ASSET INFORMATION PROVISION PROCEDURE
Document Number: CRL1-XRL-Z3-GPD-CR001-50004
Current Document History:
Revision Effective Date:
Author(s) (‘Owner’ in eB *)
Reviewed by: (‘Checked by’ in eB *)
Approved by: Reason for Issue
9.0 11/04/17 Updated
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 2 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
Previous Document History: Revision Prepared
Date: Author: Reviewed by: Approved by: Reason for Issue
8.0 28/08/15 Updated
7.0 21/11/14
Key Timescales and Asset Painter added
6.0 31/3/14
Revision and updates
5.0 27/8/13
Further minor revisions
4.0 20/9/12
Further minor revisions
3.0 4/9/12
Updates to reflect improved process
2.0 23/7/12
General refinements
1.0 17/5/12
First Version
Revision Changes:
Revision Status / Description of Changes 9.0 One page appendix detailing requirements and target dates added
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 3 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
Contents 1 Purpose...........................................................................................................................4
2 Scope ..............................................................................................................................4
2.1 Out of Scope ......................................................................................................... 5
3 Structure .........................................................................................................................6
4 Definitions ......................................................................................................................6
4.1 Key concepts ........................................................................................................ 6
4.2 Abbreviations and Acronyms ............................................................................... 6
5 Responsibilities .............................................................................................................7
5.1 Head of Technical Information .............................................................................. 7
5.2 Asset Information and Configuration Manager (AICM)......................................... 7
5.3 Asset Information Provisioning Manager (AIPM) ................................................. 7
5.4 Asset Information Technician (AIT) ...................................................................... 7
5.5 Asset Information Systems Manager (AISM) ........................................................ 7
5.6 Project Manager (PM) ............................................................................................ 7
5.7 Project Engineer ................................................................................................... 8
5.8 Designer ................................................................................................................ 8
5.9 Contractor ............................................................................................................. 8
5.10 Contractor’s Data Owner ...................................................................................... 8
5.11 Project Information Manager (PIM) ....................................................................... 8
5.12 Asset Information Governance Group (AIGG) ...................................................... 8
6 Procedure .......................................................................................................................9
6.1 Overview ............................................................................................................... 9
6.2 Stage A – Awareness and Mobilisation .............................................................. 11
6.3 Stage B – Design Information ............................................................................. 13
6.4 Stage C – Construction Information ................................................................... 15
6.5 Stage D – Review and Data Administration ........................................................ 17
6.6 Stage E - Approvals ............................................................................................ 19
7 Key contacts ................................................................................................................20
8 Reference Documents ................................................................................................21
8.1 Asset Identification Standard ............................................................................. 21
8.2 Contractor Information Pack............................................................................... 21
8.3 Contract Clauses ................................................................................................ 22
9 Standard Forms / Templates......................................................................................25
9.1 Stakeholder form ................................................................................................ 25
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 4 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
1 Purpose
The provision of good quality, complete and timely asset information is an essential deliverable of any railway project to enable effective long term management of the assets provided.
The purpose of this document is to define and clarify the process adopted by Crossrail for the provision of asset information in order to aid compliance with the relevant contractual clauses for asset information (see Section 8.3).
The overall approach being adopted is based on good practice approaches to the acquisition of asset information. This approach will help ensure that data is provided in a timely, efficient and effective manner, to meet required quality requirements and with suitable monitoring of the overall process.
2 Scope
The Crossrail Programme includes all the works and activities necessary for Crossrail Limited (CRL) to construct and commission a new railway from Reading and London Heathrow in the west to Shenfield and Abbey Wood in the east.
This procedure covers the provision of asset information from the Central Section Works (CSW) of the Crossrail Programme which includes the tunnelled section in central London, the new station construction, the section of surface route running from Plumstead Portal to and including Abbey Wood Station, the provision of signalling equipment which resides on rolling stock and train maintenance depots. Asset information arising from work undertaken by London Underground on behalf of Crossrail is also in scope.
The term asset information is used as a generic term for:
• Asset inventory;
• Classification of assets;
• Attributes of these assets;
• Location and spatial information of assets;
• Relationships between assets;
• Design models (including 2D, 3D and 4D CAD models and related data);
• Documents, drawings and records of assets and systems including test certificates; and
• Photographs.
The principal Industry Partners are:
• Rail for London (RfL)
• Network Rail (NR);
• London Underground Limited (LUL);
• Canary Wharf Group (CWG);
• Berkeley Homes (BH); and
• Contractors/Consultants – this includes Framework Design Consultants (FDC), Design and Build Contractors and Construction Contractors.
This procedure is applicable to all the above parties when engaged in CSW delivery activities.
The provision of asset related documents, drawings, designs, certificates etc. is defined in other documents and procedures which should be complied with, as relevant.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 5 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
2.1 Out of Scope The following information types are Out of Scope of this Procedure:
• Asset information arising from enabling or interface works that will be handed over directly to other parties;
• Management and utilisation of asset information once transferred to the Infrastructure Managers and the processes and software to achieve this;
• Work undertaken by Network Rail and handed over directly to RfL; and • Information relating to Over Site Developments (OSD)
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 6 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
3 Structure
The procedure comprises:
• Purpose • Scope • Definitions • Responsibilities • The five stage core process • Key contacts • Reference documents • Standard forms/templates
This procedure will be reviewed and refined as the support systems are implemented and tested.
This procedure has been defined to comply with the CRL Management System.
4 Definitions
4.1 Key concepts In order to effectively understand this procedure, it is important to understand a number of the key concepts relating to the configuration of AIMS, Crossrail’s Asset Information Management System. For more information, please see the Asset Information Fundamentals document (CRL1-XRL-Z3-GPD-CR001-50007). Additionally, the definition of how assets are classified, named and their attributes are defined in the Asset Data Dictionary Master Configuration (CRL1-XRL-Z3-ADDSD-CR001-50186).
4.2 Abbreviations and Acronyms For an explanation of the Definitions, Acronyms and Abbreviations used in this document and by CRL when describing asset information related activities please refer to the Asset Information Glossary (CRL1-XRL-Z3-GUI-CR001-50012).
The term Contractor is a collective term in this Procedure used to refer to Framework Design Contractors, Design and Build Contractors, Construction Contractors or any other Contractor responsible for the design, build, creation, installation and commissioning of assets for the Crossrail programme.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 7 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
5 Responsibilities
Within this Procedure the following roles and responsibilities have been defined:
5.1 Head of Technical Information Oversee the establishment and on-going maintenance of technical information related to supporting and enabling the whole life of the assets prior to handing them over to the Infrastructure Managers and Operators.
5.2 Asset Information and Configuration Manager (AICM) Reports to Head of Technical Information to develop, produce and implement Configuration Management (CM) and Asset Information Management (AIM) standards, plans, procedures and activities to support the establishment and on-going maintenance of technical information related to the whole life of the assets prior to handing them over to the Infrastructure Managers and Operators.
Act as the focal point for all Configuration Management and Asset Information related activities.
5.3 Asset Information Provisioning Manager (AIPM) Reports to the Asset Information and Configuration Manager:
• Acts as Data Steward for the Crossrail Asset Information Management System (AIMS) by taking an active role in the ownership, population, storage and utilisation of asset information.
• Manages the processes for the provision of asset information from contractors and other stakeholders.
• Measures and assesses the data quality of asset information with identification and delivery of appropriate remedial actions should data quality issues be identified.
• Determines whether any project specific variations to the overall procedure are required for any specific project, for example when design activities are more advanced than would normally be the case for a Stage of this Procedure
• First point of arbitration in case any issues arise
5.4 Asset Information Technician (AIT) Reports to the Asset Information Provisioning Manager:
• Develops constructive relationships with key information providers to understand design intent and to support asset information provision
• Bulk creates ‘blank’ assets in AIMS based upon expected numbers of assets
• Receives asset information from information providers, checking that it is complete and valid and then updating AIMS with this information
5.5 Asset Information Systems Manager (AISM) Reports to the Asset Information and Configuration Manager:
• Administers the Crossrail Asset Information Management System (AIMS) including creation and management of asset classes, attribute fields, system access groups, data imports/exports and process workflows
• Undertaking complex reporting on or changes to the data stored in AIMS
5.6 Project Manager (PM) • Responsible for the delivery and completion to time and design of specific contracts
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 8 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
• This also includes Manager of Engineering and any other role supporting the duties of Project Manager for a project
5.7 Project Engineer A generic role responsible for undertaking technical engineering aspects of a project. This includes, but is not limited to, the following roles:
• Project Engineer (PE) - Responsible for technical engineering aspects of a Project
• Project Field Engineer (PFE) - Responsible for on-site activities
• Engineering Manager (EM) Responsible for technical engineering aspects of a Project
5.8 Designer A generic term that can be applied to the following roles involved in design activities:
• Framework Design Consultants
• Contractor’s Designers
• Systemwide Designers
• RIBA(F) Designer
Responsible for:
• Allocation of ‘blank’ Asset Tags to designed assets, recording of asset names, descriptions and attributes in the AIMS asset spreadsheet
• Return of Asset Data Collection Spreadsheets to the Asset Information Team
5.9 Contractor Responsible for providing complete, timely and accurate asset information to the Asset Information Team, when required. This data should be supplied in the formats specified by Crossrail.
5.10 Contractor’s Data Owner The Contractor shall nominate a Data Owner who shall be accountable for the management, storage and population of the Asset Register data. The Data Owner shall attend, and contribute to Asset Information Governance Group meetings when required.
5.11 Project Information Manager (PIM) The PIM has an overall responsibility to ensure that project information is obtained from Projects to comply with contract standards and timescales which includes the scope of this Procedure. They do not have specific responsibilities as part of this Procedure, but will provide an overall monitoring/policing/troubleshooting role.
5.12 Asset Information Governance Group (AIGG) The Asset Information Governance Group (AIGG) is a senior level group who meet regularly to review the overall provision of asset information to Crossrail. The objective of the AIGG is:
• “The execution and enforcement of authority over the provision and management of asset information related to the Crossrail programme. These activities will ensure that asset information will support the long term management of these physical assets both whilst under CRL control and subsequently when transferred to the control of the relevant Infrastructure Managers.”
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 9 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
6 Procedure
6.1 Overview The overall process for the provision, creation and update of asset information has been broken down into a five stage procedure, see Figure 1, below
Figure 1 - Overview of asset information provision procedure
Note that, depending on the nature and timing of a particular project, some of these stages may be run concurrently and that the overall, process will be facilitated by the Asset Information Team. Any decisions on changes in responsibilities, specific application of procedure etc. shall rest with the Asset Information Provision Manager.
Specific asset information provision activities will be aligned with Construction Certification Packages in order both to align with actual work delivery activities and to support effective delivery assurance. This will mean that individual contracts and projects within this procedure will be treated as a number of discrete activities.
Section 10 provides an exhaustive list of Asset Information Provision requirements/timescales before and after “Final Design Wrap Up & Certificate of Integration”.
6.1.1 Stage A – Awareness and Mobilisation
The objective of this stage is to initiate the process of capturing asset information. The Stage is effectively in two parts:
• The first part to ensure that all staff involved in the provision of asset information are aware of both the overall process and their role within it, identification of key stakeholders, project priorities and milestone dates; and
• The second part of the process agrees the Functions and main Functional Units related to a project and the likely overall numbers of Asset Tags.
6.1.2 Stage B – Design Information
The objective of this stage is to allocate Asset Tags Placeholders to relevant design objects recording their names and asset IDs in the Asset Data Collection Spreadsheets. During this stage Asset Information will be compiled progressively and complete by each contractor no later than four weeks prior to the final design gate 3, this is a gate requirement.The requirements for this timescale are:
• All Asset Tag IDs shall be named by each contractor in Asset Data Collection Spreadsheets provided in accordance with the ‘Asset Identification Standard’ (CRL1-XRL-O6-STD-CR001-00031) and as further clarified in the reference documents listed in the ‘Asset Data Dictionary Master Configuration’ document (CRL1-XRL-Z3-ADDSD-CR001-50186).
• Asset Data Collection Spreadsheets (with relevant asset tag IDs and naming) will be supplied progressively by CRL via transmittal to each PM for each Contract.
6.1.3 Stage C – Construction Information
The objective of this stage is to record Equipment IDs and associated serial/batch IDs which have been installed to fulfil the requirements of the Asset Tag placeholders plus related attribute data. During this stage Asset Information will be compiled progressively and complete by each
E. ApprovalsD. Review and Data
Admin
C. Construction Information
B. Design Information
A. Awareness and
Mobilisation
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 10 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
contractor no later than four weeks after the relevant asset has been installed, assets will also have been labelled by this point. The requirements for this timescale are:
• Contractors to assign all equipment against installation positions (eg. equipment IDs assigned against asset tag IDs) in Asset Data Collection Spreadsheets provided.
• Relevant Asset Data Collection Spreadsheets will be supplied progressively by CRL via transmittal to each PM for each Contract.
• All assets labelled by the contractor. It is recommended that the contractor certifies asset/equipment labels via a Sub-Construction Certificate/Package listing. In particular, an ‘as-built record’ (containing photographic evidence of the affixed labels in place) should form part of the Package listing.
Within this stage is a further requirement that Asset Information (see the extent of the term Asset Information in section 2 Scope) is compiled and provided progressively to CRL by each contractor and complete no later than four weeks prior to handover completion for each ‘Primary Functional Unit’ and/or System (eg. Escalator, Track, OLE, Civil Structural System, Signalling & Control System, Customer Information System, Platform Screen Doors System, Floor System). This is a handover completion requirement and requires sign off by the Head of Technical Information at Stage E.
6.1.4 Stage D – Review and Data Administration
The objective of this stage is to review the supplied information to ensure that it meets quality requirements, delete any surplus assets in AIMS and change the status of correct assets.
6.1.5 Stage E – Approvals
The objective of this stage is to confirm that the Asset Information (see the extent of the term Asset Information in section 2 Scope) in AIMS is correct and complete and can be approved.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 11 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
6.2 Stage A – Awareness and Mobilisation
Title – Asset information provisioning process
Asset Information Team CRL Project Engineer CRL Project Manager Project staff(led by Data Owner) Deliverables
Sta
ge A
– A
war
enes
s an
d M
obili
satio
n
A1. Identify key contacts in Asset Information Team and Project Team
X2: Requirements and Processes communicated
A2. Arrange and deliver awareness
session for key stakeholders
X1: Project Stakeholders
identified and CRL formally informed of Data Owner via
CCM
A2. Attend awareness
session
A3. Ensure Project Team understand requirements and
key timescales
A2. Attend awareness
session
A2. Attend awareness
session
A4. Agree initial estimate of Asset
Tags to create
A4. Agree numbers of Tags
to create
A6. Bulk create Tags in AIMS
X4: Tags created in AIMS
A4. Agree numbers of Tags
to create
X3: Tag estimates agreed
X5: FUsCreated in AIMS,
with Tags assigned to FUs
A5. Develop list of FUs and configure
AIMS
A5. Provide relevant project info and agree
FUs
A5. Agree FUs
Figure 2 - Stage A - Awareness and Mobilisation
The first part of this Stage is primarily focused on communication and awareness.
A1 The Asset Information Team will identify and make contact with the appropriate PM, PE and Project Staff for each contract where Asset Data will be acquired. The Asset Information Team will agree with the project staff who the Data Owner and key contacts are for the project and will record all relevant contact details. This information will be recorded in a Project Stakeholder Form (see Section 9.1) for on-going usage by both the Asset Information Team and the Project Team. This Form shall be updated whenever a relevant change in role holder or responsibility occurs.
A2 The Asset Information Team will arrange an awareness session ensuring all required attendees are available. The awareness session will cover:
• Introductions to the Asset Information Team
• Walkthrough of the Contractors Information Pack which includes documents such as the Asset Information Provision Procedure (this document), Asset Identification Standards etc.
• Walkthrough of Asset Data Collection Spreadsheet
• Agreement of baseline project target dates for the Asset Information Provision Process
E. ApprovalsD. Review and Data
Admin
C. Construction Information
B. Design Information
A. Awareness and
Mobilisation
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 12 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
• Agreement that all attendees understand their own roles and responsibilities in the Asset Information Process
• Agreement of key points of contact
The Project Manager, Project Engineer and relevant Project Staff should attend the awareness session in order to ensure that they are aware of the overall process and their responsibilities as part of that process. If they are not able to attend, or there is a change in post holder, arrangements should be made as soon as possible to set up another awareness session.
A3 The Asset Information Team will ensure that the Project Staff have access to the Contractors Information Pack and supporting documentation, understand requirements and key timescales and that suitable update processes are put in place, if required.
The second part of this Stage should enable the high level framework of asset information to be established in AIMS.
A4 The Asset Information Team will discuss the high level design with the Project Engineer relevant Project Staff in order to determine and agree the Functions and Classes of assets and the likely number of each in order to form the asset tag estimates.
A5 The Asset Information Team will develop and set-up a draft list of Functions and Functional Units relevant to the Contract in AIMS. This will include determining correct numbering sequences based on any existing LUL assets. eg Escalator 15 being the first Crossrail Escalator number due to the LUL station already having 14 Escalators. Project Staff will provide relevant info when required.
A6 The Asset Information Team will create sufficient Asset Tags in AIMS to cover the proposed design including a number of additional Tags to allow for design changes etc.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 13 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
6.3 Stage B – Design Information
Title – Asset information provisioning process
Asset Information Team Designer Project ManagerData Owner Deliverables
Sta
ge B
- D
esig
n In
form
atio
n
B1. Asset Data Collection
Spreadsheet(s) exported from
AIMS
B2. Receive ADCS
B3. Name Asset Tag IDs and relate
to designs
B4. Commence population of
Design attributes
B5. Return ADCS to CRL within 40 Working Days of
Receipt
B8. Import ADCS into AIMS
B8. Notified that the ADCS design information is fit
for use
X6: All Asset Tags named and all
available design attributes populated
B7. Import ADCS into AIMS
B6: All asset tags named and all available
design attributes populated?
No
YesTimescale 1 / Gate 3 As-Designed
Provision Cycle
B8. Notified that the ADCS design information is fit
for use
B8. Notified that the ADCS design information is fit
for use
X7: Project Notified that the ADCS design
information is fit for use
B9. Notification that a design change impacts on the
current number of asset tag IDs or design attributes
B9. Notification that a design change impacts on the
current number of asset tag IDs or design attributes
B9. Notification that a design change impacts on the
current number of asset tag IDs or design attributes
B9. Notification that a design change impacts on the
current number of asset tag IDs or design attributes
Figure 3 - Stage B – Design information
B1 The Asset Information Technician will export from AIMS Asset Data Collection Spreadsheet(s) with sufficient blank assets to allow the designer to assign Tag IDs in their designs
B2 The Designer will receive the Asset Data Collection Spreadsheet and check that sufficient assets have been created and that they understand how to use the spreadsheet
B3 The Designer will update the Asset Data Collection Spreadsheet with asset names (according to the Asset Identification Standard and relevant AD4 documents), Locations and Attributes and relate Tag IDs to designs
B4 The Designer will commence population of design attributes in the Asset Data Collection Spreadsheet (according to the Asset Identification Standard and relevant AD4 documents)
B5 The contractor has up to 30 working days (best practice would involve the contractor and employer sharing information as frequently as possible) to populate the Asset Data Collection Spreadsheet where it is expected the contractor shall use best endeavours to populate as much data as reasonably possible within this time frame before returning the document back to the Crossrail Asset Information Team for review. The Crossrail Asset Information Team will aim to return the next iteration within 5 working days (after B7-8)
E. ApprovalsD. Review and Data
Admin
C. Construction Information
B. Design Information
A. Awareness and
Mobilisation
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 14 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
B6 Before returning the ADCS to Crossrail, the Data Owner will check that all asset tags have been named and all available design attributes have been populated. If “No” the Provision Cycle (B1 – B7) continues and if “Yes” proceed to B8
B7 The Asset Information Team will receive and check the supplied Asset Data Collection Spreadsheet taking note of the numbers of assets created, their names, attributes etc. If there are any concerns identified, such as the way that assets have been named, then the Asset Information Team will raise these with the Designer, perhaps providing further guidance and training, if required. The Asset Information Team will update the assets in AIMS based upon the supplied spreadsheet. This will both provide a secure record of the assets being created and provide wider visibility of these assets
B8 The Asset Information Team will receive and check the spreadsheet. Additionally, they will ensure that Design Elements have been correctly linked to Asset Tags. Any concerns about quality or consistency will be resolved with the Designer. The Asset Information Team will update AIMS to reflect the design and will notify the Project Manager and Data Owner that all Asset Tags have been named to standard and the Design information is fit for use.
B9 The Designer, Data Owner and Project Manager will notify the Asset Information & Configuration Management Team if a design change impacts on the current number of asset tag IDs or design attributes and process reverts to B1
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 15 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
6.4 Stage C – Construction Information
Title – Asset information provisioning process
Asset Information Team Data Owner Project EngineerConstruction Team Deliverables
Sta
ge C
– C
onst
ruct
ion
Info
rmat
ion
X8: All Equipment Created in AIMS
C9. Label assets /
equipment to required standardC11. Conduct
sample asset / equipment quality
checks
X11: All Assets / Equipment Labelled to
required standard
C1. Asset Data Collection
Spreadsheet(s) exported from
AIMS
C2. Receive ADCS
C3. All attributes populated
C4. Populate Equipment
ADCS
C5. Return ADCS to CRL within 40 Working Days of
Receipt
C7. Import Asset Tags into AIMS
C6: Asset / Equipment ADCS
fully populatedNo
Yes
Provision Cycle
Timescale 2 / As-Installed
X9: All attributes populated
X12: Asset Information Fit for
use
C10: All Assets/ Equipment Labelled
to required standard?
Yes
No
No
C12. Zero NCRs found?
Yes
C13. Follow CRL NCR process
C14. Notified fit
for use
C14. Notified fit
for use
C14. Notified fit
for use
C15. Notification that a design change impacts on the
current number of asset tag IDs or
design attributes or applied labels
C15. Notification that a design change impacts on the
current number of asset tag IDs or
design attributes or applied labels
C15. Notification that a design change impacts on the
current number of asset tag IDs or
design attributes or applied labels
C15. Notification that a design change impacts on the
current number of asset tag IDs or
design attributes or applied labels
X10: Asset / Equipment ADCS
fully populated
Timescale 3 / Completion / As-Built
X13: All asset information
complete by PFU
C16. All asset information complete by PFU and compiled for the Project Manager to submit for Stage E sign-
off
C8. Import into AIMS
C14. Notify all that fit for
use
Figure 4 - Stage C – Construction Information
C1 The Asset Information Team will create and issue an Asset Data Collection Spreadsheet to the Construction Contractor covering the assets in scope of their work
C2 The Contractor will receive the Asset Data Collection Spreadsheet and check that all the assets they will be working on have been included and that they understand how to use the spreadsheet
E. ApprovalsD. Review and Data
Admin
C. Construction Information
B. Design Information
A. Awareness and
Mobilisation
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 16 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
C3 The Contractor will populate attributes in the Asset Data Collection Spreadsheet
C4 The Contractor will update the Asset Data Collection Spreadsheet with details of the Equipment installed on site and the Serial numbers
C5 The contractor has up to 30 working days (best practice would involve the contractor and employer sharing information as frequently as possible) to populate the Asset Data Collection Spreadsheet where it is expected the contractor shall use best endeavours to populate as much data as reasonably possible within this time frame before returning the document back to the Crossrail Asset Information Team for review. The Crossrail Asset Information Team will aim to return the next iteration within 5 working days (after C8)
C6 The Data Owner will undertake checks on the quality of data supplied to ensure that the correct Equipment has been detailed and as relevant that the correct Serial or Batch Numbers and Attributes have been recorded If “No” the Provision Cycle (C1 – C7) continues and if “Yes” proceed to C8
C7 The Asset Information Team will receive and check the Asset Data Collection Spreadsheet from the Data Owner If there are any concerns identified, then the Asset Information Team will raise these with the Data Owner, perhaps providing further guidance and training, if required through the Project Manager. The Asset Information Team will update the assets in AIMS based upon the supplied spreadsheet. This will both provide a secure record of the assets being created and provide wider visibility of these assets
C8 The Asset Information Team will receive and check the Asset Data Collection Spreadsheet supplied by the Data Owner and update AIMS based upon the data supplied
C9 The Contractor will apply labels to Asset Tags and Equipment based upon the Asset Identification Standard, Asset Data Dictionary and the asset names/IDs as detailed in the Asset Data Collection Spreadsheet
C10 The Project Engineer will check that asset/equipment identification labels have been correctly manufactured and applied, collate results of asset/equipment identification label checks, record details of corrections required and raise these with the contractor
C11 The Asset Information Team will undertake sample asset/equipment quality checks to ensure that there are no data quality or labelling issues
C12 The Asset Information Team will record details of the results of the sample labelling and asset data quality checks and assess whether there is non conformance
C13 The Asset Information Team will follow the Crossrail NCR process to ensure the contractor corrects any data quality or labelling problems identified
C14 The Asset Information Team will notify the Project Engineer and Data Owner that all assets/equipment have been labelled to standard and the asset inventory information is fit for use
C15 The Designer, Data Owner and Project Engineer will notify the Asset Information Team if a design change impacts on the current number of asset tag IDs, design attributes or applied labels
C16 Project Engineer will compile and submit all asset information complete by PFU for Stage E sign off.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 17 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
6.5 Stage D – Review and Data Administration
Title – Asset information provisioning process
Asset Information Team Data Owner Project ManagerProject Engineer Deliverables
Sta
ge D
– R
evie
w a
nd D
ata
Adm
inis
tratio
n
X14: All assets in AIMS with all
attributes
D5. Check corrections
correctly undertaken
D2. Review ‘as built’ information for completeness and correctness
X15: Data quality check outcomes
D8. Notification that asset data is
complete and correct
D8. Notification that asset data is
complete and correct
D1. Assess validity of supplied
data
X16: AIMS assets ‘Approved’
D3. Notify Data Owner of
corrections required
D4. Contractor undertake requested corrections
D7. Approve assets in AIMS
D6. Delete surplus assets in AIMS
Figure 5 - Stage D – Review and Data Administration
E. ApprovalsD. Review and Data
Admin
C. Construction Information
B. Design Information
A. Awareness and
Mobilisation
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 18 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
D1 The Asset Information Team will assess the validity of supplied asset data
D2 The Asset Information Team will review ‘as built’ information for completeness and correctness
D3 The Asset Information Team via the Project Manager will notify the Contractor of any data corrections required or further ‘as built’ information
D4 The Contractor will undertake the requested corrections to asset data or ‘as built’ information
D5 The Asset Information Team will check that the requested corrections have been made and information supplied
D6 The Asset Information Team will delete any surplus Asset Tags created in AIMS
D7 The Asset Information Team will set the status of all Asset Tags in AIMS to ‘Approved’ which will restrict uncontrolled edits
D8 The Asset Information Team will notify the Project Manager and Project Engineer that asset data is complete and correct (no later than 4 weeks prior to handover completion preferably 8 weeks)
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 19 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
6.6 Stage E - Approvals
Title – Asset information provisioning process
Asset Information Team Project Engineer Project Manager Programme
Management DeliverablesHead of Technical Information
Stag
e E
– Ap
prov
als
E1. Provide notification that
asset information is ready for approval
X17: Signed off Completion Certificate
E2. Confirm that asset information
is correct and complete
E2. Confirm that asset information
is correct and complete
E3. Record approval
E4. Notify Programme
Management of approval
E5. Record approval of asset
information
E2. Confirm that asset information
is correct and complete
Figure 6 - Stage E - Approvals
E1 Once the asset information is assessed as complete and has passed the required quality checks (no later than 4 weeks prior to handover completion preferably earlier), the Asset Information Team shall notify the Project Manager, Project Engineer and Head of Technical Information (plus any other relevant parties) that the asset information relating to a particular project is ready for approval
E2 The relevant parties, or their nominated deputies, shall confirm that the asset information is complete and correct from their perspective with final sign off by Head of Technical Information.
E3 The Asset Information Team will record all approval details in eB and any other relevant systems in order to support programme management and project assurance processes
E4 The Asset Information Team shall notify the Programme Management Team of the successful delivery and approval of asset information relating to the specific project
E5 Programme Management shall record the successful approval in order to support project stage gates and assurance processes
E. ApprovalsD. Review and Data
Admin
C. Construction Information
B. Design Information
A. Awareness and
Mobilisation
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 20 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
7 Key contacts
If you require more information, please use the following contact details:
Intranet: Asset Info Intranet Site Email: [email protected]
Phone: 020 3197 5676 or Ext 5676
CAD Helpdesk: [email protected]
IT Helpdesk: 0203 229 9777 or Ext 2777 [email protected]
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 21 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
8 Reference Documents
This Procedure is part of the overall suite of documents describing Crossrail’s approach to Asset Information, as illustrated below:
8.1 Asset Identification Standard The Crossrail Asset Identification Standard defines the overall approach to the identification, naming and labelling of assets and is part of the overall Crossrail Standards Baseline. This is supported by the Asset Data Dictionary Master Configuration (CRL1-XRL-Z3-ADDSD-CR001-50186) which clarifies naming and labelling and holds other reference documents.
The Asset Identification Standard (CRL1-XRL-O6-STD-CR001-00031) can be located in eB or can be supplied by the Asset Information Team.
8.2 Contractor Information Pack A collection of supporting information provided to Contractors to guide them through the process of providing asset information to Crossrail.
Asset Information Management Plan CRL1-XRL-Z3-STP-CR001-50002
Governance Asset Information Governance Group Terms of Reference - CRL1-XRL-Z-STP-CR001_Z-50005
Specification Asset Identification Standard CRL1-XRL-O6-STD-CR001-00031
Asset Data Dictionary AIM-ADD-001
Asset Data Dictionary Master Configuration CRL1-XRL-Z3-ADDSD-CR001-50186
CAD Standards CR-STD-005
Asset Information Glossary CRL1-XRL-Z3-GUI-CR001-50012
Acquisition Asset Information Provisioning Procedure CRL1-XRL-Z3-GPD-CR001-50004
Document Management Procedure CRL1-XRL-Z3-GPD-CR001-50001
Storage AIMS User Manual CRL1-XRL-Z5-GML-CR001-50001
Asset Information Fundamentals CRL1-XRL-Z3-GPD-CR001-50007
Transfer Section 11 of Asset Information Management Plan
Discipline Specific Strategies Crossrail BIM Principles document CR-XRL-Z3-RGN-CR001-50005
GIS Business Development Plan 2013 – 2015 CRL1-XRL-G-STP-CR001-50002 (Under Review)
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 22 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
8.3 Contract Clauses The provision of asset information is included in the Contract Clauses of all contracts. The specific wording has been refined over successive versions in order to clarify the overall information requirements, but these changes have not changed the overall requirement for the provision of asset information.
These requirements are specified in:
• WORKS INFORMATION Volume 2B – General Requirements (Civils), section 13.5 ‘Asset Management & Traceability’; and
• WORKS INFORMATION Volume 2B – General Requirements (Systems), section 29.2.10 ‘Asset Management & Traceability’
Specific clauses are listed below: The Employer will develop and manage asset information provision processes which should provide assurance that asset information is of suitable quality and to minimise the overall cost of asset information provision to both the Contractor and the Employer. These processes may be refined over the life of the contract to improve the effectiveness of asset information provision. The Contractor shall be responsible for the provision of asset labels; the Contractor shall complete and submit to the Project Manager the Asset Data Collection forms in a timely manner thus allowing the Employer to issue the required asset label information. The Employer shall operate managed processes to ensure consistent asset information is provided for each contract. In order to ensure consistent approaches to asset hierarchies and asset classification, the development and population of the asset hierarchies shall be undertaken by the Employer. Classification of assets will be based upon the Uniclass Standard and shall be undertaken by the Employer. Contractors shall be issued by the Employer with Asset Data Collection Forms relevant to their contract with the required attributes specified. Contractors shall populate the Asset Information Provision with all requested details and within the timescales specified in the information request. The Employer will provide suitable briefing and training sessions to Contractors to ensure that they are aware of their responsibilities within the overall process. An example data collection form is included in Appendix 13L. All asset data shall conform to the Employer’s standards as specified in the Standards Baseline and the Employer’s Asset Information Management Plan CRL1-XRL-Z3-STP-CR001-50002. At an appropriate time the Contractor shall be provided with extracts of the Employer’s Asset Information Management System (AIMS) database by the Project Manager containing planned assets to be constructed/ modified/ demolished/ preserved/ interfaced by the Contractor as detailed in the Asset Information Management Plan CRL1-XRL-Z3-STP-CR001-50002. These extracts will contain assets adjacent to the Site which the Contractor may need to be aware of. Throughout the contract, the Contractor shall be responsible for the safe storage and management of the extracts of the Employer’s Asset Information Management System (AIMS) supplied to them. They shall maintain suitable controls to prevent the loss, deletion, corruption or degradation of the Asset Register consistent with current industry good practice. The Contractor shall populate the extracts of the Employer’s Asset Information Management System (AIMS) to support future operational, maintenance and asset management activities. The Asset Information Management System (AIMS) extracts shall be updated to contain the complete asset listing covering the contracted works.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 23 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
The Asset Information Management System (AIMS) shall enable storage and access of the following information to Employer’s standards: • Asset identification
• Asset location
• Asset classification to the classification standards of the relevant infrastructure manager
• Asset status
• Asset criticality
• Asset attributes specific to the relevant class of asset
• The capability to store identifiers to allow linkage to other information systems
The Asset Information Management System (AIMS) extracts shall be populated by the Contractor with all specified data updates to comply with Employer requirements and shall be fully populated no later than four weeks after the relevant asset has been installed/ set to work. The Contractor shall maintain at all times traceability of all assets and line wide replaceable units, including failure during testing and commissioning and product swap-out. All assets, down to the line replaceable unit, shall have a unique identification number that is capable of being used to consistently identify the asset electronically and manually. Unique identification shall be compliant with the Employer’s Asset Identification Standard (CRL1-XRL-O6-STD-CR001-00031). All assets installed or supplied by the Contractor shall have a durable label or name plate appropriate to the environment either securely fixed to the asset, or securely fixed adjacent to the asset. These labels shall be compliant with the Employer’s standards. These labels shall be compliant with the Employer’s Asset Identification Standard (CRL1-XRL-O6-STD-CR001-00031). The Contractor shall be accountable for the management, storage and population of the Asset Register data and shall attend, and contribute to Employer data governance meetings when required. If changes are required to Employer standard reference data, then the Contractor shall notify the Project Manager. The Contractor shall ensure that all data population and updates are consistent with the Employer’s quality requirements. This shall include ensuring that the accuracy, validity, precision, completeness and timeliness of asset information comply with the Employer `s standards – listed as: •Asset Identification Standard CRL1-XRL-O6-STD-CR001-00031
•Asset Information Management Plan CRL1-XRL-Z3-STP-CR001-50002 •The Contractor shall instigate suitable checks and audits of data quality to demonstrate that Employer `s standards are being complied with and shall demonstrate the effectiveness and outputs of these processes to the Project Manager, when requested. •Requirements for the coding and numbering of Employer assets shall be compliant with the Employer’s Asset Identification Standard CRL1-XRL-O6-STD-CR001-00031.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 24 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
The Contractor shall nominate a relevant senior employee as Data Owner who shall be accountable for the management, storage and population of the Asset Register data. The Data Owner shall attend, and contribute to Employer data governance meetings when required.
Learn
ing Le
gacy
Doc
umen
t
Asset Information Provision Procedure
CRL1-XRL-Z3-GPD-CR001-50004 Rev 8.0
Page 25 of 27
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
9 Standard Forms / Templates
9.1 Stakeholder form See overleaf for an example Stakeholder Form
Learn
ing Le
gacy
Doc
umen
t
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
Asset Information Stakeholder Details: [Location] Asset Information Team Contacts Role Name Telephone Email Asset Information Team - k Asset Information Provisioning Manager
Asset Information Technician
Project Team Contacts Role Name Telephone Email Project Manager Project Field Engineer Engineering Manager
[Contract code and title] Stage Accountable Telephone Email Area of
Responsibility Responsible Telephone Email
B HVAC Joe Bloggs MEP Jon Smith
C
D
E
E. ApprovalsD. Review and Data
Admin
C. Construction Information
B. Design Information
A. Awareness and
Mobilisation
Learn
ing Le
gacy
Doc
umen
t
© Crossrail Limited Template: CR-XRL-O4-ZTM-CR001-00001 Rev 8.0
CRL CONFIDENTIAL
10 Appendices
10.1 Asset Information Provision requirements/timescales Below is an exhaustive list of Asset Information Provision requirements/timescales before and after “Final Design Wrap Up & Certificate of Integration” as shown on the planning portals ‘Design Wrap Up, ESM & FDO Tracker’ and other trackers are as follows;