which outlines how
and when consultation should occur. As far as reasonably practicable, consultation and
communication relating to infrastructure risks will be undertaken when determining the
following:
• What are the high risks;
• Controls or treatments in place to manage the risks;
• The continual monitoring and reviewing process that is in place to ensure additional
risks or changes to risk are managed and accounted for; and
• What the risk strategies are moving forward.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 24
5.2.6 Monitor and Review Risk
Performance of the risks and management systems may change; and new risks may be
identified. For this reason continuous monitoring and reviewing of infrastructure risks is vital
to ensure any changes or additions to the risk register are managed as these modifications
may potentially affect the overall risk outcomes. The risk register will be reviewed and
reported on bimonthly at the risk management committee meeting.
5.3 Risk Register
An Organisational Risk Register has been developed and extends to cover risk type,
likelihood, consequence, existing controls and residual risk. Infrastructure risk is currently
only input on an ad hoc basis as individual risks are identified.
5.4 Risk Management Policy
The Risk Management Policy has recently been reviewed and adopted by Council on 13
September 2011. The risk policy statement states:
“...............Macedon Ranges Shire Council will ensure the identified risks are within
acceptable levels for them to help us achieve our objectives, support sustainability, and
safeguard Councils assets, infrastructure, people, finances and reputation.”
The Risk Management Policy identifies Council’s objectives towards risk management. Table
8 lists those objectives that have specific relevance to Council’s infrastructure:
Table 8: Risk Policy Objectives
No. Category Objective
4.1 Council’s activities
Risk Management is to be integrated into Council’s planning, values and culture, operational activities and practices, rather
than being viewed as a separate program.
4.3 Hazard
identification
Hazards and all incidents are to be reported and investigated and remedial action taken to prevent recurrence of the
incident and to eliminate or reduce the hazard.
4.4 Contracts Contracts will have the appropriate risk management
responsibilities clearly allocated consistent with the primary purpose of the Contract.
4.5 Training The development of appropriate risk management skills for
Staff will be developed through education and training.
4.6 Risk
Register
Matters identified in the Risk Register and classified as ‘major risk’ will be reviewed by Council’s Risk Management
Committee.
4.8 Council’s activities
Safe and secure systems of work procedures are to be developed, implemented, maintained and reviewed.
4.9 Council’s activities
Relevant Acts, Regulations, Codes and Standards are to be applied to Council’s activities and practices.
4.10 Council’s activities
The Risk Management Standard AS/NZS ISO 31000:2009 Risk management – Principles and guidelines is to be applied
to Council’s activities and practices and adhered to.
A Risk Management Committee will ensure that the policy is reviewed within two years of
the commencement date.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 25
5.5 Roles and Responsibilities
The responsible parties for risk management within Council as outlined in Council’s Risk
Management Policy are:
• The Chief Executive
Has the ultimate responsibility for ensuring that risk is managed across the Council.
Without changing this general accountability, the Chief Executive may delegate
specific responsibilities and accountabilities regarding risk management however
shall monitor the risk management performance of those concerned.
• Directors
Responsible for:
� establishing the organisations risk appetite;
� monitoring risks outside of Councils risk appetite and ensuring risk controls are in
place and effective;
� development and implementation of a risk management culture;
� ensuring appropriate allocation of resources for risk management strategy
development, implementation, monitoring and actions and;
� monitoring risk management performance.
• Risk Management Committee
Responsible for:
� activities outlined within the Risk Management Committee Charter.
• Managers, Co-ordinators and Team Leaders
Accountable for:
� implementing the Risk Management Policy through appropriate actions in their
area of responsibility;
� insuring that the corporate Risk Register is reviewed, updated and approved
annually;
� consulting with their staff to ensure the reporting, updating and review of the
risks within their unit are updated in the appropriate risk register
� liaising with the Risk Management Unit on any significant risks or changes to risk
profiles and;
� supporting the implementation of a risk management culture.
• Co-ordinator Risk & OH&S
To provide quarterly reports on the corporate Risk Register profiles of all units and
contribute to the development of the corporate Risk Management Strategy through
consultation. This includes ensuring the related actions, plans and systems are in
place.
• All Employees and Service Providers
Responsible for applying risk management practices in their area of work and
ensuring that Macedon Ranges Shire Council management is aware of all types of
risks associated with Council’s operations. This extends to recommending suitable
plans to manage risks and obtaining appropriate approval prior to action.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 26
6 LIFECYCLE MANAGEMENT PLANS
6.1 Introduction
The life-cycle management plan outlines the following:
• The asset hierarchy;
• Management Arrangements;
• Supporting data, including:
- Key life-cycle management issues;
- Asset performance;
- Renewal Gap;
- Asset value; and
- Historical expenditure.
• The management tactics used to achieve the levels of service, identified under the
following work categories:
- Operations;
- Maintenance;
- Renewals;
- Upgrades;
- New Works; and
- Disposals.
These works categories must be separately identified and accounted for because, broadly:
• Operational expenditure must be expensed in the financial year it is incurred. It can be a
‘life-cycle’ asset cost in that it may influence the timing of renewals, but unlike
maintenance, the activity does not physically alter the condition of the asset;
• Routine Maintenance expenditure must also be expensed in the financial year it is
incurred, and is a ‘life-cycle’ asset cost as it physically changes the asset and is a
determinant to the timing of renewals;
• Renewal expenditure is capitalised, replaces the existing asset base, and is directly
related to the ongoing replenishment of ‘service potential’;
• Upgrades are capitalised, and the asset base modified (as appropriate);
• New assets are also capitalised, and added to the asset base; and
• Disposals reduce the asset base.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 27
6.2 Work Category Definitions
Definition of work categories are provided as follows.
6.2.1 Operations
“Asset operation has no effect on asset condition but is necessary to keep the asset
appropriately utilised.”
Operational expenditure is not distinguished from maintenance expenditure in Council
financial systems.
Typical operational activities include:
• Asset cleaning i.e. facilities;
• Graffiti removal;
• Security patrols and alarm monitoring;
• Line marking;
• Drainage pit cleaning;
• Street sweeping;
• Pest Control; and
• Weed Control.
6.2.2 Routine Maintenance
“Routine Maintenance is the day-to-day work required to keep assets operating at
required service levels.”
Routine Maintenance falls into two broad categories:
• Planned (proactive) Maintenance: Proactive inspection and maintenance works planned
to prevent asset failure.
• Unplanned (reactive) Maintenance: Reactive action to correct asset malfunctions and
failures on an as-required basis (i.e. emergency repairs).
Maintenance is carried out as a result of customer complaints, audits or routine inspections.
Typical maintenance activities include:
• Building Repairs;
• Painting;
• Road pothole repairs;
• Spraying, aeration, dressing and seeding patches of ovals;
• Repairs to playground equipment;
• Tree pruning; and
• All other repairs and maintenance which are not classified as renewals.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 28
Maintenance is carried out in response to:
• Defects observed through inspections; and
• Requests via the customer request system.
A key element of advanced AM planning is determining the most cost-effective mix of
planned and unplanned maintenance.
6.2.3 Renewals
“Renewal work is the substantial replacement of the asset or a significant asset
component to its original size and capacity.”
Renewal works are alternatively defined as being:
• The renewal and rehabilitation of existing assets to their original size and capacity, or,
• The replacement of the entire component of the asset with the equivalent size or
capacity, or,
• The replacement component of capital works undertaken to increase the capacity of an
asset (i.e. that portion of the work which restores the assets to its original size and
capacity).
Typical Renewal activities may include:
• Building rehabilitation;
• Resealing (spray seals) of sealed pavements;
• Pavement rehabilitation / reconstruction of sealed pavements;
• Replacement of park seating; or
• Footpath segment replacement.
Replacement of assets shall be on a prioritised basis and determinations may be made in
response to:
• The age of the asset;
• Risk assessments;
• Safety audits;
• Maintenance histories;
• Condition;
• Compliance with current standards; or
• Customer Requests.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 29
6.2.4 Upgrades
“Upgrade work is related to the extension or augmentation of an asset in response to
growth or an increase in the defined levels of service.”
Upgrades are alternatively defined as being:
• Works which improves an asset beyond its original size or capacity; or
• Works which increase the capacity of an asset; or
• Works designed to produce an improvement in the standard and operation of the asset
beyond its original capacity.
Typical Upgrade activities may include:
• Increasing the size of a building (extension);
• Converting an unsealed road to sealed pavement;
• Installing more advanced technology;
• Replacing an existing pipe with one of greater capacity; or
• Improvement works that improve the asset in some way.
Upgrade works shall be on a prioritised basis and determinations may be made in response
to:
• Growth/capacity;
• Social and Environmental needs;
• Compliance with current standards;
• Safety audits;
• Risk assessments;
• Technology; and
• Customer Requests.
6.2.5 New Works
“New works create an asset that did not previously exist.”
New works include new assets inherited as a result of subdivision as well as new assets
created by Council in response to demand requirements, community expectations and
strategic planning.
6.2.6 Asset Disposal
“Sale, removal or decommissioning of an asset.”
The lifecycle management plan provides information about assets, including particular
actions and costs to provide a defined (current and/or target) level of service in the most
cost effective manner.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 30
Assets may become surplus to requirements for any of the following reasons:
• Under-utilisation;
• Obsolescence;
• Provision exceeds required level of service;
• Uneconomic to upgrade or operate;
• Policy change;
• Service provided by other means; and
• Potential risk of ownership.
6.3 Asset Hierarchy
The objective of developing an asset hierarchy is to divide the asset base into appropriate
classifications providing the framework in which data is collected, information is reported
and decisions are made. The hierarchy used in this plan is defined in Table 9.
Table 9 : Definitions of the hierarchy used in this plan
ASSET CLASS An Asset Class is a logical grouping of assets at its highest
functional level within the Asset Hierarchy.
ASSET GROUP
An Asset Group is the most general grouping of the asset
types within the Asset Class that allows for reporting of like
Asset types.
ASSET TYPE An Asset Type is the lowest level of grouping for similar assets
or similar assets that provide similar services.
ASSET
Infrastructure elements (such as an asset component) which
provide services that the community requires or expects in
order to carry out their normal business, private, community
or recreational pursuits.
In most cases, organisations work with an informal asset hierarchy. This often leads to data
being collected to inappropriate levels creating situations where costs escalate with minimal
increases in benefit or insufficient information is available to make informed decisions.
The asset hierarchy is used to improve the understanding of the levels at which decisions
take place and to highlight the levels at which actions such as data collection occur and
outputs are generated.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 31
7 FINANCIAL PLAN
7.1 Financial Statements and Projections
10 year projections based on the practices listed in the Lifecycle Management section for
operations, maintenance, renewal, upgrade, new and disposal costs are included in the
Financial Projections Summary in the asset specific plans
7.2 Funding Strategy
In order to manage and fund various projects within the Shire, Council relies on several
funding sources.
Current funding sources vary and are detailed in the asset specific plans.
7.3 Key Assumptions Made in Financial Forecast
Financial forecasts are an estimate of cash flow requirements to deliver the defined Levels of
Service and cover all expenditure categories (Maintenance, Operations, Renewal, Upgrade
and New).
Financial modelling enables predictions for future funding requirements to be made based
on available data and recent trends in asset life expectancies, condition, replacement costs,
etc. Modelling outcomes are very much dependent on the accuracy of the input data and
how assets are grouped for modelling. It is not a precise process but does provide a degree
of certainty in the outcomes.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 32
8 ASSET MANAGEMENT PRACTICES
Current asset management practices are identified and assessed in the Asset Management
Strategy. Refer Asset Management Strategy July 2009 for detail.
Each asset specific plan will detail the Asset Management Practices associated with the asset
class.
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 33
9 MONITORING AND REVIEW PROCEDURES
The format and content of the Asset Management Plan shall be reviewed on the following
three yearly basis.
The review process is:
Step Description Responsibility Timeframe
1 Review AMP content and report
to Asset Management
Committee, relevant Managers
and staff
Asset Management Analyst in
conjunction with relevant
Asset Providers, Maintenance
Providers, Service Managers
3 year cycle (next
review 2014/15)
2 AMP amended and reported to
Council
Asset Management Analyst /
Relevant Director
June of each cycle
3 AMP amendment adopted Council June of each cycle
4 Review improvement actions in
asset specific plans and report to
Executive
Asset Management Committee Annually
5 Amendments to Improvement
Plan adopted
Executive Annually
Macedon Ranges Shire Council
10 APPENDICES
Appendix A - Organisational
Director Assets and Operations
Manager
Community Safety
Manager Engineering, Infrastructure
& Projects
Manager Operations
Co-ordinator Engineering
Planning
Director Community Wellbeing
Manager Community
Development
Manager Community
Services
Manager Recreation &
Cultural Development
Asset Management Plan – Part A – General Information
Organisational Chart
Chief Executive Officer
Manager Community
Development
Manager Community
Manager Recreation &
Development
Director Corporate Services
Manager Finance
Manager Information &
Communications
Director Planning and Environment
Manager Economic
Development & Tourism
Manager Staturory
Planning & Development
Manager Strategic
Planning & Environment
Manager Council & Customer
Service
General Information
P a g e | 34
Manager Council & Customer
Service
Manager Organisational Development
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 35
Appendix B - Consultation Matrix
Consultation Category/Methods Matrix
The following are recommended methods for each type of issue. However, it is acknowledged that: • Some methods, such as a survey, can take various forms, • The timeframes for the consultation may not coincide with the deadlines of some
newsletters, • Some issues may not warrant a meeting or there may be insufficient interest expressed in
participating in a meeting/discussion, • There may be occasions when council does not consult on a matter due to circumstances/
requirements beyond its control, such as statutory requirements, funding requirements or policy requirements of other levels of government/agencies,
• Specific consultation requirements apply in relation to statutory consultation and land use planning matters.
The reasons for departing from this matrix should be outlined in the implementation plan and/or the report to council.
One-off
issues
Changes to
current
arrangements
on a single site
Area or
neighbourhood
impacts
Service
planning
with
shire-wide
impacts
Major plans
with
shire-wide
impacts
Major
projects
with
shire-wide
impacts
A
Write to every affected
household/group
√
√
√
B
Survey/other forms of formal
market research *
+/-
+/-
+/-
C
Council’s shire-wide ‘Update’
newsletter
+/-
√
√
√
D
Community-based newsletters
+/-
+/-
√
√
√
√
E
Council’s website
+/-
+/-
√
√
√
√
F
Letter/flier to specific area
including community
noticeboards
+/-
G
Council-organised meeting
+/-
√
√
√
√
H
Media release/advertisement
+/-
√
√
√
√
J
Input via advisory committee (if
a relevant committee exists)
√
√
√
√
√
√
Macedon Ranges Shire Council Asset Management Plan – Part A – General Information
P a g e | 36
One-off
issues
Changes to
current
arrangements
on a single site
Area or
neighbourhood
impacts
Service
planning
with
shire-wide
impacts
Major plans
with
shire-wide
impacts
Major
projects
with
shire-wide
impacts
K
Personal contact or meetings on
site
√
√
√
+/- +/- +/-
L
Attendance at community-
organised meetings (if organised)
√
√
√
√
√
√
M
Feedback at council offices/
service centres
√
√
√
√
√
√
N
Pubic exhibition with
submissions invited
√
√
√
O
Feedback formally requested
+/-
√
√
√
√
√
P
Notification on-site (if
appropriate)
√
√
√
√
Re: Statutory Planning matters, refer to the section of Council’s Consultation Framework, titled Consultative Protocol for
Planning Permits.
√ Method to be used
+/- Method will be used when appropriate
* Note: Matters that are identified as requiring surveys/other forms of formal market research will be determined
on a case-by-case basis, when the scoping of the matter and full consultative program is developed.
MACEDON RANGES SHIRE COUNCIL
ASSET MANAGEMENT PLAN
PART B – ROADS
Adopted – 28 September 2011
Review History
Issue Date Details By
A 10 March 2009 Final draft submitted to MRSC for review Gary Rykers
B 25 June 2009 Final RAMP updated after consideration of submissions received AM Co‐ord
C 22 July 2009 Road Asset Management Plan Adopted Council
D April 2011 Review of Road Asset Management Plant TBG / AM
E 24 June 2011 Final Review updated after staff consultation AM Co‐ord
F 19 August 2011 Final Review after public consultation AM Co‐ord
G 28 Sept 2011 Road Asset Management Plan Adopted Council
F 9 October 2012 Current Plan placed in new format to be approved by Executive AM Co‐ord
CONTENTS 1 EXECUTIVE SUMMARY ................................................................................................. 1
2 INTRODUCTION............................................................................................................ 3
2.1 Background ................................................................................................................. 3
2.1.1 Plan Format ......................................................................................................... 3 2.1.2 Relationship with Other Planning Documents .................................................... 3 2.1.3 Assets included in the plan ................................................................................. 4 2.1.4 Asset Ownership and Control ............................................................................. 5 2.1.5 Key Stakeholders in the Plan ............................................................................... 6 2.1.6 Asset Responsibility ............................................................................................. 6
3 LEVELS OF SERVICE ....................................................................................................... 7
3.1 Community Engagement and Expectations ............................................................... 7
3.1.1 Annual Community Satisfaction Survey May 2010 ............................................. 7 3.1.2 Infra‐Active System ............................................................................................. 9
3.2 Legislative Requirements .......................................................................................... 10
3.3 Current Levels of Service .......................................................................................... 14
4 FUTURE DEMAND ...................................................................................................... 19
4.1 Demand Forecast ...................................................................................................... 19
4.1.1 Outline Development Plans .............................................................................. 19 4.1.2 Demographic Profile .......................................................................................... 21 4.1.3 Impact of Trends on Infrastructure ................................................................... 28 4.1.4 New Infrastructure ............................................................................................ 32
4.2 Demand Management Strategies ............................................................................. 33
5 RISK MANAGEMENT .................................................................................................. 34
5.1 Risk Identification ..................................................................................................... 34
6 LIFECYCLE MANAGEMENT PLANS ............................................................................... 35
6.1 Physical Parameters .................................................................................................. 35
6.1.1 Current Issues .................................................................................................... 35 6.1.2 Asset Quantities ................................................................................................ 37
6.2 Asset Capacity/Performance .................................................................................... 37
6.2.1 Performance monitoring ................................................................................... 37
6.3 Asset Condition ......................................................................................................... 38
6.3.1 Condition Monitoring – Asset Condition Survey ............................................... 38 6.3.2 Condition Rating ................................................................................................ 38 6.3.3 Asset Useful Lives & Intervention Levels .......................................................... 38 6.3.4 Current Condition .............................................................................................. 39 6.3.5 Historical Asset Condition ................................................................................. 47
6.4 Asset Valuations ....................................................................................................... 47
6.5 Historical Data .......................................................................................................... 48
6.6 Operations ................................................................................................................ 49
6.7 Inspections ................................................................................................................ 50
6.8 Maintenance ............................................................................................................. 52
6.9 Renewal .................................................................................................................... 53
6.9.1 Renewal Gap ..................................................................................................... 55
6.10 Upgrades ................................................................................................................... 57
6.11 New Works ............................................................................................................... 59
6.12 Disposal Plan ............................................................................................................. 61
7 FINANCIAL PLAN ........................................................................................................ 62
7.1 Financial Statements and Projections ...................................................................... 62
7.2 Funding Strategy ....................................................................................................... 64
7.3 Key Assumptions Made in the Financial Forecast .................................................... 65
7.3.1 Accuracy of the Information ............................................................................. 65 7.3.2 Confidence Levels .............................................................................................. 66
8 ASSET MANAGEMENT PRACTICES .............................................................................. 67
8.1 Asset Management Systems .................................................................................... 67
8.1.1 Current Practices ............................................................................................... 67
9 PLAN IMPROVEMENTS AND MONITORING ................................................................ 68
9.1 Improvement Program ............................................................................................. 68
10 APPENDICES ............................................................................................................... 69
10.1 Road Management Plan Intervention Levels ........................................................... 69
10.2 Improvement Actions ............................................................................................... 85
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 1
1 EXECUTIVE SUMMARY
Council’s road infrastructure represents a significant investment by the community and is vital to its health and well‐being. Stewardship of road infrastructure is a core Council function. Outputs provided by the management and development of the road network and parking facilities contribute to the economy and health and safety of the community. This enables the orderly and safe access to transport throughout the Shire.
The operation , maintenance and development of the road infrastructure will be guided by and consistent with Council’s vision and key objectives as stated in the Council Plan, Asset Management Policy and Asset Management Strategy. This Road Asset Management Plan is intended to demonstrate to stakeholders that Council is managing the road assets responsibly.
Macedon Ranges Shire Council has developed Community based and Technical based Levels of Service. Community based service levels concentrate on customer satisfaction. Intervention levels support the service levels provided to the community as they define the trigger points in determining the type of works to be carried out. They are also very useful in the development of ongoing maintenance programs. Intervention levels are defined in the Macedon Ranges Shire Council Road Management Plan, which forms the framework around which Technical Levels of Services can be established and documented. Relevant extracts from the Macedon Ranges Shire Council Road Management Plan are shown in Appendix 10.1.
The population of Macedon Ranges Shire is growing. An estimated 38,360 people were living in the Shire in 2006. This is an increase of 2,103 persons from 2001. The population growth may impact on the number of roads required within the Shire as well as upgrades to the existing network. Proposed Township Development allows the impacts on infrastructure to be assessed at a township level. Macedon Ranges Shire Council is currently preparing Outline Development Plans for the shire’s major urban centres. The Outline Development Plans document the potential impacts a growing population will have on the townships road network. The aim of these Outline Development Plans is to prepare a detailed plan that provides for the future residential, commercial and industrial growth within each township. The Macedon Ranges Shire Council’s Risk Management Policy and Risk Management Strategy have recently been reviewed. These two documents were approved by the Risk Management Committee and signed off by Council’s Chief Executive Officer in March 2009. The Risk Management Policy identifies Council’s objectives towards risk management. The Risk Management Strategy also outlines the risk management process, via the incorporation of seven steps undertaken in Risk Management. The Engineering Planning Department are responsible for the strategic management and planning of the infrastructure and the Engineering, Infrastructure & Projects Department are responsible for the design of the infrastructure. The ‘roads hierarchy’ has been developed to divide the infrastructure asset base into appropriate classifications, providing the framework in which data is collected, information is reported and decisions are made. The roads hierarchy separates infrastructure assets, within the roads asset class, into five distinct road asset groups, being:
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 2
Road Pavements (sealed and unsealed);
Paths;
Kerb and Channel;
Bridges and Major Culverts; and
Road Furniture. Expenditure is identified for each of the five asset groups, under the following headings: Operations;
Maintenance;
Renewals; and
Upgrades and New Works.
Section 5 of this Plan reports the outcomes of an analysis undertaken for each of the five road asset groups, as assessed using the Renewal Gap Model. The Renewal Gap Model predicts 20‐Year future funding requirements for the renewal of road asset infrastructure. The requirements of the Moloney Model Renewal Gap are considered in developing the 10 year capital program which supports the financial projections contained in this plan. The 10 year predicted expenditure is contained in Section 6.0 of this plan. The key features of the financial projections are: Councils commitment to renewal expenditure increases over time;
Upgrade/new works expenditure peaks in year 2016/17 due to the Aitken St‐Willowbank to Melton Rd upgrade (GMNS); and
Operations and maintenance show a gradual increase over time as the expenditure forecasts are growing in line with the predicted growth of the Macedon Ranges Shire Council asset stock.
The total infrastructure asset replacement value is expected to increase over the next 10 years, from approximately $368 million to $380 million. Furthermore, there is a total loss of service potential of approximately $35 million over the next 10 years, with the current level of planned renewal expenditure. In order to manage and fund various projects within the Shire, Council relies on several funding sources. The current funding sources available for road asset infrastructure include: Roads to Recovery – this is a fixed amount allocated by the Australian Government in
four year blocks with no guarantee of continuance;
Grants Commission – roads component of grant commission funding;
Rate Revenue;
Black Spot/Length funding;
Special Charge Schemes for Infrastructure Works; and
Private developer funded works.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 3
2 INTRODUCTION
2.1 Background
2.1.1 Plan Format
This plan is part of Council’s overall asset management plan as described below:
Part A ‐ General Information: Background and information common to all assets
Part B – Roads (this plan)
Part C – Buildings
Part D ‐ Drainage
Part E ‐ Open Space
2.1.2 Relationship with Other Planning Documents
The relationship of this plan to other specific strategies and plans is outlined in Table 1.
Table 1: Relationship with other Plans
Plan Description
Budget Report 2010/11
Adopted by Council on the 30th June the Budget Report provides the community with a comprehensive description of the revenue, expenditure and resources that Council will require to deliver the complex mix of projects, services, and facilities to our citizens. It also represents the activities and initiatives that are supportive of, and contribute to, the achievement of the goals we have defined in the Council Plan.
Road Management Plan
Adopted in May 2008 the road management plan introduced under the Road Management Act 2004 identifies Council’s current management tactics, responsibilities, processes and activities associated with responsible management of Macedon Ranges' road infrastructure. This plan is currently under review.
Romsey ODP, 2009 The Romsey Outline Development Plan (ODP) aims to provide a detailed plan for the future residential, commercial and industrial growth of Romsey, with planning horizons to 2021 and 2031.
Gisborne ODP, 2009
The outcomes of this project will provide Council and the community with a clear overall structure plan that sets out main road networks, open space areas, location of community facilities, land use directions and details of issues that need to be considered when assessing subdivision applications.
Gisborne Urban Design Framework (UDF), 2008
The Shire of Macedon Ranges has prepared an Urban Design Framework (UDF) to guide the future of Gisborne. The UDF builds upon work already undertaken by the Council in preparing an Outline Development Plan for Gisborne and New Gisborne. The UDF will ensure that future streetscape works, commercial development and public sphere projects throughout the Gisborne Activity Centre are delivered in a planned, efficient and orderly fashion. The process of preparing a UDF is an opportunity for Council and the community to discuss the future of Gisborne, addressing social and economic issues, future development, housing opportunities, transport options and the education and recreation role of the centre. The UDF has received funding from the Department of Planning and Community Development as a part of the Creating Better Places Program.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 4
Plan Description
Natural Environment Strategy Provides an ideological and strategic framework to direct the Shire towards ecologically sustainable development. This strategy is currently under review.
Open Space Strategy This outlines Council’s Open Space visions and goals. It also outlines strategies to achieve these goals.
Road Safety Strategy (Adopted 2008)
Identifies the strategies proposed to ensure safety on all roads within the Shire is maintained/improved.
Tourism Policy
(Adopted 27 July 2005)
This outlines Council’s vision, mission and key values for tourism in the Macedon Ranges Shire.
Special Charge Scheme for Infrastructure Works
Adopted in 2004 this policy details the intention of road construction, path construction and drainage construction contributions under a special charge scheme.
Contracts Identifies the requirements under a contract for the provision of works undertaken for Council.
Bicycle Strategy This outlines bicycle strategies based on cyclist’s requirements and existing routes.
Weed Strategy Identifies Council’s responsibilities for weed control and provides actions to address these responsibilities.
Fire Operation Manual The Fire Operation Manual includes maps showing designated fire breaks and fire access tracks and describes the works to be carried out for fire prevention purposes.
2.1.3 Assets included in the plan
The assets included in this plan are shown in Figure 1
Figure 1: Roads – Asset Hierarchy
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 5
2.1.4 Asset Ownership and Control
Council has the option of owning road assets or supporting private sector developers/landowners in the provision of roads through development of private access roads and right‐of‐ways in accordance with engineering standards and planning objectives. Transportation is generally regarded as the most essential activity associated with enhancing the Shires economy and accessibility. According to the Local Government Act 1989 the purposes of a Council are to: Provide for the peace, order and good government of its municipal district;
Facilitate and encourage appropriate development of its municipal district in the best interests of the community;
Provide equitable and appropriate services and facilities for the community and to ensure that those services and facilities are managed efficiently and effectively; and
Manage, improve and develop the resources of its district efficiently and effectively.
Schedule 10 of the Act outlines the powers of Council over roads under the headings of: Power to construct and maintain roads;
Power to deviate roads;
Power to discontinue roads;
Power to take road‐making materials;
Power to name roads, erect signs and require premises to be numbered;
Power to establish survey marks;
Power to fix road alignment;
Power to narrow or widen roads;
Power to provide for temporary roads;
Powers concerning fences, gates and by‐passes;
Power concerning holes and other dangers; and
Powers concerning crossings over paths and channels.
Schedule 11 of the Act outlines the powers of Council over traffic under the headings of: Powers concerning parking;
Power to issue special parking permits;
Power to remove unregistered or abandoned vehicles;
Power to move obstructing vehicles;
Power to move other obstructions;
Power to restrict traffic near a construction site;
Power to close road on seasonal basis;
Power to erect and remove works and structures;
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 6
Power to place obstructions or barriers on a road permanently;
Power to place obstructions or barriers on a road temporarily;
Powers concerning shopping malls;
Power to restrict use of road by vehicles of a certain size etc.;
Power to determine speed limits; and
Power to prohibit traffic on unsafe roads.
2.1.5 Key Stakeholders in the Plan
This plan is intended to demonstrate to stakeholders that Council is managing the road assets responsibly. In addition to the key stakeholders identified in Part A, Table 2 shows stakeholders having interests and/or expectations specific to roads:
Table 2: Key Stakeholders
Utilities/Developers As non-road infrastructure providers.
Special Interest Groups Their own interests in road infrastructure.
2.1.6 Asset Responsibility
Many departments play a role in the management of Council’s road portfolio. The directorates and supporting departments involved are listed below: Assets and Environment Directorate
− Engineering, Infrastructure & Projects;
− Operations; and
− Engineering Planning.
Community Wellbeing Directorate
− Community Development;
− Community Services; and
− Recreation and Cultural Development.
Planning & Environment Directorate
- Economic Development and Tourism;
- Strategic Planning and Environment; and
- Planning and Development.
The Asset Responsibility Matrix is contained within the Asset Management Strategy. The Asset Responsibility Matrix is reviewed regularly and as changes are made the matrix in the strategy is updated.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 7
3 LEVELS OF SERVICE
3.1 Community Engagement and Expectations
Transport related levels of service are driven by both customer expectation and legislative requirements. Changes to levels of service are inspired by customer dissatisfaction gained through customer survey feedback or customer requests.
3.1.1 Annual Community Satisfaction Survey May 2010
The community satisfaction survey is an independent state‐wide survey of local Councils which measures residents’ satisfaction with the service and performance of their local Councils. The last community satisfaction survey was undertaken in 2010. For each measure, residents indicated their level of satisfaction by means of a five‐point‐scale as shown below:
Score Scale Results
5 Excellent – outstanding performance
4 Good – a high standard
3 Adequate – an acceptable standard
2 Needs some improvement
1 Needs a lot of improvement
A number of areas were measured including: Overall performance generally of the Council;
Council’s advocacy and community representation on key local issues;
Council’s engagement in decision making on key local issues.
Council’s interaction and responsiveness in dealing with the public; and
Overall performance in key service areas and responsibilities.
The measures specifically relating to roads and road infrastructure assets are: Overall performance of local roads and paths; and
Overall performance of traffic management and parking facilities. Figure 2 indicates the trend in satisfaction levels for local roads and paths over the last 7 years and shows a decrease in satisfaction levels from 2004 of 6%.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 8
Figure 2: Customer Satisfaction Survey – Local Roads and Paths
207 respondents identified areas that ‘needed improvement’ and all of the reasons given related directly to the provision of local roads and paths as shown in Figure 3.
Figure 3: Reasons Needs Improvement – Local Roads and Paths
Figure 4 indicates the trend in satisfaction levels for traffic management and parking facilities over the last 7 years and shows a decrease in satisfaction levels from 2004 of 9%.
Figure 4: Customer Satisfaction Survey – Traffic Management and Parking Facilities
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 9
103 respondents identified areas that ‘needed improvement’ and all of the reasons given related directly to the provision of traffic management and parking facilities as shown in Figure 5.
Figure 5: Reasons Needs Improvement – Traffic Management and Parking Facilities
The reasons for dissatisfaction are not addressed directly after the survey is undertaken but are addressed through the course of normal Council duties.
3.1.2 Infra‐Active System
All customer complaints/enquiries to Council, whether in person, by phone or by mail are inputted manually to the Infra‐Active computer system. This system requires the complaint/fault/enquiry to be categorised by asset type and location. It automatically assigns a department responsible and sends an e‐mail notification to the appropriate person. An appropriate response time for responding is built into the system for escalation purposes. This system has been in operation since September 2002. Council can report customer
request information against some asset groups. Common trends can therefore be
understood in relation to road asset groups such as sealed roads, unsealed roads and paths
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 10
3.2 Legislative Requirements
Legislative Requirements, Standards and Codes of Practice to be taken into account with respect to levels of service are listed in Table 3.
Table 3: Legislative Requirements, Standards and Codes of Practice
Reference Details
Road Management Act 2004
The principles of the new Act include: Set out the powers, duties and functions of highway
authorities in relation to the inspection, maintenance and repair of roads
Establish the legal framework for the management of roads and define the rights, powers and duties of road authorities and other persons and bodies (such as utilities) which install, maintain or operate infrastructure on roads or carry out such works on roads
Enable authorities to develop and publish management plans to incorporating the performance of their duties in relation to the inspection, maintenance and repair of roads, having regard to the type of road, the resources available to the authority and its budgetary and policy priorities.
Transport Act 1983
Provides for Council to be responsible for main roads within its municipal district. (Clause 5(4) of Schedule 5) Empowers Council to carry out ‘permanent works’, which shall be to the satisfaction of VicRoads. (Clause 16 of Schedule 5)
Road Safety Act 1986
Provides Council with the power to erect major traffic control items (MTCI’s) on roads other than declared main roads and the power to erect minor traffic control items on minor roads. (Section 91). Empowers Council with regard to parking.
Flora and Fauna Guarantee Act 1988
Is the key piece of Victorian legislation for the conservation of threatened species and communities and for the management of potentially threatening processes.
Environment Protection and Biodiversity Conservation Act
Is the Australian Government’s central piece of environmental legislation. It provides a legal framework to protect and manage nationally and internationally important flora, fauna, ecological communities and heritage places – defined in the Act as matters of national environmental significance.
Victoria’s Native Vegetation Management: A Framework for
Action
Was developed to implement the objectives of Victoria’s Biodiversity Strategy and the National Strategy for the Conservation of Australia’s Biological Diversity.
Catchment and Land Protection Act 1994
Sets out responsibility for control of weeds on roadsides.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 11
Reference Details
Local Government Act 1989
Section 6 outlines the purposes of a Council. The purposes of a Council are:
To provide equitable and appropriate services and facilities for the community and to ensure that those services and facilities are managed efficiently and effectively.; and
To manage, improve and develop the resources of its district efficiently and effectively.
Section 7 outlines the objectives of Council to seek its purposes. In seeking to achieve its purposes, a Council has the following objectives:
To facilitate the involvement of members of the community, users of facilities and services and Council staff in the development, improvement and co‐ordination of local government;
To co‐ordinate with other public bodies to ensure that services and facilities are provided and resources are used effectively and efficiently;
To ensure adequate planning for the future of its municipal district;
To represent and promote the interests of the community and to be responsive to the needs of the community;
To formulate comprehensive policies and set performance targets; and
To develop, implement and monitor its strategic plans and budgets.
Section 205 outlines Councils care and management, however this has changed with the new Road Management Act 2004 which will place a duty of care on Council with regard to its role as a road authority.
Environment Protection Act 1970 The legislative framework for the protection of the environment in Victoria. Legal requirements in relation to stormwater quality from building and construction work sites.
Occupational Health and Safety Act 1985
Legal requirements for employers/employees in relation to workplace safety. Requirements on those who design, manufacture, import or supply any plant for use in the workplace.
Subdivisions Act 1988 Provides for engineering plans to be provided for developments in accordance with relevant standards.
Macedon Ranges Shire Council’s Planning Scheme
Provides for protection of native vegetation on roadsides and may require planning approval for specific roadside activities.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 12
Reference Details
No. S267, Road Management Act 2004, Codes of Practice,
Operational Responsibility for Public Roads
The purpose of this Code is: To provide practical guidance by clarifying or determining
how the operational responsibility for different parts or elements of a road reserve is to be allocated between road authorities; and
To establish principles giving practical guidance for determining the boundary between a “roadway”, “pathway” or “shoulder” in any particular case and for determining which road authority is responsible for road‐related infrastructure.
This Code is intended to:
Support responsible road authorities in the performance of their road management functions with respect to the provision of a safe and efficient road network for use by road users and the community; and
Recognise that VicRoads, other State road authorities and local government are partners in managing Victoria’s road network.
No. S269, Road Management Act, Code of Practice, Management of Infrastructure in Road Reserves
The purpose of this Code is to provide practical guidance and identify benchmarks of good practice for utilities and road authorities, who are expected to work together cooperatively to facilitate the installation, maintenance and operation of road and non‐road infrastructure within road reserves.
Rail Safety Act 2006
The Act addresses:Safety interface assessment by relevant road manager of public roadway or pathway: A relevant road manager in relation to a public roadway or
public pathway must:
Identify and assess, so far as is reasonably practicable, risks to safety that may arise from the existence or use of any rail or road crossing that is part of the road infrastructure of that public roadway or that is a public pathway because of, or partly because of, rail infrastructure operations;
Determine measures to manage, so far as is reasonably practicable, any risks identified and assessed.
A relevant road manager must have regard to:
The principal object of road management; and
The works and infrastructure management principles; and
The functions, powers and duties of infrastructure managers under the Road Management Act 2004 ‐
When determining measures to manage risks identified under subsection (1).
A relevant road manager must seek to enter into a safety interface agreement with any rail infrastructure manager whose rail infrastructure operations are identified as contributing to a risk identified under subsection (1) for the purposes of managing that risk.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 13
Reference Details
Austroads Road Design Guidelines
Design guidelines published by the Australasian Association of Road and Traffic Authorities.
Australian Standards and other references
Design and development standards and guidelines relating to civil infrastructure.
Road Design Standards: Traffic Engineering Manual Vol.1
Traffic Management
Details the standards to which traffic engineering works may
be undertaken. Designed to reflect the requirements of “Road Rules – Victoria” and the Road Safety (Road Rules) Regulations 1999.
Traffic Engineering Manual Vol.2.
Signs and Markings
The primary reference for road signs, markings and delineation in Victoria. Incorporates the Australian Standard Manual of Uniform Traffic Control Devices AS 1742.
VicRoads Worksite Traffic Management (Roadworks Signing). Code of Practice.
Adopts the Manual of Uniform Traffic Control Devices AS 1742.3 Traffic Control Devices for Works on Roads.
VicRoads Road Design Guidelines Parts 1 – 12
Incorporates VicRoads Road Design Standards
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 14
3.3 Current Levels of Service
Transportation assets serve the community and enable: The movement of people and goods;
Access to properties;
Provision for non‐vehicular users (pedestrians and cyclists); and
Provision for parking space.
With the use of this broad description of service as a guide, a key objective of this Plan is to define the levels of service covering key service areas such as safety, quality and availability. There are two types of service levels required:
Community based; and
Technical based.
Council has acknowledged and recognised results from Community Satisfaction Surveys and requests within Council’s InfraActive System and used these to established Community Levels of Service.
The next step for Council in defining the Community Levels of Service is to have a good understanding of the cost to deliver the ‘current’ Levels of Service. This will enable Council to undertake Community Consultation and negotiate the agreed level of service targets.
Technical based service levels define the measures and targets in place to allow Council to manage its infrastructure to a standard ensuring satisfactory achievement of the community levels of service. The technical levels of service support the processes engaged to meet community expectations. The Macedon Ranges Shire Council’s Road Management Plan forms the framework around which Technical Levels of Services can be established and documented. Relevant extracts from the Macedon Ranges Shire Council Road Management Plan are shown in Appendix 10.1. Council’s current service levels are shown in Tables 4 to 7.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 15
Table 4: Levels of Service – Unsealed Roads
Asset: Unsealed Roads Services utilised: Transport
Indicator Category Customer
Expectation Service Indicator
Community Levels of Service Technical Levels of Service
Community Measure Community Target Technical Measure Council Target
Safety “I want a smooth driving surface free of corrugations and potholes.”
Maintain unsealed roads to satisfy customer expectations.
Number measure for Customer Requests – Request Type Roads‐Gravel/Maintenance/PotholesOr Maintenance/Grading.
Less than 210
Comply with RMP Unsealed Road Maintenance intervention levels as detailed in Council's Road Management Plan(table 3.1 No. 3.1).
100% compliance annually.
“Will I have a trafficable non‐slippery surface to drive on?”
Maintain unsealed roads to satisfy customer expectations.
Number measure for Customer Requests – Request Type Roads‐Gravel/Maintenance/Slippery.
Less than 40 requests per year.
Comply with minimum inspection frequencies as detailed in Schedule 3 (unsealed Roads & Car parks) of Council’s Road Management Plan
100% compliance annually.
“Will I have a clear view with no obstructions?”
Remove vegetation to satisfy customer expectations.
Number measure for Customer Requests – Request Type Roads‐Trees/Rural/Overhanging Limbs or Sight Distance Clearance.
Less than 25 requests per year.
Comply with RMP Unsealed Road Maintenance Intervention levels as detailed in Council’s Road Management Plan (table 3.6)
100% compliance annually.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 16
Table 5: Levels of Service – Sealed Roads
Asset: Sealed Roads Services utilised: Transport
Indicator Category Customer
Expectation Service Indicator
Community Levels of Service Technical Levels of Service
Community Measure Community Target Technical Measure Council Target
Safety “I need a two lane road.”
Amenity and safety of the network.
Number measure for Customer Requests – Request Type Roads Sealed/Widening
Less than 10 requests per year.
Seal widths to at least 6 metres
At times of renewal or upgrade.
“I feel unsafe with deep edge drop‐offs.”
Safety condition of edge drop‐offs.
Number measure for Customer Requests – Request Type Roads Sealed/Maintenance/Shoulder Maintenance
Less than70 requests per year
Comply with RMP Sealed Road Maintenance Intervention levels as detailed in Council’s Road Management Plan (table 5.4)
100% compliance.
“I expect a smooth road with.”
Roughness of the road due to potholes or failures.
Number measure for Customer Requests – Roads Sealed/Maintenance/Potholes
Less than 110 requests per year.
Comply with RMP Sealed Road Maintenance intervention levels as detailed in Council’s Road Management Plan (table 5.1 & 5.2
100% compliance.
“I want lines on the road.”
Line marking on sealed roads.
Number measure for Customer Requests – Roads Sealed/Line marking
Less than 10 requests per year.
Comply with RMP Line marking Maintenance intervention levels as detailed in Council’s Road Management Plan (table 6.1).
100% compliance.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 17
Table 6: Levels of Service – Footpaths
Asset: Footpaths Services Utilised: Transport
Indicator Category
Customer Expectation
Service Indicator
Community Levels of Service Technical Levels of Service
Community Measure Community
Target Technical Measure Council Target
Safety “No trip hazards or uneven footpaths.”
Maintain footpaths to satisfy customer expectation.
Number measure for Customer Requests – Request Type Footpaths/Footbridges/Maintenance/ Concrete Damage – Gravel Path – Asphalt Damage ‐ Potholes
Less than 150 requests per year
Comply with RMP Urban Streets Maintenance intervention levels as detailed in Council's Road Management Plan(table 2.1 No.2.3).
100% compliance annually.
Connectivity “Will I have a footpath in my street?”
Availability of footpaths
Number measure for Customer Requests ‐ Request Type Footpaths/Footbridges/Request for New
Less than 40 requests per year
Develop ‘Shire Wide Footpath Plan’
Ensure 100% of works as outlined in Shire Wide Footpath Plan are completed annually.
Accessibility “I need crossings accessible by wheelchair or pram.”
Accessibility of the footpath, DDA access
Number measure for Customer Requests – Request Type Footpaths/Footbridges/Disability Access – Pram Crossings
Less than 20 requests per year
Number of crossings with DDA / Ramp
100% by 2020
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 18
Table 7: Levels of Service – Bridges & Major Culverts
Asset: Bridges & Major Culverts Services Utilised: Transport
Indicator Category
Customer Expectation
Service Indicator
Community Levels of Service Technical Levels of Service
Community Measure Community
Target Technical Measure Council Target
Safety “Will I feel safe driving over a bridge or major culvert crossing.”
Maintain bridges to satisfy customer expectation.
Number measure for Customer Requests – Request Type Roads Sealed or Gravel//Bridges/General Maintenance.
Less than 100 requests per year.
Comply with RMP Bridges & Major Culverts maintenance intervention levels as detailed in Council’s Road Management Plan (table 1.1)
100% compliance annually.
Connectivity “Will I have appropriate connection?”
Bridges are at appropriate locations
Number measure for Customer Requests – Bridges‐New.
Less than 5 requests.
Ensure bridges are at convenient locations to minimise travel time.
100% compliance.
Accessibility “Bridges are open to traffic.”
Bridges are accessible at all times
Number measure for Customer Requests – Request Type Roads Sealed or Gravel/Bridges/Major Works.
Less than 10 requests per year.
1. Maximum length of detour at time of closure.
2. Temporary bridge crossing in place where appropriate.
15 kms. 100% compliance.
“I need large vehicles to be able to access bridges.”
Bridges are accessible to high mass vehicles (buses, emergency vehicles, wide vehicles)
Number measure for Customer Requests – Request Type Roads Sealed or Gravel/Bridges/Major Works.
Less than 10 requests per year.
Number of bridges on designated heavy vehicle or bus routes with load restrictions.
0 bridges.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 19
4 FUTURE DEMAND
4.1 Demand Forecast
4.1.1 Outline Development Plans
Outline Development Plans (ODP’s) have been developed for the Gisborne/New Gisborne and Romsey townships. The aim of an ODP is to prepare a detailed plan that provides for the future residential, commercial and industrial growth within each township. Objectives for road infrastructure are stated at a high level indicating the growth and needs of the township. Romsey ODP The Romsey township area is located within the Macedon Ranges Shire approximately 63km north‐west of Melbourne. The township forms the major urban centre in the east of the municipality and is located within the Melbourne–Lancefield Road corridor. Current road infrastructure issues and requirements as identified in the Romsey ODP are as follows: Indicate the likely future need for an upgraded intersection at Barry Street/Melbourne‐
Lancefield Road and investigate upgrading Portingales and Greens Lanes to provide alternative access between the industrial area and areas to the south of Romsey;
Footpath provision is generally poor and there are a number of missing links to footpath connection. This can force residents to walk on the roadway, particularly people with prams, pushchairs or mobility scooters;
The span of peak hours for commuting traffic is spread due to differing employment locations and differing hours of work. However, congestion is an issue on roads around the primary school at school drop‐off and pick‐up times;
Bicycle facilities are generally poor with currently no significant provision of cycling facilities in road reserves or elsewhere;
Consultants for the Council have recently completed the Romsey Movement Network Infrastructure Study. The Study recommends measures such as right turn lanes on the highway, provision of lighting at key crossing points, improvements to bus stops, new cycle lane connections, key footpath improvements and improvements to signage; and
Major issues raised by the Movement Study include the likely future need for a signalised intersection at Barry Street/Melbourne‐Lancefield Road; and potential to upgrade Portingales and Greens Lanes as an alternative access between the industrial area and areas south of Romsey.
Gisborne and New Gisborne ODP Gisborne and New Gisborne are currently experiencing growth and development pressures. Macedon Ranges Shire Council recognises this, and has prepared an overall framework plan to ensure future development within the area is managed in an orderly, co‐ordinated and sustainable way.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 20
The Gisborne township area, comprising the settlements of Gisborne and New Gisborne, is located within the Macedon Ranges Shire, approximately 52km north‐west of Melbourne. The township forms the major urban centre in the southern end of the municipality and is located within the Melbourne– Bendigo regional fast rail corridor. The Calder Freeway passes between the townships, with New Gisborne to the north and Gisborne to the south. The ODP highlights the following road infrastructure principles for Gisborne and New Gisborne townships: Investigate alternative transport networks west and east of Station Road and south of
Ferrier Road;
Ensure pedestrian and bicycle networks are improved and form key components of the ODP;
Continue to improve bus and pedestrian links to the train station; and
Prepare a Developer Contributions Plan to ensure new development provides appropriate funding for transport infrastructure.
Key features of the ODP roads and public transport are: Identification of key traffic management issues raised by VicRoads including:
− Providing only one vehicle access from Jacksons Creek Estate to Station Road via
Wallaby Run; − Truncating McKim Road, Radiata Road/Oakwood Close/Government Road at
Station Road; − Providing a local connector road to link Morrow Road with The Boulevard; − Investigating the need to realign Ross Watt Road northerly to intersect with
Morrow Road as a major controlled intersection; and − Provision of future curve alignment improvements at Melbourne
Road/Calthorpe Street intersection. Retention of Station Road as the key north‐south road;
Development of a key collector street within the new development front west of Station Road. Connection points to Station Road are identified immediately north of Colwyn Estate, and immediately south of the Whistle Stop Tavern;
An indicative road layout be provided for the expanded industrial area, including the
possible provision of an additional east – west connection to Payne Road. The intersection of Barry Road and Saunders Road will require reviewing prior to any further development off Barry Road;
An indicative road layout be provided for the Low Density Residential area between Kilmore Road and Saunders Road; and
Indicative road networks are provided for all new development areas. Each of these will be subject to further investigation and design at the PSP or Development Plan (DP) stage.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 21
Key features of the ODP walking and trails plan are: Identification of bicycle and pedestrian networks, utilising public open spaces and road
networks;
The provision of bicycle paths on Station Road is limited due to its narrow road reservation with little prospect of it being widened. An alternative shared bicycle/pedestrian network is proposed through the new residential area west of Station Road, utilising the new road network and linear open space corridor. This path will connect Gisborne to the train station;
A key bicycle and pedestrian network is to be developed along the Mt Gisborne Road/Aitken Street spine through Gisborne. This network currently partially exists, primarily north of Jackson’s Creek; and
New bicycle and pedestrian networks are to be provided through all new linear links, particularly through South Gisborne.
4.1.2 Demographic Profile
Demographic information provides an indication of the age profiles and tourism factors that drive asset management decision‐making within the shire.
Road infrastructure within the Macedon Ranges Shire is impacted on by the growth within the area. The following information is from Macedon Ranges Shire Council’s ‘Macedon Ranges Shire Demographic Profile October 2008’: Alongside the ODP’s sits the Macedon Ranges Settlement Strategy (DSS) that is still in Draft form but is due to be finalised before the end of the 2010/11 financial year. This section will also consider the potential future township requirements identified within this document.
Household Numbers ‘Macedon Ranges Shire Demographic Profile October 2008’, states that the average household size in Macedon Ranges Shire was 2.8 in 2006 (compared to the Victorian average of 2.6). This figure has been used within the demand analysis and results from the analysis are reported in Section 3.1.1.
Household Income and Affordability As of the 2006 census the median gross weekly household income in Macedon Ranges was $1,113. This was higher than the Victorian median of $1,022. The median rental in Macedon Ranges was $170 per week. This was slightly lower than the Victorian median of $185. Lower than average rental prices may pose to be an incentive for residents to live in the Shire of Macedon Ranges however Macedon Ranges had a higher proportion of homes being purchased than did Victoria (46% compared to 35%) and a lower proportion of homes being rented (15% compared to 25%). The higher proportion of houses being purchased may be an indication of more affordable housing. Affordable housing is a great incentive for families and individuals to move into the Shire.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 22
Tourism The Macedon Ranges is a vibrant growing tourism region, located right on the city's doorstep, less than an hour's drive from Melbourne along the Calder Freeway (or 30 minutes from Melbourne Airport). The region is dotted with a delightful mix of thriving businesses, relaxed villages and heritage charm. It offers a variety of attractions from Hanging Rock and Mount Macedon to the historic townships of Gisborne, Kyneton, Lancefield, Macedon, Mount Macedon, Malmsbury, Riddells Creek, Romsey and Woodend.
Tourism is rich in Macedon Ranges Shire and as this increases, the demand for adequate tourist roads will continue well into the future. Residential Land Supply Residential development will provide increased need for road infrastructure within the Shire. Land supply information is available for Gisborne, Romsey and Kyneton as discussed below: Gisborne ODP An assessment of existing residential land finds that 210 hectares of vacant Residential 1 Zone land currently exists. These calculations are raw land areas only and do not take into account any site constraints such as environmental, heritage, engineering, current land use etc. Therefore the area of land actually available is likely to be less than this. While physical constraints and current land use will affect the area of developable land to some extent, the available land is expected to yield well in excess of 30 years supply of residential land. For the purpose of the ODP, the existing zoned land supply is likely to more than adequately cater for the future population as projected until 2031. Romsey ODP The Romsey ODP seeks to promote a planning approach that protects the character of the town. To this end the ODP does not envisage that a large proportion of the town will be subject to redevelopment or wholesale infill, but is premised on the basis that the majority of medium density development will be located within easy walking distance (200‐300m) of the town core. The balance of new dwellings are planned to be provided in new growth areas identified by the ODP. This approach seeks to maximise the efficiency of redevelopment of large lots in close proximity to town services and facilities. This strategy will also allow available capacity in water, sewer, drainage and road infrastructure to be utilised and contain the extent of areas where infrastructure upgrading is required. In terms of accommodating expected growth, approximately 62 ha of land is required to meet the future residential land needs of Romsey to 2026. This additional land is proposed to be provided through Planning Scheme Amendment C66 which is being exhibited until 31 May 2011.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 23
As previously discussed, there is also an expectation that the majority of medium density land needs will be taken up in close proximity to the town centre as infill development opportunities. Thus, limited medium density development is expected to occur in the new growth areas. The Draft Macedon Ranges Settlement Strategy recommends that further growth beyond that provided by C66 should not be facilitated, largely due to the comparatively limited transport infrastructure available. Expansion of the Existing Commercial and Industrial Areas Gisborne/New Gisborne Commercial (ODP) The Gisborne Commercial Assessment 2009 identifies that Gisborne/New Gisborne currently has approximately 46,900sqm of commercial floor space including 4,700sqm of vacant floor space. In the period to 2031, approximately 19,600 sqm of additional commercial floor space is required to meet demand, equating to between 4 and 6 hectares of additional land being required to accommodate commercial development in Gisborne to 2031. Commercial Land Provision (DSS) The Draft Settlement Strategy relies on the Commercial Assessments undertaken by Tim Nott: Economic Analysis and Strategy for Gisborne (2009). This assessment suggests that, in the period to 2031, between 4 ha and 6 ha of additional development land will be required to accommodate commercial development in the Gisborne town centre. This assessment allows for the development of local activity centres in New Gisborne, West Gisborne and South Gisborne. Industrial (ODP) Gisborne area’s industrial land is focussed in New Gisborne. There is currently 41.5 hectares of land zoned for industrial purposes, including 11.5 hectares of vacant land. The Industrial Land Analysis 2009 identifies 53.1 hectares of land is required within Gisborne/New Gisborne to support existing industrial jobs. An additional 23.3 hectares of industrial land is required between 2009 and 2021 and an additional 24 hectares is required between 2021 and 2031 to support local employment requirements. Industrial Land Provision (DSS) The Gisborne ODP and Planning Scheme Amendment C67 identify a 42 ha area for future industrial expansion in New Gisborne. This will meet the demand identified by Urban Enterprise in their analysis of industrial land.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 24
Romsey Commercial (ODP) Romsey contains a total area of land zoned for retail/commercial purposes of 12.2 hectares: The town centre in the Business 1 Zone comprises the majority of this area, generally
bounded by Woodend‐Wallan Road (south side), Pohlman Street (west), Five Mile Creek (north) and the rear of properties fronting Main Street (east). This area is occupied by shops, commercial premises, community facilities and remnant dwellings; and
There are two separate areas south of Woodend‐Wallan Road in the Business 4 Zone. These sites are occupied by a service station and plant nursery/display businesses.
There is approximately 1.5ha of vacant land in the Romsey town centre and perhaps a further 2ha of land that contains dwellings or industrial activities, or which is substantially under‐utilised. Romsey has a small number of offices that service the local population including professional business services and health services. Whilst it is not anticipated that Romsey would attract large office based business enterprises, Romsey could play an increasing role in the provision of professional services and health and other services for the eastern part of the Shire. Taking Council population growth projections of 2.96% per annum into account, as well as standard growth in expenditure and visitation (around 1% per annum), an estimated 8,116m2 of retail floor space will be required by 2021. The current retail floor space in Romsey is approximately 5,000m2, indicating that there is an existing undersupply of retail floor space of around 2,000m2. In the period between 2009 and 2021, a further 1,000m2 of retail floor space will be required in Romsey, resulting in a total demand for an extra 3,000m2 by 2021. It should be noted that this estimate of floor space is considered conservative and is based on low to medium expenditure containment rates. Industrial (ODP) There is a limited supply of industrial land in Romsey, reflecting Romsey’s rapid growth from a small population base. There are currently approximately 13.3 hectares of land zoned for industrial purposes, located in two areas: A small industrial estate in Mitchell Court close to town centre of Romsey; and
A small industrial subdivision in Portingales Road, adjacent to the wastewater treatment plant.
There have been a total of 20 lots approved for industrial development in Romsey in the past three years. The largest of these is an industrial subdivision and development of 15 factories in Mitchell Court. The building approvals data highlights continued industrial land consumption, even though land supply is constrained. This indicates that there is likely to be continued demand for industrial land in Romsey if new development opportunities were provided.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 25
Real estate agents have reported that they have experienced a consistently high demand for industrial land. Some businesses have been in need of appropriate industrial zoned land for a number of years, but have been unable to find a ready supply in Romsey. Most demand has originated from trade businesses and large format retailers such as garden supply businesses. These uses require an area with good access and visibility. The population of working age Romsey and surrounding residents (ages 15‐65), is projected to increase by 36% by 2021. This creates further demand for 6.9 hectares of industrial land between 2006‐2021. Based on existing levels of employment, and the unmet supply to meet job containment targets, 12.7 hectares of new industrial land supply is therefore required by 2021. Amendment C66 provides for a new 21ha business and industrial area on the corner of Melbourne Lancefield Road and Greens Lane. Kyneton Commercial Land Provision (DSS) Kyneton is an attractive activity centre with an extensive mix of retail, other commercial and community uses. The centre draws heavily on the spending of people from outside the immediate area – people from the wider region and visitors travelling on the Calder Freeway. Currently the centre provides a successful retail mix, managing to accommodate a variety of comparison goods as well as local convenience goods. This assessment suggests that the town centre can continue to provide this central role for its trade area in the period to 2031. Over that time up to 1 ha of land will be required to accommodate additional retail and other development. This assessment allows for the development of local activity centres in east and south Kyneton, modest development of peripheral sales on the edge of town and minor additions to retail floor space elsewhere in the Kyneton trade area. There is sufficient vacant land and buildings to accommodate the expected growth in the town centre, although developers of larger format uses may need to spend time in assembling sites for redevelopment. Industrial Land Provision (DSS) Industrial provision identified by Urban Enterprise indicates that Kyneton is forecast to have a substantial oversupply of industrially zoned land, even at 2031. This analysis was based on servicing a population of some 6,400 people (Macedon Ranges Social Development Unit). Kyneton’s vacant industrially zoned land more than meets the demand for local job containment. The extent to which Kyneton should be providing the industrial zoned land needs of neighbouring towns will be considered further in the recommendations.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 26
Lancefield Commercial Land Provision (DSS) While the work undertaken by Tim Nott: Economic Analysis and Strategy provides an estimate of 0.25 ha of land required to accommodate the forecast additional activity space in the Lancefield town centre over the period to 2036, this assessment is made on an expectation of an increase in the population to almost 3,700 people by 2036. The population estimates relied upon in the DSS are in the order of 2,300 (based on historical growth numbers) to 3,200 people (applying the VIF extrapolated growth) with the limited growth likely to be encouraged given the lack of public transport and inadequacy of the road provision to the town. On this basis, together with the economic role of Lancefield within the broader economic hierarchy, it is not anticipated that any significant retail and commercial provision will be required to support the population of Lancefield out to 2036. Tim Nott’s report indicated that even the notional space requirement of 2,500 sq. m by 2036 can readily be accommodated on Main Street, through redevelopment of existing housing. Industrial Land Provision (DSS) Lancefield has an existing area of vacant Industrial 3 Zone land of approximately 6 hectares. Urban Enterprises’ assessment of Industrial Land needs in Lancefield was that given the size, location and nature of the town, Lancefield is not considered an appropriate location for future industrial activity. Macedon Commercial Land Provision (DSS) The population estimates relied upon in the DSS are in the order of a resident population of 1,500 to 2,000 people with the minimal scope for growth in light of environmental constraints. On this basis, together with the nominal economic role of Macedon within the broader economic hierarchy, it is not anticipated that any additional retail and commercial provision will be required to support the population of Macedon out to 2036. Industrial Land Provision (DSS) Macedon currently has no land zoned for industry. Urban Enterprises’ assessment of Industrial Land needs in Macedon was that given the size, location and nature of the town, Macedon is not considered an appropriate location for future industrial activity. Malmsbury Commercial Land Provision (DSS) The resident population estimates relied upon in the DSS are in the order of 900 to 1,500. On this basis, together with the economic role of Malmsbury within the broader economic hierarchy, it is not anticipated that any additional retail and commercial provision will be required to support the population of Malmsbury out to 2036. Even if additional land were required, the existing town centre already carries large areas of vacant land (including on the corner of Barker Street and the Calder Highway) where there are opportunities for more intensive development of existing premises.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 27
Industrial Land Provision (DSS) Urban Enterprises’ assessment of Industrial Land needs in Malmsbury is that no land should be zoned for industrial uses given the significant industrial land supply in Kyneton. Mount Macedon Commercial Land Provision (DSS) The existing town centre of Mount Macedon sits in the Rural Conservation Zone, which does not provide for business purposes. Tim Nott reported that in order to allow the Mt Macedon activity centre to grow to its full potential as a local centre serving residents and visitors, a potential solution would be to change the zoning of the existing town centre precinct to Township Zone. The boundaries of this Zone would require further discussion and consultation with land‐holders but should include some land capable of being further developed (including land on the west side of Mt Macedon Road for example). The Township Zone would allow development of commercial activities with a permit. Industrial Land Provision (DSS) Urban Enterprises’ assessment of Industrial Land needs in Mount Macedon was, that given the size, location and nature of the town, Mount Macedon is not considered an appropriate location for future industrial activity. Riddells Creek Commercial Land Provision (DSS) Riddells Creek has a small town activity centre providing local convenience services, some professional services and a strong range of community service activities. The centre principally serves the people of Riddells Creek Township and immediate surrounds. A major development has been proposed for the centre which would provide a larger supermarket and further specialty shops. This would expand the centre from a small neighbourhood activity centre to a more substantial neighbourhood centre that could cater for most of the weekly shopping requirements of trade area residents. In addition to the proposed development, in the period to 2031, around a further 1 ha of land will be required to accommodate the growth of the centre. One option is that some or all of the 2.1 ha of vacant land currently zoned B3 adjacent to the centre could be rezoned for town centre purposes to meet this need. Such a rezoning should only be undertaken following the preparation of an urban design framework that provides for the future shape and integration of the centre. Industrial Land Provision (DSS) Industrial provision identified by Urban Enterprise indicates only a modest additional provision will be required to support demand out to 2036. Urban Enterprise note that considering the constrained existing supply of industrial land and the local population base, it may be appropriate to set aside a small amount of land for industrial use to cater for small service industrial businesses with any larger scale industrial businesses located in New Gisborne.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 28
It should be noted that the Business 3 zoned land (3.4 ha) referred to in the commercial assessment above can also accommodate some industrial uses and hence, the relative demands for commercial and industrial land will need to be balanced. Out to 2036 the additional industrial land provision in Riddells Creek is expected to be in the order of 2‐3ha. Woodend Commercial Land Provision (DSS) While the work undertaken by Tim Nott: Economic Analysis and Strategy provides an estimate of the 2.7 ha of land required to accommodate the forecast additional activity space in the Woodend over the period to 2036, this assessment is made on an expectation of an increase in the population based on a trade area population of 15,500 by 2036. The population estimates relied upon in this strategy are in the order of 4,400 to 5,900. Even allowing for the tourism demand, it is not anticipated that the level of additional retail and commercial provision forecast in the Tim Nott work will be required to support the population of Woodend out to 2036. A more realistic provision in light of the projected population would be in the order of 0.7‐1 ha of land which may be able to be accommodated at the rear of the existing strip shopping area. Industrial Land Provision (DSS) Industrial provision identified by Urban Enterprise indicates an additional 12 hectares is required to support demand to 2031 which could be extrapolated to an overall increase of 18.1ha to 2036 to support a population of some 4,950 people. While the population estimates relied upon in this strategy are in the range of that relied upon by Urban Enterprise (in the order of 4,400 to 5,900), given the expectation that Kyneton will carry an excess supply of Industrially zoned land, together with the potential lack of fit between the tourist role of Woodend and industrial uses, it is not expected Wooded should re‐zone any additional land for industrial use. Further research into the road infrastructure requirements associated with the predicted commercial and industrial land use requirements above is required in order to understand the impacts of growth on MRSC’s road network into the future.
4.1.3 Impact of Trends on Infrastructure
Macedon Ranges Shire Council’s ‘Outline Development Plans’ document the potential impacts a growing population will have on the townships road network. Key issues and recommendations identified from the ODP’s are detailed below:
Romsey Transport and Movement issues within Romsey related to road infrastructure are: Existing road formations throughout residential areas and road side drainage works
utilize soft engineering techniques. Decision as to whether new development maintains this standard or up graded standard to be considered in line with heritage and existing character attributes of the town;
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 29
Congestion on roads around the primary school at school drop off and pick up times;
Path connectivity is poor and there exists a number of missing links to path connection;
Limited public transport services continue to impact on commuters, youth and the aged. This issue has been the focus of on‐going work for over 2 years and bus service improvements were introduced in late 2007. Growth in the non‐driving ‘population’ is likely to continue to provide pressure for the development of public transport options. Limitations on this service are also felt at times of higher petrol prices;
Ensure pedestrian and bicycle networks are improved; and
Provide for bus stops to service new development area along Melbourne–Lancefield Road.
Residential, commercial and industrial growth within Romsey will be influenced by the Planning Scheme Amendment C66 that will be publicly exhibited in April and May 2011. The Amendment implements the Romsey ODP and Romsey Residential Character Study.
The key outcomes of the Amendment are:
Rezones 62 ha of land on the southern edge of the town, at 68 Knox Road, and ‘Silverdale’ Lots 2 PS506812P, and 262 Melbourne Lancefield Road; from Rural Living to Residential 1. This will facilitate an additional 400 houses;
Rezones 21 ha of land at 2598 Melbourne‐Lancefield Road, (south of the town, on the corner of Greens Lane) from Farming Zone to Business 4 and Industrial 1. This will facilitate retail and wholesale businesses, service industry, manufacturing, transport and storage businesses;
Rezones the area around Stuartfield Ave, Bentley Court and Dowie Court (approximately 56 ha) from Residential 1 to Low Density Residential Zone, reflecting the absence of sewerage in this area;
Rezones land on the western side of the Melbourne‐Lancefield Road at 51 to 79 Main Street, Romsey, from Business 4 Zone (1.19 ha) and Residential 1 Zone (2.41 ha), to Business 1 Zone. This is likely to facilitate additional retail development in this area;
Applies a new Design and Development Overlay to existing and proposed residential areas as identified in the Romsey Residential Character Study; and
The effect on development trends will be a concentration of infill residential development in an identified medium density area around the town centre. Subdivision of existing lots outside this area will be restricted to a 1200m2 minimum lot size, unless part of a comprehensive medium density proposal.
New Gisborne Impacts of growth on road, pedestrian and bicycle networks within New Gisborne are as follows:
Retention of Station Rd as the key north – south road;
Development of a key collector street within the new development front west of Station Rd to alleviate traffic pressure on Station Road. A collector street collects traffic from the access places and access streets and carries higher volumes of traffic. A detailed
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 30
traffic assessment will be a requirement of a schedule to the Development Plan Overlay to be applied to this Area;
Where relevant, roads are encouraged to front open space to provide passive surveillance and an active interface;
An indicative road layout is provided for the Barry Rd industrial area, including the possible provision of an additional east – west connection to Payne Rd. The intersection of Barry Rd and Saunders Rd will require reviewing prior to any further development off Barry Rd. This could be required with a rezoning request for expansion of this area south to Saunders Rd (i.e. as a requirement of a schedule to the Development Plan Overlay);
An indicative road layout is provided for the Low Density Residential area between Kilmore Rd and Saunders Rd;
Providing road infrastructure to cater for new business/industrial areas in New Gisborne; and
The provision of bicycle paths on Station Rd is limited due to its narrow road reservation with little prospect of it being widened. An alternative shared bicycle/pedestrian network is proposed through the new residential area west of Station Rd, utilising the new road network and linear open space corridor. This path will connect Gisborne to the train station.
Gisborne Impacts of growth on road, pedestrian and bicycle networks within Gisborne are as follows: The existing key road network is to remain the same in Gisborne, though the following
intersections will ultimately need review and possible upgrade: Willowbank Rd/Aitken St/Mt Gisborne Rd; Willowbank Rd/Gisborne – Melton Rd; Brady Rd/Willowbank Rd;
Indicative road networks are provided for all new development areas. Each of these will be subject to further investigation and design at the Development Plan stage;
A key bicycle and pedestrian network is to be developed along the Mt Gisborne Rd/Aitken St spine through Gisborne. This network currently partially exists, primarily north of Jackson’s Creek. Some works were completed in 2010/11 and more are to be undertaken 2011/12;
New bicycle and pedestrian networks are to be provided through all new linear links, particularly through South Gisborne; and
Where relevant, roads are encouraged to front open space to provide passive surveillance and an active interface.
In addition, the Gisborne Movement Network Study 2006 identifies the following additional upgrades to the pedestrian network: Kilmore Road – install gravel footpath on one side in the next 5 – 10 years;
Aitken Street between Willowbank Road and the Town Centre – install a sealed shared pathway (2.5m min) on one side in the short term (1‐3 years);
Ferrier Road – install footpaths on both sides when abutting land is developed;
Willowbank Road – install footpaths on both sides when abutting land is developed;
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 31
Brady Road – install footpaths on both sides when abutting land is developed;
Brooking Road – install footpaths on both sides when abutting land is developed;
Fersfield Road – install gravel footpath on one side in the next 5 – 10 years; and
Fisher Street – upgrade existing footpath on south side to provide a 1.5m minimum pavement width in the short term (1‐3 years).
Identification of the intersections to be upgraded, as recommended in the Gisborne Movement Network Study are as follows: Ferrier Road and a new cross road intersection – roundabout to be constructed when
new cross road is built;
Station Road and Saunders Road/new subdivision access point – roundabout to be constructed when new access road is constructed;
Station Road and Wallaby Run intersection – protected left and right turn lanes when Wallaby Run is connected to Station Road;
Station Road and Robertson Street intersection – signalise when traffic volumes exceed 10,000 vehicles per day at this point;
Melbourne Road and Kilmore Road intersection – roundabout and possible road realignment when traffic volumes exceed 9,000 vehicles per day on Melbourne Road;
Willowbank Road and Gisborne‐Melton Road intersection – roundabout to be constructed when Willowbank Road is extended west of Gisborne‐Melton Road;
Willowbank Road and Mt Gisborne Road – roundabout or protected right‐turn and left turn slip lanes as traffic volumes on Willowbank Road east of Aitken Street approach 2,000 vehicles per day; and
Willowbank Road and Brady Road – intersection upgrade to provide a standard T‐intersection when abutting land is developed.
Identification of the roads to be upgraded, as recommended in the Gisborne Movement Network Study are as follows: Aitken Street between Gisborne‐Melton Road and Willowbank Road – upgrade to
include 6m through lane and 2m wide sealed shoulders on both sides when volumes exceed 4,000 vehicles per day;
Brady Road – upgrade to include 6m through lane and 2m wide sealed shoulders on both sides when abutting land is developed;
Station Road between Melbourne Road and Calder Freeway – duplication as traffic volumes approach 16,000 vehicles per day;
Willowbank Road ‐ upgrade to include 6m through lane and 2m wide sealed shoulders on both sides when abutting land is developed; and
The Boulevard/Oakwood Close/Station Road – connection of Wallaby Run through to Station Road when abutting land is developed.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 32
4.1.4 New Infrastructure
From the population statistics taken from the 2006 Census (outlined in Part A), it is anticipated that the population of Macedon Ranges Shire will reach 47,956 by 2028. The average person per household is typically expected to be 2.8 persons per household1 (this compares with a figure of 2.6 per household in the state). Using these statistics, and making a number of assumptions on the typical characteristics of new roads and developments, an analysis was undertaken on the predicted road infrastructure assets required by 2028. The assumptions made are listed below. Please note that these assumptions are based on the urban areas only. The average number of residences per property will be 1.00;
Each new house will have a street frontage of 13 ‐ 17 m (15m used as average);
There will be a new house on each side of a road;
Each metre of new road will have 1m of path associated with it;
The length of major stream culverts will be 20m;
There will be 10 new signs (of various types) for every new km of road;
The length of new kerb and channel is twice that of the length of new road built;
There will be one new street lantern every 60‐100m (80m used as average);
The average person per household will be 2.8;
There is a linear annual growth increase in population figures; and
The cost of new infrastructure is based on the unit rate of the current replacement cost.
The results of the analysis showed that the following would be required (approximate figures only): 25.7 km of new roads at a cost of $8.6M
25.7 km of new paths at a cost of $2.2M
22 new stream culverts
51 km of new kerb and channel at a cost of $4.6M
321 new streetlights
257 new signs
The Shire is currently experiencing a number of subdivisions. As can be seen in Table 8 Gisborne is, by far, experiencing the most growth with 15 individual subdivisions occurring within the Shire. The status of subdivision is identified in Table 8.
1 2006 Census of Population and Housing, Basic Community Profile for Macedon Ranges (Local Government Area) which remains the copyright of the Australian Bureau of Statistics (ABS)
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 33
Table 8: Current Subdivisions within Macedon Ranges Shire
Defects Liability Period Over – March 2010
Defects Liability Period about to End
Defects Liability Period Commenced
Works in Progress
Works about to Commence.
Gisborne (3) Kyneton (1) Riddells Creek (1) Woodend (2)
Gisborne (2) Kyneton (1) Riddells Creek (2) Lancefield (1)
Gisborne (4) Riddells Creek (6) Woodend (1)
Lancefield (1)
Gisborne (3) Kyneton (1) Lancefield (1)
Gisborne (3) Woodend (1)
Lancefield (1) Romsey (1)
4.2 Demand Management Strategies
Demand management strategies provide alternatives to the creation of new assets in order to meet demand and look at ways of modifying customer demands in order that the utilisation of existing assets is maximised and the need for new assets is deferred or reduced. Non‐asset solutions include:
Transportation Strategies;
Traffic Controls;
Traffic Local Laws;
Road Safety Strategy; and
Reduced Level of Service.
Council could implement the following demand management strategies to modify demand for traffic services and minimise the need for capital road infrastructure improvements:
Transportation strategies: The Council will promote alternative forms of transport and review the road hierarchy and linkages to allow the road network to develop in an efficient manner.
Traffic controls: The increased development of urban areas may create the need to implement traffic control strategies. Examples of traffic control strategies include the installation of roundabouts and intersection improvements. Roundabouts are considered a preferable option to traffic signals.
Traffic Local Laws: Council have applied limits to the type of vehicles that may be parked on private land in residential areas. There are also load limit and B Double restrictions on some roads within the Shire.
Road Safety Strategy: Council has recently completed a road safety strategy for the area. The Road Safety Strategy includes a number of non‐engineering solutions such as education as well as engineering solutions such as line marking and road safety audits.
Reduced level of service: Level of service in the Shire tends to be very good due to the low traffic volumes when compared to metropolitan Melbourne. However residents appear to expect a high level of service and concern is raised for minor delays in traffic flow.
It should be noted that Council is reluctant to restrict traffic movement unnecessarily and will develop the road network in a way that ensures the least amount of disturbance to traffic flow.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 34
5 RISK MANAGEMENT
5.1 Risk Identification
The objective of risk management is to identify the business risks associated with the ownership and management of the road infrastructure and identify the direct and indirect costs associated with these risks. Risk assessment with respect to road assets is addressed specifically within the context of the Road Management Plan (RMP). For specific strategies used to address risk refer to the RMP.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 35
6 LIFECYCLE MANAGEMENT PLANS
6.1 Physical Parameters
6.1.1 Current Issues
Current issues influencing the assets included in this plan are:
Road Pavements
Increased traffic flows due to growth increases the frequency of heavier traffic e.g. buses, garbage trucks, large vehicles;
Some areas are experiencing problems due to the movement of tree roots;
Macedon Ranges Shire Council has some rural roads and residential streets, that as growth continues, will need to be upgraded;
Development in formerly semi‐urban areas is leading to traffic loadings unsuitable for the road pavement;
The emphasis on predictive modelling of pavement deterioration needs to be continued, to enable understanding of pavement lives and justify planned increases in renewal/rehabilitation expenditure;
The quality of road reinstatement by other organisations has a significant effect on road quality, in particular the quality of sealed road reinstatement by service authorities;
The harsh seasons of the area cause problems. The winter can be very wet causing more rapid deterioration of roads. The summer can be very dry and water resources required for continual maintenance are limited;
The underlying soil is expansive clay which swells when wet and contracts when dry. This causes problems such as cracking and is accentuated by the wet conditions described above;
Pavement materials that were available locally and used in the past may be of a lesser quality than present day available materials; this can result in a higher cost of road rehabilitation / reconstruction to ensure structural integrity of the pavement; and
Extreme weather conditions, such as flash flooding, cause more rapid deterioration of roads.
Paths The quality of path reinstatement by other organisations has a significant effect on path
quality;
The underlying soil is expansive clay, which swells when wet and contracts when dry. This causes problems such as cracking;
Some paths are experiencing problems due to the movement of tree roots, this is particularly evident in asphalt paths;
More demand for paths, including bicycle and shared paths, due to an ageing population and current trends;
The condition of paths is adversely affected by construction traffic;
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 36
Extreme weather conditions, such as flash flooding, cause more rapid deterioration of paths; and
Construction of paths by Community Groups is often not undertaken according to Council standards and deterioration is more rapid.
Kerb & Channel Extreme weather conditions;
The quality of reinstatement by other organisations has a significant effect on kerb and channel quality;
The underlying soil is expansive clay, which swells when wet and contracts when dry. This causes problems such as cracking;
Increased traffic flows due to growth increases the frequency of heavier traffic e.g. buses, garbage trucks, and large vehicles. Road widths are narrower and large heavy vehicles do not have the turning capacity of domestic vehicles; and
Some areas are experiencing problems due to the movement of tree roots.
Bridges & Major Culverts Harsh weather conditions, including extended periods of both wet and dry, have
adverse effects on timber bridges. Abutment backfilling shrinks in these conditions causing a drop to the bridge approach. There is also a problem with flooding during these periods;
There is a need to increase the lifecycle modelling of bridges and major culverts and this has been identified in the improvement plan;
Increased traffic flows due to growth increases the frequency of heavier traffic e.g. buses, garbage trucks, large vehicles;
Vegetation issues in sensitive areas; and
There is currently no formal procedure for identifying renewals or upgrades for major bridges and culverts. Renewal works are reactive and potential renewals are assessed on an individual basis.
Major culverts are defined in Council’s Road Management Plan as having a cross sectional area of greater than 6m2. All culverts with a cross sectional area of less than 6m2 are treated separately. A separate drainage asset management plan is currently being prepared and will document the requirements of underground drainage assets not categorised as major culverts. Road Furniture Problems with vandalism including assets being broken and damaged;
Regulation changes for signs which means that a large number of assets may become obsolete at the same time;
Aging of assets without a defined replacement strategy; and
Occupational Health and Safety issues such as accidental damage of signs by heavy goods vehicles.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 37
6.1.2 Asset Quantities
The quantity of assets are listed in Table 9.
Table 9: Asset Quantities
ROAD PAVEMENT
PATHS
KERB & CHANNEL
BRIDGES
Asset Type
Quantity (km)
Asset Type
Quantity (km)
Asset Type
Quantity (km)
Asset Type
Quantity (No.)
Sealed 833 Concrete 60 Kerb & Channel
281 Road
Bridges 63
Unsealed 913 Brick
Paved 2
Major Culverts
73
Sealed Surface
833 Sealed 22 Foot
bridges 65
Other 17
TOTAL 1,746 TOTAL 101 TOTAL 281 TOTAL 201
6.2 Asset Capacity/Performance
6.2.1 Performance monitoring
Information regarding the performance of Council’s road pavements, paths, kerb & channel and bridges and major culverts are obtained from InfraActive, Council’s Customer Request System. Through the analysis of condition profiles and through defects and hazards observed from routine inspection programs, Council is able to gain an overall understanding of the performance of its assets. Details of other performance monitoring activities are provided in Table10 .
Table 10 : Details of performance monitoring activities
Asset Group Performance Monitoring Activities
Road Pavement
Traffic counts are undertaken on nominated roads in each category on a cyclic basis as follows: Category 1 – Every 4 years Category 2 – Every 6 years Category 3 – as required Category 4 – Every 6 years Category 5 – as required This information is used to investigate traffic management requests and plan road upgrades/new works.
Road Furniture Night time inspections of street lighting are undertaken quarterly to ensure required LOS is being provided by the utility provider.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 38
6.3 Asset Condition
6.3.1 Condition Monitoring – Asset Condition Survey
Asset Condition Surveys are undertaken on road assets, including paths and kerb & channel, every three years. The last survey was undertaken in 2009/10 and is due again in 2012/13.
The next Bridges & Major Culverts Condition Survey is also due in 2012/13 and will be undertaken on a five year cycle.
6.3.2 Condition Rating
The scale used for assessment of condition is shown in Table 11. 0‐1 = Excellent ‐ 10 = Poor.
Table 11: Condition Rating
CONDITION RATING
DEFINITION
0‐1 New asset 2 As new condition. No visible signs of wear and tear or defects
3 Good condition with some signs of wear and tear commensurate with the age and use of the asset
4 More significant wear and tear but no evidence of degradation of the asset 5 Some minor degradation of the asset which could potentially shorten life 6 Significant degradation of the asset which could lead to failure 7 Evidence of minor isolated failure in an asset which will reduce future life
8 Evidence of multiple failures and the inability of the asset to continue to satisfactorily service the original intended purpose
9 Significant evidence of failure of the asset and failure to provide design purpose
10 Total failure of the asset
The overall condition of the sealed pavement, unsealed pavement, sealed surface, paths, kerb & channel and bridges is weighted against certain criteria individual to each asset type. These criteria are outlined in the Moloney Asset Management Systems Operation Manual for Roads and Streets.
6.3.3 Asset Useful Lives & Intervention Levels
The current useful lives and intervention levels for the road asset components are shown in Table 12.
Table 12: Useful Lives & Intervention Levels
Asset Component Intervention Level
Physical Life (Years)
Useful Life (Years)
Sealed Pavement 8 80 76
Unsealed Pavement 8 16 15.2
Spray Seal Surface 8 15 14.6
Asphalt Surface 8 30 28.8
Paths – Concrete 8 50 48.5
Paths – Brick Paved 8 40 38.8
Paths – Other 8 15 14.6
Bridges – Long Life 7 120 106.8
Bridges – Short Life 7 70 62.3
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 39
6.3.4 Current Condition
Sealed Pavement The current condition profiles for the sealed pavement are shown in Figures 6 to 9. Sealed Pavement condition is recorded for the following categories: Pavement (High Traffic) Urban;
Pavement (Low Traffic) Urban;
Pavement (High Traffic) Rural; and
Pavement (Low Traffic) Rural.
Figure 6: Current Condition Distribution for Pavement (High Traffic) Urban
Figure 7: Current Condition Distribution for Pavement (Low Traffic) Urban
0.0
5.0
10.0
15.0
20.0
25.0
30.0
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Pavement (High Traffic) Urban
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Pavement (Low Traffic) Urban
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 40
Figure 8: Current Condition Distribution for Pavement (High Traffic) Rural
Figure 9: Current Condition Distribution for Pavement (Low Traffic) Rural
Unsealed Pavement The current condition profile for the unsealed pavements are shown in Figures 10 & 11. Unsealed pavement condition is recorded for the following categories:
Unsealed Pavement (High Traffic); and
Unsealed Pavement (Low Traffic).
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Pavement (High Traffic) Rural
0.00
5.00
10.00
15.00
20.00
25.00
30.00
1 2 3 4 5 6 7 8 9 10 11
% of Asset Base within Condition
Current Condition ‐ Pavement (Low Traffic) Rural
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 41
Figure 10: Current Condition Distribution for Unsealed Pavements (High Traffic)
Figure 11: Current Condition Distribution for Unsealed Pavement (Low Traffic)
Sealed Surface The current condition profile for sealed surfaces are shown Figures 12 to 17. Sealed surface condition is recorded for the following categories: Asphalt Seal (High Traffic) Urban; Asphalt Seal (Low Traffic) Urban; Spray Seal (High Traffic) Urban; Spray Seal (Low Traffic) Urban; Spray Seals (High Traffic) Rural; and Spray Seals (Low Traffic) Rural.
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Unsealed Pavement (High Traffic)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Unsealed Pavement (Low Traffic
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 42
Figure 12: Current Condition Distribution for Asphalt Seal (High Traffic) Urban
Figure 13: Current Condition Distribution for Asphalt Seal (Low Traffic) Urban
Figure 14: Current Condition Distribution for Spray Seal (High Traffic) Urban
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Asphalt Seal (High Traffice) Urban
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Asphalt Seal (Low Traffic) Urban
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Spray Seal (High Traffic) Urban
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 43
Figure 15: Current Condition Distribution for Spray Seal (Low Traffic) Urban
Figure 16: Current Condition Distribution for Spray Seal (High Traffic) Rural
Figure 17: Current Condition Distribution for Spray Seal (Low Traffic) Rural
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Spray Seal (Low Traffic) Urban
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Spray Seal (High Traffic) Rural
0.002.004.006.008.0010.0012.0014.0016.0018.0020.00
0 1 2 3 4 5 6 7 8 9 10% of Asset Base within Condition
Current Condition ‐ Spray Seal (Low Traffic) Rural
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 44
Paths The current condition profile for paths are shown in the Figures 18 to 21. Path condition is recorded for the following categories:
Concrete Paths;
Brick Paved Paths;
Sealed Paths; and
All other Paths.
Figure 18: Current Condition Distribution for Concrete Paths
Figure 19: Current Condition Distribution for Brick Paved Paths
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Concret Paths
0.00
10.00
20.00
30.00
40.00
50.00
60.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Brick Paved Paths
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 45
Figure 20: Current Condition Distribution for Sealed Paths
Figure 21: Current Condition Distribution for All other Paths
Kerb & Channel The current condition profile for kerb & channel is shown in Figure 22.
Figure 22: Current Condition Distribution for Kerb & Channel
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condtion ‐ Seald Paths
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ All Other Paths
0.00
5.00
10.00
15.00
20.00
25.00
1 2 3 4 5 6 7 8 9 10 11
% of Asset Base within Condition
Current Condition ‐ Kerb & Channel
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 46
Bridges & Major Culverts The current condition profile for bridges and major culverts are shown in Figures 23 and 24. Bridges and major culvert condition is recorded for the following categories: Long life bridges and major culverts; and
Short life bridges and major culverts.
Figure 23: Current Condition Distribution for Long Life Bridges & Major Culverts
Figure 24: Current Condition Distribution for Short Life Bridges and Major Culverts
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Long Life Bridges & Major Culverts Rating
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
0 1 2 3 4 5 6 7 8 9 10
% of Asset Base within Condition
Current Condition ‐ Short Life Bridges & Major Culverts
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 47
6.3.5 Historical Asset Condition
Moloney Asset Management Systems has been undertaking condition assessments of Council’s road related assets tri‐annually since 1999. Consistent methodology used has now produced good historic data which is used to assist with the planning of renewal and capital works programs.
6.4 Asset Valuations
The replacement value of the road assets are shown in Table 13.
Table 13: Road Asset Valuations
PAVEMENTS Road Pavement Replacement Value ($,000)
Written Down Value ($,000)
Sealed 256,002 185,382
Unsealed 21,493 18,640
Sealed Surface 29,421 19,007
TOTAL $306,916 $223,029
PATHS Asset Type Replacement Value ($000)
Written Down Value ($000)
Concrete 9,173 7,246
Brick Paved 672 470
Sealed 921 569
Other 427 249
TOTAL $11,193 $8,534
KERB & CHANNEL
Asset Description Replacement Value ($000)
Written Down Value ($000)
Kerb & Channel $24,556 $17,690
BRIDGES Asset Type Replacement Value ($000)
Written Down Value ($000)
Road Bridges 16,126 10,175
Major Culverts 7,565 4,264
Foot bridges 1,687 914
TOTAL $25,378 $15,353
It should be noted that replacement values, not market values, are used for determining costs associated with renewal, upgrade and new works. The replacement values are also used for renewal gap modelling.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 48
6.5 Historical Data
Historical expenditure in Tables 14 to 18 shows the expenditure for the period 2005/06 to 2010/11.
Table 14: Historical Expenditure for Road Pavement Assets
Expenditure category
2005/06 ($,000)
2006/07 ($,000)
2007/08 ($,000)
2008/09 ($,000)
2009/10 ($,000)
Maintenance 1,402 1,518 1,687 1,519 1,648
Renewal 1,858 2,010 2,085 1,966 2,707
Upgrade 649 1,253 1,236 1,003 1,104
New 0 72 30 2 885
TOTAL 3,909 4,853 4,811 4,490 6,380
Table 15: Historical Expenditure for Paths
Expenditure Category
2005/06 ($,000)
2006/07 ($,000)
2007/08 ($,000)
2008/09 ($,000)
2009/10 ($,000)
Maintenance 72 201 44 107 51
Renewals 150 131 156 91 118
Upgrades 36 191 0 8 111
New 0 0 81 74 387
TOTAL 258 523 150 280 667
Table 16: Historical Expenditure for Kerb and Channel
Expenditure Category
2005/06 ($,000)
2006/07 ($,000)
2007/08 ($,000)
2008/09 ($,000)
2009/10 ($,000)
Maintenance 10 21 11 15 2
Renewals 0 95 94 85 60
Upgrades 36 0 0 0 0
New 0 0 9 0 0
TOTAL 46 116 88 100 62
Table 17: Historical Expenditure for Bridges and Major Culverts
Expenditure Category
2005/06 ($,000)
2006/07 ($,000)
2007/08 ($,000)
2008/09 ($,000)
2009/10 ($,000)
Maintenance 135 127 49 40 38
Renewals 270 0 287 0 613
Upgrades 5 0 0 80 9
New 0 0 135 0 1,050
TOTAL 410 127 625 120 1,710
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 49
Table 18: Historical Expenditure for Road Furniture
Expenditure Category
2005/06
($,000)
2006/07
($,000) 2007/08 ($,000)
2008/09 ($,000)
2009/10 ($,000)
Maintenance 156 126 139 146 166
Renewals - - 29 154 35
Upgrades - - 15 6 1
New - - 58 94 28
TOTAL 156 126 241 400 230
6.6 Operations
Operational activities for road related assets include:
Inspections including hazard, defect and condition identification;
Administration;
Line marking;
Vegetation Control / Removal;
Street Sweeping; and
Cleaning.
The frequencies of operational activities vary depending on the location where the activity is taking place. Table 19 identifies operational activities and their frequencies (dependant on location).
Table 19: Operational Activities and Frequencies
Activity Frequency Location
Line marking
6 monthly School Crossings
Annually Centreline, car parks, parking bays,
Every Two Years Statcon
Weed Spraying / Vegetation Clearance
Annually Around road side furniture e.g. guide posts,
guard rail, signs etc.
Street Sweeping
Twice Weekly
Gisborne Township – Business District
Kyneton Township – Business District
Woodend Township – Business District
Weekly
Lancefield Township – Business District
Riddells Creek Township – Business District
Romsey Township – Business District
Fortnightly Lancefield Township
Monthly
Kyneton Township – Township Entrance Gisborne Townships
Gisborne Car Park areas
Woodend Car Parks areas
Romsey Car Parks areas
Quarterly Kyneton Car Parks (1 additional in autumn)
All remaining kerb areas
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 50
6.7 Inspections
Inspections of the road network are managed by the Operations Department and completed by the in‐house Council works crew. Any defects or hazards observed as part of the inspections are recorded and scheduled as part of the maintenance program. Inspections will result in the programming of maintenance work, asset renewals or changes to processes where the intervention levels are not met. Details of all inspections carried out for the road network are outlined in Table 20 The inspection frequencies are shown in Appendix 10.1.
Table 20 : Inspection Type and Responsibilities
Asset Group Inspection Type Frequency Outcomes Responsibility
Road Pavement
Local sealed road inspection
Refer to the Road Management Plan
Maintenance / renewals programmed
Managed by Operations Department, works completed in‐house
Local unsealed road inspection
Refer to the Road Management Plan
Maintenance / renewals programmed
Managed by Operations Department, works completed in‐house
Sealed road condition assessment
3‐yearly Maintenance / renewals programmed
Engineering Planning Department
Unsealed road condition assessment
3‐yearly Maintenance / renewals programmed
Engineering Planning Department
Kerb and Channel
Visual inspection
Annually Maintenance / renewals programmed
Operations Department
Condition assessment
3‐yearly Maintenance / renewals programmed
Engineering Planning Department
Visual inspection
Annually Maintenance / renewals programmed
Operations Department
Paths Condition assessment
3‐yearly Maintenance / renewals programmed
Engineering Planning Department
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 51
Asset Group Inspection Type Frequency Outcomes Responsibility
Bridges and Major Culverts
Level 1 Bridge Inspection
Annually
Maintenance works programmed Any need for level 2 inspections identified
Managed by Operations Department, works completed by Operations Department
Level 2 Bridge Inspection
As required
Capital works programmed Any need for level 3 inspections identified
Managed by Engineering Infrastructure & Projects Department, works completed by contractor
Level 3 Bridge Inspection
As required
Input to detailed design specification Capital works programmed
Managed by Engineering Infrastructure & Projects Department, works completed by contractor
Pedestrian Bridges
Annually Maintenance / renewals programmed
Managed by Operations Department, works completed by Operations Department/ contractor
Road Furniture (includes Signs)
By request As requested Maintenance / renewals programmed
Managed by Operations Department, works completed by Operations Department/ contractor
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 52
6.8 Maintenance
Maintenance of the road network is managed by the Operations Department and the majority of the routine maintenance works are undertaken by the in‐house crews. Some activities, such as vegetation control, are contracted out on an as‐required basis. Additionally, some rehabilitation works are undertaken in‐house, with decisions being made on a case‐by‐case basis depending on the amount and complexity of the works. Maintenance intervention criteria are detailed in Councils Road Management Plan (RMP). Council’s RMP is currently under review. Maintenance items are most commonly programmed in response to defects observed as part of Council’s routine inspection program.
Routine maintenance activities for road assets include:
Road Pavement Pothole repairs;
Surface defect repairs;
Edge break repairs;
Pre‐seal repair work (hot mix surfacing, milling high lips, re‐levelling surface boxes, patch stabilisation);
Maintenance grading (unsealed);
Surface and shape restoration (unsealed);
Graffiti removal; and
Emergency works (repair to storm damage, removal of dead animals, accident clean‐ups).
Paths Repair of potholes;
Surface defects;
Edge breaks;
Grinding or filling of trip hazards;
Replacement of individual bays or pavers; and
Upgrades from unsealed to sealed (spray seal or asphalt).
There is a capital program for renewal of paths, but not for upgrades. If a path is to be upgraded from unsealed to sealed (spray seal) these works are undertaken by the maintenance crew using the maintenance budget. For this reason path upgrade works are considered a maintenance activity.
Kerb & Channel Repair of surface defects; and
Minor replacement.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 53
Bridges & Major Culverts Rust removal;
Painting;
Vegetation clearance;
Minor decking replacement;
Replacing guardrails;
Guidepost replacement; and
Other minor works as required.
Road Furniture Repairs (e.g. vandalism);
Replacement (e.g. signs, bus shelter enclosures);
Upgrades; and
Removal (e.g. graffiti).
6.9 Renewal
Road Pavement Renewal activities essentially involve:
Resealing (spray seals) of sealed pavements;
Pavement rehabilitation / reconstruction of sealed pavements (E.g. stabilisation works); and
Re‐sheeting of unsealed pavements.
The selection of road sections to be treated each year and the treatment used is initially based on the Moloney Asset Management System. The selected sections are then validated using other relevant information at hand such as customer consultation, staff knowledge and traffic volumes.
Renewal projects planned for the next 10 years include:
Road Rehabilitation Program;
Road Improvement Program;
Gravel Road Resheeting Program;
Reseal/Final Seal incl. prep. Work;
Asphalt Resurfacing Program;
Intersection Rehabilitation Program; and
Car parking.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 54
Paths Renewal works for paths consist of complete reconstruction and they are generally replaced like‐for‐like. Renewal works are programmed based on condition‐data using the Moloney Asset Management System. The selected paths are then validated using other relevant information at hand such as customer consultation and staff knowledge. A once‐off payment has been granted by the federal government as part of its plan to strengthen the economy. It is likely a significant amount of this money will go towards path renewals. Renewal projects planned for the next 10 years will be undertaken as part of the Footpath Renewal Program.
Kerb & Channel
Renewal works for kerb and channel consist of complete reconstruction. Kerb and channel are generally replaced like‐for‐like over the full length of the street.
Renewal works are programmed based on condition data collected using the Moloney Asset Management System. Scheduling of kerb and channel renewals considers the timing of any adjacent planned road pavement works. Renewal projects planned for the next 10 years will be undertaken as part of the Kerb and Channel Renewal Program Bridges Renewal works for bridges and major culverts are programmed based on results from Level 2 inspections. Further bridge works are planned for 2010/11 at a total cost of $90,000. These works include rust treatment and painting and are funded by Macedon Ranges Shire Council.
Renewal projects planned for the next 10 years include:
Bridge Renewal Program;
Wedge St Kyneton Bridge Refurbishment;
Jeffrey St Woodend Bridge Replacement;
Malmsbury Botanic Gardens Bridge Replacement;
Forest St Woodend Bridge Replacement;
Woodend Football Ground 2 bridge Replacement;
Woodend Football Ground 1 bridge Replacement;
Station St R/Creek Bridge Replacement;
Sutherlands Rd R/Creek Bridge Replacement;
Hennebergs Rd Bridge Replacement;
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 55
Mooneys Lane Bridge Replacement; and
Lauriston Road Bridge Replacement.
Road Furniture There are no specific renewal criteria for road furniture although the following general guidelines apply:
Road Furniture is generally replaced when it is reported that it is missing or badly damaged either by a member of Council or a member of the general public; and
Requests for new bus shelters are generally provided for by relocating existing shelters.
There are no major renewal activities expected in the next ten years.
Capital expenditure on road furniture and signage is not currently itemised in the budget with most activities included within the maintenance budget.
6.9.1 Renewal Gap
An analysis of the road network is undertaken annually using the Renewal Gap Model. The modelling requires information on:
Asset condition (rating 0 good – 10 poor);
Asset Lives;
Intervention points for renewal activity;
Asset replacement cost;
Average annual maintenance expenditure; and
Average annual renewal expenditure.
The Renewal Gap Model predicts future funding requirements for the renewal of road related infrastructure. The outcomes of the model are shown in Table 21:
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 56
Table 21: 2011 Renewal Gap
ROAD PAVEMENT
Type
Average Annual
Renewal Expenditure
Renewal Gap (2011)
Cumulative Gap over 20
Years
Sealed Pavement (High Traffic) Urban $168,301 $134,479 $3,270,733 Pavement (Low Traffic) Urban $32,000 $107,548 $4,026,802
Pavement (High Traffic) Rural $388,326 $1,135,588 $31,913,500
Pavement (Low Traffic) Rural $406,408 $558,397 -$268,664
Sub Total $995,035 $1,936,012 $38,942,371
Unsealed Pavement (High Traffic) Unsealed $345,000 -256,946 2,666,955
Pavement (Low Traffic) Unsealed $405,000 -268,077 268,648
Sub Total $750,000 ‐$525,023 $2,935,603
Sealed Surface Asphalt Seal (High Traffic) Urban $59,400 -$21,363 $37,878
Asphalt Seal (Low Traffic) Urban $236,600 -$79,355 -$2,381,550
Spray Seal (High Traffic) Urban $279,199 $65,329 -$1,543,169
Spray Seal (Low Traffic) Urban $175,000 -$27,968 -$366,851
Spray Seals (High Traffic) Rural $343,295 $595,581 $10,405,879
Spray Seals (Low Traffic) Rural $169,192 $38,485 $147,184
Sub Total $1,262,686 $570,709 $6,299,371
TOTAL FOR ROAD PAVEMENT $3,007,721 $1,981,698 $48,177,345
PATHS Type
Average Annual
Renewal Expenditure
Renewal Gap (2011)
Cumulative Gap over 20
Years
Concrete Pathways & Areas $52,500 $8,321 $867,771
Brick Paved Pathways & Areas $3,000 -$3,000 $353,952
Sealed Pathways $30,000 -$9,211 $110,048
All other Pathways $15,000 $22,045 $42,397
TOTAL $100,500 $18,155 $1,374,168
KERB & CHANNEL
Type
Average Annual
Renewal Expenditure
Renewal Gap (2011)
Cumulative Gap over 20
Years
Kerb & Channel $24,556 $17,690
BRIDGES & MAJOR
CULVERTS Type
Average Annual
Renewal Expenditure
Renewal Gap (2011)
Cumulative Gap over 20
Years
Long life Bridges & Major culverts $56,000 $2,500 $1,928,541
Short life Bridges & Major culverts $44,000 $29,118 $76,567
TOTAL $100,000 $31,618 $2,005,108
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 57
6.10 Upgrades
Road Pavement Sealed pavement upgrade activities essentially consist of works such as widening an existing road, sealing road shoulders on spray sealed roads, converting a spray sealed road to an asphalt surface.
Unsealed roads may be sealed through Council’s upgrade program or as part of a special charge scheme. Council’s policy ‘Special Charge Schemes for Infrastructure Works’ details the following:
Council’s process for implementing a special charge scheme; and
Contribution information and requirements for:
- Roads;
- Paths; and
- Drainage.
Upgrade projects planned for the next 10 years include:
Road Construction Special Charge Scheme;
Intersection Upgrade Program;
Fisher St Gisborne – widening;
Aitken St‐Willowbank to Melton Rd upgrade (GMNS);
Road Improvement Program;
Car parking;
Macedon Car parking Permit P209;
Minor Road Works; and
Minor Traffic Management.
Paths Path upgrade activities essentially consist of works such as widening an existing path or sealing an existing unsealed path.
Paths may be upgraded through Council’s upgrade program or as part of a special charge scheme. Council’s policy ‘Special Charge Schemes for Infrastructure Works’ details the following:
Council’s process for implementing a special charge scheme; and
Contribution information and requirements for:
- Roads;
- Paths; and
- Drainage.
A once‐off payment has been granted by the federal government as part of its plan to strengthen the economy. Some of this money will go towards path upgrades.
No Upgrade projects are planned for the next 10 years.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 58
Kerb & Channel Kerb and channel upgrade activities essentially consist of works such as converting the kerb type for example from a spoon drain to kerb and channel or to change the material used e.g. bluestone to concrete. Kerb and channel may be upgraded through Council’s upgrade program or as part of a special charge scheme. Council’s policy ‘Special Charge Schemes for Infrastructure Works’ details the following: Council’s process for implementing a special charge scheme; and
Contribution information and requirements for:
- Roads;
- Paths; and
- Drainage.
No Upgrade projects are planned for the next 10 years. Bridges Upgrade activities for bridges and major culverts consist predominantly of bridge widening. Increasing the capacity of major culverts is also classified as an upgrade. Funding for bridges and major culvert upgrades has been limited, with only $5,000 being spent in the last 3 years on bridge and major culvert upgrades. No Upgrade projects are planned for the next 10 years. Road Furniture Upgrade works for road furniture are limited and capital funding is allocated only to bus shelters and guard rail. The majority of road furniture upgrades will be funded through the road maintenance budget. Upgrade projects planned for the next 10 years will be undertaken as part of the Guardrail Upgrade/Renewal Program.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 59
6.11 New Works
In new subdivisions the developer pays for and constructs any roads, paths and kerb & channel that are required in accordance with Council’s ‘Engineering Requirements for Infrastructure Construction’ policy. This requirement is specified by Council’s Planning and Development Department via referral to the Engineering, Infrastructure & Projects Department as a condition on the permit. Council is currently preparing a Developer Contribution Plan for Gisborne and New Gisborne and it is anticipated that this plan will be incorporated into the Planning Scheme by June 2010. Gisborne is a major growth centre in the Shire and Council seeks to collect $650 per new lot created. This will be replaced by the change set out in the Developer Contribution Plan. Council does not currently have a forward plan in place for roads, paths and kerb & channel capital works. One method used is the demand analysis which identifies new road infrastructure requirements over the next 20‐Years based on assumptions as identified in Section 4. It is common practice that most new road assets are constructed by developers and Council will be responsible for the ongoing maintenance of those assets. Council will typically not contribute to the initial construction cost of new road assets. It is uncommon practice that Council will build new road assets in rural areas and therefore Council funded expenditure for new works is limited within the Shire. Road Pavement As identified in Section 4, demand analysis estimates a total of 25.7 km new road pavement will be required by 2028, at an estimated cost of $8.6M. Analysis is based on growth rates and the current population of the Shire. New Works projects planned for the next 10 years include:
Minor Traffic Management; and
Station/Saunders Rd Roundabout. Paths As identified in Section 4, demand analysis estimates a total of 25.7 km of new path will be required by 2028, at an estimated cost of $2.2. Analysis is based on growth rates and the current population of the Shire. A once‐off payment has been granted by the federal government as part of its plan to strengthen the economy. It is likely a significant amount of this money will go towards new works.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 60
New paths may also be constructed in line with the ‘Special Charge Schemes for Infrastructure Works’ policy that details the contribution options for path construction through a special charge. New Works projects planned for the next 10 years include: Footpath Construction Program; and
Footpath Works Gisborne (GMNS).
Kerb & Channel As identified in Section 4, demand analysis estimates a total of 51 km of new kerb and channel will be required by 2028, at an estimated cost of $4.6M. Analysis is based on growth rates and the current population of the Shire. No New Works projects are planned for the next 10 years. Bridges $47,000 has spent on new bridges and major culverts in the last three years. From this it can be seen that very little funding is allocated to new bridges and major culverts. However this year, 2010/11, a major project in conjunction with Hume City Council is planned. The new bridge, Konagaderra Road Bridge, Clarkefield, is to be constructed adjacent to an existing heritage bridge that will be decommissioned. The bridge is on the boundary of Hume and Macedon Ranges and for this reason both Councils are working together to achieve the construction of the new bridge. The total cost of the bridge, estimated at $2 million dollars, will be split 50/50 with both Councils. Macedon Ranges Shire Council’s half of the fee will be funded as follows: $200,000 funded by Council;
$440,000 funded by the Roads to Recovery budget; and
$360,000 funded by the Roads to Recovery Supplementary budget.
No New Works projects are planned for the next 10 years. Road Furniture Capital works funding is only allocated for bus shelters and guard rail. New works on any other road furniture is funded through the road maintenance budget. Council records requests that are made for new bus shelters and this information is considered as part of the capital project decision making process. New Works projects planned for the next 10 years include: School Bus Shelter Works
Signage Program
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 61
6.12 Disposal Plan
There is currently no policy to dispose of road assets within Council’s boundaries. Disposal costs will only be recognised in the 10‐Year plan once a management strategy is in place to deal with their disposal. In the past bridges have been decommissioned but not demolished. This has occurred with at least three bridges, one was formally a traffic bridge and is now used for pedestrian access, the other two have been closed to the public. Another historic bridge is about to be decommissioned.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 62
7 FINANCIAL PLAN
7.1 Financial Statements and Projections
Expenditure is identified by asset group, under the following headings and shown in Figure 25. Operations;
Maintenance;
Renewals; and
Upgrades and New Works. Figure 25: 10‐Year Financial Forecast
The key features of the financial projections are: Councils commitment to renewal expenditure increases over time;
Upgrade/new works expenditure peaks in year 2016/17 due to the Aitken St‐Willowbank to Melton Rd upgrade (GMNS); and
Operations and maintenance show a gradual increase over time as the expenditure forecasts are growing in line with the predicted growth of the Macedon Ranges Shire Council asset stock.
Table 22 summarises the 10‐year financial forecast for road assets (from 2011/12 to 2020/21) based on the forecasts for each asset group contained in Section 5. These costs exclude inflation and GST.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 63
Table 22: 20‐Year Financial Forecast
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 64
7.2 Funding Strategy
In order to manage and fund various projects within the Shire, Council relies on several funding sources. The current funding sources available for road assets include: Roads to Recovery – this is a fixed amount allocated by the Australian Government in
four year blocks with no guarantee of continuance;
Grants Commission – roads component of grant commission funding;
Rate Revenue;
Black Spot/Length funding;
Special Charge Scheme for Infrastructure Works; and
Private developer funded works.
The Road Improvement Program and Road Rehabilitation Program receive funding from Roads to Recovery (R2R). Typically $1M a year is received and split between the two projects mentioned above. This funding is not guaranteed, however, the assumption has been made that it will continue. Grants Commission Road Funding is available each year and is spread across all the road projects. Table 23 shows the predicted Grants Commission Road Funding for the next 10 years. It has been increased by CPI each year.
Table 23: Predicted Grants Commission Road Funding
Year Predicted Road Funding from Grants Commission
2011/12 $1,899,603
2012/13 $1,956,591
2013/14 $2,015,289
2014/15 $2,075,748
2015/16 $2,138,020
2016/17 $2,202,161
2017/18 $2,268,226
2018/19 $2,336,272
2019/20 $2,406,361
2020/21 $2,478,551
TOTAL $21,776,822
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 65
7.3 Key Assumptions Made in the Financial Forecast
7.3.1 Accuracy of the Information
The following general assumptions have been made in preparing the 20‐year expenditure forecasts. All expenditure is stated in present day dollar values with no allowance made for
inflation over the 10‐Year planning period;
Renewal costs have been taken from the 10 year capital program that is reflected within the Strategic Resource Plan 2011;
Maintenance costs were calculated by using maintenance expenditure figures for 2007/08 and extrapolating by an estimated growth rate of 1.02% as determined in the demand analysis. This assumption will need to be closely monitored to ensure that sufficient maintenance funds are available to optimise long term expenditure and not create a maintenance backlog;
Upgrade / new works costs (council funded) were based on the 10 year capital works program;
New works costs (non‐council funded) are included for upgrades and new work and mainly consist of Roads to Recovery and special charge scheme funding;
Replacement Cost (RC), Depreciated Replacement Cost (DRC) and Annual Depreciation are calculated for the 10‐Year period. The values are taken from the June 30, 2010 valuation and the formulae below are used for the ensuing years:
- RC (08/09) = RC (07/08) + new works (08/09)
- DRC (08/09) = DRC (07/08) + new works (08/09) + renewals (08/09) – Depreciation (08/09)
- Depreciation (08/09) = RC (08/09) / Average Asset Life
The factors outlined below may influence the forecasts given in this plan. Costs may be offset slightly by reductions in maintenance costs for the assets involved in
renewals and savings achieved through competitive tendering of road infrastructure work;
Assumptions have been made as to the average remaining lives of the asset groups based on the Moloney Model, current local knowledge and historical trends. These should be reviewed, and the accuracy improved, based on real time assessments of asset deterioration. Review of the asset life of pavement surfacing has the potential for greatest variance in future cost predictions;
Grants Commission Road Funding is available each year and is spread across all the road projects (as the spread and specific project allocation is unknown this is not portrayed as external funding);
Changes in development needs associated with the rate and location of growth; and
Changes in the desired level of service and service standards from those identified in
this Plan.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 66
7.3.2 Confidence Levels
The matrix in Figure 26 has been used to estimate the confidence level of the Road Asset Management Plan input data. This confidence level estimate is a function of ‘data availability’ and ‘data completeness’.
Figure 26: Data Confidence
Data Completeness
Data Availability 1 2 3 4 5
Primary data located across Macedon
Ranges Shire Council in hardcopy format
available to a few staff
Primary data located across Macedon
Ranges Shire Council in
hardcopy and electronic format
available to a few staff
Primary data located across Macedon
Ranges Shire Council in electronic format
available to a few staff
Primary data recorded in electronic format
throughout Macedon
Ranges Shire Council
available to most staff
Primary data recorded in a computer system
available to all relevant staff
1
Primary data for limited number of assets
POOR (4)
POOR (8)
POOR (12)
POOR (16)
POOR (20)
2
Primary data for limited number of major and minor assets
POOR (8)
POOR (16)
FAIR (24)
FAIR (32)
FAIR (40)
3 Primary data for some assets
POOR (12)
FAIR (24)
FAIR (36)
GOOD (48)
GOOD (60)
4 Primary data for most assets
POOR (16)
FAIR (32)
GOOD (48)
VERY GOOD (64)
VERY GOOD (80)
5 Complete
data sets for all assets
POOR (20)
FAIR (40)
GOOD (60)
VERY GOOD (80)
EXCELLENT (100)
The data availability has been assessed as a rating 3, which is described as ‘primary data located across Macedon Ranges Shire in electronic format available to a few staff’. The Macedon Ranges Shire Council data completeness has been assessed as a rating 4, which is described as primary data for most assets’. Based on available information, Macedon Ranges Shire Council has been assessed as having a good (48%) level of confidence, for the Road Asset Management Plan input data. Therefore, there is a good level of confidence in the plan outputs. Improvement opportunities have been outlined in Section 7 that is intended to result in a greater confidence level for future Road Asset Management Plan outputs.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 67
8 ASSET MANAGEMENT PRACTICES
8.1 Asset Management Systems
8.1.1 Current Practices
The Moloney Pavement Management System is a series of Excel spreadsheets used to record road assets. The following road sub‐assets are included:
sealed pavements
unsealed pavements
sealed surfaces
kerb & channel
footpaths
Bridge assets are recorded in the Moloney Asset Management System in a series of Excel spreadsheets. Information recorded includes:
The Moloney Asset Management Systems are used to calculate replacement values, written down values and depreciation of road and bridge assets. It is also used to determine the reseal, renewal, upgrade and reconstruction programs. Maintenance inspections for bridges, kerb & channel and unsealed roads are documented manually using a paper system of inspections. Required repairs for bridges and kerb & channel are documented on Council’s Customer Request System. Required repairs for unsealed roads are scheduled on Council’s maintenance grading program. The AXIM Maintenance Management System is currently being used for footpaths and sealed roads and maintenance inspections are recorded. Required repairs are recorded and work orders are logged within the system, undertaken in the field and closed off within the system. These systems are not integrated and have no link to the financial/accounting system. Council is in the process of implementing an integrated asset register called MyData for all infrastructure assets. In the future Council will implement a Maintenance and Management System integrated with the asset register.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 68
9 PLAN IMPROVEMENTS AND MONITORING
9.1 Improvement Program
Through the development of the Building Asset Management Plan, improvement actions have been identified and are attached as Appendix 10.2. The improvement actions will be reviewed and reported to the Executive annually. Any amendments or additions to the improvement plan will be approved by the Executive.
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 69
10 APPENDICES
10.1 Road Management Plan Intervention Levels
Schedule 1: Bridges and Culverts
Schedule 2: Urban Streets
Schedule 3: Unsealed Roads and Carparks
Schedule 4: Signs and Guardrails
Schedule 5: Sealed Roads and Carparks
Schedule 6: Linemarking
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 85
10.2 Improvement Actions
AMP Reference
Improvement Action Responsibility Timeframe Status
Part B ‐ Roads Improvement Action 1: Renewal Gap Strategy. Produce a strategy detailing how Council intends to respond to current funding levels, the predicted renewal gap and future revenue raising activities. This document needs to address what Council intends to do if the required funding is not available. This may lead to a drop in service potential.
Relevant Service Mangers / Co‐ordinator Engineering Planning
2012/13 Programmed to commence 2012/13
Part B ‐ Roads Improvement Action 2: Asset Hierarchies. Produce a document that identifies and details Council’s asset hierarchies for all infrastructure assets. Use Council’s asset hierarchies to assist in the:
Recording and reporting of inventory, condition, performance and
treatment history data;
Prioritisation of asset expenditure; and
Identification of critical assets. Using GIS functionality to map asset hierarchies will provide a visual aid, thus making the above business critical activities more efficient and effective.
Relevant Service Managers / Co‐
ordinator Engineering Planning
2013/14 Programmed to commence 2013/14
Part B ‐ Roads Improvement Action 3: Condition Assessment Policy. Develop Council policy documenting the condition assessment approach and survey frequency for all infrastructure asset groups. Identify the asset groups for which Council will not be collecting condition information and the associated reason(s) why.
Relevant Service Managers / Coordinator
Engineering Planning
2011/12
Part B ‐ Roads Improvement Action 4: Condition Rating Manual. Document the repeatable methodology used to assess the condition of Council’s infrastructure assets. The condition rating manual(s) should identify the condition assessment criteria to be used, including the condition rating range and associated definitions. The condition rating manual(s) should be used by all condition assessors (internal or external to the business) to ensure a consistent and repeatable methodology.
Relevant Service Managers / Co‐
ordinator Engineering Planning
2011/12
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 86
AMP Reference
Improvement Action Responsibility Timeframe Status
Part B ‐ Roads Improvement Action 5: Asset Handover Process. Review the Asset Handover Process which should include all steps required for a successful handover of assets (internally or externally) including the information required to be transferred. The document needs to detail how and where the information will be stored.
Relevant Service Managers / Co‐
ordinator Engineering Planning
2011/12 Commenced –
Member of ASpec Consortium.
Part B ‐ Roads Improvement Action 6: Identify Specific Growth Impacts. Use ODP’s and other planning documentation to identify the specific impacts growth will have on existing infrastructure. Spreadsheet the demand parameter including the asset affected as well as works proposed and costs involved. Once the projection of works is complete incorporate this into the financial forecasts.
Relevant Service Managers / Co‐
ordinator Engineering Planning
Ongoing Commenced
Part B ‐ Roads Improvement Action 7: Refine Asset Lives. Undertake a research activity (potentially working with neighbouring Council’s and other large shires) to increase the level of confidence in the asset lives contained within the Moloney Renewal Gap Model. Gaining confidence in the asset lives used within this plan will allow Council to have increased confidence that the service potential loss (or gain) is accurate and that depreciation is not over‐stated.
Co‐ordinator Engineering Planning
2012/13 Programmed to commence 2012/13
Part B ‐ Roads Improvement Action 8: Define Community Levels of Service. Define the current service levels received by the community in line with Council’s current technical levels of service. Define and set targets based on what Council can deliver to the community given the current level of funding.
Relevant Service Managers / Co‐
ordinator Engineering Planning
2012/13
In Progress – Service Managers to develop service
plans.
Part B ‐ Roads Improvement Action 9: Monitor Levels of Service. Develop Key Performance Indicators (KPIs) to monitor Levels of Service provided in the management of network infrastructure. Establish a time based target for each KPI, to monitor Levels of Service. Report on KPIs / Levels of Service and whether targets are achieved.
Relevant Service Manager
2012/13 Programmed to commence 2012/13
Part B ‐ Roads Improvement Action 10: Undertake a Criticality Assessment. Produce a criticality process document outlining the parameters that define an asset as critical and the criticality scoring system and weightings applied to each parameter. Undertake the assessment using this method.
Relevant Service Managers / Manager
Organisational Development
2011/12
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 87
AMP Reference
Improvement Action Responsibility Timeframe Status
Part B ‐ Roads Improvement Action 11: Identify Road Infrastructure Risks. Assess the risk of all critical assets and record these within the relevant risk register. Identify actions that can be implemented to manage risk. Cost these actions and incorporate the total costs in the financial forecasts.
Relevant Service Managers / Manager
Organisational Development
From 2011/12
Part B – Roads Improvement Action 12: Disposal / Rationalisation Policy. Develop a Disposal / Rationalisation policy that details the process undertaken to rationalise or dispose of infrastructure assets. Use flowcharts to show the process steps.
Relevant Service Managers / Manager Finance / Co‐ordinator Engineering Planning
2011/12
Part B – Roads Improvement Action 13: AM Plan Update. Update this Road Asset Management Plan every 3 years to monitor the rolling effect current funding levels have on the predicted required expenditure and infrastructure renewal gap.
Co‐ordinator Engineering Planning
2013/14
Part B – Roads Improvement Action 14: Enhance Financial Forecasts. Incorporate the 8‐year capital works program into the financial forecast of this Plan. Compare current funding levels with those identified in the Moloney Renewal Gap Model. Develop KPI’s to monitor the level of the renewal gap. Incorporate realistic funding opportunities within the financial forecasts.
Relevant Service Managers / Manager Finance / Co‐ordinator Engineering Planning
2011/12
Part B – Roads Improvement Action 15: Data Framework Development. Produce a data framework document for all asset groups within this plan. The framework should identify the required attributes to be collected against each asset to effectively manage and make day‐to‐day decisions about its infrastructure. All data collected should be recorded in Council’s asset management system and be available to all parties within Council. The Data Framework should be inherently linked to the Asset Hierarchies and the Asset Handover Process.
Relevant Services Managers / Co‐
ordinator Engineering Planning
2012/13 Programmed to commence 2012/13
Part B – Roads Improvement Action 16: Bridge Performance Modelling. Use the information from the bridge condition data collected in 2009/10 to support capital works expenditure decisions.
Relevant Service Managers / Co‐
ordinator Engineering Planning
2011/12
Complete Information used to determine
works for 2012/13
Macedon Ranges Shire Council Part B-Road Asset Management Plan
P a g e | 88
AMP Reference
Improvement Action Responsibility Timeframe Status
Part B – Roads Improvement Action 17: Operations & Maintenance Cost Capture.
Separately record operational and maintenance costs within a system so that it is understood where all costs are going. Once this is known, cost reduction and efficiency strategies can be developed.
Relevant Service Managers / Manager Finance / Co‐ordinator Engineering Planning
2012/13
Part B – Roads Improvement Action 18: Financial Outputs. Include the financial outputs of this Asset Management Plan within Council’s Strategic Resource Plan.
Manager Finance / Co‐ordinator
Engineering Planning 2011/12
Part B – Roads Improvement Action 19: Use Asset Management Systems to Monitor
Asset Performance. Use Asset Management systems within Council to:
Record traffic counts;
Record asset condition;
Record treatment history;
Analyse maintenance and asset performance trends and utilise in decision making;
Record condition; and
Undertake pavement management modelling.
Manager Engineering Infrastructure and
Projects / Co‐ordinator Engineering Planning
Ongoing In progress
MACEDON RANGES SHIRE
ASSET MANAGEMENT PLAN
PART
Review History
Issue Date
A March 2012 Draft for comment to Asset Management Committee
B May 2012 Draft for comment to relevant staff
C May 2012 Draft for
D 27 June 2012 Adopted
MACEDON RANGES SHIRE COUNCIL
ASSET MANAGEMENT PLAN
PART C – BUILDINGS
Adopted
Details
for comment to Asset Management Committee
Draft for comment to relevant staff
Councillor Briefing
ASSET MANAGEMENT PLAN
Adopted - 27 June 2012
By
TG, AM
AM
AM
Council
CONTENTS
1 EXECUTIVE SUMMARY ............................................................................................... 1
2 INTRODUCTION.......................................................................................................... 2
2.1 Background ............................................................................................................. 2
2.1.1 Plan Format ...................................................................................................... 2
2.1.2 Relationship with Other Planning Documents .................................................. 2
2.1.3 Assets included in the plan ............................................................................... 4
2.1.4 Asset Ownership and Control ........................................................................... 4
2.1.5 Assets not included in this plan ........................................................................ 5
2.1.6 Key Stakeholders in the Plan ............................................................................ 5
2.1.7 Asset Responsibility .......................................................................................... 5
2.1.8 Building User Agreements ................................................................................ 6
2.1.8.1 Leased Buildings ........................................................................................ 6
2.1.8.2 Committee of Management (CoM) ............................................................ 6
3 LEVELS OF SERVICE ..................................................................................................... 8
3.1 Community Engagement and Expectations ............................................................. 8
3.1.1 Annual Community Satisfaction Survey May 2011 ............................................ 8
3.1.2 Community Access and Inclusion Plan 2009-2013 Survey ................................. 9
3.2 Legislative Requirements ....................................................................................... 10
3.3 Current Levels of Service ....................................................................................... 13
3.3.1 Asset Based Community and Technical Levels of Service ................................ 13
4 FUTURE DEMAND .................................................................................................... 15
4.1 Demand Forecast .................................................................................................. 15
4.1.1 Outline Development Plans ............................................................................ 15
4.1.2 Demographic Profile ....................................................................................... 15
4.1.3 Impact of Trends on Infrastructure ................................................................. 16
4.2 Demand Management Strategies .......................................................................... 16
5 RISK MANAGEMENT................................................................................................. 17
5.1 Risk Identification .................................................................................................. 17
6 LIFECYCLE MANAGEMENT PLANS ............................................................................. 19
6.1 Physical Parameters .............................................................................................. 19
6.1.1 Current Issues ................................................................................................ 19
6.1.2 Asset Quantities ............................................................................................. 19
6.2 Asset Capacity/Performance ................................................................................. 20
6.2.1 Performance monitoring ................................................................................ 20
6.3 Asset Condition ..................................................................................................... 20
6.3.1 Condition Monitoring – Asset Condition Survey ............................................. 20
6.3.2 Condition Rating ............................................................................................. 21
6.3.3 Asset Useful Lives & Intervention Levels ......................................................... 22
6.3.4 Historical Asset Condition ............................................................................... 22
6.4 Asset Valuations .................................................................................................... 23
6.5 Historical Data ....................................................................................................... 23
6.6 Operations ............................................................................................................ 24
6.7 Inspections ............................................................................................................ 25
6.8 Maintenance ......................................................................................................... 26
6.9 Renewal ................................................................................................................ 27
6.9.1 Renewal Gap Model ....................................................................................... 28
6.10 Upgrades ............................................................................................................... 29
6.11 New Works ............................................................................................................ 30
6.12 Disposal Plan ......................................................................................................... 31
6.13 Heritage Buildings ................................................................................................. 32
7 FINANCIAL PLAN ...................................................................................................... 33
7.1 Financial Statements and Projections .................................................................... 33
7.2 Funding Strategy ................................................................................................... 35
7.3 Key Assumptions Made in the Financial Forecast .................................................. 35
7.3.1 Accuracy of the Information ........................................................................... 35
8 ASSET MANAGEMENT PRACTICES ............................................................................. 36
8.1 Asset Management Systems .................................................................................. 36
8.1.1 Current Practices ............................................................................................ 36
9 PLAN IMPROVEMENTS AND MONITORING ............................................................... 37
9.1 Improvement Program .......................................................................................... 37
10 APPENDICES ............................................................................................................. 38
10.1 Heritage Buildings ................................................................................................. 38
10.2 Improvement Actions ............................................................................................ 44
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 1
1 EXECUTIVE SUMMARY
Council’s building assets represent a significant investment by the community and are vital
to its health and well-being. Stewardship of building assets is a core Council function.
Outputs provided by the management and development of buildings and facilities contribute
to the economy and health and safety of the community.
The operation, maintenance and development of the building infrastructure will be guided
by and consistent with Council’s vision and key objectives as stated in the Council Plan, Asset
Management Policy and Asset Management Strategy.
Council has a commitment to establishing individual Service Plans for the services it provides
which are reliant on Infrastructure assets. Customer Levels of Service and the Technical
Levels which support them, will be stated in the relevant Service Plans.
The Engineering Infrastructure and Projects Department is responsible for the strategic
management, planning and design of the infrastructure. The ‘buildings hierarchy’ has been
developed to divide the infrastructure asset base into appropriate classifications for the
purpose of this plan. The building hierarchy separates infrastructure assets, within the
buildings and facilities asset class, into five building asset groups:
• Community Facilities;
• Recreation, Leisure and Cultural Facilities;
• Tourism Facilities;
• Municipal Facilities; and
• Open Space Facilities.
Expenditure is identified for each of the asset groups, under the following headings:
• Operations;
• Maintenance;
• Renewals; and
• Upgrades and New Works.
Section 6 of this Plan reports the findings of a condition audit undertaken in 2008 for
Council’s building portfolio. This condition audit is currently under review. An overall
statement is included regarding Councils Building Renewal Gap which portrays the gap in
renewal expenditure over a 10-year period. This is a high level view and is used as an
indication of funding shortfalls.
As part of this plan a 10-year financial forecast has been developed that portrays the funding
requirements identified within the 10-year capital program and planned funding
requirements beyond this timeframe. Based on these forecasts the service potential is
modelled to provide an indication of the renewal funding that may be required over the next
10 years.
As part of this asset management plan production many gaps have been identified relating
to processes, data and systems. An improvement plan has been developed to support
Council to improve its asset management practices and capabilities in relation to building
asset management.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 2
2 INTRODUCTION
2.1 Background
2.1.1 Plan Format
This plan is part of Council’s overall asset management plan as described below:
• Part A - General Information: Background and information common to all assets
• Part B - Roads
• Part C – Buildings (this plan)
• Part D - Drainage
• Part E - Open Space
2.1.2 Relationship with Other Planning Documents
The relationship of this plan to other specific strategies and plans is outlined in Table 1.
Table 1: Relationship with other Plans
Plan Description
Open Space Strategy This outlines Council’s open space visions and goals. It also outlines strategies to achieve these goals.
Tourism Industry Strategic Plan 2011-2016
The Tourism Strategy includes a detailed analysis of the tourism strengths, opportunities, threats & weaknesses while looking at the long-term vision for the development of tourism in the Macedon Ranges. It also assesses and aligns local directions to regional, state, national and international strategies as well as determines business activities, existing and potential, that will provide a Macedon Ranges with a truly sustainable industry.
Community Access & Inclusion Plan 2009-2013
This plan represents the Council’s commitment to improving access for all residents, workers and visitors within the Macedon Ranges Shire, especially those living with a disability and the aged. It also demonstrates a whole of Council (and community) approach to effectively work towards creating a more accessible and inclusive environment in the Shire. The plan aims to improve the accessibility and inclusion of those that may have previously been restricted in accessing Council’s services and facilities
Aquatic Strategy The primary purpose of the strategy is to develop an integrated strategic approach to planning and provision of affordable aquatic facilities across the Shire.
Cultural Development Strategy 2011-2013
This strategy sets the goal for Cultural Development within Macedon Ranges Shire and identifies the strategic objections and actions required to achieve this end goal.
Early Years Infrastructure Plan 2009-2019
This report presents a profile of early-year’s services, a demographic profile for the main towns in the Shire and recommends actions to address the current and anticipated service needs and their associated infrastructure requirements.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 3
Plan Description
Family and Children’s Services Strategy
The Family & Children’s Strategy 2009-2012 is a high-level strategic plan for the development, support and coordination of health care and education services for children aged from birth to 8 years and their families in the Macedon Ranges Shire.
Health & Well Being Plan 2009-2013
Identifies the following strategic action 3.2a:‘Plan and provide a range of sport and recreation facilities’. This strategy is in support of Objective 3.2: ‘Maximise access to a wide range of leisure and recreation activities and services that satisfy the needs of all interests’.
Housing Strategy, 2007
(to be reviewed)
The Housing Strategy outlines the legislation and policy context of housing, changing community demographics and needs and the implications of Victorian and Australian Government retreating from funding and provision of social housing. The issues and challenges facing council are outlined. The Strategy articulates the vision and goals for housing in the Shire and the specific activities that will be implemented to accomplish these.
Leisure Strategy Plan, 2006 This 10 year strategy considers current and future population and demographic profiles to project the requirements for improving old or creating new leisure facilities
Youth Strategy, 2005-2008 (to be reviewed)
The plan provides a strategic framework to guide all future decision making processes in the youth area. It documents Council’s commitment to young people, and ensures the needs and interests of young people are incorporated into Council’s planning for existing and future communities.
Living Art Strategy, 2005-2008 (to be reviewed)
This strategy outlines Council’s key directions and initiatives in supporting the arts for the past 3 years. This document is currently being reviewed and is now called the Cultural Development Strategic Plan.
Older People’s Future Service Needs
This report shows service need projections for older people across a range of core aged care services. As well as the services projected in this report, Council and other local providers offer many other services for older residents, people with disabilities and their careers and families.
Macedon Ranges Shire Tourist Impact Study
This report provides an analysis of the economic impact of tourism and performance of the tourism industry in Macedon Ranges Shire.
Interim Leasing and Licensing Policy
The purpose of the policy is to promote responsible stewardship to ensure that Council owned or managed premises are appropriately and responsibly maintained, developed and occupied.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 4
2.1.3 Assets included in the plan
The assets included in this plan are shown in Figure 1
Figure 1: Buildings – Asset Hierarchy
2.1.4 Asset Ownership and Control
Council has the option of owning and occupying property assets or entering into a lease
arrangement for the occupancy. This allows various community groups to operate within the
Shire.
This plan includes all building and structure assets where Council has a ‘control’ of that
asset. This includes public facilities such as senior citizens centres, public toilets,
kindergartens, public halls, libraries, swimming pools and barbeque shelters. The plan also
includes buildings located at Council offices, saleyards and transfer stations.
This plan may also address assets where council has an ‘interest’ in the asset which may
place council in some form of risk exposure or maintenance responsibility. This may result
from circumstances due to:
• Council land occupied by others;
BUILDINGS HIERARCHY
Asset Group
Community Facilities
Recreation, Leisure and Cultural
Tourism
Municipal
Open Space
Community Centres
Towers
Museums
Club Social Rooms
Aquatic Centres
Halls
Art Facilities
Old Court Houses
Pools
Gardener's Cottage
Leisure Centres
Community Hubs
Shelters
Ticket Boxes
Rotundas
Sale Yards
Asset Class Asset Type
Maternal Child Health
BUILDINGS
Libraries
Indoor Sports Courts
GrandstandsChange Rooms
Visitor Information Centres
Playgroups
Child CareToy Libraries
Hanging Rock Facilities
MemorialsClock tower
Occasional Care
Sheds
Offices
Transfer Stations
Toilet Blocks
Pre-schools
Housing
Neighbourhood HousesYouth Service Centres
Senior Citizen Centres
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 5
• Facility management and/or maintenance responsibility for buildings on land owned
by others; and
• Some other form of possible exposure to liability.
2.1.5 Assets not included in this plan
Assets excluded from this plan include:
• Buildings on Crown land for which Council is not the Committee of Management
• Buildings on private land (may be council depending on lease conditions)
• Buildings on council land or road reserves occupied by individuals or single clubs
where council does not have control.
2.1.6 Key Stakeholders in the Plan
This plan is intended to demonstrate to stakeholders that Council is managing the building
assets responsibly. In addition to the key stakeholders identified in Part A, Table 2 shows
stakeholders having interests and/or expectations specific to buildings:
Table 2: Key Stakeholders
Visitors Having expectations as temporary users of the building services.
Committees of Management (CoM)
Having a responsibility to the community to ensure buildings on Crown land reserves provide efficient, reliable and safe services.
Facility User Groups Having expectations as temporary users of the building services.
2.1.7 Asset Responsibility
Many departments play a role in the management of Council’s building portfolio. The
directorates and supporting departments involved are listed below:
Community Wellbeing Directorate
− Community Development – including Housing Stock, Neighbourhood Houses, Youth
Services;
− Community Services – including Maternal Child Health, Playgroups, Pre-schools,
Community Hubs and Community Centres; and
− Recreation and Cultural Development – including Indoor Sports Centres, Leisure
Centres, Aquatic Centres, Art Facilities, Museums and Hanging Rock.
Chief Executive Directorate
− Council and Customer Service – Municipal Offices and Town Halls.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 6
Assets and Environment Directorate
− Operations – Municipal buildings such as Transfer Stations, Sale Yards; Open Space
facilities such as Toilet Blocks;
− Engineering, Infrastructure & Projects – Building Maintenance, New and Upgrade
Building Projects; and
− Engineering Planning – Asset Management.
Planning & Environment Directorate
- Economic Development and Tourism – including Visitor Information Centres; and
- Heritage Advisor – including Heritage listed buildings.
The Asset Responsibility Matrix is contained within the Asset Management Strategy. The
Asset Responsibility Matrix is reviewed regularly and as changes are made the matrix in the
in strategy is updated.
2.1.8 Building User Agreements
Usage agreements/leases/licences need to be executed between council and community
groups/facility users and/or Committees of Management for the ongoing use of specific
Council buildings & facilities. The arrangements in these agreements will cover the actual
usage permitted, maintenance and housekeeping responsibilities as well as any potential
reporting requirements.
Typical agreements include:
• Section 86 (LG Act) agreements
• Leases
• Occupancy agreements
• Exchange of letters allowing permissive occupancy
• Other agreements entered into by council
2.1.8.1 Leased Buildings
Council has several buildings leased to community groups and others for private purposes.
Council has some lease arrangements in place for these building types and is developing
standardised leases covering non-profit and for-profit users, e.g. scout halls, tennis club
rooms etc. These standardised leases will clearly define the maintenance arrangements that
should apply to the ongoing management by the lessee. This will ensure Macedon Ranges
Shire Council is not caught with run down facilities when such leases end.
2.1.8.2 Committee of Management (CoM)
Macedon Ranges Shire Council appoints Committees of Management to act for Council for
its buildings under Section 86 of the Local Government Act 1989 and the Crown Land
(Reserves) Act 1978 for a number of Council and Crown land reserves throughout the
municipality. This includes buildings such as community halls and sports stadiums which play
an important part in recreational, social and cultural activities within the community.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 7
Council is responsible for the operational, maintenance and capital improvements of the
buildings on Council and Crown land reserves managed by a S86 Committee of Management
appointed by Council. These buildings are included in Council’s list of building assets and
form part of this Building Asset Management Plan.
The only buildings that are the exception are those managed by the Department of
Sustainability & Environment (DSE) or their appointed Committees of Management. The
buildings associated with these Committees of Management are not the responsibility of
Council and therefore not included in Council’s list of building assets and do not form part of
this Building Asset Management Plan.
Examples of Committee of Management (CoM) buildings are listed below:
• Lancefield Park (DSE Land) – DSE owned buildings and DSE managed via DSE CoM
Reserve;
• Riddells Creek Recreations Reserve (DSE Land) – DSE owned buildings, Council
managed;
• Community Halls (Council Land) – Council owned buildings – Section 86 CoM; and
• Hanging Rock Reserve (DSE Land) 0 Council owned buildings – Council CoM.
Often a Committee of Management will request a review of their facility when they have
identified defects, there is a required change in function or improvements have been
identified. Council will respond to this request by inspecting the building to ascertain the
urgency and need for work to be carried out.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 8
3 LEVELS OF SERVICE
3.1 Community Engagement and Expectations
Building related levels of service are driven by both customer expectation and legislative
requirements. Changes to levels of service are inspired by customer dissatisfaction gained
through customer survey feedback or customer requests.
3.1.1 Annual Community Satisfaction Survey May 2011
Macedon Ranges Shire Council surveys two areas that relate to this building asset
management plan:
• Health and Human Services; and
• Recreation Facilities.
Figure 2 shows the trend in satisfaction levels for health and human services over the past 7
years and shows an overall increase in satisfaction levels.
Figure 2: Customer Satisfaction Survey – Health & Human Services
Figure 3 shows the trend in satisfaction levels for recreation facilities over the past 7 years
and shows an increase in satisfaction levels over the longer term.
Figure 3: Customer Satisfaction Survey – Recreational Facilities
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 9
Respondents identified areas that ‘needed improvement’ and some of the reasons given
related to the provision of facilities. The reasons for dissatisfaction are addressed through
the course of normal Council activities.
3.1.2 Community Access and Inclusion Plan 2009-2013 Survey
Council’s strategic goals for community access and inclusion cover four areas:
1. Whole of Council;
2. Community Wellbeing;
3. Assets and Environment; and
4. Corporate Services.
Of the above four strategic goals, Assets and Environment presents two strategic goals
specific to buildings:
“3.1 – To ensure that people of all abilities are able to access and utilise premises
including buildings, facilities and public outdoor spaces provided by Council.”
“3.2 – To develop consistent and appropriate, internal and external consultation
processes to ensure that Council’s built and natural environments are accessible to
all.”
Overall Facilities and Services
Respondents were asked to give a rating of 1 to 10 for the level of overall access and
inclusion of facilities and services in the Macedon Ranges Shire. Results are shown in Table 3.
Table 3: Rating of Overall Access and Inclusion of Facilities and Services
Rating of Overall Access and Inclusion
of Facilities and Services No. %
Poor to very poor (Score 1-4) 31 36%
Reasonable (Score 5-7) 36 41%
Good to excellent (Score 8 – 10) 20 23%
Total 87 100%
Building and Facilities
Respondents were asked to give a rating of 1 to 10 based on their perception of disability
access to buildings and facilities in the Macedon Ranges Shire. Results are shown in Table 4.
Table 4: Rating of Disability Access to Buildings and Facilities
Rating of Disability Access to
Facilities and Services No. %
Poor to very poor (Score 1-4) 11 13%
Reasonable (Score 5-7) 39 45%
Good to excellent (Score 8 – 10) 36 42%
Total 87 100%
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 10
Many people participating in the survey made comments and provided feedback relating to
buildings. The feedback is addressed through the course of normal Council activities.
3.2 Legislative Requirements
Legislative Requirements, Standards and Codes of Practice specific to buildings which have
an impact on levels of service are listed in Table 5.
Table 5: Legislative Requirements, Standards and Codes of Practice
Reference Details
Building Regulations 2006 Building Act 1993
Part 3, Permits; Part 5, Occupation of buildings and public venues; Part 7, Protection of adjoining properties; and Part 8, Enforcement of safety standards.
Building Code Australia (BCA)
The BCA (Building Code of Australia) is the definitive regulatory
resource for the domestic and non-domestic building
construction industries, providing a nationally accepted and
uniform approach to technical requirements for the building
industry. It is routinely called up in legislation and cited in building
contracts, making it an important document for everyone in the
building industry.
Disability Act 2006
The objects of this Act are:
(a) to eliminate, as far as possible, discrimination against
persons on the ground of disability in the areas of: (i) work, accommodation, education, access to premises,
clubs and sport; and (ii) the provision of goods, facilities, services and land;
and (iii) existing laws; and (iv) the administration of Commonwealth laws and
programs;
(b) to ensure, as far as practicable, that persons with
disabilities have the same rights to equality before the
law as the rest of the community; and
(c) to promote recognition and acceptance within the
community of the principle that persons with disabilities
have the same fundamental rights as the rest of the
community.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 11
Reference Details
Victorian Disability Act 2006
The purpose of the Disability Act 2006 is to enact a new legislative
scheme for persons with a disability which reaffirms and
strengthens their rights and responsibilities and which is based on
the recognition that this requires support across the government
sector and within the community. Under Section 38 of the Act,
the Victorian Government makes it a legal requirement for public
sector bodies to develop Disability Action Plans (DAP) and that
each DAP should address the following outcomes:
(d) reducing barriers to persons with a disability accessing
goods, services and facilities;
(e) reducing barriers to persons with a disability obtaining
and maintaining employment;
(f) promoting inclusion and participation in the community
of persons with a disability; and
(g) achieving tangible changes in attitudes and practices
which discriminate against persons with a disability.
Commonwealth Disability
Discrimination Act 1992
Makes it unlawful to discriminate in the provision of goods,
services or facilities, against people on the basis that they have or
may have, a disability. It also makes it unlawful to discriminate
against a person on the basis that one of their associates has, or
may have, a disability.
Essential Services Act 1958 Determines how interruption or dislocation to essential services
such as light, power, water, sewer etc. is managed.
Equal Opportunity Act 1995 Provision of equitable services.
Children’s Services Act 1996 Provides for the licensing and regulation of children’s services.
Health Act 1958 Controls public health standards i.e. food handling.
Heritage Act 1995 Part 4, Permits and Covenants
All Local Laws and relevant policies of
the Council
Local Laws are adopted to protect public health, safety, or
amenity in a municipality. They are designed to ensure that the
actions of an individual or group do not have a negative or
undesirable impact on the rest of the community.
Charter of Human Rights and
Responsibilities Act 2006
Provides a legislative framework that states that human rights are
essential in a democratic and inclusive society that respects the
rule of law, human dignity, equality and freedom. The Charter
imposes an obligation on all public authorities to act in a way that
is compatible with human rights.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 12
Reference Details
All other relevant Australian
Standards and Codes of Practice
State Environment Protection Policies (SEPPs) SEPP is subordinate legislation made under the provisions of the
Environment Protection Act 1970 to provide more detailed
requirements and guidance for the application of the Act to
Victoria.
SEPP aims to safeguard the environmental values and human
activities (beneficial uses) that need protection in the State of
Victoria from the effect of waste. Such as:
• Human health and well-being;
• Ecosystem protection;
• Visibility;
• Useful life and aesthetic appearance of buildings, structures,
property and materials;
• Aesthetic enjoyment; and
• Local amenity.
SEPP expresses in law the community’s expectations, needs and
priorities for using and protecting the environment.
The National Pollutant Inventory (NPI) was developed as a
National Environment Protection Measure (NEPM) by the
National Environment Protection Council (NEPC), and is a
statutory instrument under the National Environment Protection
Council Act (Australia) 1994. It was incorporated into Victorian
law as an Industrial Waste Management Policy. This applies to all
industries regardless of whether facilities are licensed by EPA or
not.
Children's Services Regulations 1998, Version No. 003, S.R. No.
59/1998 Version incorporating amendments as at 1 November 2002. The objective of these Regulations is to regulate the licensing and
operation of children's services.
AS 2555-1982: Supervised adventure playgrounds - Guide to
establishment and administration The standard aims to draw attention to potential hazards and to
ways in which these can be minimised so that children may have
a feeling of confidence and security in the use of the structures,
which they themselves build or cooperate in building.
AS/NZS 4486.1:1997: Playgrounds and playground equipment –
Development, installation, inspection, maintenance and
operation This Standard specifies requirements for the development,
installation, inspection, maintenance and operation of
playgrounds and playground equipment to ensure a continuing
level of function and safety.
Design and development standards and guidelines relating to civil
infrastructure.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 13
3.3 Current Levels of Service
Community based levels of service are defined in terms of key performance indicators (KPI’s)
that are of importance to the community. Once defined these indicators can be measured
and monitored to ensure performance targets are achieved. Typical customer service KPI’s
for buildings:
• Capacity
• Safety
• Affordability
• Quality
• Responsiveness
• Accessibility
• Maintenance
Technical based levels of service are also defined using key performance indicators (KPI’s)
however the KPI’s identified as technical are often in support of those customer KPI’s. For
instance to ensure that the ‘quality’ of a building is sustained, Council staff co-ordinate
frequent cleaning of buildings. It is the technical duties and activities that take place to
ensure that customers are satisfied.
The technical levels of service support the processes engaged to meet community
expectations. Key performance indicators that may apply to technical measures for buildings
are:
• Compliance
• Condition/Performance
• Maintenance
• Environmental Impacts
• Costs
• Quantity
Council has a commitment to establishing individual Service Plans for the services it provides
which are reliant on building assets. Customer Levels of Service and the Technical Levels
which support them, will be stated in the relevant Service Plans.
3.3.1 Asset Based Community and Technical Levels of Service
Current asset based service levels are outlined in Table 6. These will be further developed
as individual Service Plans are completed.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 14
Table 6: Current Asset Based Service Levels
Asset: Buildings Services Utilised: All
Indicator
Category Customer
Expectation
Service
Indicator
Community Levels of Service Technical Levels of Service
Community
Measure
Community
Target
Technical
Measure Council Target
Safety “I want the
building to
be safe”
Maintain
Essential
Services to
satisfy
customer
Number
measure for
Customer
Requests
Less than 50
requests per
year
Comply
with
Essential
Services
100% compliance
annually.
Amenity
“I want the
building to
be clean”
Building
should be
clean to
satisfy
customer
Number
measure for
Customer
Requests
Less than 30
requests per
year
Cleaning
schedules are
adequate
100% compliance
daily/weekly/fortni
ghtly depending on
schedules.
“I need the
building to
be well lit”
Amenity of
the building
– lighting
Number
measure for
Customer
Requests
Less than 30
per requests
per year
Ambient
lighting lux
levels at
reading
stations
300 lux minimum
at all times.
Accessibility
“I want
disability
access”
Accessibility
of the
building,
DDA access
Number
measure for
Customer
Requests
Less than 40
requests per
year Number of
buildings
with DDA /
ramp
Ensure 100% of
’Disability Access
Council Facilities’
capital works
projects
completed
annually.
Community
Access and
Inclusion Plan
Survey
Less than 13%
dissatisfaction
rating
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 15
4 FUTURE DEMAND
4.1 Demand Forecast
4.1.1 Outline Development Plans
Outline Development Plans (ODP’s) have been developed for the Gisborne/New Gisborne
and Romsey townships. The aim of an ODP is to prepare a detailed plan that provides for
the future residential, commercial and industrial growth within each township. Objectives
for building infrastructure are stated at a high level indicating the growth and needs of the
township.
The Gisborne/New Gisborne ODP highlighted that youth facilities are required in the
township areas. An indoor sports facility is currently being proposed on the Gisborne
Secondary College site. This is planned for and identified within the 10-year capital works
program.
The Romsey ODP identified that the existing building infrastructure i.e. kindergarten,
Maternal & Child Health service and Community Hub should be able to meet the needs of
the population for the next 25 years.
4.1.2 Demographic Profile
Demographic information provides an indication of the age profiles and tourism factors that
drive asset management decision-making within the shire.
Building infrastructure is mainly impacted by the age profile changes within the Shire.
Whilst age profiles are considered when planning for township development any decisions
made on infrastructure requirements must consider the current service provision within the
areas.
Macedon Ranges is a vibrant growing tourism region dotted with a mix of thriving
businesses, relaxed villages and heritage charm. It offers a variety of attractions from
Hanging Rock and Mount Macedon to the historic townships of Gisborne, Kyneton,
Lancefield, Macedon, Mount Macedon, Malmsbury, Riddells Creek, Romsey and Woodend.
As tourism increases the demand for adequate tourist facilities to support growing services
will continue into the future and a Tourism Industry Strategic Plan (2011) has been prepared.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 16
4.1.3 Impact of Trends on Infrastructure
Council has developed many planning documents over the past years that identify
infrastructure requirements for existing and new infrastructure. The plans, which are listed
below, have considered population and demographic changes across the Macedon Ranges
Shire:
• Leisure Strategy Plan, 2006;
• Community Access & Inclusion Plan 2009-2013;
• Early Years Infrastructure Plan 2009-2019;
• Outline Development Plan’s; and
• Community Plans.
Existing and new infrastructure requirements identified in these Plans are listed in the
Lifecycle Management Section of this plan.
4.2 Demand Management Strategies
Demand management strategies provide alternatives to the creation of new assets in order
to meet demand and look at ways of modifying customer demands so to maximise the
utilisation of existing buildings and reduce or defer the need for new facilities.
Non-asset solutions include:
• Multi-use facilities;
• Offers of more convenient opening hours; and
• Reduced levels of service.
Multi-use Facilities: Combining several services within the one building could be the answer
to resolving under-utilised and under capacity facilities. If demand issues are known for
each facility then Council can make executive and coordinated decisions around successive
time slots. As well as addressing performance issues this approach promotes social
integration and community interaction.
Offer more convenient opening hours: To analyse the feasibility of offering abnormal or
varied opening hours on certain days within the week to allow those who work late and
commute to work the opportunity to use the facility.
Reduced level of service: In the long term Council may reduce the level of service provided
by the building facilities, however it is not recommended that this option be implemented at
this time. A process of negotiation with the community regarding service levels should
consider reduction in levels of certain services only when there are unsustainable
alternatives. If agreed with the community then reduction can be implemented.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 17
5 RISK MANAGEMENT
5.1 Risk Identification
As owner of the land, Council will be subject to a number of obligations imposed on building
owners. In cases where Council has leased the land, including the building, to another, it
cannot wholly escape liability.
Council can minimise its exposure by:
• Insuring against any legal liability as the property owner by effecting and maintaining
a Public Liability Policy of Insurance;
• Insisting upon the lessee or tenant holding a current Public Liability Policy of
Insurance noting Council as a co-insured which provides cover for the lessee for legal
liability and costs incurred in defending any claim made against the occupant, or
jointly against the property owner and the occupant;
• Insuring council owned and/or managed buildings against property damage; and
• Imposing under the terms of a lease a deductible payable by the occupant in the case
of damage to buildings.
Council is yet to implement an Infrastructure Risk Register however the identified risks
associated with the building assets included in this plan are outlined in Table 7.
Table 7: Identified Risks
Risk Event Cause Main Area of
Impact Controls
Building catching fire • Electrical fault in high use
building
• Occupant behaviour
Public Health &
Safety
• Fire protection
equipment inspected
• Fire protection
equipment provided in
accordance with code
Theft from high use
building
• Burglary
• Occupant or visitor
behaviour
Financial
• Risk assessment
(security measures,
locks, alarms, barriers
CCTV) and upgrade
program
Damage to building
• Falling tree or limbs
• From poor equipment
and emergency
procedures
Service Delivery Financial
• Maintenance
inspections and work’s
programming
Fall from height to
maintenance
personnel
• Barriers, fall equipment
inadequate.
Public Health &
Safety
• Risk assessment and
barrier upgrade
program
Ill health of building
occupants tradesmen • Asbestos in building
Public Health &
Safety
• Risk assessment
(asbestos) and removal
program
User Injury • Poor lighting in building
• Poorly controlled
Public Health &
Safety • Lighting to standard
• Maintenance
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 18
Risk Event Cause Main Area of
Impact Controls
dangerous goods
• Falling limbs or trees
• Poor emergency
procedures
• Fall or trip
inspections and work’s
programming
• Occupant
housekeeping
Injury to building
occupant from
building structural
failure
• Poor building condition
• Inadequate maintenance
• Extreme weather event
• Terrorism
Public Health &
Safety
• Condition surveys and
renewal program
• Maintenance
inspections and works
programs
Lack of provision of
essential services • Absence of compliance
audit
Public Health &
Safety Legislation
• Audit and compliance
with legislation
program
Manual handling
injury by building
occupant
Public Health &
Safety • OH&S training
programs
Poor cleanliness of
high use building • Cleaning schedule
inadequate
Image and
reputation • Cleaning contract
specifications review
Poor comfort level in
building
• Temperature/humidity in
highly used offices and
meeting places
Service Delivery
• Level of service
appropriate
• Undertake review of
heating/cooling
equipment
Poor visual
presentation of
prominent building
• Maintenance inadequate
• Architectural design
• Age of building
Image and
reputation
• Maintenance
inspections and work’s
programming
Staff member
assaulted in council
building • Customer behaviour
Public Health &
Safety
• Barriers between
public and staff areas
• Visitor accreditation
• CCTV
Stormwater damage
to building – High
value of contents
• Inadequate drains
• Extreme weather event Financial
• Maintenance
inspections (gutters)
and work’s
programming
User electrocuted • Faulty electrical
equipment
Public Health &
Safety • Electrical testing and
tagging program
Damage to
infrastructure • Vandalism Financial • CCTV
Poor access for all • No disabled access Service Delivery Legislative
• Risk assessment and
access upgrade
program
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 19
6 LIFECYCLE MANAGEMENT PLANS
6.1 Physical Parameters
6.1.1 Current Issues
Current issues influencing the assets included in this plan are:
• Aging;
• Reactive maintenance focus;
• Lack of resources does not allow for periodic proactive inspections;
• Lack of Council commitment to fund and resource the 2008 building audit items;
• Poor up-keep of heritage buildings in the past has now resulted in more expense for
repairs and general maintenance;
• Planning for future infrastructure requirements are often not identified as part of plan
development i.e. Older Peoples Future Service Needs (Has identified future service
needs however needs to extend the plan to incorporate infrastructure requirements to
support future service needs);
• Various individual building registers;
• Lack of ongoing commitment to fund consumption of our building portfolio through
investment in renewals;
• Ability to report and analyse customer requests for buildings; and
• Building audit does not include design life and construction date therefore preventing
the prediction of renewal expenditure requirements using condition results.
6.1.2 Asset Quantities
The quantity of assets are listed in Table 8.
Table 8: Building Asset Quantities
Asset Groups Unit Quantity
Community Facilities No. 106
Recreation, Leisure and
Cultural Facilities No. 106
Tourism No. 16
Municipal No. 20
Open Space No. 104
Total 352
Note: The asset quantities listed are taken from the 2008 Condition Audit which were the only available quantities at the time of the development of this plan. The 2011/12 Condition Audit is about to commence.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 20
6.2 Asset Capacity/Performance
6.2.1 Performance monitoring
Performance monitoring of Council buildings includes:
• Condition;
• Utilisation; and
• Customer Requests.
Utilisation figures can assist sound decision making by justifying:
• Effective building rationalisation;
• The need to decommission a facility;
• The need to increase the capacity of a building through improvement works; or
• The need to build a new facility to cater for demand.
Utilisation figures are collected and in most cases are used to support funding requests.
Customer requests can be used as an indicator of performance for buildings. At this point
there is no process in place to analyse the different types of requests recorded through the
system. If a request is issued and is deemed ‘urgent’ then the works will be arranged
immediately and carried out as soon as possible.
Assets which are not achieving the current level of service will be identified from the levels
of service developed in the relevant Service Plans. Identified assets will be referred for
consideration in the 10-year Capital Works Program.
6.3 Asset Condition
6.3.1 Condition Monitoring – Asset Condition Survey
A formal condition assessment was carried out for all buildings in 2008. A condition audit is
scheduled for 2011/12 and is about to commence.
A condition audit /survey should be conducted every 3 to 4 years.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 21
6.3.2 Condition Rating
The scale used for assessment of condition is shown in Table 9. 1 = Excellent - 10 = Poor.
Table 9: Condition Criteria
CONDITION
RATING DEFINITION
1 New Building
2 As new condition. No visible signs of wear and tear or defects
3 Good condition with some signs of wear and tear commensurate with the age
and use of the building
4 More significant wear and tear but no evidence of degradation of the element
5 Some minor degradation of the element which could potentially shorten life
6 Significant degradation of the element which could lead to failure
7 Evidence of minor isolated failure in an element which will reduce future life
8 Evidence of multiple failures and the inability of the element to continue to
satisfactorily service the original intended purpose
9 Significant evidence of failure of the element and failure to provide design
purpose
10 Total failure of the element
Physical condition assessments were undertaken for the element groups shown in Table 10.
Table 10: Elements Assessed
ELEMENT GROUP ASSESSMENT
CONSIDERATIONS ELEMENTS INCLUDED
Structural Structural integrity, evidence of
movement of walls, floor, other
structural elements
External walls, floors, structural
elements of roof
External Fabric Operation, deterioration of
paintwork, evidence of rot or
corrosion
External cladding, doors, windows,
trim, fascias
Roofing Integrity, evidence of leaks
and/or damage, general
deterioration
Roof, flashings, spouting,
downpipes, eaves, insulation
Internal Fabric &
Fitments General condition, obvious
hazards (trips, slips, falls)
Internal walls, ceilings, floor
coverings, doors, benches,
cupboards
Health and Amenity Hygiene, serviceability,
deterioration
Kitchens & equipment, sanitary
accommodation, evidence of
vermin
Building Services
(general) Standards, deterioration,
function,
Includes electrical switchboards &
fittings; standard heating,
ventilating, cooling; cold water
supply, hot water service
Building Services
(mechanical)
General condition,
effectiveness, maintenance
records
Major air conditioning systems, hot
water boilers, lifts,
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 22
ELEMENT GROUP ASSESSMENT
CONSIDERATIONS ELEMENTS INCLUDED
Compliance and Safety
Comparison of actual standard
with current standards and
Regulations, maintenance of
Essential Services, obvious
hazards
Building Code of Australia, Essential
Services, disabled access & facilities,
hazardous materials, OH&S
Regulations, Food Safety Standards
Hazardous Building
Materials
Visual assessment compared to
condition at last audit,
age/type of materials used in
building
Asbestos, PCBs, Lead paint,
synthetic mineral fibres
Building Environs
Condition in relation to
ongoing maintenance, obvious
hazards, potential effect on
building
Approaches to/immediate
surrounds of building (paths,
roadways, hardstands, retaining
walls, trees, vegetation)
Malicious Damage
Access under building, break-
and-enter through skylights
etc, combustible materials
(rubbish, long grass/weeds)
Opportunity for Arson, burglary,
unauthorised access,
Other Considerations Leave blank if not relevant Heritage, special needs/uses
Structural Structural integrity, evidence of
movement of walls, floor, other
structural elements
External walls, floors, structural
elements of roof
External Fabric Operation, deterioration of
paintwork, evidence of rot or
corrosion
External cladding, doors, windows,
trim, fascias
6.3.3 Asset Useful Lives & Intervention Levels
The current useful lives and intervention levels for the building asset components are shown
in Table 11.
Table 11: Poor Overall Building Condition
Asset Component Intervention
Level
Physical Life
(Years)
Useful Life
(Years)
Structure Long Life 8 120 111.6
Structure Short Life 8 50 46.5
Roof 8 50 46.5
Mechanical 8 20 18.6
Fit-out 8 25 23.3
6.3.4 Historical Asset Condition
The 2008 Condition Audit was the first condition audit undertaken on all Council buildings
therefore there is no historical data available.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 23
6.4 Asset Valuations
The replacement value of the building assets are shown in table 12.
Table 12: Building Valuations
Asset Groups 2007/08
Replacement Value
Indexed 2009/10
Replacement Value
Indexed 2011/12
Replacement Value
2011/12 Written Down
Value
Community Facilities $14,181,000 $15,044,623 $15,960,840 $8,044,263 Recreation, Leisure and Cultural Facilities $43,085,000 $45,708,877 $48,492,547 $19,629,483
Tourism $2,507,000 $2,659,676 $2,821,650 $1,410,825 Municipal $11,485,000 $12,184,437 $12,926,469 $6,527,866 Open Space $5,397,000 $5,725,677 $6,074,370 $2,265,740
Total $76,655,000 $81,323,290 $86,275,876 $37,878,177
It should be noted that replacement values, not market values, are used for determining
costs associated with renewal, upgrade and new building works. The replacement values are
also used for renewal gap modelling.
6.5 Historical Data
Historical Expenditure in table 13 shows the building asset expenditure for the period 2006/07
to 2011/12. The table shows:
• Significant increase in operations and maintenance expenditure over the last 6 years;
• A defined increase in renewal expenditure however peaking in year 2007/08 due to
major building works;
• Fluctuating spend on upgrades catering for the need in each given year; and
• Quite a large fluctuation every year for new works spend having just $368,000 in
2008/09 and $6.7M in 2009/10.
Table 13: Historical Expenditure
(000’S) 2006/07 2007/08 2008/09 2009/10 2010/11 PROPOSED
2011/12
Operations $245,857 $374,524 $577,036 $437,732 $457,720 $637,771
Maintenance $444,000 $682,000 $808,000 $793,166 $526,371 $570,100
Renewal $37,000 $2,326,000 $339,000 $478,292 $749,951 $1,805,315
SUBTOTAL $726,857 $3,382,524 $1,724036 $1,709,190 $984,091 $3,013,086
Upgrade $759,000 $3,199,000 $193,000 $1,266,405 $659,858 $377,767
New asset $2,515,000 $354,000 $368,000 $6,758,140 $1,063,11 $3,548,046
TOTAL $4,000,857 $6,935,524 $2,285,036 $9,733,735 $3,457,011 $6,938,999
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 24
6.6 Operations
Common operational activities for buildings include:
• Public Toilet Cleaning;
• Community Facilities Cleaning;
• Municipal Offices Cleaning;
• Recreational Facilities Cleaning;
• Tourist Facilities Cleaning;
• Leisure & Aquatics Cleaning;
• Town Halls Cleaning;
• Utilities; and
• Security patrols and alarm monitoring of Municipal Offices.
The frequencies of operational activities vary depending on the location where the activity is
taking place. Table 1 14 identifies operational activities and their frequencies (dependent on
location). Table 14: Operational Activities and Frequencies
Activity Frequency Location Budget Funding
Department
Public Toilet Cleaning
Daily Townships Operations
2-3 times / week Country Areas Operations
Daily Tourist Areas Operations
Community Facilities Cleaning
Daily or As Required
Townships Community Services /
Community Development
Municipal Offices Cleaning
Daily Townships Council and Customer
Service
Recreational Facilities Cleaning
As Required Townships Recreation & Culture
Tourist Facilities Cleaning
Daily Townships/Hanging
Rock
Council and Customer Service / Recreation &
Culture
Leisure & Aquatics Cleaning
Daily Townships Recreation & Culture
Town Halls Cleaning
As Required Townships Council and Customer
Service
Security patrols and alarm
monitoring of Municipal Offices
24 hours / day Townships Council and Customer
Service
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 25
Additional operational activities may include:
• Minor maintenance (equipment servicing);
• Equipment purchases;
• Septic pumping;
• Web page provision;
• Internet;
• Electricity, Gas; and
• Rubbish Removal.
Operational activities are not funded through the building maintenance budget as each
department has an operational budget used to fund cleaning and other activities within their
responsible buildings.
6.7 Inspections
Inspections are designed to identify defects that have the potential to create a risk of
damage or inconvenience to the public. The types of inspections carried out for buildings are
as follows:
• Essential Services inspections – shown in Table 15:
Table 15: Essential Services Inspections
Essential Service Inspection Frequency
Fire Services 6 monthly
Exit/Emergency Lighting, Doors,
Signage 6 monthly
Testing and Tagging Annually
Ventilation / Air Conditioning 6 monthly
Thermostatic Mixing Valves Annually
Emergency Power Supply (Heaters &
Boilers) 6 monthly
• Building condition audit;
• DDA Compliance audits;
• Housing inspections; and
• Asbestos Audits.
Council will appointed a consultant in 2012/13 to review the Essential Services Inspection
frequency to ensure compliance with current Legislation.
Inspections result in the programming of maintenance work, asset renewals or changes to
processes where the service levels are not met. The works identified are prioritised based
on the facilities usage, safety and environs. Any ‘quick-win’ type works are completed first,
then minor issues and then capital projects as an order of priority. Capital projects require
funding approval and for this reason the process may be lengthy.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 26
It is planned to introduce a regular formal defect inspection regime for buildings in 2012/13.
Recreation buildings have an OH&S and Essential Services audit undertaken on a monthly
basis. There is a strong working relationship between the OH&S department and the Building
Maintenance Co-ordinator and an understanding exists to ensure that all OH&S issues are
actioned accordingly.
Council is working towards introducing a 6-monthly audit process to be undertaken by
Section 86 Committee of Management groups which would include the following:
• Essential services inspection;
• OH&S inspection; and
• Identification of maintenance issues.
Any items of concern identified through this audit would be channelled back to the manager
responsible for that building type and issued to the maintenance co-ordinator for
prioritisation and programming of the works.
In accordance with Council’s annual audit plan, a review of the adequacy of processes and
procedures surrounding Building Maintenance – Essential Safety Measures (ESM) is currently
being undertaken. The objectives of the audit are to:
1. Identify and assess the adequacy of policies and procedures regarding Council’s building
Essential Safety Measures (ESM) inspections and management;
2. Review the adequacy of Council’s ESM inspection program;
3. Review the adequacy of Council’s ESM annual reporting program; and
4. Identify and assess how Council manages its ESM responsibilities for its tenanted
buildings.
6.8 Maintenance
Macedon Ranges Shire Council manages and co-ordinates all building maintenance with the
majority (approx 95%) of activity being undertaken on a reactive basis.
Typical building maintenance includes the following type of works:
• Plumbing – issued under a current contract with Council;
• Electrical – issued under a current contract with Council;
• Carpentry – issued under a current contract with Council;
• Painting – issued on an as-need basis;
• Timber Floor – a new condition maintenance contract;
• Mechanical Plant – service provider used to service plant on a 6-monthly basis e.g.
servicing of air con/heating systems prior to winter and prior to summer seasons; and
• Graffiti Removal – Council has a Graffiti Trailer used to remove graffiti from Council
owned and operated buildings and property.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 27
Currently building maintenance costs are not distributed back to individual buildings
therefore the cost of a building, or the service utilising the building is not known.
Maintenance is most commonly carried out in response to:
• Defects observed by user groups or Committee of Management; and
• Requests via the customer request system (internal or external requests).
Routine maintenance activities carried out include:
• Gutter and Downpipe Cleaning – monthly and yearly programs depending on need; and
• Gutter screening program.
General maintenance strategies are considered as part of work prioritisation such as
deferring minor maintenance work if a building is due for rehabilitation.
6.9 Renewal
Renewal activities typically include:
• Renovation of Council housing stock;
• Refurbishment of public toilets; and
• Renewal of existing buildings such as pavilion renewal program identified through
department driven building plans or identified through the customer request system.
Prioritisation of works is based on location and use of the facility and typically undertaken in
response to complaints made by the user, cleaners or the general public.
In the instance of public halls, Committees of Management may put in a request for a
renewal activity to take place and Council considers the feasibility and options of the request
and act accordingly. Requests are commonly submitted in the form of a business case that is
either approved or declined based on the benefits identified within the business case. A
capital evaluation framework (business case process) exists by which capital projects are
identified in a consistent manner allowing all nominated projects to be analysed equitably.
This is essential when many user groups/Committees of Management are competing for
funding.
Renewal projects that have been identified as part of the 10 year capital works program are
as follows:
• Recreation, Leisure and Cultural Facilities
- Woodend Indoor Stadium
- Gisborne Library
- Gisborne Aquatic Centre
- Woodend Community Arts Precinct Stage 1, 2 and 3
- Kyneton Museum Redevelopment
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 28
• Open Space Facilities
- Public Toilet Renewal Program
• General
- Council Building Renewal
6.9.1 Renewal Gap Model
An analysis of the building portfolio is undertaken yearly using the Renewal Gap Model.
The modelling requires information on:
• Asset condition (rating 0 good – 10 poor);
• Asset lives;
• Intervention points for renewal activity;
• Asset replacement cost; and
• Average annual renewal expenditure.
The Renewal Gap Model predicts future funding requirements for the renewal of building
infrastructure.
The condition audit on Council’s buildings was completed in 2008 and the data used for the
Renewal Gap is outdated.
Table 16 shows the current replacement cost of Council’s buildings based on the 2008
condition audit and the budgeted maintenance and renewal expenditure for 2011/12.
Table 16: Replacement Cost based on 2008 Condition Audit
Buildings – 2011/12
Current Replacement Value $77,772,000
Renewal Expenditure $1,805,315
Maintenance Expenditure $570,100
The renewal gap for buildings is shown in Figure 4.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 29
Figure 4: Total Annual Renewal Gap for Buildings 2011/12
The renewal gap for Council is still showing a significant net deficit.
6.10 Upgrades
Building upgrade activities essentially consist of works such as building extensions or
improvements.
Upgrade works are commonly triggered by high demand and utilisation of buildings, poor
condition, risk or change in building function.
In line with renewal, the capital evaluation framework equally applies to upgrade works.
Again user groups/CoM may put forward a business case to request funding for a building
extension or improvement.
Council has prepared many planning documents that identify infrastructure required to cater
for aspects of a growing community with changing needs.
The following documents have provided useful information in regard to the upgrade life-
cycle plan:
• Leisure Strategy Plan, 2006;
• Community Access & Inclusion Plan;
• Early Years Infrastructure Plan 2009-2019; and
• Outline Development Plans.
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
2012 2014 2016 2018 2020 2022 2024 2026 2028 2030Year Ahead
(The Predicted Renewal Expend. To Maintain Asset Cond. - Less the Propsed Renewal Exp)
Total Annual Renewal Gap in $ - Buildings …
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 30
Projects that have been identified from the above documentation and that are additional to
those found in the Capital Works Program include:
• Upgrade the facilities at the Hurry Reserve velodrome estimated at $17,000; and
• Complete the fit out of the Lancefield Indoor Centre by constructing appropriate
indoor sports floor.
Upgrade projects that have been identified as part of the 10 year capital works program are
as follows:
• Recreation, Leisure and Cultural Facilities
- Pavilion Upgrade Program
- Building Accessibility Works
- Woodend Indoor Stadium
- Gisborne Library
- Gisborne Aquatic Centre Project
- Woodend Community Arts Precinct Stage 1,2 and 3
- Kyneton Museum Redevelopment
• Open Space Facilities
- Public Toilet Upgrade Program
• General
- OH&S Building Code Compliance
- Building Sewerage Connection Works
- Essential Services
Plans for future upgrades (beyond the 10 year capital works program) are currently based on
the Shire’s growth rate of 0.09% per annum, this has been forecast out using the average
upgrade and new works expenditure forecast over the 10 year capital works program period.
As capital funding acquired through external sources is not guaranteed for any year this
funding source cannot be relied on and for this reason has not been projected out past the
capital works program 10 year period.
6.11 New Works
Council has prepared many planning documents such as strategic plans that identify
infrastructure required to cater for aspects of a growing community with changing needs.
The following documents have provided useful information:
• Leisure Strategy Plan, 2006;
• Community Access & Inclusion Plan;
• Early Years Infrastructure Plan 2009-2019; and
• Outline Development Plans.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 31
In line with renewal and upgrade, the capital evaluation framework equally applies to new
works. User groups/CoM’s may put forward a business case to request funding for a new
building.
New works projects that have been identified as part of the 10 year capital works program
are as follows:
• Community Facilities
- Gisborne Preschool Additional Unit
- Kyneton Early Years Hub
- Riddells Creek Extra Preschool Unit/Hub
- Lancefield Early Years & Community Hub
- Kyneton Integrated Hub
• Recreation, Leisure and Cultural
- Romsey Sports Precinct
- Gisborne Aquatic Centre Project
- Gisborne Indoor Sports Centre
• Municipal
- Archives Storage Area
- Small Business Support
Plans for future new works (beyond the 10 year capital works program) are currently based
on the Shire’s growth rate of 0.09% per annum, this has been forecast out using the average
upgrade and new works expenditure forecast over the 10 year capital works program period.
As capital funding acquired through external sources is not guaranteed for any year this
funding source cannot be relied on and for this reason has not been projected out past the
10-year capital works program period.
6.12 Disposal Plan
There is currently no policy to close or dispose of buildings. Council has a fixed asset policy
however it does not strictly cover the disposal of buildings.
Building disposal costs will be recognised in the 10-Year Financial Forecast as an operational
cost if available and deemed appropriate.
The buildings planned for disposal are:
• Woodend Racecourse Reserve, Shed adjacent to Storage Shed (to be removed)
• Malmsbury Recreation Reserve, Jack Bates Shelter (fell over and not replaced);
• Woodend Racecourse Reserve, Jockeys Shed (to be demolished); and
• Woodend Racecourse Reserve, Storage Shed (building to be relocated).
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 32
6.13 Heritage Buildings
Council has an obligation to appropriately care for and maintain places which have been
identified as being of Cultural Heritage Significance to the State (Victorian Heritage Register)
and/or to the Shire (Heritage Overlay). A list of buildings which are either individually listed
or within a heritage precinct is attached as Appendix 10.1.
It is important that the appropriate Council staff and building tenants are aware of the
heritage status of these buildings and understand the permit requirements that may
exist. All capital works will require a permit but maintenance and repairs are permit exempt
if the works are 'like for like'. However, any visual change (e.g. changing profile of guttering,
painting a different colour) does require a permit regardless of whether it is considered
maintenance or repairs.
Council's Heritage Advisor should be consulted when proposing works to these heritage
listed places. The Heritage Advisor will be able to advise on appropriate materials,
methodologies and scopes of work as well as provide assistance with heritage and planning
permit applications.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 33
7 FINANCIAL PLAN
7.1 Financial Statements and Projections
Expenditure is identified by asset group, under the following headings:
• Operations;
• Maintenance;
• Renewals; and
• Upgrades and New Works.
Figure 5: 10-Year Financial Forecast
The key features of the financial projections are:
• Councils commitment to renewal expenditure increases over time;
• Upgrade/new works expenditure peaks in year 2021/22 due to the Woodend
Community Arts Precinct Stage 1, 2 and 3; and
• Operations and maintenance show a gradual increase over time as the expenditure
forecasts are growing in line with the predicted growth of the Macedon Ranges Shire
Council asset stock.
Figure 6 summarises the 10-year financial forecast for building assets (from 2012/13 to
2021/22) based on the forecasts for each asset group contained in Section 5. These costs
exclude inflation and GST.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 34
Figure 6: 10-Year Financial Forecast
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 35
7.2 Funding Strategy
In order to manage and fund various projects within the Shire, Council relies on several
funding sources.
The Community Grants Funding Scheme has three levels of available funding as follows:
1. Operational Grant – Max $500;
2. Service and Delivery – Max $3,000; and
3. Establishment and Development – Max $6,000.
The current funding sources available for buildings include:
• Department of Education & Early Childhood Development (DEECD);
• Regional Development Victoria (RDV);
• Department of Planning and Community Development (DPCD);
• Sports and Recreation Victoria (SRV);
• Office for Youth (part of DPCD);
• Rate Revenue;
• User / Public Contributions;
• Reserves and loan income;
• Developer Contributions (Open Space Reserve Fund); and
• Australian Government Funding.
7.3 Key Assumptions Made in the Financial Forecast
7.3.1 Accuracy of the Information
The following assumptions have been made in developing the financial forecast:
• All information provided is current and representative of Council’s current and future
plans;
• Values used in the forecasting i.e. replacement costs, quantities and asset lives are
representative of the best available data;
• The model that calculates the asset expenditure growth and service potential is only
a model, used to serve a purpose and indicate the current funding position of Council
based on information provided;
• Council will commit to the funding included in the 10 year Capital Plan; and
• Operations and maintenance expenditure is forecast to increase by 3% per/annum.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 36
8 ASSET MANAGEMENT PRACTICES
8.1 Asset Management Systems
8.1.1 Current Practices
Council uses an Access Database commonly known as the Buildings Asset Management
System to house the current register of buildings. This system is currently being driven by
the Building Maintenance Co-ordinator. The system was created in 2008 in response to the
2008 buildings audit, after it was identified that a system was needed to provide
functionality for work instruction generation for building renewal and maintenance.
This system has no link to the financial/accounting system.
Council is in the process of implementing an integrated asset register called MyData for all
infrastructure assets. Building assets will be the first asset class configured and migrated
into the asset register. In the future Council will implement a Maintenance and
Management System integrated with the asset register.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 37
9 PLAN IMPROVEMENTS AND MONITORING
9.1 Improvement Program
Through the development of the Building Asset Management Plan, improvement actions
have been identified and are attached as Appendix 10.2. The improvement actions will be
reviewed and reported to the Executive annually. Any amendments or additions to the
improvement plan will be approved by the Executive.
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 38
10 APPENDICES
10.1 Heritage Buildings
LOCALITY BUILDING NAME MAINTENANCE
RESPONSIBILITY ADDRESS HERITAGE SIGNIFICANCE
Bolinda Hall - Bolinda Shire 5 Mullalys Road Proposed
Gisborne Courthouse (Museum) Shire 2 Hamilton St Yes Local HO86
Gisborne Lock-up (Courthouse) Shire 2 Hamilton St Yes Local HO86
Gisborne Mechanics-Community
Centre Shire 18 HAMILTON ST Proposed
Gisborne Museum - Stables Shire 2 Hamilton St Yes Local HO86
Gisborne Museum - toilets Shire Hamilton St Yes Local HO86
Kerrie SCHOOL Shire 7 CHEROKEE RD Yes State HO53 (H1631)
Kerrie SCHOOL (original shelter) Shire 7 CHEROKEE RD Yes State HO53 (H1631)
Kerrie SCHOOL (Shelter Shed) Shire 7 CHEROKEE RD Yes State HO53 (H1631)
Kerrie School (Toilet Block) Shire 7 CHEROKEE RD Yes State HO53 (H1631)
Kyneton ARTS CENTRE - Bluestone Shire HUTTON ST Yes State HO256 (H1989)
Kyneton ARTS CENTRE - Red Brick Shire 23 YALDWYN ST Yes Local HO119
Kyneton ARTS CENTRE-TOILETS Shire HUTTON ST Yes State HO256 (H1989)
Kyneton Caravan Park-Amenities
(Red brick) Shire CLOWES ST Yes State HO165 (H1994)
Kyneton Caravan Park-Amenities
(South Eastern) Shire CLOWES STREET Yes State HO165 (H1994)
Kyneton Caravan Park-Amenities
(Yellow Brick) Shire CLOWES ST Yes State HO165 (H1994)
Kyneton Caravan Park-
Office/Kiosk/House Shire CLOWES ST Yes State HO165 (H1994)
Kyneton Caravan Park-Rotunda Shire CLOWES ST Yes State HO165 (H1994)
Kyneton Caravan Park-Shed Shire CLOWES ST Yes State HO165 (H1994)
Kyneton Caravan Park-Shelter Shire CLOWES ST Yes State HO165 (H1994)
Kyneton GARDENER'S COTTAGE Shire CLOWES STREET Yes State HO165 (H1994)
Kyneton Kyneton Town Hall Shire 129 Mollison St Yes Local HO170
Kyneton HOUSE (Adj Museum) Shire 75 PIPER STREET Yes Local HO196
Kyneton Kyneton Macedon
Maternal & Child Health Shire 3 HUTTON ST Yes Local HO119
Kyneton Kyneton Pre-School Shire 5 HUTTON ST Yes Local HO119
Kyneton Mechanics Res-
Library/Senior Citz Shire 81 Mollison St Yes State HO254 (H1904)
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 39
LOCALITY BUILDING NAME MAINTENANCE
RESPONSIBILITY ADDRESS HERITAGE SIGNIFICANCE
Kyneton MINERAL SPRINGS -
PUBLIC TOILETS Shire 200 BURTON AVE Yes Local HO25
Kyneton MINERAL SPRINGS
SHELTER Shire 200 BURTON AVE Yes Local HO25
Kyneton MINERAL SPRINGS-
ROTUNDA Shire 200 BURTON AVE Yes Local HO25
Kyneton MUSEUM - BLUESTONE Shire 67 PIPER ST Yes State HO202 (H0308)
Kyneton MUSEUM-(old cottage) Shire 67 PIPER ST Yes State HO202 (H0308)
Kyneton MUSEUM-HOUSE Shire 67 PIPER ST Yes State HO202 (H0308)
Kyneton MUSEUM-KITCHEN Shire 67 PIPER ST Yes State HO202 (H0308)
Kyneton MUSEUM-MYSTERY
BUILD Shire 67 PIPER ST Yes State HO202 (H0308)
Kyneton MUSEUM-SHED Shire 67 PIPER ST Yes State HO202 (H0308)
Kyneton MUSEUM-STABLE Shire 67 PIPER ST Yes State HO202 (H0308)
Kyneton OFFICE/GARAGE Shire Mollison St
(Botanic Gardens Yes State HO165 (H1994)
Kyneton PUBLICTOILETS-
CARAVANPARK Shire CLOWES ST Yes State HO165 (H1994)
Kyneton Public Toilets-Hutton St Shire HUTTON STREET Yes Local HO119
Kyneton PUBLIC TOILETS-JEAN
HAYNES PLAYGROUND Shire HIGH ST Yes Local HO89
Kyneton Public Toilets-Mechanics
Res Shire 81 Mollison St Yes State HO254 (1904)
Kyneton Rotunda-Kyneton
Gardens Shire Mollison St Yes State HO165 (H1994)
Kyneton Shelter (Jean Haynes) Shire HIGH STREET Yes Local HO91
Kyneton Shire Office Shire 129-141 Mollison
St Yes Local HO162
Kyneton Shire Office (Youth
Services) Shire
129-141 Mollison
St Yes Local HO162
Kyneton Shire Office Annexe Shire 125-127 Mollison
St Yes Local HO162
Kyneton Showgrounds
(Clubrooms) Shire Mollison St Proposed
Kyneton
Showgrounds
(Grandstand, Change
rooms)
Shire Mollison St Proposed
Lancefield Kiosk Other HIGH ST Yes Local HO92
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 40
LOCALITY BUILDING NAME MAINTENANCE
RESPONSIBILITY ADDRESS HERITAGE SIGNIFICANCE
Lancefield Lancefield Museum
(Courthouse) Shire
MELB-
LANCEFIELD RD Yes Local HO157
Lancefield Lancefield Rotunda Shire HIGH ST Yes Local HO92
Lancefield Lancefield Swimming
Pool-Change rooms Shire CHAUNCEY ST Yes Local HO52
Lancefield Lancefield Swimming
Pool-Plant Room Shire
CHAUNCEY
STREET Yes Local HO52
Lancefield Lancefield Tennis
Clubrooms Other CHAUNCY ST Yes Local HO52
Lancefield Public Toilets (adj Tennis
Club) Other CHAUNCY ST Yes Local HO52
Lancefield Public Toilets-The
Crescent Shire THE CRESCENT
Yes Local (not
contributory)
Malmsbury Malmsbury Hall Shire 91 Mollison St Yes State HO253 (H1993)
Malmsbury Malmsbury Mechanics
Institute Hall Shire Mollison St Yes Local HO148
Malmsbury Malmsbury Recreation
Reserve Change rooms Shire MOLLISON ST Yes Local HO148
Malmsbury Malmsbury Recreation
Reserve Shed Shire Mollison St Yes Local HO148
Malmsbury
Malmsbury Recreation
Reserve Shelter (Jack
Bates)
Shire Mollison St Yes Local HO148
Malmsbury Malmsbury Tennis Shed Shire Ellesmere St Yes Local HO148
Malmsbury Public Toilets Malmsbury Shire MOLLISON ST Yes Local HO148
New
Gisborne
Ross Watt Res Public
Toilets Shire Station Rd Proposed
New
Gisborne
Ross Watt Reserve
(Tennis) Shed Shire Station Rd Proposed
Newham Hanging Rock-Café Shire SOUTH ROCK RD Yes Local HO88
Newham Hanging Rock-Change
rooms/Pavilion Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Cricket
Clubrooms Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Discovery
Centre Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Ex
Kiosk/First Aid Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Machinery
Shed Shire
SOUTH ROCK
ROAD Yes Local HO88
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 41
LOCALITY BUILDING NAME MAINTENANCE
RESPONSIBILITY ADDRESS HERITAGE SIGNIFICANCE
Newham Hanging Rock-Public
Toilet (Car park) Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Public
Toilet (N of Race track) Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Public
Toilet (near BBQ E side) Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham
Hanging Rock-Public
Toilet (near Tennis
courts)
Shire SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Public
Toilet (w of Café) Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Racing
Clubrooms Other
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Shelter
(East) Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Shelter
(West) Shire
SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Staff Room Shire SOUTH ROCK
ROAD Yes Local HO88
Newham Hanging Rock-Tennis
Clubrooms Shire
SOUTH ROCK
ROAD Yes Local HO88
Riddells
Creek Lions Park Rotunda Shire 63A MAIN RD Yes Local HO230
Riddells
Creek Montessori Kindergarten Other 59 MAIN RD Proposed
Riddells
Creek
Public Toilets-Jackson's
Creek Res Shire 57 MAIN RD Yes Local HO84
Riddells
Creek Public Toilets-Lions Park Shire 63A MAIN RD Yes Local HO230
Riddells
Creek
Public Toilets-
Sutherlands Rd Shire
SUTHERLANDS
ROAD Proposed
Riddells
Creek
Riddells Creek
Community Centre Shire 59 MAIN RD Proposed
Riddells
Creek
Riddells Creek
Community House Other 59 MAIN RD Proposed
Riddells
Creek
Riddells Creek Rec
Centre-Football
Clubrooms
Other SUTHERLANDS RD Proposed
Riddells
Creek
Riddells Creek
Recreation Centre Shire
SUTHERLANDS
ROAD Proposed
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 42
LOCALITY BUILDING NAME MAINTENANCE
RESPONSIBILITY ADDRESS HERITAGE SIGNIFICANCE
Riddells
Creek
Riddells Creek Toy
Library Other 59 MAIN RD Proposed
Romsey Library/Community Hub Shire 96-100 MAIN RD Yes Local HO144
Romsey Public Toilets-Lions Park
(adj creek-N) Shire MAIN RD Yes Local
Romsey Public Toilets-Lions Park
(adj Skate Park-S) Shire MAIN RD Yes Local
Romsey Recreation Centre Shire PARK LANE Yes Local HO195
Romsey Romsey Park Football
/cricket Clubroom Shire PARK LANE Yes Local HO195
Romsey Romsey Park Visitors'
Change rooms Shire PARK LANE Yes Local HO195
Romsey Romsey Park-Bowls
Clubrooms Other PARK LANE Yes Local HO195
Romsey Romsey Park-Golf Club
Shed Other PARK LANE Yes Local HO195
Romsey Romsey Park-Lions Pump
Shed Other BARRY STREET Yes Local HO195
Romsey Romsey Park-Play Hut Shire BARRY STREET Yes Local HO195
Romsey Romsey Park-Public
Toilets (adj bowls Club) Shire PARK LANE Yes Local HO195
Romsey Romsey Park-Public
Toilets (adj Scout Hall) Shire BARRY STREET Yes Local HO195
Romsey Romsey Park-Rotunda Shire PARK LANE Yes Local HO195
Romsey Romsey Park-Scorers Box Other PARK LANE Yes Local HO195
Romsey Romsey Park-Scout Hall Shire BARRY STREET Yes Local HO195
Romsey Romsey Park-Ticket Box Shire PARK LANE Yes Local HO195
Romsey Rotunda-Lions Park (adj
Skate Park-S) Shire MAIN RD Yes Local
Woodend Campaspe Park-Rotunda Shire 144 HIGH STREET Yes Local HO103
Woodend Clock tower Shire HIGH ST Yes Local HO105
Woodend Community Hub (Cobaw
Health) Other 47 FOREST ST Proposed
Woodend Keating’s Memorial Shire 142 HIGH ST Yes Local HO103
Woodend Museum Woodend
(Courthouse) Shire 43 FOREST STREET Yes State HO78 (H1489)
Woodend Neighbourhood House Other 47 FOREST ST Proposed
Woodend Race Res-Coaches Box
(Home) Other
1-29 FOREST
STREET Proposed
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 43
LOCALITY BUILDING NAME MAINTENANCE
RESPONSIBILITY ADDRESS HERITAGE SIGNIFICANCE
Woodend Race Res-Coaches Box
(Visitors) Other
1-29 FOREST
STREET Proposed
Woodend Race Res-Covered Way
(ex ped entry) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-ex Pigeon Club Shire 1-29 FOREST
STREET Proposed
Woodend Race Res-ex Toy Library Shire 1-29 FOREST
STREET Proposed
Woodend Race Res-Grandstand Shire 1-29 FOREST
STREET Proposed
Woodend Race Res-Jockeys' Shed Shire 1-29 FOREST
STREET Proposed
Woodend Racecourse Res-Judges
Tower Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Shed (adj ex
Little Aths) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Shelter (Pony
Club) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Stables (Pony
Club store) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Stewards
Tower (North) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Stewards
Tower (South) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Store Shed (ex
Little Aths) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Store Shed (ex
Vet) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Toilets (adj
Pony Club) Shire
1-29 FOREST
STREET Proposed
Woodend Race Res-Toilets (small) Shire 1-29 FOREST
STREET Proposed
Woodend Race Res-Youth/Athletics Shire 1-29 FOREST
STREET Proposed
Woodend Woodend Indoor Sports
Stadium (Buffalo) Shire
1-29 FOREST
STREET Proposed
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 44
10.2 Improvement Actions
AMP Reference Improvement Action Responsibility Timeframe Status
Part C - Buildings Improvement Action 1: Ensure lease agreements exist
for all Council leased buildings defining specific
requirements for building maintenance responsibilities.
Relevant Service
Mangers 2012/13
Commenced – Standardised
Lease/Licence Agreement
template complete
Part C – Buildings Improvement Action 2: Develop Individual Service Plans
defining Customer & Technical Levels of Service for those
services relevant to building assets.
Relevant Service
Managers 2012/13
Programmed to commence
2012/13
Part C - Buildings Improvement Action 3: As Service Plans are completed
review the levels of service, identify assets under-
capacity and add to Building Asset Management Plan.
Relevant Service
Managers / Coordinator
Engineering Planning
2012/13 Programmed to commence
2012/13
Part C – Buildings Improvement Action 4: Develop and implement an
Infrastructure Risk Register or incorporate into existing
Risk Register.
Manager Organisational
Development 2012/13
Programmed to commence
2012/13
Part C - Buildings Improvement Action 5: Assess the risk of all critical
assets and record these within the relevant risk register
identifying actions that can be implemented to manage
the risk.
Manager Engineering
Infrastructure &
Projects / Manager
Organisational Develop.
2012/13 Programmed to commence
2012/13
Part C - Buildings Improvement Action 6: Undertake cyclic Condition
Assessment Surveys for Building Assets to ensure
accuracy of data
Manger Engineering
Infrastructure &
Projects
Tri-annually Commenced
Part C - Buildings Improvement Action 7: Investigate the opportunity to
distribute operational and maintenance costs to
individual buildings to identify the true costs associated
with the building and the service it provides.
Finance Manager /
Manager Engineering
Infrastructure &
Projects / Service
Managers
2012/13 Programmed to commence
2012/13
Part C - Buildings Improvement Action 8: Separate renewal costs from the
existing maintenance budget so that reports reflect
capital verses operational expense.
Finance Manager /
Manager Engineering
Infrastructure &
Projects
2013/14 Programmed to commence
2013/14
Macedon Ranges Shire Council Part C-Building Asset Management Plan
P a g e | 45
AMP Reference Improvement Action Responsibility Timeframe Status
Part C - Buildings Improvement Action 9: Define request types in
Council’s CRM specific to buildings to enable the ability
to report and analyse customer requests This will assist
with defining Levels of Service and planning maintenance
and renewal programs.
Manager Engineering
Infrastructure &
Projects / Manager
Council & Customer
Service
2012/13 Programmed to commence
2012/13
Part C- Buildings Improvement Action 10: Implement a building register
that is integrated with relevant applications within
Council and that captures all specified building
information in a central location.
Coordinator Engineering
Planning / Manger
Engineering
Infrastructure &
Projects
2012/13
Commenced – Integrated
asset register purchased and
implementation about to
commence.
Part C – Buildings Improvement Action 11: Annual inspections,
assessments or reports required under legislation should
be undertaken and continually monitored.
Manager Engineering
Infrastructure &
Projects
Annually Commenced
Review History
Issue Date Details By
A 19 April 2013 Review AM/DP
B 28 June 2013 Final Draft AM
C 4 July 2013 Final for Public Consultation after further staff comment AM
D 9 August 2013 Final Draft for Councillor Briefing AM
E 25 September 2013 Adopted Council
3
CONTENTS
1 EXECUTIVE SUMMARY ............................................................................................... 1
2 INTRODUCTION.......................................................................................................... 2
2.1 Background ................................................................................................................. 2
2.1.1 Plan Format ......................................................................................................... 2
2.1.2 Relationship with Other Planning Documents .................................................... 2
2.1.3 Assets included in the Plan .................................................................................. 3
2.1.4 Assets not Included in this Plan .......................................................................... 4
2.1.5 Key Stakeholders in the Plan ............................................................................... 4
2.1.6 Asset Responsibility ............................................................................................. 4
2.2 Goals & Objectives of Asset Ownership ..................................................................... 5
2.2.1 Links to Organisation Vision, Mission, Goals & Objectives ................................. 5
3 LEVELS OF SERVICE ..................................................................................................... 6
3.1 Community Engagement and Expectations ............................................................... 6
3.1.1 Background and Customer Engagement Undertaken ........................................ 6
3.1.1.1 Annual Community Satisfaction Survey ....................................................... 6
3.1.1.2 Pathway – Customer Request Management System (CRM) ....................... 6
3.1.2 Details of How Engagement Translates into Levels of Service ........................... 9
3.2 Legislative Requirements.......................................................................................... 10
3.3 Current Levels of Service .......................................................................................... 11
3.3.1 Asset Functional Hierarchy ................................................................................ 11
3.3.2 Community and Technical Service Levels ......................................................... 12
4 FUTURE DEMAND .................................................................................................... 13
4.1 Demand Forecast ...................................................................................................... 13
4.1.1 Water Sensitive Urban Design........................................................................... 13
4.1.2 Outline Development Plans .............................................................................. 13
4.1.3 Demographic Profile .......................................................................................... 13
4.2 Demand Management Strategies ............................................................................. 13
5 RISK MANAGEMENT................................................................................................. 14
5.1 Hazard Identification ................................................................................................ 14
5.2 Asset Criticality ......................................................................................................... 14
5.2.1 Critical Assets .................................................................................................... 14
5.2.1.1 List of Critical Assets: ................................................................................. 15
5.2.2 High Risk Assets ................................................................................................. 15
5.2.2.1 List of High Risk Assets ............................................................................... 15
6 LIFECYCLE MANAGEMENT PLANS ............................................................................. 16
6.1 Physical Parameters.................................................................................................. 16
4
6.1.1 Current Issues .................................................................................................... 16
6.1.2 Asset Quantities ................................................................................................ 16
6.2 Asset Capacity/Performance .................................................................................... 17
6.2.1 Stormwater Drainage Studies / Flood Studies .................................................. 17
6.2.2 Levels of Service ................................................................................................ 17
6.3 Asset Condition ......................................................................................................... 17
6.3.1 Condition Rating ................................................................................................ 18
6.3.2 Current Asset Condition .................................................................................... 19
6.3.3 Deterioration Curves ......................................................................................... 20
6.3.4 Asset Useful Lives & Intervention Levels .......................................................... 20
6.3.5 Historical Asset Condition ................................................................................. 20
6.4 Historical Data .......................................................................................................... 20
6.5 Asset Valuations ....................................................................................................... 20
6.6 Routine Maintenance ............................................................................................... 21
6.6.1 Defect Inspections ............................................................................................. 21
6.6.2 Prioritisation of Maintenance Works ................................................................ 22
6.6.3 Defect Response Times ..................................................................................... 22
6.6.4 Standards and Specifications ............................................................................ 23
6.6.5 Basis for Future Maintenance Costs ................................................................. 23
6.7 Renewal Plan ............................................................................................................ 23
6.7.1 Renewal Capital Works Programs ..................................................................... 23
6.7.2 Drainage Renewal Program ............................................................................... 23
6.7.3 Treatment Options ............................................................................................ 23
6.7.4 Basis for Future Renewal Costs ......................................................................... 24
6.7.4.1 Renewal Modelling - Renewal Rates ......................................................... 24
6.7.5 Renewal Demand and Renewal Gap ................................................................. 24
6.8 Upgrades & New Works ........................................................................................... 24
6.8.1 Drainage Upgrade ............................................................................................. 24
6.8.2 Drainage New Works ......................................................................................... 24
6.8.3 Summary of New & Upgrade Works ................................................................. 24
6.9 Operations ................................................................................................................ 26
6.9.1 Operations Future Costs.................................................................................... 26
6.10 Disposal Plan ............................................................................................................. 26
7 FINANCIAL PLAN ...................................................................................................... 27
7.1 Financial Statements and Projections ...................................................................... 27
7.1.1 Expenditure History ........................................................................................... 27
7.1.2 Financial Projections ......................................................................................... 27
7.2 Funding Strategy ....................................................................................................... 28
7.3 Key Assumptions Made in the Financial Forecast .................................................... 28
5
7.3.1 Accuracy of the Information ............................................................................. 28
8 ASSET MANAGEMENT PRACTICES ............................................................................. 29
8.1 Asset Management Systems .................................................................................... 29
8.1.1 Available Data .................................................................................................... 29
8.2 Standards & Guidelines ............................................................................................ 29
8.2.1 Construction Standards ..................................................................................... 29
9 PLAN IMPROVEMENTS AND MONITORING ............................................................... 30
9.1 Improvement Program ............................................................................................. 30
9.2 Monitoring and Review Procedures ......................................................................... 30
9.2.1 AMP Review Procedure ..................................................................................... 30
10 APPENDICES ............................................................................................................. 31
10.1 Improvement Action Plan ......................................................................................... 31
10.2 Attachment #1 – Budgeted Capital Works Statement ............................................. 32
10.3 Attachment #2 – Infrastructure Financial Projections ............................................. 33
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 1
1 EXECUTIVE SUMMARY
The drainage network represents a significant investment by Council and its ongoing
development, management and maintenance is an important commitment. The purpose of
this commitment is to protect, maintain and enhance the public health and safety, and to
care for the general welfare of the community by safe guarding against the water damage
aspect from storms and flooding.
The operation, maintenance and development of the drainage infrastructure will be guided
by and consistent with Council’s vision and key objectives as stated in the Council Plan, Asset
Management Policy and Asset Management Strategy. This Drainage Asset Management Plan
is intended to demonstrate to stakeholders that Council is managing the drainage assets
responsibly.
The population of Macedon Ranges Shire is growing which may impact on the amount of
drainage infrastructure required within the Shire as well as upgrades to the existing network.
Proposed Township Development allows the impacts on infrastructure to be assessed at a
township level.
The Macedon Ranges Shire Council’s Risk Management Policy identifies Council’s objectives
towards risk management. The Risk Management Strategy also outlines the risk
management process, via the incorporation of seven steps undertaken in Risk Management.
The Assets and Operations Directorate is responsible for the strategic management, planning
and design of the infrastructure. The ‘drainage hierarchy’ has been developed to divide the
infrastructure asset base into appropriate classifications for the purpose of this plan. The
drainage hierarchy separates infrastructure assets, within the drainage asset class, into four
drainage asset groups, being:
• Underground Drainage;
• Surface Drainage;
• Water Quality Devices; and
• Flood Prevention.
Expenditure is identified for each of the asset groups, under the following headings:
• Operations;
• Maintenance;
• Renewals;
• Upgrades;
• New Works.
The financial projections, Attachment #2, have been developed based on the funding
requirements identified from the Moloney Renewal Gap Model.
As part of this asset management plan production, many gaps have been identified relating
to processes, data and systems. As such an improvement plan has been developed to
support Council to improve its asset management practices and capabilities in relation to
drainage asset management.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 2
2 INTRODUCTION
2.1 Background
2.1.1 Plan Format
This plan is part of Council’s overall asset management plan as described below:
• Part A - General Information: Background and information common to all assets
• Part B - Roads
• Part C - Buildings
• Part D – Drainage (this plan)
• Part E - Open Space
2.1.2 Relationship with Other Planning Documents
The relationship of this plan to other specific strategies and plans is outlined below:
Plan Description
Urban Stormwater
Management Plan (USWMP)
The USWMP has been developed in a number of stages as guided by
the requirements of the Victorian Stormwater Action Program (VSAP)
and involved close consultation with Council, North Central Catchment
Management Authorities and other stakeholders.
Gisborne Flood Study, 2006
The Gisborne Flood Study investigated the flood behaviour of Jacksons
and Howey Creeks within the township of Gisborne, in four major
stages; hydrology, hydraulics, existing flood risk assessment, mitigation
options risk assessment. Key findings of these four stages are included
in the report.
Gisborne /New Gisborne
Drainage Study – 2011
Kyneton Township
Stormwater Drainage Study -
2011
Riddells Creek Drainage
Study - 2011
Romsey Township
Stormwater Drainage Study,
2009
Council commissioned Aurecon Australia in 2009 to prepare a
stormwater drainage study for Romsey. This study (s5.1) indicates that
“the stormwater network is generally still in good condition.” However,
it identifies a substantial need for upgrading of infrastructure that does
not have the capacity to convey flows from a ten year storm event.
Romsey ODP
The Romsey Outline Development Plan (ODP) aims to provide a
detailed plan for the future residential, commercial and industrial
growth of Romsey, with planning horizons to 2021 and 2031.
Gisborne ODP, 2009
The outcomes of this project will provide Council and the community
with a clear overall structure plan that sets out main road networks,
open space areas, location of community facilities, land use directions
and details of issues that need to be considered when assessing
subdivision applications.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 3
Plan Description
Draft Flood Management
Plan for MRSC Melbourne
Water and North Central
CAM
Aimed at assisting MRSC, North Central CMA, Victoria SES and
Melbourne Water undertake their flood management responsibilities
and ensuring that suitable flood management measures are being
implemented in order to reduce flood risk where possible. It is also
aimed at fostering preparedness for flood events and ability to respond
in an informed and appropriate manner within the Municipality and its
communities.
Road Management Plan
2.1.3 Assets included in the Plan
The assets included in this plan are:
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 4
2.1.4 Assets not Included in this Plan
Assets specifically excluded from this plan are:
• Kerb and channel
• Pipes providing driveway access to private property;
• Drainage within private property and to the point of connection to the council system
including the connection itself;
• Drainage within property not within a Council easement;
• VicRoads pits and pipes that drain only VicRoads roads as defined in the Operational
Responsibility for Public Roads Code of Practice; and
• Grass urban table drains not providing continuity of the network or not subject to
council maintenance.
2.1.5 Key Stakeholders in the Plan
This plan is intended to demonstrate to stakeholders that Council is managing the drainage
assets responsibly. In addition to the key stakeholders identified in Asset Management Plan
Part A – General Information, stakeholders having interests and/or expectations specific to
drainage are:
Stakeholder Interest
Melbourne Water As responsible owners of drainage infrastructure.
Northern Central Catchment Authority As responsible owners of drainage infrastructure.
Developers Reasonable rules to drainage consistently applied.
Environmental groups, e.g. Individual
reserve friends groups, LandCare groups.
Conservation of the environment.
Consultation about changes that have
environmental impacts.
2.1.6 Asset Responsibility
Local government is responsible for drainage areas smaller than 60 hectares and for ongoing
drainage management including operations and maintenance. This includes providing a
drainage system connected to the main system and ensuring the legal point of discharge, for
each property. Local Government also has a role in setting required building floor heights in
relation to flood levels and declaring areas subject to flooding in which special designs are
necessary to respond to potential flood conditions.
Many departments play a role in the management of Council’s drainage portfolio. The
directorates and supporting departments involved are listed below:
Assets and Operations Directorate
• Operations – Drainage construction, operations and maintenance;
• Engineering, Infrastructure & Projects – Drainage infrastructure planning, design,
renewal and disposal; and
• Engineering Planning – Asset Management
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 5
Planning and Environment Directorate
• Strategic Planning & Environment – Wetlands.
The Asset Responsibility Matrix is contained within the Asset Management Strategy. The
Asset Responsibility Matrix is reviewed regularly and as changes are made the matrix in the
in strategy is updated.
Council services which utilise the assets included in this plan are:
• Stormwater Management
• Flood Mitigation
• Environment
Improvement Action: 1 Develop individual service plans defining the responsibilities and
levels of service for those services relevant to the assets included in this plan
2.2 Goals & Objectives of Asset Ownership
Drainage within the Shire assists in protecting community property and assets from flooding.
As custodians of drainage it is Council’s responsibility to provide a safe, clean and free-
flowing drainage network that is adequate to cater for peak storm water events.
2.2.1 Links to Organisation Vision, Mission, Goals & Objectives
Document Section Goal Objective Action
Council Plan
2013-2017
Action Plan
1
Our infrastructure
supports the needs
of future
generations.
To plan for, develop
and maintain
community facilities
that meet its
changing needs
Deliver prioritised
projects from
Council’s Capital
Works Programs on
time and on budget.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 6
3 LEVELS OF SERVICE
3.1 Community Engagement and Expectations
3.1.1 Background and Customer Engagement Undertaken
Drainage related levels of service are driven by customer survey feedback, customer
requests/expectation and legislative requirements.
3.1.1.1 Annual Community Satisfaction Survey
The community satisfaction survey is an independent state-wide survey of local Councils
which measures residents’ satisfaction with the service and performance of their local
Councils. The last community satisfaction survey was undertaken in 2013. No specific
drainage satisfaction results were identified as part of this process.
3.1.1.2 Pathway – Customer Request Management System (CRM)
All customer complaints/enquiries to Council, whether in person, by phone or by mail are
registered in the Pathway CRM. This system requires the complaint/fault/enquiry to be
categorised by asset type and location. It automatically assigns a department responsible
and sends an e-mail notification to the appropriate person. An appropriate response time
for responding is built into the system for escalation purposes.
This system has been in operation since November 2011 when it replaced the previous Infra-
Active Customer Request System. Customer requests are captured against the following
drainage related request types:
• Aboveground
• Car Parks
• New or Upgrade
• Private Property
• Stormwater
• Underground
• Pits – Concrete
• Pits – Grated
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 7
The results of these requests are as follows:
Pathway Request Type 1-11-11 to
30-6-12
1-7-12 to
31-3-13
Aboveground
• Bluestone Gutters 11 13
• Concrete Gutters 22 17
• Effluent 3 1
• Open Drains 187 156
Car Parks 1 0
Total
New or Upgrade 39 24
Total
Private Property
• Flooding 55 21
• Easement (Right Of Way) 10 5
Total
Stormwater
• Inspection 59 86
• Legal Point of Discharge 8 2
• Maintenance 201 87
Total
Underground
• Culvert (covered pipes) 95 82
Total
Pits - Concrete
• Lid Missing 0 5
• Lid Dislodged 5 11
• Damaged 31 18
• Surrounds 1 6
Total
Pits – Grated
• Lid Missing 1 0
• Lid Dislodged 1 2
• Damaged 1 3
• Surrounds 0 1
Total
Note: Key issues are highlighted.
Some of the request type categories in the pathway CRM and Infra-Active Customer Request
System are too general and provide no useful information on the key issues relating to
maintenance.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 8
The previous Infra Active System captured requests against the following request types:
• Easement Drains;
• Culverts;
• Open Table Drains;
• Stormwater Drains; and
• Pits.
The results for the above request types have been included in the tables below:
Request Type 2008/09 2009/10 2010/11 1-7-11 to
30-10-11
Easements
• Overgrown 0 1 8 0
• Easement Drains 7 2 3 0
• Blocked 3 4 21 4
• Maintenance 14 7 32 9
• Insufficient Drain 6 9 36 8
Total
Culverts
• Roadside Culvert 114 99 173 45
Total
Open Table Drains
• Overgrown 10 7 13 2
• Insufficient Drain 6 13 46 4
• Blocked 13 18 29 8
• Flooding 10 30 74 18
• Maintenance 23 48 67 30
Total
Stormwater Drains
• Stormwater Drain 13 7 36 10
• Maintenance 9 10 529 126
Pits
• Missing Grate/Lid 9 6 2 0
• Blocked Grate/pit 1 6 7 1
• Damaged 10 25 21 1
• Dislodged 4 11 7 3
Note: Key issues are highlighted.
The customer request numbers include internal inspection referrals. These would generally
not be used to assess community issues.
2010/11 had some extreme weather events resulting in flash flooding and a massive increase
in the number of maintenance and flooding requests received from both customers and
internal staff.
Historic information taken from the previous Infra-Active Customer Request System has
been utilised to determine current customer needs.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 9
Improvement Action: 2 Introduce ability to categorise customer requests between internal
(inspections) and external (community) requests
The community engagement proposed for the assets included in this plan is:
Audience/Technique
Customer requests
Community Satisfaction Survey
The outcomes from the engagement are summarised below:
Audience/ Technique /Date Needs/comments/outcomes/issues
Draft needs developed from the
Regional Asset Service project
Not to be flooded
Open drains being untidy
Open drains are a drowning risk
Too much litter is getting into the river
Customer request
Open table drains – flooding
Open table drains – maintenance
Stormwater drains – maintenance
Pits – damaged pit lid
Community Satisfaction Survey No specific drainage issues identified
3.1.2 Details of How Engagement Translates into Levels of Service
From the engagement process the key customer expectations relating to the assets included
in this plan are:
Customer Needs (outcome of customer engagement)
• Not to be flooded
• Open drains require maintenance (clearing, mowing)
• Damaged pit lids
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 10
3.2 Legislative Requirements
Legislative Requirements, Standards and Codes of Practice specific to drainage assets which
have an impact on levels of service are listed in the table below:
Reference Details
Water Act 1989 Provides for the liability of any person who causes unreasonable flows, which
result in damage or injury. (Section 16(1)).
Subdivisions Act
1988
Provides for engineering plans to be provided for developments in accordance
with relevant standards.
Road Management
Act 2004
The principles of the Act include:
• Set out the powers, duties and functions of highway authorities in relation to
the inspection, maintenance and repair of roads
• Establish the legal framework for the management of roads and define the
rights, powers and duties of road authorities and other persons and bodies
(such as utilities) which install, maintain or operate infrastructure on roads
or carry out such works on roads
Enable authorities to develop and publish management plans to incorporating
the performance of their duties in relation to the inspection, maintenance and
repair of roads, having regard to the type of road, the resources available to the
authority and its budgetary and policy priorities.
Building Regulations
1994
PART 6 - BUILDING WORK IN SPECIAL AREAS
Sect 6.2. Flood areas
Sect 6.6. Uncontrolled overland drainage
Catchment and Land
Protection Act 1994
Includes setting up a framework for the integrated management and protection
of catchments (S1).
The Act establishes the catchment management authorities (S11).
Melbourne and
Metropolitan Board
of Works Act 1958
For the operation of main drains and floodplain management.
Building Act 1993
and Building
Regulations 2006
To provide for the regulation of building and building standards (S1) Provides
for:
• Consent from council to build over easements vested in Council (reg. 310)
• A report to be gained from Council on the point of discharge (reg. 610)
• Control of building in flood prone areas (reg. 802)
All Local Laws and
relevant policies of
the Council
Local Laws are adopted to protect public health, safety, or amenity in a
municipality. They are designed to ensure that the actions of an individual or
group do not have a negative or undesirable impact on the rest of the
community.
All other relevant
Australian Standards
and Codes of
Practice
State Environment Protection Policies (SEPPs)
SEPP is subordinate legislation made under the provisions of the Environment
Protection Act 1970 to provide more detailed requirements and guidance for the
application of the Act to Victoria.
SEPP aims to safeguard the environmental values and human activities
(beneficial uses) that need protection in the State of Victoria from the effect of
waste. Such as:
• Human health and well-being;
• Ecosystem protection;
• Visibility;
• Useful life and aesthetic appearance of buildings, structures, property and
materials;
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 11
Reference Details
• Aesthetic enjoyment; and
• Local amenity.
SEPP expresses in law the community’s expectations, needs and priorities for
using and protecting the environment.
The National Pollutant Inventory (NPI) was developed as a National Environment
Protection Measure (NEPM) by the National Environment Protection Council
(NEPC), and is a statutory instrument under the National Environment Protection
Council Act (Australia) 1994. It was incorporated into Victorian law as an
Industrial Waste Management Policy. This applies to all industries regardless of
whether facilities are licensed by EPA or not.
Design and development standards and guidelines relating to civil infrastructure.
Australian Rainfall and Runoff Guidelines.
National Plumbing and Drainage Code.
3.3 Current Levels of Service
3.3.1 Asset Functional Hierarchy
Functional hierarchies applicable to assets included in this plan are:
Underground Drainage Functional Hierarchy
Hierarchy Description
1 Intensely developed business and industrial where flooding would cause serious
damage or inconvenience
2 Other business and industrial areas, developed residential
3 Sparsely populated residential such as parks, playing fields
Pits by Importance
Type Description
Critical Pits Pits with a high likelihood of blockage and risk of flooding
CBD pits Located within the Central Business District
Other All other pits
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 12
3.3.2 Community and Technical Service Levels
Community Level of
Service (Customer Need)
Service Indicator Technical Level of Service
Measure Target
Not to be flooded Safety and
financial
Occurrence of flooding
above floor level of dwelling,
shop, factory
0/year
Average recurrence interval 1 in 100 - ARI
Open drains require
maintenance
(clearing, mowing)
Amenity Safety
Responsiveness
Regular defect inspections
Number of identified defects
outside intervention
corrected within the
response time as defined in
the RMP
100% completed in
compliance with RMP
100% in compliance
with RMP
Damaged pit lids Safety
Regular defect inspections
Number of identified defects
outside intervention corrected
within the response time as
defined in the RMP
100% completed in
compliance with RMP
100% in compliance
with RMP
Note: RMP: Road management Plan
Improvement Action: 3 Review current design standards for pit lids load capacity
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 13
4 FUTURE DEMAND
4.1 Demand Forecast
4.1.1 Water Sensitive Urban Design
All new developments should implement Water Sensitive Urban Design (WSUD) treatment
measures (e.g. wetlands) in both the main and local drainage network.
4.1.2 Outline Development Plans
Outline Development Plans (ODP’s) have been developed for the
• Gisborne/New Gisborne and
• Romsey townships.
The aim of an ODP is to prepare a detailed plan that provides for the future residential,
commercial and industrial growth within each township. Objectives for drainage
infrastructure are stated at a high level indicating the growth and needs of the township.
4.1.3 Demographic Profile
Demand for new and improved drainage systems in the future will be dependent on
activities currently under consideration and future developments, including:
a) New Dwellings;
b) Residential Land Supply; and
c) Expansion of the existing commercial and industrial areas.
4.2 Demand Management Strategies
Demand management strategies provide alternatives to the creation of new assets in order
to meet demand and look at ways of modifying customer demands so to maximise the
utilisation of existing drainage assets and reduce or defer the need for new assets.
Council has not yet identified demand management strategies for drainage assets.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 14
5 RISK MANAGEMENT
5.1 Hazard Identification
Hazards associated with the assets covered by this plan include:
Hazard Cause Main Area of
Impact Controls
Personal and
property damage
due to flooding
• Pipe pit condition
• Pipe failure
• Blockages
• Pipe pit capacity
• Poor design
• Climate change
Financial
• Design standards for ARI
and pit design appropriate
and affordable.
• Effective customer request
system.
• Maintenance inspections
and work’s programming.
• Risk assessment to Identify
high risk (critical)
pipes/areas develop
monitoring program and
upgrade/mitigation
program
• Insurance
Road damage from
flooding
• Pipe pit condition
• Blockages
• Pipe pit capacity
• Poor design
Financial
• Design standards for ARI
and pit design appropriate
and affordable.
Unauthorised pipe
or channel entry
• Lack of barriers
• Missing pit lids Public health
and safety
• Maintenance inspections
and work’s programming.
Trip or fall accident
• Missing damaged
pit lids
• Exposed pies or
pits
Public health
and safety
• Effective customer request
system.
• Maintenance inspections
and work’s programming.
Fall from endwalls • Fall height Public health
and safety
• Maintenance inspections
and work’s programming.
5.2 Asset Criticality
Asset criticality addresses assets that are:
• Critical Assets: Assets with a high consequence (impact Major or Catastrophic) of
failure
• High Risk Assets: Assets with a high likelihood of failure. Mode of failure
5.2.1 Critical Assets
Description Area of Impact Actions to Address
• Habitable buildings, shops, services that
would be flooded by overland flow above
floor levels.
Public Health &
Safety
Higher priority in
capital works
programs
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 15
5.2.1.1 List of Critical Assets:
• Woodend levee
Council will continue to identify critical areas as the issue arises.
Improvement Action: 4 Investigate commencement of program of drainage modelling in
known areas where flooding may occur with a high consequence
5.2.2 High Risk Assets
Asset Description Mode of Failure Actions to Address
Pipes
• Failure is considered imminent
• Pipe material is prone to sudden
failure. E.g. brick pipes,
corrugated steel pipes
Structural failure Increased condition
survey frequency
Pipes The design flow is known to exceed
the drain capacity Design failure
Inclusion in Drainage
Upgrade Program
(refer to Levels of
Service, New &
Upgrade section)
Pits
Pits prone to collecting sediment,
particularly at junction pits (Critical
Pits)
Service failure
Increased pit cleaning.
Program to
hydraulically improve
pit design
5.2.2.1 List of High Risk Assets
• Unknown
Improvement Action: 5 Commence recording of high risk drainage assets
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 16
6 LIFECYCLE MANAGEMENT PLANS
6.1 Physical Parameters
6.1.1 Current Issues
Current issues influencing the assets included in this plan are:
• Swale drains and rain gardens are not performing as intended typically due to
damage and poor location;
• The drainage maintenance budget does not increase to reflect the increasing life-
cycle costs when Council inherits drainage assets from new developments; and
• Current program to replace older rectangular pit lids with stronger round type
6.1.2 Asset Quantities
The quantity of assets are:
Drainage Asset Group Drainage Asset Type Unit Quantity
Underground Drainage
Pits No. 8478
Pipes metres 236,043
Roadside Culverts No. Approx
4,000
Surface Drainage Open Drains kms 2,732
Water Quality Devices
Swale Drains No. 2
Wetlands No. 2
Gross Pollutant Traps No. 4
Rain Gardens1 No. Unknown
Flood Prevention
Retarding Basins No. Unknown
Sediment Pits/Ponds No. Unknown
Underground Retention
System No. 1
Flood Walls No. 2
Pump Wells No. 1
Pumps No. 2
Non-Return Valves No. 3
Improvement Action: 6 Determine unknown drainage asset quantities (rain gardens,
retarding basins and sediment ponds)
1 Also known as urban sensitive drainage systems
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 17
6.2 Asset Capacity/Performance
6.2.1 Stormwater Drainage Studies / Flood Studies
Stormwater Drainage Studies have been undertaken as follows:
• Gisborne Flood Study – 2006
• Gisborne / New Gisborne Drainage Study – November 2012
• Kyneton Township Storm Water Drainage Study – March 2012
• Riddells Creek Drainage Study – November 2011
• Romsey Township Stormwater Drainage Study – May 2009
• Woodend Township Drainage Study – February 1997
The recommendations provided by the consultants are listed within the relevant documents
for each town. These recommendations are assessed and considered for inclusion in the
Capital Works Program annually.
6.2.2 Levels of Service
Assets which are not achieving the current level of service are listed are:
Technical Level of Service
Measure
Technical Level of Service
Target Current Assets Under-Capacity
Council has not identified drainage assets which are not achieving the current level of
service.
6.3 Asset Condition
Council does not undertake condition surveys of the drainage assets on the basis that:
Pipes
• Are out of sight
• Generally small and inaccessible.
• Unsafe to enter.
There is the opportunity to assess pipes by remote camera. However this is expensive.
Pits
• Require special attention to lift pit lids.
• Being long lasting, simple strong construction and relatively new are unlikely to fail
and represent a low risk.
Other assets:
• Flood prevention, Water quality and Natural surface Open Drains assets: Are
typically treated with maintenance work and do not require renewal, hence there is
no necessity to condition rate.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 18
6.3.1 Condition Rating
Industry discussions have indicated that the greatest factor influencing the forecast useful
life of a pipe is the quality of construction. The age of the pipe may not be the critical factor,
however, in the absence of other data age is used as the indicator of performance of the
pipe over time.
The current condition used for the pits and pipes renewal forecast is based on age
distribution as described below:
Condition
Rating Current Age
(years)
1 10
2 20
3 30
4 40
5 50
6 60
7 70
8 80
9 90
10 100
Council will continue to use age based approach until further data is available.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 19
6.3.2 Current Asset Condition
The current condition of the assets is:
Pits:
Pipes:
Note: The quantities listed are correct only at the time of the development of this plan. Up to date information is obtained
from the asset register.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 20
6.3.3 Deterioration Curves
The basis for the adoption of the deterioration curves are:
Asset Type Basis for Adoption of Deterioration Curve
Pits Custom
Pipes Custom
Open drains
Not modelled Water quality devices
Flood
6.3.4 Asset Useful Lives & Intervention Levels
The current useful lives and intervention levels for the drainage asset components are
shown in the table below:
Asset Type Intervention
Level
Physical Life
(Years)
Useful Life
(Years)
Pits 10 100 100
Intervention of 10 reflects lack of
condition data and the reactive
response.
Asset lives are based on industry
benchmarking
Pipes 10 100 100
Open drains N/a
Not specified
Water quality
devices N/a
Flood N/a
6.3.5 Historical Asset Condition
Data collection of Council’s stormwater network was completed in December 2010 with an
assessment made on functionality rather than condition. There is no historical asset
condition data available for drainage assets.
6.4 Historical Data
Important or relevant historical data applicable to the assets included in this plan are:
• Nil
6.5 Asset Valuations
The valuation, or replacement cost, of the assets used for financial reporting are:
Asset
Component
Quantity
(No.)
Quantity
(metres)
Replacement
Value
Written Down
Value
Pits 8478 $10,334,609 $7,769,005
Pipes 213,684 $30,166,636 22,538,882
TOTAL $40,501,245 $30,307,888
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 21
Replacement costs are based on supply costs and an installation component depending on
depth. The replacement cost rates have been based on a Greenfield site and therefore do
not include the cost of having existing assets removed.
The Brownfield rate may be significantly more expensive to allow for costs such as service
relocation, road and driveway reinstatement, stormwater and traffic control. This may also
vary to minimal difference. Council has not yet researched actual Brownfield rates.
6.6 Routine Maintenance
Maintenance is most commonly carried out in response to:
• Defects observed by Macedon Ranges personnel; and
• Requests via the customer request system (internal or external requests).
Macedon Ranges Shire Council manages and co-ordinates all drainage operations and
maintenance within the municipality. Contractors are used on an-as needed basis.
Drainage maintenance includes the following type of works:
• Pits – Pit lid replacement and internal wall rendering and repairs;
• Pipes – Root cutting, jet blasting and small lengths of pipe replacement;
• GPT’s – Repairs including broken lids, cage repairs, erosion and scouring; and
• Flood Walls – Wall reinstatement due to erosion.
6.6.1 Defect Inspections
Inspections are designed to identify defects that have the potential to create a risk of
damage or inconvenience to the public. The types of inspections carried out for drainage are
as follows:
Inspection Name Defects Recorded Frequency/Hierarchy Responsibility
Roadside Pits
Broken lids, blockages,
cracked walls, rubbish,
sediment build-up,
positioning of pit and
surrounds (drop-offs and
displacement)
Critical Pits: Monthly as part
cleaning schedule.
CBD Pits: Year
Other pits: 2 year
Operations
Department
Minor Roadside
Culverts
Broken, blocked and
separated pipe sections.
The municipality is divided
into twelve areas of which
six areas are inspected in
any given year
Operations
Department
Table Drains Checking the mitres for
blockages
As part of the minor
roadside culvert inspection
Operations
Department
Flood Walls,
Pumps and NRV’s
Flood walls are subject to
visual assessment, pumps
and NRV’s are tested to
confirm operability
Four times per year
Operations
Department
Easement Pits N/a Not inspected
Operations
Department
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 22
Inspection Name Defects Recorded Frequency/Hierarchy Responsibility
Critical assets Blockages
To be developed once
identified refer improvement
action
Operations
Department
Pipe camera Blockages, tree roots,
plumbing errors. As required
Operations
Department
Other assets N/a As identified Operations
Department
Incident Inspection:
Instances of advice
of flooding event
Blockages, tree roots,
plumbing errors. Upon notification
Operations
Department
CCTV inspections are undertaken on a reactive basis. Council own a small CCTV camera unit
which is used for all small pipe length investigations. Large pipe length investigations are
undertaken by a contractor who uses a large CCTV unit.
6.6.2 Prioritisation of Maintenance Works
Maintenance works are prioritised:
1. Emergency maintenance: refer to Road Management Plan
2. Intervention maintenance: refer to Road Management Plan
3. Programmed maintenance
In assessing the priority of programmed maintenance works the inspector, in developing a
works program, shall take into account:
• Extent
• Severity
• Component
• Hierarchy
• Public safety
• Location
6.6.3 Defect Response Times
Defect response times are applicable to the following defects:
Defect Response Times Apply
1. Emergency Works Refer to Road Management Plan
2. Intervention level Refer to Road Management Plan
3. Programmed Nil. Works are undertaken as funds and resources allow.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 23
6.6.4 Standards and Specifications
The standards for maintenance are described by:
• Intervention Levels:
Defect Intervention Level
1. Emergency Works Refer to RMP. Otherwise not specified
2. Intervention levels Refer to RMP. Otherwise not specified
3. Programmed Not specified, as determined by the inspector
6.6.5 Basis for Future Maintenance Costs
Proposed maintenance expenditure is assessed on an annual basis.
6.7 Renewal Plan
6.7.1 Renewal Capital Works Programs
Drainage renewal activities typically include the replacement of an asset such as pipe-
segment replacement, pit replacement, pump replacement etc.
In the absence of any condition surveys being undertaken Council is typically reactive to any
capital renewal works. Projects are added as identified.
6.7.2 Drainage Renewal Program
Renewal projects are ranked by a sort of:
1. Failure has occurred and renewal is the most efficient life cycle cost alternative.
2. Condition, taking into account High Risk pipes
In finalising the program the timing of any road reconstruction or development works will be
considered.
6.7.3 Treatment Options
Treatment options that are available are summarised below:
Asset Type Treatment Option Comments (why used, not used)
Pipes Plastic lining Not used – too expensive
Pipes Rubber ring joint pipes Effective - prevents water seepage
which deters tree root invasion
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 24
6.7.4 Basis for Future Renewal Costs
6.7.4.1 Renewal Modelling - Renewal Rates
The Moloney Asset Sets used and the renewal rate are detailed below.
Asset Type Corresponding Standard
Moloney Set
Renewal
Rate/unit Comments
Pits Storm Water - Pits $1,219 Based on an analysis industry rates and
new works (Council and developers) rates. Pipes Storm Water - Pipes $141.20
The following assets are not modelled:
• Natural open drains due to very long useful life of the formation of the drain
• Water quality devices and flood prevention are immaterial in renewal cost
6.7.5 Renewal Demand and Renewal Gap
An analysis of the drainage portfolio is undertaken yearly using the Renewal Gap Model.
The current renewal demand and renewal gap is detailed in the Asset Management Plan Part
A – General Information, Attachment #2 – Infrastructure Financial Projections.
6.8 Upgrades & New Works
New and Upgrade programs identified:
• From a relevant Service Strategy,
• Current issues discussion,
• Under-capacity analysis,
• Assessment of future demand, and
• Risk assessment.
6.8.1 Drainage Upgrade
Drainage upgrade activities consist of works undertaken on the drainage infrastructure that
enhances the current size or capacity of the asset such as increasing the size of a pipe,
installing a larger pit, or replacing an existing pump with a greater one.
6.8.2 Drainage New Works
New work drainage activities include the creation of new drainage infrastructure often
undertaken in relation to growth, development works including urban sensitive design
principles, risk mitigation strategies and environmental management improvements.
New works may include the following:
• New assets such as pits, retarding basins, GPTs; or
• Creation/addition of a new pipe segment.
6.8.3 Summary of New & Upgrade Works
Asset Program/Project Details Source Timing Cost
Flood
Prevention
Gisborne and New Gisborne ODP: Retarding basin in
New Gisborne to the west of Station Road -This
retarding basin has been located and sized in
accordance with Melbourne Water’s ultimate
development scenario, and as such may be larger and
more extensive than what is required for the
No date set Funded by
developers
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 25
Asset Program/Project Details Source Timing Cost
development allowed by the Structure Plan
Underground
Drainage
Gisborne and New Gisborne ODP: Drainage scheme
for Central Creek, both north and south of
Willowbank Road. The drainage scheme has been
located and sized in accordance with Melbourne
Water’s ultimate development scenario and as such
may be larger and more extensive than what is
required for the development allowed by the
Structure Plan
No date set Funded by
developers
Underground
Drainage
Gisborne Flood Study, 2006: Relocation of the
discharge point for the Skyline Estate drain to the
east of Aitken Street into Sankey Reserve. Beech
Court is a local depression with a small catchment to
the north. Under existing conditions it is inundated
very early in a large storm event due to the runoff
from the local catchment and poor drainage.
2013/14 $200,000
Flood
Prevention
Gisborne Flood Study, 2006: Frith Road Estate Levee
Project - scheduled for and to be undertaken by
Melbourne Water.
2013/14
Funded by
Melbourne
Water
Flood
Prevention
Gisborne Flood Study, 2006: Howey Creek Retarding
Basin - A number of retarding basins on Howey Creek
were initially proposed in a drainage investigation in
1996 by Coomes Consulting. The preferred option
was to install a detention basin upstream of Fersfield
Road. A block of land on the corner of Fersfield Road
and Aitken Street has been acquired by Macedon
Ranges Shire Council and set aside for the
construction of a flood retarding basin.
2016/17
2018/19
$367,000
$450,000
Flood
Prevention
Quahlee Estate Woodend – Insufficient drainage.
Council and Developer to share cost. 2013/14 $298,000
Flood
Prevention
Woodend Flood Study, 1997: Quarry Road Woodend
– detention basin upgrade 2014/15 $400,000
Flood
Prevention
Howey Street Gisborne – required works to ensure
embankment holds 2014/15 $30,000
Flood
Prevention
Woodend Flood Study 1997: Washington Lane &
Quarry Road Woodend – upgrade of drainage system
between Washington Lane and Quarry Road
2017/18 $800,000
Unspecified
Minor Drainage Works – identified: This program is
undertaken each year. Projects are identified and a
works program put in place at the commencement of
each financial year. $250,000 is allocated each year
for the next 10 years
2013/14
To
2022/23
$250,000
Annually
Unspecified
Minor Drainage Works – unplanned: This program is
undertaken each year and funds are allocated as
unplanned projects are identified.
2013/14
To
2022/23
$50,000
Annually
Programs & Projects listed beyond 2013/14 are a guide only and have not been approved.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 26
6.9 Operations
Common operational activities and frequencies for drainage are identified in the table
below:
Activity Frequency Method
Pit Cleaning As identified through
inspections
Using a jet blaster and street sweeper to
pick silt
Minor Roadside Culvert
Cleaning
As identified through
inspections Cleaned using a backhoe
Table Drains Cleaning Reactive Cleaned in response to customer
requests
GPT Cleaning 5 times per year Cleaned as part of ongoing program
Swale Drains/Rain Gardens
Cleaning Reactive
Cleaned in response to customer
requests
Wetlands Cleaning Reactive Cleaning and removal of blockages
Sediment Pits/Ponds Cleaning Reactive Cleaning sediment out of pits and ponds
using a backhoe
Electric Pumps Testing 4 times per year On/off test
6.9.1 Operations Future Costs
Proposed operational expenditure is assessed on an annual basis.
6.10 Disposal Plan
There is currently no policy to close or dispose of drainage assets within the Shire of
Macedon Ranges. Council has a fixed asset policy however it does not strictly cover the
disposal of drainage assets.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 27
7 FINANCIAL PLAN
7.1 Financial Statements and Projections
Expenditure is identified by asset group, under the following headings:
• Operations;
• Maintenance;
• Renewals;
• Upgrades; and
• New Works.
7.1.1 Expenditure History
The table below summarises the drainage asset expenditure from 2009/10 to 2011/12 and the
budgeted expenditure for 2012/13.
Activity 2009/10 2010/11 2011/12 Budgeted
2012/13
Operations 52,914 34,954 36,998 22,760
Maintenance 374,000 437,567 768,713 237,185
Operations &
Maintenance - Sub Total 426,914 472,521 805,711 259,945
Renewal 76,000 67,438 88,124 209,584
Upgrade 0 0 264,375 68,333
New asset 17,186 0 125,633 568,133
Capital – Sub Total 93,186 67,438 478,132 846,050
Total Expenditure $520,100 $539,959 $1,283,843 $1,105,995
Comments:
• The high maintenance expenditure in 2011/12 was attributable to the flood events of
September 2010 and January 2011.
The substantial drop in maintenance expenditure proposed for 2012/13 is due to
wages costs being moved to a single, higher level line item.
Improvement Action: 7 To allow calculation of the full cost of service delivery, review the
recent changes to centralising maintenance wages costs.
7.1.2 Financial Projections
Projections are developed from:
• Short term: Capital works programs, summarised in Attachment #1 Budgeted Capital
Works Statement.
• Long term: Moloney renewal forecast which is summarised in Attachment #2
Infrastructure Financial Projections.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 28
7.2 Funding Strategy
In order to manage and fund various projects within the Shire, Council relies on several
funding sources.
The current funding sources available for drainage include:
• Rate Revenue;
• Reserves and loan income;
• Developer Contributions; and
• State and Federal Funding.
An example of the type of funding received for drainage infrastructure is the Regional Flood
Mitigation Program through DSE. This is a shared cost program and was used for the
Woodend Levy Bank Project. Council had to contribute one third of the cost of the project,
DSE provided two thirds of the cost.
The funding strategy is documented in Attachment #2 Infrastructure Financial Projections.
7.3 Key Assumptions Made in the Financial Forecast
7.3.1 Accuracy of the Information
The following general assumptions have been made in preparing the 10-year expenditure
forecasts.
• All expenditure is stated in present day dollar values with no allowance made for
inflation over the 10-year planning period;
• It should be noted that the figures exclude costs such as corporate administration
charges, interest costs, inflation and GST and other indirect overheads
The factors outlined below may influence the forecasts given in this plan:
• Changes to budget allocations; and
• Changes in the desired level of service and service standards from those identified in
this Plan.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 29
8 ASSET MANAGEMENT PRACTICES
8.1 Asset Management Systems
Details on Asset Management Systems used by Council are summarised below:
Asset Type Software/Asset Management
System Data Collection/Review
All
Council is in the process of
implementing an integrated asset
register called MyData for all
infrastructure assets.
Current asset data is considered to be
of a reasonably high accuracy.
Nil reviews of the data are undertaken
apart from random desktop reviews as
required and identified
The asset systems have the following link to the financial/accounting system:
• Nil
8.1.1 Available Data
Data which is available on assets to help decision making:
• Align with D-Spec
Other information includes:
• Depth to invert
• Pit internal and external dimensions
8.2 Standards & Guidelines
8.2.1 Construction Standards
Standard drawings and technical standards applicable to the assets included in this plan are:
• Council standard drawings
• VicRoads Design Manual Section 6 Drainage
• VicRoads Standard Drawings
• Australian rainfall & Runoff
• Water Sensitive Urban Design manual
• Infrastructure Design Manual
• Manufacturers recommendations.
The WUSD Engineering Procedures; Stormwater manual identifies a number of work
elements including:
• Sediment basins
• Bio-retention swales and basins
• Sand filters
• Swale buffer systems
• Constructed wetlands
• Ponds
• Infiltration measures
• Rainwater tanks
• Aquifer storage and recovery.
Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 30
9 PLAN IMPROVEMENTS AND MONITORING
9.1 Improvement Program
Through the development of the Drainage Asset Management Plan, improvement actions
have been identified and are attached as Appendix 10.1. The improvement actions will be
reviewed and reported to the Executive annually. Any amendments or additions to the
improvement plan will be approved by the Executive.
9.2 Monitoring and Review Procedures
9.2.1 AMP Review Procedure
This Asset Management Plan is relevant and integral to daily Asset Management activity. To
ensure the plan remains useful and relevant the following on-going process of monitoring
and review activity will be undertaken.
• Formal adoption of the plan by the Council:
• A complete revision of the AM plan will be carried out every three years and
presented to Council for adoption.
The next review is due on 2015/16.
DRAFT Asset Management Plan
Macedon Ranges Shire Council Part D - Drainage
Page | 31
10 APPENDICES
10.1 Improvement Action Plan
AMP Reference Improvement Action Responsibility Timeframe Status
Part D - Drainage
Improvement Action 1: Develop individual
service plans defining the responsibilities and
levels of service for those services relevant to the
assets included in this plan.
Relevant Service Managers 2013/14 Programmed to
commence 2013/14
Part D - Drainage
Improvement Action 2: Introduce ability to
categorise customer requests between internal
(inspections) and external (community) requests.
Manger Operations / Manager
Engineering Infrastructure &
Projects / Manager Council &
Customer Service
2014/15
Part D - Drainage Improvement Action 3: Review current design
standards for pit lid load capacity.
Manager Engineering
Infrastructure & Projects 2014/15
Part D - Drainage
Improvement Action 4: Investigate
commencement of program for drainage
modelling in known areas where flooding may
occur with a high consequence.
Manger Operations /
Coordinator Engineering
Planning 2015/16
Part D - Drainage Improvement Action 5: Commence recording of
high risk drainage assets.
Manager Operations / Manager
Engineering Infrastructure &
Projects
2013/14
Ongoing Programmed to
commence 2013/14
Part D - Drainage
Improvement Action 6: Determine unknown
drainage asset quantities (rain gardens, retarding
basins and sediment ponds).
Manager Operations /
Coordinator Engineering
Planning 2013/14
Part D - Drainage
Improvement Action 7: Allow calculation of the
full cost of service delivery and review the recent
changes to centralise maintenance wages costs.
Manager Finance / Manager
Operations 2013/14
DRAFT Asset Management Plan
Macedon Ranges Shire Council Part D - Drainage
Page | 32
10.2 Attachment #1 – Budgeted Capital Works Statement
MACEDON RANGES SHIRE COUNCIL
2013-14
ATTACHMENT #1 – BUDGETED CAPITAL WORKS STATEMENT
Macedon Ranges
Budgeted Standard Capital Works Statement
Strategic Resource Plan Projections
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000
Capital works areas
Land & Buildings
4,081 6,820 5,380 4,555 620 1,485 2,890 2,090 5,100 4,810
Roads
5,410 5,287 4,574 5,078 5,556 7,243 6,788 7,900 7,932 6,968
Footpaths
550 426 450 498 506 516 527 532 542 551
Bridges
540 450 125 125 160 130 160 160 160 160
Drainage
862 760 700 767 1,200 950 800 800 800 800
Furniture & Equipment
767 722 323 388 655 290 355 280 345 350
Plant & Machinery
791 815 897 692 725 825 825 875 875 875
Recreation
3,804 1,285 1,865 845 2,205 1,585 754 1,108 496 325
Other Infrastructure
537 - - - - - - - - -
Total capital works
17,342 16,565 14,314 12,947 11,627 13,024 13,098 13,745 16,250 14,839
Represented by:
Asset renewal
5,664 6,853 7,277 6,565 6,204 7,292 8,437 8,447 9,998 10,186
New assets
5,120 5,882 3,348 2,570 1,479 1,232 484 1,688 2,274 2,073
Asset expansion/upgrade
6,558 3,830 3,689 3,813 3,944 4,500 4,178 3,610 3,977 2,580
Total capital works
17,342 16,565 14,314 12,947 11,627 13,024 13,098 13,745 16,250 14,839
DRAFT - Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 33
10.3 Attachment #2 – Infrastructure Financial Projections
MACEDON RANGES SHIRE COUNCIL
2012-13
ATTACHMENT #2 - INFRASTRUCTURE FINANCIAL PROJECTIONS
1. Introduction
This report provides the annual result for infrastructure asset renewal forecasts in
accordance with the principles stated in Section 7 of the Asset Management Plan Part A
General Information.
Assets are reported at Asset Component level, utilising the following information provided
in Parts B – G Asset Management Plans:
Input Data Source
Intervention level Asset Specific AMP’s – section 6
Useful life Asset Specific AMP’s – section 6
Condition rating distribution Asset Register
Annual renewal expenditure Annual budget
Annual maintenance expenditure Annual budget
Asset quantity Asset register
Renewal rates AMP section 6
Deterioration graph profile Asset Specific AMP’s – section 6
2. Renewal Demand and Renewal Gap Forecast
2.1 Results The following results are extracted from the Moloney model dated November 2012.
Total Renewal Value All Assets $ $461,255,453
Total Present Renewal Exp $ $4,940,401 Av Annual rate of Asset Consumption to Cond.10 $8,324,611 Av Annual rate of Asset Consumption to Intervention Cond. $9,429,262.79
% of Long Term Av Consumption being met 52.39%
The Average Annual rate of Asset Consumption to Intervention Condition of $9,429,262
represents the funding target Council must be able to achieve.
DRAFT - Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 34
2.2 Moloney Model Graphs For the next 20 year period following reports are attached:
• Total Annual Renewal Gap
• Cumulative Total Renewal Gap
• Annual Renewal Gap Separated by Asset Group
• Proposed Renewal/Predicted Renewal/% of Asset base above Intervention
Comments:
1. A backlog of around $7.5M exists. The backlog is primarily in the Rural Roads asset
group.
2. Renewal demand increases relatively sharply over the next 10 years then increases
at a slower rate.
Backlog
DRAFT - Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 35
Comments:
1. The total predicted cumulative renewal gap is approx $80M after 20 years.
Comments:
1. The renewal gap is an approx average of $4M/year
2. The major impacts on the renewal gap are:
• Buildings, and
• Rural Roads
3. More specifically
• Rural Roads – Pavement (approx average $1.0M/year)
• Buildings –Structure (approx average $2.0M/year)
• Buildings – Fit Out (approx average $0.5M/year)
DRAFT - Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 36
Comments:
1. The Average Annual Rate of Asset Consumption to Intervention of $9.4M is reached
in 2027.
2. The % of renewal demand being met is:
• Current 55%
• 2027 52%
3. On current funding approx 18% of assets will be over intervention by 2032.
3. Level of Confidence/Accuracy of Results
Buildings Structure – Low: Issues remain as to whether an overall building condition
properly reflects the future expenditure profile and asset life as often the building is subject
minor renewal throughout its life.
Buildings Fit-out – Low: Investigations at other Councils indicates that the fit-out renewal is
overestimated due to the very high level rating approach to describe a larger, complicated
building, and possible under-estimation of life and over-estimation of value.
Rural Roads Pavements - Good: Council and the industry have a longer history of road
assessments and a higher level of accuracy would be expected.
DRAFT - Asset Management Plan
Macedon Ranges Shire Council Part D – Drainage
Page | 37
4. Funding Strategy
Council faces a significant renewal funding challenge over the next 10 years. At some time in
the future Council must have the ability to fund the Average Annual rate of Asset
Consumption to Intervention Condition of $9.4M. Funding must almost double to meet the
projected renewal demand.
In responding to the forecast and developing a funding strategy Council must be mindful of
the low level of accuracy which may influence the timing of when this funding target must
be achieved.
Based on the current input data Council must introduce a funding strategy which:
1. Addresses the backlog works.
2. Progressively increases renewal expenditure from current $4.9M to $9.4M by 2027.
Two options on how this could be achieved are:
• An annual $300,000 increase in renewal funding over that period or:
• An annual rate increase of 1% based on a rate income of $31.585M over that period.
5. Improvement Actions
Future financial forecasts may be improved by the following Improvement Actions:
Improvement Action: 1 Review the current accuracy and methodologies for condition
rating, in particular rural roads, building structure and building fit-out, particularly assets
nearing or past intervention
Improvement Action: 2 Describe levels of service and discuss potential of lowering
standards (an increase in intervention levels) to decrease the asset renewal demand
Improvement Action: 3 Decrease the asset renewal demand by identifying possible
disposal of over-servicing assets
Review History
Issue Date Details By
A 19 April 2013 Review AM/DP
B 28 June 2013 Final Draft AM
C 4 July 2013 Final for Public Consultation after further staff comment AM
D 9 August 2013 Final Draft for Councillor Briefing AM
E 23 September 2013 Final Amendments after Councillor Briefing AM
F 25 September 2013 Adopted Council
CONTENTS
1 EXECUTIVE SUMMARY ............................................................................................... 1
2 INTRODUCTION.......................................................................................................... 2
2.1 Background ................................................................................................................. 2
2.1.1 Plan Format ......................................................................................................... 2
2.1.2 Relationship with Other Planning Documents .................................................... 2
2.1.3 Assets included in the Plan .................................................................................. 3
2.1.4 Assets not included in this Plan ........................................................................... 4
2.1.5 Key Stakeholders in the Plan ............................................................................... 4
2.1.6 Asset Responsibility ............................................................................................. 5
2.1.6.1 Committees of Management ....................................................................... 5
2.2 Goals & Objectives of Asset Ownership ..................................................................... 5
2.2.1 Links to Organisation Vision, Mission, Goals & Objectives ................................. 5
3 LEVELS OF SERVICE ..................................................................................................... 6
3.1 Community Engagement and Expectations ............................................................... 6
3.1.1 Background and Customer Engagement Undertaken ........................................ 6
3.1.1.1 Annual Community Satisfaction Survey ....................................................... 6
3.1.1.2 Pathway - Customer Requests Management System (CRM)....................... 6
3.1.1.3 Committees of Management Meetings ....................................................... 7
3.1.1.4 Community Plans ......................................................................................... 7
3.1.1.5 Community Engagement Plan ..................................................................... 7
3.1.2 Details of How Engagement Translates into Levels of Service ........................... 9
3.2 Legislative Requirements............................................................................................ 9
3.3 Current Levels of Service .......................................................................................... 10
3.3.1 Asset Functional Hierarchy ................................................................................ 10
3.3.1.1 Open Space ................................................................................................ 10
3.3.1.2 Sports Facility ............................................................................................. 11
3.3.1.3 Playgrounds ................................................................................................ 12
3.3.1.4 Trees ........................................................................................................... 12
3.3.2 Community & Technical Levels of Service......................................................... 13
3.3.2.1 Open Space ................................................................................................ 13
3.3.2.2 Sports Grounds .......................................................................................... 14
3.3.2.3 Playgrounds ................................................................................................ 15
4 FUTURE DEMAND .................................................................................................... 16
4.1 Demand Forecast ...................................................................................................... 16
4.1.1 New Developments ........................................................................................... 16
4.2 Demand Management Strategies ............................................................................. 16
5 RISK MANAGEMENT................................................................................................. 17
5.1 Hazard Identification ................................................................................................ 17
5.2 Asset Criticality ......................................................................................................... 18
5.2.1 Open Space ........................................................................................................ 19
5.2.2 Sports Grounds .................................................................................................. 19
5.2.3 Playgrounds ....................................................................................................... 19
5.2.4 Trees .................................................................................................................. 20
6 LIFECYCLE MANAGEMENT PLANS ............................................................................. 21
6.1 Physical Parameters.................................................................................................. 21
6.1.1 Current Issues .................................................................................................... 21
6.1.1.1 Parks Current Issues ................................................................................... 21
6.1.1.2 Sportsgrounds Current Issues .................................................................... 21
6.1.1.3 Playgrounds Current Issues........................................................................ 21
6.1.1.4 Trees Current Issues ................................................................................... 21
6.1.2 Asset Quantities ................................................................................................ 22
6.1.2.1 Open Space Asset Quantities ..................................................................... 22
6.1.2.2 Sportsgrounds Asset Quantities................................................................. 23
6.1.2.3 Playgrounds Asset Quantities .................................................................... 24
6.1.2.4 Trees Asset Quantities ............................................................................... 24
6.2 Asset Capacity/Performance .................................................................................... 24
6.2.1 Assets Under-Capacity ...................................................................................... 24
6.3 Asset Condition ......................................................................................................... 25
6.3.1 Condition Monitoring - Asset Condition Survey Frequency & Responsibility .. 25
6.3.2 Condition Rating ................................................................................................ 25
6.3.2.1 Open Space, Sports Grounds and Playgrounds ......................................... 25
6.3.2.2 Trees Condition Rating ............................................................................... 25
6.3.3 Current Asset Condition .................................................................................... 26
6.3.4 Deterioration Curves ......................................................................................... 27
6.3.5 Asset Useful Lives & Intervention Level & Basis for Adopting Useful Lives ...... 27
6.3.6 Historical Asset Condition ................................................................................. 27
6.3.7 Age Profile ......................................................................................................... 27
6.4 Asset Valuations ....................................................................................................... 28
6.5 Historical Data .......................................................................................................... 28
6.6 Routine Maintenance Plan ....................................................................................... 28
6.6.1 Defect Inspections ............................................................................................. 29
6.6.2 Prioritisation of Maintenance Works ................................................................ 31
6.6.3 Defect Response Times ..................................................................................... 31
6.6.4 Standards and Specifications ............................................................................ 31
6.6.5 Basis for Future Maintenance Costs ................................................................. 31
6.7 Renewal Plan ............................................................................................................ 32
6.7.1 Renewal Capital Works Programs ..................................................................... 32
6.7.1.1 Open Space Renewal ................................................................................. 32
6.7.1.2 Sportsgrounds Renewal ............................................................................. 32
6.7.1.3 Playgrounds Renewal ................................................................................. 32
6.7.1.4 Trees Renewal ............................................................................................ 32
6.7.2 Renewal Priority Ranking .................................................................................. 32
6.7.3 Summary of Renewal Works ............................................................................. 33
6.7.4 Basis for Future Renewal Costs ......................................................................... 34
6.7.4.1 Renewal Modelling – Renewal Rates ......................................................... 34
6.7.4.2 Renewal Gap .............................................................................................. 34
6.8 New & Upgrade Plan ................................................................................................ 35
6.8.1 Future New and Upgrade Programs Identified in this Plan .............................. 35
6.8.2 Summary of New and Upgrade Works .............................................................. 35
6.9 Operations Plan ........................................................................................................ 36
6.9.1 Operations Future Costs.................................................................................... 37
6.10 Disposal Plan ............................................................................................................. 37
7 FINANCIAL PLAN ...................................................................................................... 38
7.1 Financial Statements and Projections ...................................................................... 38
7.1.1 Historical Expenditure ....................................................................................... 38
7.1.1.1 Open Space ................................................................................................ 38
7.1.1.2 Sportsgrounds ............................................................................................ 38
7.1.1.3 Playgrounds ................................................................................................ 39
7.1.1.4 Trees ........................................................................................................... 39
7.1.2 Financial Forecast .............................................................................................. 40
7.2 Funding Strategy ....................................................................................................... 40
7.3 Key Assumptions Made in the Financial Forecast .................................................... 40
7.3.1 Accuracy of the Information ............................................................................. 40
8 ASSET MANAGEMENT PRACTICES ............................................................................. 41
8.1 Asset Management Systems .................................................................................... 41
8.1.1 Current Practices ............................................................................................... 41
8.1.2 Available Data .................................................................................................... 41
8.2 Standards & Guidelines ............................................................................................ 41
8.2.1 Construction Standards ..................................................................................... 41
8.2.1.1 Playgrounds ................................................................................................ 41
8.2.1.2 Tree Planting .............................................................................................. 42
9 PLAN IMPROVEMENTS AND MONITORING ............................................................... 43
9.1 Improvement Program ............................................................................................. 43
9.2 Monitoring and Review Procedures ......................................................................... 43
9.2.1 AMP Review Procedure ..................................................................................... 43
10 APPENDICES ............................................................................................................. 44
10.1 Improvement Program ............................................................................................. 44
10.2 Attachment #1 – Budgeted Capital Works Statement ............................................. 46
10.3 Attachment #2 – Infrastructure Financial Projections ............................................. 47
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 1
1 EXECUTIVE SUMMARY
Open space makes an important contribution to the outdoor lifestyle of residents, attracts
visitors, protects important natural values and is a major component of the attractive rural
landscapes and topography in the Shire. Open spaces range from major parks such as
Macedon Regional Park and Hanging Rock Reserve to smaller town and local parks, botanic
gardens, nature reserves, stream sides, trails and sporting grounds.
The operation, maintenance and development of the open space infrastructure will be
guided by and consistent with Council’s vision and key objectives as stated in the Council
Plan, Asset Management Policy and Asset Management Strategy. This Open Space Asset
Management Plan is intended to demonstrate to stakeholders that Council is managing the
open space assets responsibly and to demonstrate that Macedon Ranges Shire Council
intends to develop Community based and Technical based Levels of Service.
The population of Macedon Ranges Shire is growing which may impact on the number of
open spaces and facilities required within the Shire as well as upgrades to the existing stock.
Proposed Township Development allows the impacts on infrastructure to be assessed at a
township level. The Macedon Ranges Shire Council’s Risk Management Policy identifies Council’s objectives
towards risk management. The Risk Management Strategy also outlines the risk
management process, via the incorporation of seven steps undertaken in Risk Management.
Asset management risks have been identified and included into the Corporate Risk Register.
The Community Wellbeing and Assets and Operations Directorates have a shared
responsibility for the strategic management, planning and design of the infrastructure.` The
‘open spaces hierarchy’ has been developed to divide the infrastructure asset base into
appropriate classifications for the purpose of this plan. The open space hierarchy separates
infrastructure assets, within the open spaces asset class, into four distinct open space asset
groups, being:
• Open Space Infrastructure;
• Sportsgrounds;
• Playgrounds; and
• Trees.
Expenditure is identified for each of the asset groups, under the following headings:
• Operations;
• Maintenance;
• Renewals;
• Upgrades; and
• New Works.
The financial projections have been developed based on the funding requirements identified
from the Moloney Renewal Gap Model.
As part of this asset management plan production, many gaps have been identified relating
to processes, data and systems. An improvement plan has been developed to support
Council to improve its asset management practices and capabilities in relation to open space
asset management.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 2
2 INTRODUCTION
Provision of and access to a reasonable amount of open space is essential for the general
spiritual and physical health of communities. It is also vital for providing environmental
values related to clean air, water quality, protection of biodiversity and general visual
amenity.
The community has different demands and expectations of their open space so the provision
of a wide diversity of open space experiences is necessary.
2.1 Background
2.1.1 Plan Format
This plan is part of Council’s overall asset management plan as described below:
• Part A - General Information: Background and information common to all assets
• Part B - Roads
• Part C - Buildings
• Part D - Drainage
• Part E - Open Space (this plan)
2.1.2 Relationship with Other Planning Documents
The relationship of this plan to other specific strategies and plans is outlined in the table
below.
Plan Description
Open Space
Strategy
This outlines Council’s open space visions and goals. It also outlines strategies
to achieve these goals.
Playground
Strategy, 2009-
2014
This report provides a strategic direction for the future planning and
development of playground facilities across the municipality over the next 5
years.
Street Tree Policy The Street Tree Policy and the guidelines within aim to ensure that a cost
effective management program and maintenance guide is balanced with
environmental sensitivity. Consideration must be given by Council to the
number of street trees planted and Council’s ability to maintain the assets.
Contracts Identifies the requirements under a contract for the provision of works
undertaken for Council.
Leisure Strategy
Plan, 2006
This strategy considers current and future population and demographic profiles
to project the requirements for improving old or creating new leisure facilities.
Romsey ODP The Romsey Outline Development Plan (ODP) aims to provide a detailed plan
for the future residential, commercial and industrial growth of Romsey, with
planning horizons to 2021 and 2031.
Gisborne ODP The outcomes of this project will provide Council and the community with a
clear overall structure plan that sets out main road networks, open space
areas, location of community facilities, land use directions and details of issues
that need to be considered when assessing subdivision applications.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 3
2.1.3 Assets included in the Plan
The assets included in this plan are:
Asset Ownership and Control
This plan includes all recreation and open space assets where Council has a ‘control’ of that
asset. Where ‘control’ is defined as: Council has the controlling interest, the final say, in
decision making.
This plan may also address assets where council has an ‘interest’ in the asset which may
place council in some form of risk exposure or maintenance responsibility. This may result
from circumstances due to:
• Council land occupied by others
• Facility management and/or maintenance responsibility for buildings on land owned
by others
• Some other form of possible exposure to liability
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 4
These circumstances will be addressed in the plan under the risk, operations or maintenance
sections.
2.1.4 Assets not included in this Plan
Facilities and the accompanying assets excluded from this plan are:
• Assets on Crown land for which Council is not the Committee of Management
• Assets on private land (may be council depending on lease conditions)
• Assets on council land or road reserves occupied by individuals or single clubs where
council does not have control (with a lease in place)
Assets specifically excluded from this plan are:
• Paths which are a part of the Road AMP
• Structures such as coaches boxes, rotundas, scoreboards which are part of the
Buildings AMP
• Internal roads which are part of the Road AMP
• Council owned vacant land
2.1.5 Key Stakeholders in the Plan
This plan is intended to demonstrate to stakeholders that Council is managing the open
space assets responsibly. In addition to the key stakeholders identified in Asset Management
Plan Part A – General Information, the following table shows stakeholders having interests
and/or expectations specific to open space assets:
Stakeholder Interest
Sports clubs, administrators, referees,
players and spectators
Players can perform to the best of their ability.
Provides spectators with an entertaining experience.
Comfortable environment, appropriate amenities
Park users, walkers, picnickers,
families, dog walkers, cyclists
Safe, clean and comfortable environment.
Opportunity for different activities, (organised sport,
passive recreation, walking, picnicking).
Business in general Visually appealing areas, amenity for customers and staff.
Key events within reserves to bring increased business to
MRSC.
Schools Use area for educational/fitness purposes.
Event organisers Visually appealing areas, opportunities to hold events.
Developers Reasonable rules to open space consistently applied.
Authorities, e.g. DSE, Environment
Protection Authority, VicRoads, Parks
Victoria, service authorities.
Systems and procedures, which meet statutory obligations.
Involvement in decision-making.
Environmental groups, e.g. Individual
reserve friends groups, LandCare
groups.
Conservation of the environment.
Consultation about changes that have environmental
impacts.
Special interests groups, e.g. residents
groups, disability awareness groups,
Rotary.
Inclusion on decision making and the need to be heard.
Flexibility.
Indigenous groups Recognition of status in the community, consultation on
cultural aspects or environmental impacts.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 5
2.1.6 Asset Responsibility
Many departments play a role in the management of Council’s Open Space portfolio.
The Asset Responsibility Matrix is contained within the Asset Management Strategy. The
Asset Responsibility Matrix is reviewed regularly and as changes are made the matrix in the
in strategy is updated.
At this time some responsibilities for the development and reporting of capital renewal
programs rests outside the asset management area. This can result in an inconsistent
approach to renewal planning.
Improvement Action 1: Review Renewal Planning and Long Term Financial Plan
Development processes in particular in relation to open space assets to ensure consistent
approach and knowledge of responsibilities.
Council services which utilise the assets included in this plan are:
• Parks
• Playgrounds
• Recreation
2.1.6.1 Committees of Management
Council has varying arrangements and involvement with committees of management. These
are currently being documented in service agreements.
2.2 Goals & Objectives of Asset Ownership
2.2.1 Links to Organisation Vision, Mission, Goals & Objectives
Document Section Goal Objective Action
Council Plan
2013-2017
Action Plan
1
Our lifestyle, culture
and sense of place
are strengthened by
best practice
planning and
development.
To develop and
maintain inclusive
public open spaces
and enhance access
Open Space Strategy
presented to Council
by 31 December
2013.
Our infrastructure
supports the needs
of future
generations.
To plan for, develop
and maintain
community facilities
that meet its
changing needs
Complete Romsey
Spots Precinct by 30
June 2014
Action Plan
2
Our community is
inclusive and
connected and enjoys
strong mental and
physical health and
wellbeing
To create a more
healthy, active
community and
reduce the incidence
of obesity-related
conditions.
Continue to provide
aquatic, structured
and passive
recreation
opportunities
across the Macedon
Ranges
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 6
3 LEVELS OF SERVICE
3.1 Community Engagement and Expectations
3.1.1 Background and Customer Engagement Undertaken
Open Space related levels of service are driven by customer survey feedback, customer
requests/expectation and legislative requirements.
3.1.1.1 Annual Community Satisfaction Survey
Macedon Ranges Shire Council surveys two areas that relate to this open space asset
management plan:
• Appearance of Public Places; and
• Recreation Facilities.
The survey provides a high level indication of the communities satisfaction with the services
covered by the assets within this plan. The 2013 Community Satisfaction Survey showed
that Council has performed well in relation to the appearance of public areas and recreation
facilities.
3.1.1.2 Pathway - Customer Requests Management System (CRM)
All customer complaints/enquiries to Council, whether in person, by phone or by mail are
registered in the Pathway CRM. This system requires the complaint/fault/enquiry to be
categorised by asset type and location. It automatically assigns a department responsible
and sends an e-mail notification to the appropriate person. An appropriate response time
for responding Is built into the system for escalation purposes.
This system has been in operation since November 2011 when it replaced the previous Infra-
Active Customer Request System. Customer requests are captured against the following
Open Space related request types:
• BBQ’s – Parks/Reserves
• Grass Cut & Mow – Parks/Reserves
• Litter – Parks/Reserves
• Rec Facility – Parks/Reserve
• Rec Facility – Playgrounds
• Rec Facility – Hanging Rock
• Rec Facility – Skate Park
• Street Furniture
• Trees – Township
• Trees – Parks/Reserves
• Weeds – Parks/Reserves
The request type categories are too general (i.e. complaint, maintenance, request for new)
to be able to provide reports from the system, however responsible officers are aware of the
issues and prioritise works accordingly.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 7
Improvement Action 2: Review current request type categories for ‘maintenance’ and
‘complaint’ to better define customer expectations.
3.1.1.3 Committees of Management Meetings
On a more informal basis attendance at committee of management meetings and other
events provides opportunities for customer feedback.
3.1.1.4 Community Plans
Macedon Ranges Shire Council has assisted members of the community to put together
Community Plans for their respective townships. The plans outline projects/actions that are
a priority to the community and not necessarily priorities for Council. Where possible and if
budget allows these projects will fit in with other Council Plans or may be referred to the 10
year Capital Works Program.
3.1.1.5 Community Engagement Plan
The community engagement proposed for the assets included in this plan is:
Audience/Technique
Customer requests
Community Satisfaction Survey
Community Plans
Committees of Management meetings
The outcomes from the engagement process are summarised below:
Open Space
Audience/ Technique / Expectations/comments/outcomes/issues
Draft expectations developed
from the Regional Asset
Service project
A park/open space nearby
Rubbish lying about
Untidy and hazardous long grass
Provide seats and tables, shade and BBQs
The park should be available to a range of uses, dogs, event
Customer requests Not evaluated – request types too general
Community Satisfaction
Survey (2010 & 2013) Appearance of public areas are important to the community.
Committees of Management Not evaluated
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 8
Sportsgrounds
Audience/ Technique Expectations/comments/outcomes/issues
Draft expectations developed
from the Regional Asset
Service project
An open space/competition facility for my community
Surface dimensions are suitable and run-off distances are
compliant
The playing surface is in good condition. Not to dry, hard or rough.
The facility is available for play.
Off field facilities to support the user operations. Such as change,
spectator, parking.
Lighting suitable for training, matches
Customer requests Not evaluated – request types too general
Community Satisfaction
Survey (2010 & 2013)
Recreation facilities are important to the community (2013)
Better maintenance of sporting facilities (2010)
Committees of Management Not evaluated
Playgrounds
Audience/ Technique /Date Expectations/comments/outcomes/issues
Draft expectations developed
from the Regional Asset
Service project
A playground nearby
Access to the playground
Variety and a good and different experience
Fully accessible equipment
A safe playground
Customer requests Not evaluated – request types too general
Community Satisfaction
Survey (2010) More/better/safer playground facilities with sunshade (2010)
Committees of Management Not evaluated
Trees
Audience/ Technique /Date Expectations/comments/outcomes/issues
Draft expectations developed
from the Regional Asset
Service project
Not evaluated
Customer requests Not evaluated – request types too general
Community Satisfaction
Survey (2010)
More/better pruning of street trees
Better care of street trees – watering, staking, removal (2010)
Committees of Management Not evaluated
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 9
3.1.2 Details of How Engagement Translates into Levels of Service
From the engagement process the key customer needs relating to the assets included in this
plan are:
Asset Component Customer Needs (outcome of customer engagement)
Open space • A park/open space nearby
Sports Grounds • An open space/competition facility for my community
Playgrounds • A playground nearby
• Safer playground facilities
Trees • New tree
3.2 Legislative Requirements
Legislative Requirements, Standards and Codes of Practice specific to open space assets
which have an impact on levels of service are listed in the table below.
Reference Details
Water Act 1989 Provides for the liability of any person who causes unreasonable
flows, which result in damage or injury. (Section 16(1)).
Subdivisions Act 1988 Provides for engineering plans to be provided for developments in
accordance with relevant standards.
Disability and
Discrimination Act
(a) to eliminate, as far as possible, discrimination against persons on
the ground of disability in the areas of:
(i) work, accommodation, education, access to premises, clubs
and sport; and
(ii) the provision of goods, facilities, services and land; and
(iii) existing laws; and
(iv) the administration of Commonwealth laws and programs;
and
(b) to ensure, as far as practicable, that persons with disabilities have
the same rights to equality before the law as the rest of the
community; and
(c) to promote recognition and acceptance within the community
of the principle that persons with disabilities have the same
fundamental rights as the rest of the community.
Litter Act 2004 Regulates the depositing of litter, or other material that may
become litter; and facilitates the removal of litter
Public Health Act 1997 With respect to water quality of lakes, ponds, rivers and pools.
Electricity Safety Act 1998 With respect to Electric Line Clearance.
Electrical Safety (Electric
Line Clearance)
Regulations 2010
With respect to Electric Line Clearance.
Australian Rainfall and
Runoff Guidelines
Guidelines for design flood estimation.
AS 4685 Playground
Equipment
AS 4685.1
AS 4685.2
AS 4685.3
General safety requirements and test methods
Particular safety requirements and test methods for swings
Particular safety requirements and test methods for slides
Particular safety requirements and test methods for runways
Particular safety requirements and test methods for carousels
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 10
AS 4685.4
AS 4685.5
AS 4685.6
Particular safety requirements and test methods for rocking
equipment
AS/NZS 4486.1 1997
Playgrounds and
Playground Equipment
Part 1: Development,
installations, inspection,
maintenance and
operation.
Development, inspection maintenance and operation of playground
Equipment.
It defines the requirements of the development and installation of
new playgrounds. It describes a “Playground Safety Management
System” that must be adopted by all operators of playgrounds.
AS 4373:2007 Pruning
Amenity Trees
Prescribed techniques for pruning amenity trees.
AS 2550.10 1994 Elevated
working platforms
Work Safe guidelines for working at elevated heights adopted, and
procedures for using elevated working platforms adopted.
AS/NZS 4422 1996
Playground Surfacing
Specifications,
requirements and test
methods.
This standard gives general requirements for surfacing to be used in
children’s playgrounds and specific requirements for areas where
impact energy attenuation is necessary. All operators of playgrounds
must ensure that the size and the performance of surfacing meet the
requirements of this standard.
3.3 Current Levels of Service
3.3.1 Asset Functional Hierarchy
3.3.1.1 Open Space
Open Space Functional Hierarchy:
Hierarchy Description
1 High use particularly from visitors.
Major parks.
High quality plants and fixtures with a comprehensive, programmed
maintenance
CBD streetscape or major town entrances
2 Other formal parks
Major street streetscape or minor town entry
Higher standard of maintenance. e.g. mowing
3 Generally open space only with no formal planting
Local street streetscapes
Lower level of maintenance e.g. slashing, trimming.
Open Space Classification by Type
Classification Description
Park Developed land, highly maintained with formal features such as
gardens, paths, seating, parks fixtures
Streetscape Located within local streets, town entrances and within the
commercial precincts
Reserve Generally undeveloped open space, minimal features and fixtures
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 11
3.3.1.2 Sports Facility
Sports Ground Functional Hierarchy
Hierarchy Description
Level 1 • Used all year with multiple users.
• A high quality surface
• A comprehensive maintenance program
• All off field facilities are available at an excellent standard
• Facilities for night time local competition would be available
Level 2 • Used all year round but usually with single user at a time.
• A good standard of playing surface
• Regular but often with maintenance only as required.
• All off-field facilities would be available but some may only be at a basic
level.
• May have facilities for night competition
Level 3 • A facility would be used only part of the year with a single user.
• It would only have a low standard laying surface with reactive
maintenance.
• Off-field facilities are simple and minimal.
• Night time use would be unavailable.
Sport facilities by Irrigation
Classification
Irrigated
Non-irrigated
Sporting surfaces classification by type:
Classification Description
Active reserves Football grounds,
Manicured Bowling greens
Synthetic playing surfaces Concrete, asphalt, artificial grass
Sporting surfaces classification by use:
Classification
Ovals
Cricket wickets (hard)
Cricket wickets (turf)
Athletics tracks
Equestrian Facilities
Netball Courts
Tennis Courts
Multipurpose Courts
Velodrome
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 12
3.3.1.3 Playgrounds
Playground Functional Hierarchy
Hierarchy Features
Local Generally located in local / neighbourhood settings and serve the general day to
day playground needs of the local surrounding neighbourhood. Intended for local
play and provide a basic level of play equipment and associated support facilities.
Are accessible within a 500m radius of intensively developed residential urban
areas (taking into consideration barriers such as major roads, waterways, railway
lines) Visits to local playground facilities are generally short in duration.
District District playgrounds are generally located in large open space areas with
established infrastructure and facilities for a range of recreation activities. District
park settings generally cater for family or group activities, and may include
sporting activities, BBQ and picnic facilities and toilet facilities.
District playgrounds provide for a more extensive play experience, and have a
greater number of play elements than you would see in a local playground setting.
District playground settings often attract visitors from several kilometres away and
generally longer visits are spent due to the range of activities and facilities
provided.
Major Major playground sites generally serve a Regional or Shire-wide purpose and are
likely to be visited by people across the Shire, as well as attract visitors from
outside the municipality. Major playgrounds are generally located in large well
developed open spaces that provide a focal point for large gatherings of people.
Major playgrounds provide a diversity of play opportunities and play themes,
offering residents and visitors with a highly accessible environment which
supports the inclusion and participation of children of all ages and all abilities.
Major playground sites also feature a higher level of support facilities which may
include car parking, toilets, shelter, picnic settings, BBQ’s and drinking fountains to
cater for the higher level of use and the longer period spent at the site.
Playgrounds Classification by Location/Management
Description
Preschool playgrounds
Park playgrounds and reserves
3.3.1.4 Trees
Trees Functional Hierarchy:
Hierarchy Description
1 High CBD trees
2 Medium Parks and reserves trees
3 Low Other street trees
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 13
Trees Classification by Importance
Classification
National Trust Registered
Not Registered
Trees Classification by Location:
Classification
Declared Area
Non-declared Area
Classification Trees in Declared Area by risk:
Type
HV power lines
LV power lines
Overhead Service lines
Non-powerline
3.3.2 Community & Technical Levels of Service
Current asset based service levels are outlined below:
These will be further developed as individual Service Plans are completed.
3.3.2.1 Open Space
Customer Need Service
Indicator
Community Levels of Service Technical Levels of Service
Community
Measure
Community
Target
Technical Measure Technical Target
A park/open
space nearby Availability
Number
measure for
customer
requests
0/year
Ensure park/open
space is provided
where appropriate
100% compliance with
planning permit
requirements.
No rubbish
lying about Amenity
Number
measure for
customer
requests
Less than 20
requests per
year
Ensure litter is
removed
Establish program for
litter removal by June
2014
No long grass
that is untidy
and hazardous
Safety and
amenity
Number
measure for
customer
requests
Less than 50
requests per
year
Grass length
Mowing frequency
100% compliance with
mowing schedule
annually
Seats and
tables, shade
and BBQs
Quality
Number
measure for
customer
requests
Less than 10
requests per
year
Ensure
infrastructure is
provided where
appropriate
100% compliance
annually
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 14
3.3.2.2 Sports Grounds
Customer Need Service
Indicator
Community Levels of
Service
Technical Levels of Service
Community
Measure
Community
Target
Technical
Measure
Technical Target
An sportsground/
competition
facility for my
community
Availability Number
measure
for
customer
requests
Less than 10
requests per
year
Number and
location of
recreation
facilities where
appropriate
Provide a:–
Level 1 facility within the
municipality.
Level 2 facility where active
sports such as competition
football, soccer, hockey or
similar is played.
Level 3 facility where i)
seasonal only competition
other than football or ii) where
a non-competition facility
services a town to provide for
active recreational pursuits.
Lighting suitable
for training,
matches
Accessibility Number
measure for
customer
requests
Less than 10
requests per
year
Minimum lux
level
Training:
Level 1 Sportsfields: 50 lux
over whole oval.
Netball/Tennis 350 lux.
Level 2 Sportsfields: 50 lux
over part oval. Other nil.
Level 3 Sportsfields: nil
Match
Level 1 Sportsfield: 100 lux
Netball 200 lux. Tennis 350 lux
Level 2 & 3 Sportsfields: Nil
Off field facilities
that support the
user operations”
Quality.
Amenity
Number
measure for
customer
requests
Less than 15
requests per
year
Where
appropriate
refer to AFL
'Preferred
Facilities
Requirements'
100% compliance to refer,
where appropriate, to AFL
‘Preferred Facilities
Requirements’
Dimensions and
run-off
Quality:
Safety
Number
measure for
customer
requests
Less than 10
requests per
year
Where
appropriate
refer AFL
'Preferred
Facilities
Requirements'
Undertake ground checks
twice per year.
100% compliance with
Australian Standards for
various sports.
Playing surface
condition
Quality Number
measure for
customer
requests
Pre-match
checklists
Less than 10
requests per
year
Grass surface
minimum
rating
Drainage,
reticulation,
100% compliance with mowing
to standard heights.
Ground checks twice per year.
90% passing/year
Ground is
available for play
Accessibility No. games
abandoned
or
relocated
Less than 5
per year
Pre-match
checklists
90% of grounds available for
play.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 15
3.3.2.3 Playgrounds
Customer Need Service Indicator Community Levels of Service Technical Levels of Service
Community
Measure
Community
Target
Technical Measure Technical Target
A playground
nearby
Availability of
playgrounds,
location &
distribution
Number measure
for customer
requests
Less than 10
requests per
year
Number of
playgrounds
Distance to
playground
• One Major in
Gisborne, Kyneton,
Romsey &
Woodend by 2018.
• One District within
a 2+km radius or
per town.
• One Local within
500m radius of
intensely developed
residential/urban
area.
Access to the
playground
Accessibility of
playground
Number measure
for customer
requests
Less than 20
requests per
year
Footpath access
Shared path for direct
access to major &
district
Variety and a
good
experience
Amenity of
playground,
types of
equipment
Number measure
for customer
requests
Feedback, survey
Less than 10
requests per
year
80% satisfied
with
equipment
variety,
number
Meet guidelines in
Playground
Strategy
100% within 10 years
Accessible
equipment
Accessibility to
the equipment,
Disability
Discrimination
Act (DDA)
Number measure
for customer
requests
Less than 10
requests per
year
Playgrounds with
accessible
equipment/Internal
paths
100% Major and
District by 2018
A safe
playground
Safety of the
equipment
Number of
Accidents
No accidents Identified defects
(defined, priority)
corrected within
specified time
100% compliance with
AS 4685
Improvement Action 3: Develop individual service plans defining the responsibilities and
levels of service for those services relevant to the assets included in this plan.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 16
4 FUTURE DEMAND
4.1 Demand Forecast
Demand Drivers for Open Space Infrastructure:
Driver Impact
Age Profiles Influences the type of open spaces required depending on the age profile
trends i.e. young population
Tourism Indicates the need for improvement to existing open space tourist areas or the
need for additional tourist open spaces
New Developments As more people build within the Shire there will be an increased need to
provide more open spaces for the growing community
4.1.1 New Developments
The 1988 Subdivision Act requires developers to provide 5% of land as open space unless
there is adequate open space already in which case they provide a monetary contribution for
the development/maintenance of the existing open space.
4.2 Demand Management Strategies
Demand management strategies provide alternatives to the creation of new assets in order
to meet demand and look at ways of modifying customer demands to maximise the
utilisation of existing open space assets and reduce or defer the need for new assets.
Council has not yet identified demand management strategies for open space assets.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 17
5 RISK MANAGEMENT
5.1 Hazard Identification
Open Space
Hazard Cause Main Area of Impact Potential Controls
Vehicle damage or injury • Mowing Public health and
safety
Financial
• Plant and equipment
inspections undertaken
• Insurance
• Site inspections for hazards
Accident in lakes • Uncontrolled access
• Drop offs and edges
• Inadequate
supervision
Public health and
safety
• Signage
• Insurance
Hazard from parks
furniture
• Poor condition
• Lack of maintenance
Public health and
safety
• Maintenance inspections and
works programming
• Insurance
Hazard from wildlife
• Uncontrolled
‘visiting’ wildlife
Public health and
safety
• Provision of fencing
Trip or fall hazard • Obstacles. Public health and
safety
• Maintenance inspections and
works programming
Personal assault • Personal behaviour. Public health and
safety
• Provision of security lighting
Conflict with adjacent
uses
• Events Image and reputation • Events procedures.
Playgrounds
Hazard Cause Main Area of
Impact
Controls
Fall from height, striking
or catch accident
• Poor condition
• Poor maintenance
• Protruding items
• Trip hazards
Public health and
safety
• Maintenance inspections
and work’s programming
undertaken.
• Signage
• Insurance
Sun safe • Lack of shade Public health and
safety
• Risk assessment
Non-compliance with
Disability Discrimination
Act (DDA) legislation
• Lack of DDA access Service delivery
Legislative
• Level of service for DDA
access appropriate.
Damage to playgrounds • Vandalism
• Inappropriate use
Financial • Effective customer request
system.
• Insurance
Sharps • Inadequate site
security.
Public health and
safety
• Maintenance inspections
and works programming
undertaken.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 18
Sports Grounds
Hazard Cause Main Area of Impact Controls
Play prevented
ground unsuitable for
play
• Surface to dry, hard
• Surface to wet
• Surface to rough,
uneven
Service delivery
Financial
Image and reputation
• Pre-match inspections
• Level of service for
drainage and reticulation
appropriate for location
and use.
• Maintenance works
programming.
Accident from run-off
areas
• Inadequate run-off
distances
• Fences not protected
Public health and safety • Compliance with ruling
body standards
• Pre-match inspections
Claim from
unauthorised use
• Inadequate security Financial • Signage
• Lighting upgrade program
undertaken.
• Facility booking
procedures.
• Maintenance inspections
and works programming.
• Seasonal hire agreements
Injury from use
• Rough playing surface
• Sprinkler covers
• Inadequate lighting
Public health and safety • Pre-match inspections
• Safety padding
• Run-off areas
• Conformance with
match/training lighting
standards
• Insurance
Conflict with
adjacent uses
• Hours of use
• Parking
• Noise
• Lighting
Image and reputation • Provision of off-street
parking.
• Level of service for hours of
operation appropriate for
location.
Trees
Hazard Cause Main Area of Impact Potential Controls
Injury from falling limbs • Type, condition, size
of trees
Public health and
safety
• Maintenance inspections and
works programming
Damage to trees from
pests
• Pests Service delivery
Financial
• Maintenance inspections and
works programming
Damage to infrastructure
(heritage) trees
• Vandalism Service delivery • Security lighting provided.
5.2 Asset Criticality
Asset criticality addresses assets that are:
• Critical Assets: Assets with a high consequence (major or catastrophic) of failure;
• High Risk Assets: Assets with a high likelihood of failure.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 19
5.2.1 Open Space
Critical Assets
Description Area of Impact Actions to Address
• Nil
List of Critical Assets:
• Nil
High Risk Assets
Description Mode of Failure Actions to Address
• Nil
List of High Risk Assets:
• Nil
5.2.2 Sports Grounds
Critical Assets
Description Area of Impact Actions to Address
Nil
List of Critical Assets:
• Nil
High Risk Assets
Description Mode of Failure Actions to Address
• Nil
List of High Risk Assets:
• Nil
5.2.3 Playgrounds
Critical Assets
Description Area of Impact Actions to Address
Nil
List of Critical Assets:
• Nil
High Risk Assets
Description Mode of Failure Actions to Address
• Equipment at condition rating of
greater than 7
Structural failure Higher priority in renewal
programs
List of High Risk Assets:
• Refer to most recent Risk Audit.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 20
5.2.4 Trees
Critical Assets
Description Area of Impact Actions to Address
Nil
List of Critical Assets:
• Nil
High Risk Assets
Description Mode of Failure Actions to Address
• Very poor health, large trees in heavy
pedestrian areas
Structural Increased monitoring
List of High Risk Assets:
• Refer to most recent tree inspections
Improvement Action 4: Commence recording of Critical and High Risk open space assets.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 21
6 LIFECYCLE MANAGEMENT PLANS
6.1 Physical Parameters
6.1.1 Current Issues
6.1.1.1 Parks Current Issues
The key issues related to the management of MRSC park infrastructure are:
• Limited resources to manage the asset base;
• No assigned staff for litter cleanup in parks and reserves;
• No irrigation audits are undertaken;
• Maintenance and management practices are reactive rather than proactive;
• Contractors are not maintaining infrastructure under the defect period before
handover to Council;
• Roles and responsibilities in regard to the management of open space infrastructure
are unclear in some instances; and
• No consistent guidelines in relation to styles/colours for new open space
infrastructure.
6.1.1.2 Sportsgrounds Current Issues
The key issues related to the management of MRSC sportsgrounds are:
• Unwillingness of community to pay for facility use;
• Roles and responsibilities in regard to the velodrome are unclear;
• Increasing turf maintenance issues due to ageing assets, no condition assessments
and no formal renewal program in place ; and
• Synthetic athletic tracks require a high level of maintenance (cleaning) to ensure the
full life of the surface is achieved, and replacement costs are high.
6.1.1.3 Playgrounds Current Issues
The key issues related to the management of MRSC playgrounds are:
• Vandalism;
• Managing wear and deterioration of older equipment;
• Meeting the requirements of playground standards and safety compliance as
standards are subject to change; and
• Providing playground equipment that is safe and compliant without jeopardising the
play experience for children.
6.1.1.4 Trees Current Issues
The key issues related to the management of MRSC trees are:
• Pest and Disease;
• Drought;
• Hedge management is intensive;. and
• Senescence (ageing tree population)
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 22
6.1.2 Asset Quantities
6.1.2.1 Open Space Asset Quantities
There are many public parks, gardens, and recreation reserves located within the Macedon
Ranges Shire, including botanic gardens at Malmsbury, Kyneton and Gisborne.
One of the Macedon Ranges' most famous reserves is Hanging Rock, which caters for a wide
range of activities from the racecourse, ovals and tennis courts to wide expanses of lawns.
Parks in Macedon Ranges with tourist or community significance are follows:
Park Name Significance
Hanging Rock Reserve Tourist
Kyneton Botanic Garden Tourist
Malmsbury Botanic Gardens Tourist
Gisborne Adventure Playground Community
Woodend Children’s Park Community
A summary of the park infrastructure by asset type is shown in the table below:
Asset Type Unit Quantity
Retaining & Feature Walls No. 6
Irrigation Systems No. 14
Garden Beds No. 337
BBQs No. 48
Bin Stands No. 58
Park Furniture &Equipment No. 821
Lighting No. 226
Fencing Meters 78,418 m
Recycled Water Tanks No. 2
Basketball Facilities (slab, pole and ring) No. 1
Hit Up Walls No. 1
Signage No. Unknown
Ornamental Fountains No. 3
Monuments No. 8
These figures are from 2010 / 2011 Opens Space Data Collection project and do not include
infrastructure located within streetscapes.
Improvement Action 5: Undertake open space asset inventory update and condition
assessment as required.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 23
6.1.2.2 Sportsgrounds Asset Quantities
Council’s sportsgrounds provide the play surfaces and surrounds required for the provision
of many popular sports such as football, cricket, tennis, basketball, netball, skateboarding,
soccer, rugby, athletics, softball, equestrian and BMX riding.
Sportsgrounds
MRSC manages various sportsgrounds as identified below:
No. Sports Parks / Grounds Playing Area M2
1 Bullengarook Recreation Reserve 1.4 ha
2 Clarkefield Recreation Reserve Committee of Management
3 Gardiner Reserve 1.6 ha
4 Sankey Reserve 1.3 ha
5 Dixon Field - Field 1 - includes athletics track 1 ha
6 Dixon Field - Field 2 1 ha
7 Dixon Field - Field 3 1.1 ha
8 Kyneton Showgrounds No.1 Oval 1.7 ha
9 Kyneton Showgrounds No. 2 Oval 1.3 ha
10 Barkly Square 1.8 ha
11 Lancefield Park Committee of Management
12 Tony Clarke Reserve 1.9 ha
13 JD Clifford Reserve 1.3 ha
14 Malmsbury Sportsground 1.3 ha
15 Riddells Creek Recreation Reserve 1.7 ha
16 Riddells Creek School Oval 1.1 ha
17 Romsey Park 1.8 ha
18 Romsey Park 2 (new oval) 1.7 ha
19 Tylden Recreation Reserve 1.5 ha
20 Woodend Racecourse Reserve 1.6 ha
21 Gilbert Gordon Oval 1.5 ha
A summary of sportsgrounds by asset type is shown in the table below:
Asset Type Quantity (No.)
Ovals 21
Cricket wickets (hard) 15
Cricket wickets (turf) 2
Athletics tracks 1
Equestrian Facilities 7
Netball Courts 6
Tennis Courts 74
Multipurpose Courts 5
Irrigation Systems 14
Recycled Water Tanks 15
Water Tanks 3
Ground Water Bores and Pumps 4
Velodrome 1
Skate Parks 6
BMX Tracks 4
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 24
6.1.2.3 Playgrounds Asset Quantities
Macedon Ranges Shire has a total of 56 playground sites located across the municipality in
public open space settings and kindergartens. This includes 2 locations providing fitness
equipment.
A summary of playgrounds owned by Council by asset type is shown in the following table:
Asset Type Quantity
Local – including Preschools 40
District 14
Major 2
Total 56
6.1.2.4 Trees Asset Quantities
A summary of trees by asset type is shown in the table below:
Asset Type Quantity (No.)
Street Tress 28,116
Park and Reserve Trees
Total Unknown
however approx.
5,900 identified
with risk issues
Hedges 8
Total 34,063
6.2 Asset Capacity/Performance
Performance monitoring includes:
• Assets under-capacity v Levels of Service
6.2.1 Assets Under-Capacity
Assets which are not achieving the current level of service are listed are:
Technical Measure Technical Target Current Assets Under-Capacity
Open Space
Sports Grounds
Playgrounds
Trees
Council has not identified open space assets which are not achieving the current level of
service.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 25
6.3 Asset Condition
6.3.1 Condition Monitoring - Asset Condition Survey Frequency & Responsibility
Condition surveys are conducted in accordance with the following program:
Survey Name Frequency/
Hierarchy
Responsibility Dates
Previously
Completed
Open Space Infrastructure Nil N/A Nil
Sportsgrounds, skate parks
and dirt jumps: Risk
assessment
Nil Manager Recreation &
Cultural Development Nil
Playground Condition Survey Nil Manager Recreation &
Cultural Development Nil
Trees Condition (Safe Useful
Life)
1 High: Annual
2 Medium: 3 years
3 Low: 3 year s
Operations Department 2012
Open space (parks fixtures and landscaping) are not condition surveyed. Parks fixtures on the
basis that the effort is not justified against the small value of the asset and landscaping on
the basis this asset is not renewal modelled or renewal works undertaken.
Grassed Sports facilities surfaces are not condition surveyed on the basis that works on the
surface are maintenance based not capital renewal. E.g. for this plan top dressing is
considered a maintenance activity.
Playgrounds are currently not condition survey.
6.3.2 Condition Rating
6.3.2.1 Open Space, Sports Grounds and Playgrounds
During the 2010 asset data collection project a condition rating was applied to all assets. The
rating was based on the following factors:
• General condition
• Functionality
• Safety
• Age
A matrix then converts the above factors with weightings to an overall 0-10 score.
6.3.2.2 Trees Condition Rating
Trees are rated 0-10 utilising the general rating descriptions, taking into account the
following factors, including:
• Health
• Safety
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 26
6.3.3 Current Asset Condition
The current condition of the assets is:
Active Reserves
Playgrounds
Improvement Action 6: Undertake an analysis of the 2010 and 2011 data collection to
report on asset condition.
0.00
10.00
20.00
30.00
40.00
50.00
60.00
109876543210% Within Cond in Year 2012 0.000.000.0022.7617.7552.197.310.000.000.000.00
% W
ITH
IN C
ON
DIT
ION
RA
TIN
G
0 Good - Condition - 10 Poor
PRESENT CONDITION DISTRIBUTION BY % OF ASSET BASE
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
109876543210% Within Cond in Year 2012 0.000.000.000.001.063.532.6544.7613.8434.160.00
% W
ITH
IN C
ON
DIT
ION
RA
TIN
G
0 Good - Condition - 10 Poor
PRESENT CONDITION DISTRIBUTION BY % OF ASSET BASE
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 27
6.3.4 Deterioration Curves
The basis for the adoption of the deterioration curves are:
Asset Type Basis for Adoption of Deterioration Curve
Playgrounds Default
Active Reserves Default
6.3.5 Asset Useful Lives & Intervention Level & Basis for Adopting Useful Lives
The adopted intervention levels and useful life of the asset components are stated below,
including the basis by which each was adopted:
Asset Type Intervention
level
Physical Life
(years)
Useful Life
(years)
Basis for Useful Life
Playgrounds 8 20 18.6
Industry benchmarks
Active reserves 8 30 27.9
Manicured N/A
Synthetic playing
surfaces
Parks Fixtures N/A
Improvement Action 7: Undertake a research activity to identify the asset lives of all
assets contained within this open space asset management plan.
Improvement Action 8: Add synthetic playing surfaces and parks fixtures into the long
term renewal forecast.
6.3.6 Historical Asset Condition
Open Space Historical Asset Condition
Council does not currently hold any historical asset condition information in regard to open
space infrastructure.
Playgrounds Historical Asset Condition
Council does not currently hold any historical asset condition information in regard to
playgrounds.
Sportsgrounds Historical Asset Condition
Council does not currently hold any historical asset condition information in regard to
sportsgrounds.
Trees Historical Asset Condition
Council does not currently hold any historical asset condition information in regard to trees.
6.3.7 Age Profile
Age profile graphs are provided:
• N/A
Note: The quantities listed are correct only at the time of the development of this plan. Up to date information is obtained
from the asset register.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 28
6.4 Asset Valuations
The valuation, or replacement cost, of the assets used for financial reporting are:
Asset Component Replacement
Value $000
Written Down
Value $000
Active Reserves (Ovals) $4,790,000 $4,789,799
Playgrounds $3,396,000 $3,395,857
Total $8,186,000 $7,832,000
6.5 Historical Data
Important or relevant historical data applicable to the assets included in this plan are:
• Nil
6.6 Routine Maintenance Plan
Operations and maintenance activities are co-ordinated by the Parks Development Officer
and undertaken by the in-house team using a range of contractors on an as need basis.
Open Space
Maintenance in response to Parks Officer notification or customer requests include:
• Garden bed repairs including repairs to edging and replanting of plant material;
• BBQ maintenance including repairs to electrical faults;
• Park furniture and equipment repairs, component replacement and painting;
• Bulb replacement on park lighting;
• Recycled water tank repairs;
• Park signage and pole replacement;
• Repairs and sealing of ornamental fountains;
• Fencing repairs;
• Maintenance of irrigation systems including repairs and fitting replacement, filter
cleaning and pump repairs; and
• Repairs to any other open space related infrastructure.
No maintenance on monuments or bin stands is currently undertaken.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 29
Sportsgrounds
Current proactive maintenance activities undertaken include:
• Spraying, aeration, dressing and seeding patches of ovals;
• Repairs to concrete and matting of cricket wickets (clubs responsibility);
• Scheduled repairs to turf cricket wickets (clubs responsibility);
• Filling pot holes and levelling jumps at skate and BMX parks (undertaken by a
contractor);
• Synthetic track repairs and brushing. Fertilising of ovals quarterly unless deemed
otherwise; and
• Basketball facility repairs including general repairs, painting, pole replacement, ring
replacement, and backboard replacement.
Maintenance in response to Parks Officer notification or customer requests include repairs
to:
• Oval irrigation;
• Maintenance of practice wicket enclosures and synthetic cricket wickets;
• Recycled water tanks;
• Water tanks; and
• Ground water bores and pumps.
No maintenance is undertaken by Council at the equestrian facilities.
Playgrounds
Maintenance activities undertaken in response to customer requests, defect inspections or
risk audit inspections consist of:
• Repairs to equipment;
• Graffiti removal: and
• Top up of soft fall.
Trees Maintenance
Maintenance activities undertaken in response to customer requests or defect inspections
commonly consist of:
• Pruning;
• Mulching;
• Cabling and bracing;
• Corrective and repair treatments;
• Control of insect/disease;
• Hedge Trimming; and
• Tree root pruning/removal and root barrier installation works.
6.6.1 Defect Inspections
Works are identified in response to the following factors:
• Customer Requests;
• Tree inspections;
• Park Officer identification; and
• Risk assessments
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 30
Maintenance defect inspections are scheduled as below:
Inspection Name Defects Recorded Frequency/Hierarchy Responsibility
Open Space
BBQ’s Tested for operability
and any defects reported
back to Council
As part of cleaning
schedule
Otherwise reactive
basis
Manager Operations
Other open space
infrastructure
N/A Reactive basis Manager Operations
Sportsgrounds
Skate park
inspections • Trip and other
hazards
• Safety
Monthly Manager Recreation &
Cultural Development
Ovals State of the turf, identify
any holes and to check
the overall safety of the
ground including cricket
wicket inspections
Weekly Manager Recreation &
Cultural Development
Ground hardness
risk assessments
Ground Hardness six monthly – at the
start of the summer
and winter seasons
Manager Recreation &
Cultural Development
Sports reserve
risk assessments
Including playing surfaces 6 monthly Manager Recreation &
Cultural Development
Equestrian facility
inspections
N/A Regular basis Committee of
Management
Other
Sportsground
Infrastructure
N/A reactive basis Manager Recreation &
Cultural Development
Sporting
competition pre-
match
Pre-match Checklist Prior to each match Competing clubs Council
however the works are
passed onto the club for
implementation
Playgrounds
Playground
Defects Visual
Inspection
• Entrapment openings
• Graffiti
• Standards Non-
compliance
• Under surfacing
• Faulty equipment
Major: Weekly
Other: Monthly
Manager Operations
Playground Risk
Assessment
6 monthly External Consultant: Ray
Hutchinson
Trees
Street &
park/reserve
Trees
• Crown height
• Crown width
• General condition
High: Annual
Others : 3 year (in conjunction with
condition survey)
Manager Operations
Declared area
Powerline
inspection
Encroachment Annual
Legislated
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 31
6.6.2 Prioritisation of Maintenance Works
Playgrounds
Playground defects are prioritised on the basis of the Functional Hierarchy and Council’s risk
rating:
• Extreme
• High
• Moderate
• Low
Sportsgrounds
Sportsgrounds defects are prioritised based on the level of risk nominated through the
assessment process.
Trees
Trees defects are prioritised on the basis of:
• High risk
• Medium risk
• Low risk
Works identified from the tree inspections are prioritised using a ranking based on tree
importance.
6.6.3 Defect Response Times
Defect response times are applicable to the following defects:
Playgrounds
Defect Response Times Apply
1. Extreme Immediate action, manager notified within 2 hours
2. High Same day action required (within 24hrs), manager notified
3. Moderate Rectify within 7 days
4. Low Manage within routine processes, action within 30 days
6.6.4 Standards and Specifications
If the risk assessment deems the sportsground unsafe due to a high risk rating then it will not
be used until the necessary works required to make the ground safe are undertaken.
Defects shall be repaired to ensure:
• Fit for use
• Safety
• Standards are met
6.6.5 Basis for Future Maintenance Costs
Proposed maintenance expenditure is assessed on an annual basis.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 32
6.7 Renewal Plan
6.7.1 Renewal Capital Works Programs
6.7.1.1 Open Space Renewal
Renewal activities within parks infrastructure are undertaken in response to:
• Issues identified through customer requests;
• Aging open space infrastructure that requires replacing;
• Open space issues as identified by a parks officer; and
• Vandalism.
Renewal activities typically consist of:
• Replacement of seating;
• Replacement of bollards; and
• Fence Replacement.
BBQ’s and bin stand replacement is reactive and only undertaken if funds are available from
another source as there is no capital budget for these infrastructure types.
6.7.1.2 Sportsgrounds Renewal
Renewal projects are identified in the Leisure Strategy Plan, 2006 and have been identified
considering the following:
• State of the assets;
• Demand for the sports;
• Community consultation; and
• Participation rates.
6.7.1.3 Playgrounds Renewal
A playground strategy has been developed that identifies the renewal activities planned for
playgrounds between 2010 and 2014.
6.7.1.4 Trees Renewal
Tree replacement works are funded from the tree planting budget.
6.7.2 Renewal Priority Ranking
Renewal projects are prioritised on the basis of:
• Condition/Risk
• Hierarchy
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 33
6.7.3 Summary of Renewal Works
Asset Program/Project Details Source Timing Cost
Open Space
Infrastructure
Parks Infrastructure Renewal Program: Consists
of replacement of seating, bollards, fencing etc.
2013/14 –
2016/17
2017/18 –
2018/19
2019/20
2020/21 -
2022/23
$50,000
annually
$60.000
annually
$70,000
$75,000
annually
Playgrounds
Playground Development Program: Renewal
and development of current playgrounds.
2013/14 –
2016/17
2017/18 –
2018/19
2019/20 –
2022/23
$40,000
annually
$45,000
annually
$50,000
annually
Sportsgrounds Reconstruction Multi Purpose Courts Tylden:
Renewal of courts. 2013/14 $200,000
Sportsgrounds Woodend Oval Upgrade: Renewal portion of
upgrade works – total cost of project is $764,000 2013/14 $250,000
Sportsgrounds Gardiner Reserve Netball Courts: Renewal of
netball courts 2013/14 $140,000*
Sportsgrounds Lancefield Skatepark: Renewal works to
skatepark 2013/14 $200,000*
Sportsgrounds Renewal of Gisborne Athletics Track: Renewal
works to athletics track 2014/15 $65,000*
Sportsgrounds
Gardiner Reserve Redevelopment: Renewal
portion of redevelopment works – total cost of
project is $800,000
2015/16 $400,000
Open Space Community Parks: Renewal portion of works –
total cost of project is $100,000 2015/16 $50,000
Open Space Community Parks: Renewal portion of works –
total cost of project is $100,000 2016/17 $50,000
Note: Costs marked with *indicates grant or other funding may be available.
Programs & Projects listed beyond 2013/14 are a guide only and have not been approved.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 34
6.7.4 Basis for Future Renewal Costs
6.7.4.1 Renewal Modelling – Renewal Rates
The Moloney Asset Sets used and the renewal rate and the basis and assumptions by which
the rate has been adopted are detailed below.
Asset Component Corresponding Standard
Moloney Set
Renewal
Rate/unit
Basis for Renewal Rate
Playground Recreation Group - Play Equipment $60,642.90 In-house estimates
based on individual
asset cost
Sports grounds Recreation Group - Active Reserves
(Footy Ovals etc) $281,764.70
The following assets are not modelled:
• Trees: No ‘real’ renewal cost. Replace with small inexpensive trees.
• Open space: Minimal renewal work undertaken, similar to formation in roads,
therefore minimal cost
The Moloney Asset Sets are not used:
Standard Moloney Sets Not Used Reasons for Not Being Used
Recreation Group - Manicured Turf
(Bowling Greens etc) N/a
Recreation Group - Synthetic Playing
Surfaces N/a
Recreation Group - Street & Park
Furniture N/a
Recreation Group - Bores, Pumps Included in Active Reserves/Manicured Turf/Synthetic
Playing Surface Recreation Group - Reticulation
Recreation Group - All Lighting
Refer to improvement actions for future modelling of other assets.
6.7.4.2 Renewal Gap
The current renewal demand and renewal gap is detailed in the Asset Management Plan Part
A – General Information, Attachment #2 – Infrastructure Financial Projections.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 35
6.8 New & Upgrade Plan
6.8.1 Future New and Upgrade Programs Identified in this Plan
New and Upgrade programs are identified:
• From a relevant Service Strategy,
• Current issues discussion,
• Under-capacity analysis,
• Assessment of future demand, and
• Risk assessment
6.8.2 Summary of New and Upgrade Works
Asset Program/Project Details Source Timing Cost
Sportsgrounds Woodend Oval Upgrade: Upgrade portion of works –
total cost of project is $764,000 2013/14 $514,000
Playgrounds Kyneton Community Park: Playground works at Botanic
Gardens 2013/14 $400,000*
Playgrounds Greater Romsey All Abilities Park: New playground
facility for Romsey
2013/14
2018/19
$400,000*
$300,000
Sportsgrounds Oval Lighting Upgrade Kyneton Showgrounds (Football
Club): Upgrade of sports lighting 2014/15 $230,000*
Sportsgrounds Gardiner Reserve Redevelopment: Upgrade portion of
redevelopment works – total cost of project is $800,000 2015/16 $400,000
Sportsgrounds Kyneton Skatepark Upgrade: Upgrade of existing
skatepark 2015/16 $200,000*
Sportsgrounds
Oval Lighting Upgrade Barkley Square (Soccer Club):
Upgrade of sports lighting. 2015/16 $150,000
Open Space Community Parks: Upgrade portion of works– total cost
of project is $100,000 2015/16 $50,000
Sportsgrounds Oval Lighting Upgrade Riddells Creek Recreation
Reserve: Upgrade of sports lighting 2016/17 $230,000*
Open Space Community Parks: Upgrade portion of works – total cost
of project is $100,000 2016/17 $50,000
Sportsgrounds Gisborne Dixon Field extension: Upgrade works – two
ovals 2017/18 $1,000,000
Sportsgrounds Lancefield Sports Ground: Upgrade works 2017/18 $400,000*
Sportsgrounds Third Oval at Woodend soccer athletics: Upgrade of 3rd
oval at Racecourse Reserve 2017/18 $500,000*
Sportsgrounds Multi Purpose Courts Malmsbury: Construction of
multipurpose court 2018/19 $300,000*
Sportsgrounds Oval Lighting Upgrade – Kyneton Football Club:
Upgrade of sports lighting 2018/19 $250,000*
Open Space Open Space System Eastern Residential Area: New
works / Development Contribution Plan funds - Romsey 2019/20 $254,003
Open Space
Fersfield Rd-Willowbank Rd Open Space Works: New
works from Development Contribution Plan funds –
Gisborne
2020/21 $230,000
Open Space Open Space System Western Drainage Reserve: New
works / Development Contribution Plan funds – Romsey 2020/21 $283,095
Note: Costs marked with *indicates grant or other funding may be available.
Programs & Projects listed beyond 2013/14 are a guide only and have not been approved.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 36
6.9 Operations Plan
Open Space Operations
The operational activities involved in the ownership and management of the MRSC open
space infrastructure include:
• Gardening duties in all public open space including, mulching, weeding, pruning,
planting, litter and debris removal, pest and disease control;
• Programmed mowing throughout all public open space areas:
− Town centre - fortnightly;
− All other areas - monthly in the peak season and fortnightly in off peak season;
• Irrigation and hand watering;
• Inspections of public open space and hazard management;
• Inspection and risk reporting of playground equipment;
• BBQ cleaning;
• Rubbish bin pickup; and
• Vandalism removal.
Sportsgrounds Operations
The regular and on-going operations and maintenance of the sportsgrounds is necessary to:
• Maintain a safe playing surface for all users;
• To optimise the state and usability of sportsgrounds;
• Provide clean, quality and appealing infrastructure to support recreation and leisure
services; and
• Continually provide the best possible service in line with defined service levels.
The operational activities involved in the ownership and management of the MRSC
sportsgrounds include:
• Reactive mowing of ovals as required up to 3 times per week in peak seasons;
• Pest and disease control; and
• Irrigating turf.
Playgrounds Operations
The regular and on-going maintenance of the playgrounds is necessary to:
• To manage and minimise Council’s exposure to risk;
• Maintain a safe environment for the users of the playgrounds;
• Preserve the condition of the playground within agreed service levels; and
• Meet the requirements of playground standards.
The operational activities involved in the ownership and management of the MRSC
playgrounds include:
• Cleaning;
• Litter removal; and
• Inspections.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 37
Trees Operations
The operational activities involved in the ownership and management of the MRSC trees
include:
• Street sweeping undertaken by Council’s works crew (cleans up debris and leaves);
• Irrigation of street and park/reserve trees;
• Pruning, including electric line clearance pruning; and
• Inspection of trees
6.9.1 Operations Future Costs
Proposed operational expenditure is assessed on an annual basis.
6.10 Disposal Plan
Open Space
There is currently no policy to close or dispose of open space infrastructure within the Shire
of Macedon Ranges. Council has a fixed asset policy however it does not strictly cover the
disposal of open space infrastructure.
Sportsgrounds
There is currently no policy to close or dispose of sportsgrounds within the Shire of Macedon
Ranges. Council has a fixed asset policy however it does not strictly cover the disposal of
sportsgrounds.
Playgrounds
There is currently no policy to close or dispose of playgrounds within the Shire of Macedon
Ranges. Council has a fixed asset policy however it does not strictly cover the disposal of
playgrounds.
Trees
There is currently a policy for the removal of trees within the Shire of Macedon Ranges. This
information is detailed in the Street Tree Policy.
Note: In 2013/14 Council has resolved to dispose of a number of blocks of vacant land with reserve status.
As per Section 2.1.4, this vacant land is excluded from the assets in this plan.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 38
7 FINANCIAL PLAN
7.1 Financial Statements and Projections
Expenditure is identified by asset group, under the following headings:
• Operations;
• Maintenance;
• Renewals;
• Upgrades; and
• New Works.
7.1.1 Historical Expenditure
7.1.1.1 Open Space
The table below summarises the open space infrastructure historical expenditure over the
period 2010/11 to 2011/12 and the budgeted expenditure for 2012/13.
Activity 2010/11 2011/12 Budgeted
2012/13
Operations $762,736 $877,861 $1,648,979
Maintenance $339,152 $347,179 $80,230
Operations &
Maintenance – Sub Total $1,101,888 $1,225,040 $1,729,209
Renewal $20,716 $102,331 $55,000
Upgrade $29,601 $0 $5,500
New Assets $105,756 $56,608 $600,000
Capital – Sub Total $156,073 $158,939 $660,500
Total Expenditure $1,257,961 $1,383,979 $2,389,709
7.1.1.2 Sportsgrounds
The table below summarises the sportsgrounds historical expenditure over the period
2010/11 to 2011/12 and the budgeted expenditure for 2012/13.
Operational and maintenance expenditure for sportsgrounds only includes active reserves
(sports ovals). Operational and minor maintenance activities for tennis courts, netball
courts, skate parks, BMX tracks, equestrian facilities are generally undertaken by the
relevant clubs or associations.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 39
Activity 2010/11 2011/12 Budgeted
2012/13
Operations $79,011 $18,977 $87,110
Maintenance $232,087 $264,078 $46,975
Operations &
Maintenance – Sub Total $311,098 $283,055 $134,085
Renewal $377,884 $72,169 $672,494
Upgrade $136,518 $122,440 $50,000
New Assets $633,811 $1,504,670 $2,551,445
Capital – Sub Total $1,148,213 $1,699,279 $3,273,939
Total Expenditure $1,459,311 $1,982,334 $3,408,024
7.1.1.3 Playgrounds
The table below summarises the playgrounds historical expenditure over the period 2010/11
to 2011/12 and the budgeted expenditure for 2012/13.
Activity 2010/11 2011/12 Budgeted
2012/13
Operations $21,714 $13,584 $6,230
Maintenance $37,545 $39,332 $17,180
Operations &
Maintenance – Sub
Total
$59,259 $52,916 $23,410
Renewal $0 $0 $28,526
Upgrade $6,794 $22,947 $28,526
New Assets $6,794 $10,000
Capital – Sub Total $13,588 $22,947 $67,052
Total Expenditure $72,847 $75,863 $90,462
7.1.1.4 Trees
Historical operations and maintenance expenditure for the period 2010/11 to 2011/12 and
the budgeted expenditure for 2012/13 for trees is as follows. Please note that new plantings
are not capitalised and are included in the operational budget.
Activity 2010/11 2011/12 Budgeted
2012/13
Operations $112,610 $98,820 $170,510
Maintenance $665,418 $664,577 $378,345
New Plantings $24,190 $0 $18,780
Operations &
Maintenance – Sub Total $802,218 $763,397 $567,635
Renewal $0 $0 $4,545
Upgrade $0 $0 $0
New Assets $0 $35,393 $0
Capital – Sub Total $35,393 $4,545
Total Expenditure $802,218 $798,790 $572,180
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 40
The substantial drop in maintenance expenditure proposed for 2012/13 is due to wages costs
being moved to a single, higher level line item.
Improvement Action 9: To allow calculation of the full cost of service delivery, review the
recent changes to centralising maintenance wages costs.
7.1.2 Financial Forecast
Projections are developed from:
• Short term: Capital works programs summarised in Attachment #1 Budgeted Capital
Works Statement.
• Long term: Moloney renewal forecast which is summarised in Attachment #2
Infrastructure Financial Projections.
7.2 Funding Strategy
In order to manage and fund various projects within the Shire, Council relies on several
funding sources.
It has been estimated that 70% of Councils activities are supported by grant funding. The
current funding sources available for open spaces include:
• Small town development fund;
• Sports and Recreation Victoria (SRV);
• Rate Revenue;
• Reserves and loan income;
• Developer Contributions (Open Space Reserve Fund); and
• Various Federal and State Funding.
The funding strategy is documented in Attachment #2 Infrastructure Financial Projections.
7.3 Key Assumptions Made in the Financial Forecast
7.3.1 Accuracy of the Information
The following general assumptions have been made in preparing the 20-year expenditure
forecasts.
• All expenditure is stated in present day dollar values with no allowance made for
inflation over the 10-Year planning period;
• It should be noted that the figures exclude costs such as corporate administration
charges, interest costs, inflation and GST and other indirect overheads
The factors outlined below may influence the forecasts given in this plan:
• Changes to budget allocations; and
• Changes in the desired level of service and service standards from those identified in
this Plan.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 41
8 ASSET MANAGEMENT PRACTICES
8.1 Asset Management Systems
8.1.1 Current Practices
Details on Asset Management Systems used by Council are summarized below:
Asset Type Software/Asset Management System Data Collection/Review
All Council is in the process of
implementing an integrated asset
register called MyData for all
infrastructure assets.
Current asset data is considered to be of a
reasonable accuracy.
Nil reviews of the data are undertaken apart
from random desktop reviews as required
and identified
The asset systems have the following link to the financial/accounting system:
• Nil
8.1.2 Available Data
Data which is available on assets to help decision making:
• To be aligned with O-Spec
Other information includes:
• Nil
8.2 Standards & Guidelines
8.2.1 Construction Standards
Standard drawings and technical standards applicable to the assets included in this plan are:
8.2.1.1 Playgrounds
• AS 4422:1996 Playground Surfacing – Specification’s requirements & test method.
• AS 4486:1987 Playground Equipment – Development, installation inspection
maintenance and operation
• AS1924 Part 2: 1981 Design & Construction – Safety Aspects
• AS4685.1: 2004 General Safety Requirements & test methods
• AS4685.2: 2004 Particular Safety Requirements & test methods for swings
• AS4685.3: 2004 Particular Safety Requirements & test methods for slides
• AS4685.4: 2004 Particular Safety Requirements & test methods for runways
• AS4685.5: 2004 Particular Safety Requirements & test methods for carousels
• AS4685.6: 2004 Particular Safety Requirements & test methods for rocking
equipment
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 42
8.2.1.2 Tree Planting
Tree replacement planting (as identified in the Street Tree policy) needs to consider the
following when replacing trees:
• All trees removed from the streetscape are to be replaced as quickly as possible
depending on the season. Trees should not generally be planted in the summer
months or during periods of prolonged drought. These plantings are to take priority
over new plantings.
• Individual tree requests by residents must be fully assessed for suitability. If deemed
appropriate the request will be placed on the street tree planting list for action when
appropriate. If a request is received before and deemed appropriate planting will
take place between May and September of that year.
• The selection of an appropriate planting site is crucial in regard to the long term
visual aspects and maintenance of the tree. A poorly positioned tree can cause
property and infrastructure damage and diminish the streetscapes visual appeal.
Planting sites should be selected to allow for functional limitations imposed by the
street environment while complying with the existing streetscape.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 43
9 PLAN IMPROVEMENTS AND MONITORING
9.1 Improvement Program
Through the development of the Open Space Asset Management Plan, improvement actions
have been identified and are attached as Appendix 10.1. The improvement actions will be
reviewed and reported to the Executive annually. Any amendments or additions to the
improvement plan will be approved by the Executive.
9.2 Monitoring and Review Procedures
9.2.1 AMP Review Procedure
This Asset Management Plan is relevant and integral to daily Asset Management activity. To
ensure the plan remains useful and relevant the following on-going process of monitoring
and review activity will be undertaken.
• Formal adoption of the plan by the Council:
• A complete revision of the AM plan will be carried out every three years and
presented to Council for adoption.
The next review is due in 2015/16.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 44
10 APPENDICES
10.1 Improvement Program
AMP Reference Improvement Action Responsibility Timeframe Status
Part E – Open Space
Improvement Action 1: Review renewal planning and
Long Term Financial Plan Development processes in
particular in relation to open space assets to ensure
consistent approach and knowledge of responsibilities.
Manager Recreation &
Cultural Development /
Manager Operations
2013/14
Part E – Open Space
Improvement Action 2: Review current request type
categories for ‘maintenance’ and ‘complaint’ to better
define customer expectations.
Manager Recreation &
Cultural Development /
Manager Operations /
Manager Council &
Customer Service
2013/14
Part E – Open Space
Improvement Action 3: Develop individual service plans
defining the responsibilities and levels of service for those
services relevant to the assets included in this plan.
Relevant Service Managers 2014/15
Part E – Open Space Improvement Action 4: Commence recording of Critical
and High Risk open space assets.
Manager Recreation &
Cultural Development /
Manager Operations
2013/14
Part E – Open Space Improvement Action 5: Undertake open space asset
inventory update and condition assessment as required.
Manager Operations /
Manager Recreation &
Cultural Development /
Coordinator Engineering
Planning
2014/15
Part E – Open Space Improvement Action 6: Undertake an analysis of the 2010
/ 2011 data collection to report on asset condition.
Coordinator Engineering
Planning 2013/14
Part E – Open Space
Improvement Action 7: Undertake a research activity
to identify the asset lives of all assets contained
within this open space asset management plan.
Manger Operations /
Manager Recreation &
Cultural Development /
Coordinator Engineering
2014/15
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 45
AMP Reference Improvement Action Responsibility Timeframe Status
Planning
Part E – Open Space Improvement Action 8: Add synthetic playing surfaces
and parks fixtures into the long term renewal forecast.
Manager Recreation &
Cultural Development /
Manager Operations
2015/16
Part E – Open Space
Improvement Action 9: To allow calculation of the full
cost of service delivery, review the recent changes to
centralising maintenance wages costs.
Manager Operations /
Finance Manager 2013/14
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 46
10.2 Attachment #1 – Budgeted Capital Works Statement
MACEDON RANGES SHIRE COUNCIL
2013-14
ATTACHMENT #1 – BUDGETED CAPITAL WORKS STATEMENT
Macedon Ranges
Budgeted Standard Capital Works Statement
Strategic Resource Plan Projections
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000
Capital works areas
Land & Buildings
4,081 6,820 5,380 4,555 620 1,485 2,890 2,090 5,100 4,810
Roads
5,410 5,287 4,574 5,078 5,556 7,243 6,788 7,900 7,932 6,968
Footpaths
550 426 450 498 506 516 527 532 542 551
Bridges
540 450 125 125 160 130 160 160 160 160
Drainage
862 760 700 767 1,200 950 800 800 800 800
Furniture & Equipment
767 722 323 388 655 290 355 280 345 350
Plant & Machinery
791 815 897 692 725 825 825 875 875 875
Recreation
3,804 1,285 1,865 845 2,205 1,585 754 1,108 496 325
Other Infrastructure
537 - - - - - - - - -
Total capital works
17,342 16,565 14,314 12,947 11,627 13,024 13,098 13,745 16,250 14,839
Represented by:
Asset renewal
5,664 6,853 7,277 6,565 6,204 7,292 8,437 8,447 9,998 10,186
New assets
5,120 5,882 3,348 2,570 1,479 1,232 484 1,688 2,274 2,073
Asset expansion/upgrade
6,558 3,830 3,689 3,813 3,944 4,500 4,178 3,610 3,977 2,580
Total capital works
17,342 16,565 14,314 12,947 11,627 13,024 13,098 13,745 16,250 14,839
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 47
10.3 Attachment #2 – Infrastructure Financial Projections
MACEDON RANGES SHIRE COUNCIL
2012-13
ATTACHMENT #2 - INFRASTRUCTURE FINANCIAL PROJECTIONS
1. Introduction
This report provides the annual result for infrastructure asset renewal forecasts in accordance with
the principles stated in Section 7 of the Asset Management Plan Part A General Information.
Assets are reported at Asset Component level, utilising the following information provided in Parts B
– G Asset Management Plans:
Input Data Source
Intervention level Asset Specific AMP’s – section 6
Useful life Asset Specific AMP’s – section 6
Condition rating distribution Asset Register
Annual renewal expenditure Annual budget
Annual maintenance expenditure Annual budget
Asset quantity Asset register
Renewal rates AMP section 6
Deterioration graph profile Asset Specific AMP’s – section 6
2. Renewal Demand and Renewal Gap Forecast
2.1 Results The following results are extracted from the Moloney model dated November 2012.
Total Renewal Value All Assets $ $461,255,453
Total Present Renewal Exp $ $4,940,401
Av Annual rate of Asset Consumption to Cond.10
$8,324,611
Av Annual rate of Asset Consumption to Intervention Cond.
$9,429,262.79
% of Long Term Av Consumption being met 52.39%
The Average Annual rate of Asset Consumption to Intervention Condition of $9,429,262
represents the funding target Council must be able to achieve.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 48
2.2 Moloney Model Graphs For the next 20 year period following reports are attached:
• Total Annual Renewal Gap
• Cumulative Total Renewal Gap
• Annual Renewal Gap Separated by Asset Group
• Proposed Renewal/Predicted Renewal/% of Asset base above Intervention
Comments:
1. A backlog of around $7.5M exists. The backlog is primarily in the Rural Roads asset
group.
2. Renewal demand increases relatively sharply over the next 10 years then increases
at a slower rate.
Backlog
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 49
Comments:
1. The total predicted cumulative renewal gap is approx $80M after 20 years.
Comments:
1. The renewal gap is an approx average of $4M/year
2. The major impacts on the renewal gap are:
• Buildings, and
• Rural Roads
3. More specifically
• Rural Roads – Pavement (approx average $1.0M/year)
• Buildings –Structure (approx average $2.0M/year)
• Buildings – Fit Out (approx average $0.5M/year)
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 50
Comments:
1. The Average Annual Rate of Asset Consumption to Intervention of $9.4M is reached
in 2027.
2. The % of renewal demand being met is:
• Current 55%
• 2027 52%
3. On current funding approx 18% of assets will be over intervention by 2032.
3. Level of Confidence/Accuracy of Results
Buildings Structure – Low: Issues remain as to whether an overall building condition properly reflects
the future expenditure profile and asset life as often the building is subject minor renewal
throughout its life.
Buildings Fit-out – Low: Investigations at other Councils indicates that the fit-out renewal is
overestimated due to the very high level rating approach to describe a larger, complicated building,
and possible under-estimation of life and over-estimation of value.
Rural Roads Pavements - Good: Council and the industry have a longer history of road assessments
and a higher level of accuracy would be expected.
Asset Management Plan
Macedon Ranges Shire Council Part E – Open Space
Page | 51
4. Funding Strategy
Council faces a significant renewal funding challenge over the next 10 years. At some time in the
future Council must have the ability to fund the Average Annual rate of Asset Consumption to
Intervention Condition of $9.4M. Funding must almost double to meet the projected renewal
demand.
In responding to the forecast and developing a funding strategy Council must be mindful of the low
level of accuracy which may influence the timing of when this funding target must be achieved.
Based on the current input data Council must introduce a funding strategy which:
1. Addresses the backlog works.
2. Progressively increases renewal expenditure from current $4.9M to $9.4M by 2027.
Two options on how this could be achieved are:
• An annual $300,000 increase in renewal funding over that period or:
• An annual rate increase of 1% based on a rate income of $31.585M over that period.
5. Improvement Actions
Future financial forecasts may be improved by the following Improvement Actions:
Improvement Action: 1 Review the current accuracy and methodologies for condition
rating, in particular rural roads, building structure and building fit-out, particularly assets
nearing or past intervention
Improvement Action: 2 Describe levels of service and discuss potential of lowering
standards (an increase in intervention levels) to decrease the asset renewal demand
Improvement Action: 3 Decrease the asset renewal demand by identifying possible
disposal of over-servicing assets