. 35 ASSESSMENT WORK REPORT ON POUPORE, SMEENK, HEMSWORTH MINING CLAIMS SCHOLES TWP, NTS 41-1116, SUDBURY MINlNG DIVISION WO RK CARRIED OUT ON CLAIMS: 3014444,3017117, 3017138,420979 1, 4209792, 4209793 , 4209 74,4209799, 4215614 AND 42]5615 . "RE-ESTABLISHED EXPLORATION CONTROL BASE LINE, GRID LAYOUT CONFIGURATION AND GROUND MAGNETOMETER SURVEY". Prepared by: Ed A. Rose Au g/2007 RECEIVED AUG 2 0 2007 GEOSCIENCE ASSESSMENT OFFICE + EdROse 49 CaroUne Ct Sudbury ON P3A 4HZ

Upload: dinhngoc

Post on 30-Jul-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

. 35

ASSESSMENT WORK REPORT

ON

POUPORE, SMEENK, HEMSWORTH MINING CLAIMS

SCHOLES TWP, NTS 41-1116, SUDBURY MINlNG DIVISION

WORK CARRIED OUT ON CLAIMS: 3014444,3017117, 3017138,420979 1, 4209792,

4209793, 420974,4209799, 4215614 AND 42]5615 .

"RE-ESTABLISHED EXPLORATION CONTROL BASE LINE, GRID LAYOUT CONFIGURATION AND GROUND MAGNETOMETER SURVEY".

Prepared by: Ed A. Rose Aug/2007

RECEIVED AUG 2 0 2007

GEOSCIENCE ASSESSMENT OFFICE

+EdROse

~ 49 CaroUne Ct

Sudbury ON P3A 4HZ

TABLE OF CONTENTS:

SUMMARY: ........................................................................................................................................ 1

INTRODUCTION! TERMS OF REFERENCE: .................................................................................. 3

LOCATION AND ACCESS: ................................................................................................................ 3

TOPOGRAPHY : .................................................................................................................................... 3

PREVIOUS WORK: .............................................................................................................................. 3

REGIONAL GEOLOGy: ...................................................................................................................... 4

PROPERTY GEOLOGY (SYNOPSIS): .............................................................................................. .4

WORK CARRIED OUT (METHOD! APPROACH): .......................................................................... .4

PHASE 1 (FIELD TRAVERSES AND RECONNAISSANCE): .................................. .4

PHASE2: ........................................................................................................................ 5

PHASE2 (SEE APPENDIX 1)

PHASE3 ......................................................................................................................... 5

PHASE3 (SEE APPENDIX 2)

PROJECT COST ................................................................................................................................... 6

CONCLUSION ...................................................................................................................................... 6

REFERENCES ...................................................................................................................................... 6

LOCATION MAP ................................................................................................................................. 7

FIGURE 1 ..... "::: ...... ~-.~.~:.!.~ ...... ~~ .. :::.~ ........................................................................ 8

FIGURE 2 (FIELD DATA BASE MAP) .............................................................................................. 9

APPENDIX 1 (BASELINE RE-EST ABLISHMENT)

APPENDIX 2 (MAG SURVEY)

11

SUMMARY: Located some 154 km East-North East of Sudbury, the Poupore, Smeenk, Hemsworth property

consists of 149 contiguous claim units in Scholes and Belfast Township with a sliver in Phyllis Twp.

The position of the claims is detailed in this report on page 4 of the mag survey (appendix 2) section

and on an attached claim map.

The property is underlain by pre-cambrian Keewatin greenstone which contains iron formation,

(acid/basic volcanic flows), granite and granodiorite; overlaid by cobalt sediments (huronian), then

nipissing diabase sills (keweenawan).

1956-57 drill reports show a body of iron formation (Magnetite) measuring over 7, 000 ft by a

minimum of 500 ft and depth of plus 1,000 ft. This deposit is reported to contain 327.9 millions tons

at 26.9% Sol. Fe. Based on (some) compilation of the results of previous exploration and drilling, the

property owners commissioned a field program to locate and re-established the 1956 exploration and

D.D.H. control based line in preparation for the layout of a grid configuration for a 2007 ground mag

survey.

After evaluation of previous field work, an exploration compilation plan was developed to show the

"plotted" locations of drill hole sites, topo features, geophysical signatures and geology. A phase 1

program was then designed to locate and flag the position of the old based line tied into the drill hole

sites and other topographical features.

Based on data control information plotted, field traverses were carried out on pace/compass/GPS lines

in search of this 1956 exploration control lines (the base line), and/or old D.D.H. location(s) which

could be used for tie reference(s).

Evidence in the field suggested that the area was burnt over at least twice and was logged sometime

after the 1956-1957 exploration programs. Trees in the area were determined to be not much older

than 20 years and lake shoreline features changed over the period 1956 to present. D.D.H. #9 was

found but the baseline could not be referenced. Another method was used in the search for the old

baseline, as none of the other plotted features were fOlmd (located). A flag line was established to run

north from the center of an old shaft to drill hole #9. A pace and compass traverse was established

Page 1

from this drill hole location to calculated points which should represent the locations of other holes

tied to the old base and grid lines (centers). This exercise failed to locate the drill hole location,

therefore accurate ties to the old base line location could not be established. As the old base line was

used as the control line for previous work and as its location is relevant for present and feature

exploration endeavours, a surveyor was engaged to layout and re-established this line. This task was

successfully accomplished and facilitated the layout of a grid plan for the ground mag survey.

Page 2

INTRODUCTIONI TERMS OF REFERENCE: Poupore, Smeenk and Hemsworth the owners of a group of claims (shown of the location map

contained in this report) initiated a work program to include the re-estabHshment of an old control

baseline, a grid line survey and a ground mag survey. Field work was carried out between June 27-

August 10,2007 by Ed Rose, Jerry Shyminsky and Miller Usro Surveying Inc. all of Sudbury, Ontario

and Meegwich Consultants Inc. of Temagami, Ontario.

LOCATION AND ACCESS: Access to the area is via highway 17 East from Sudbury to Verner a distance of 63 km; then on to

highway 539 for 19 km to Field; thence 15 km to River Valley, then North for 37 km to a bridge, then

East on Highway 805. Tum right (note a sign 4 km to Obabika Lake Lodge). Travel East 3 km further

on this road to Greenrod Lake. Continue on this road 3 km further. At this locating tum right. The road

is in poor condition and from this point an A TV or 4wd is recommended. The coordinates at this

junction are (NAD27 UTMI7 0555771E 5201302N). Travel this road to a small lake and continue one

kilometre to coordinates (NAD27 UTM17 0559647E 5201109N). Then south on poor gravel road (to

Gull Lake) for a distance of approximately 13 km.

TOPOGRAPHY: Vegetation in the area is second growth jackpine, cedar, alder, birch, poplar and spruce. The area is

rugged with intermittent swamps, hills and wide distribution of Nip is sing Diabase outcrops.

PREVIOUS WORK: MDM assessment files show that between 1952-1961 the following companies carried out work over

the claim area:

• Dominion Golf Co (mag survey);

• Tamicon Mines Ltd (mag survey and dd);

• North American Rear Metals Ltd; the Rio Tinto Mining Co of Canada Ltd; Rio Algom Mines

Ltd; Tinto Iron Mines Ltd; Homestake Exploration Limited and Eagle Rock Iron Mines Ltd

(dd, bulk sampling, met. Testing, Aero mag, electromag, underground development and shaft

development. )

Page 3

REGIONAL GEOLOGY: Rocks in the area are of pre-Cambrian age. The oldest rocks are greenstone and schists, aged

Keewatin. Bands of iron formation, consisting of banded magnetite with some hematite are also

classified as Keewatin (Moore 1936). Overlying the Keewatin are Temiskaming sediments

(conglomerate, arkose, quartzite and greywacke). Algoma age feldspar pmphyries intrude the above

rocks. All were subsequently overlain by cobalt sediments (Huronian), then by Nipissing Diabase sills.

Gold massive and disseminated sulfites were reported as commodities found in Scholes Township.

The former Golden Rose goldmine property is located less than 6 miles west of Scholes Townsip.

PROPERTY GEOLOGY (SYNOPSIS): The rocks are aU Precambrian in age. The oldest formations are acid and basic Keewatin volcanics,

including some sediments and iron formation. These rocks have been folded, faulted, and intruded by

Algoman granitic rock types, and dikes and sills of diabase and diorite.

The older rocks are overlain unconformably by later sediments of Cobalt age and the Keweenawan

Nipissing diabase sill. These rocks cover all of Scholes township except a window on the Scholes

Afton boundary. West of Cummings Lake the differential weathering of the columnar-jointed

Nipissing diabase sill in the anomalous area above the iron deposit has produced very rugged

topography with precipitous cliffs.

WORK CARRIED OUT (METHOD/APPROACH):

PHASE1: A phase 1 program, part of a planned systematic exploration program was undertaken to research,

locate and re-establish an old base line used by previous workers as the control line for field

exploration programs. Plans were made to use this 2,350 metres long (approx.) line as the control line

for a grid layout to be followed by a field mag survey. Initial work was carried out by Ed Rose and

Jerry Shyminsky both of Sudbury, Ontario. This work included the following tasks:

• June 2i\ MNDM file research I start layout offield compilation details (1.5 hour)

Page 4

• June 30th, field reconnaissance survey (11 Hrs)

• July 1_51\ Layout I drafting offield data I details (12.5 Hrs)

• July 19th, Field traverse / layout and flagged lines from old Shaft location North East to

DDH #67 Location and reconnaissance in the area (12.75 Hrs)

The crew was not successful in finding enough evidence to locate and tie this old base line, therefore a

phase two program (plan) was initiated and a surveyor was put in the field to work with the crew to

establish and layout the control baseline. In order to accelerate the program, the phase 1 crew prepared

a "FIELD DATA BASE MAP", to show, 1956 and present claim boundaries; old drill hole locations

and numbers; shaft locations, topo features; road; trails; plotted location of the old base line ?; ore

body projected to surface; anomalies and old grid layout.

• July 20th, field layout and traverse to approximate old base line locations and grid lines to

locate drill holes # 17, 4 and 14 as ties to locate the exact location of the baseline. Hole # 14

was the only hole found (12.75 Hrs)

• July 16-20t\ miscellaneous field details and related calculations (1.5 Hour)

• July 27th, traverse filed layout of approximate location for West section grid area and locate

drill #11 (as tie for baseline locations) (12.SHrs)

• August 2nd, field layout of approximate location for East grid area and locate holes #2, 3

and 8. (as tie for baseline locations) (12SHrs)

• August 3-15 t\ Detailing of project maps / plans with surveyor / field mag crew and report

preparation. (12 Hrs)

PHASE2: JULY 12TH AUGUST 2ND

, 2007

Information gathered from phase 1 could not be properly referenced. Therefore, no proper tie could be

established to accurately layout the location of the control baseline. This line grid configuration was

established by the surveyor crew with support from the phase 1 crew. Part 2 of this report details the

activities and finding of this phase.

PHASE3: AUGUST 1ST 10TH

, 2007

Page 5

Having established the baseline and the grid area configuration, a ground mag survey was carried out

over 35 km of grid lines by Meegwich Consultants Inc. Part 3 of this report details the activities and

finding of this phase.

PROJECT COST: The project cost totalled $40,630.00.

CONCLUSION: The phase 1 and 2 coordinated field program successfully established the 1956 baseline. This

controlled baseline is now tied to the found drill hole locations and to the center line of the old shan ..

A survey grid was established and tied to this baseline and a (phase 3) ground mag survey was carried out.

REFERENCES:

Files from MNDM Sudbury, office for Scholes and Belfast townships.

Respectfully submitted August l]'h, 2007,

i\

EdA. Rose

Page 6

Location Map

Page <7

laim Map

A Figur I

· '

Report on Exploration Baseline Re-establishment Geographic Township of Scholes District of Nipissing Sudbury Mining District

Prepared by:

Miller & Usro Surveying Inc. Our File: 5633

August 13, 2007

Background

Miller & Urso Surveying Inc. was approached in early July by the Temagami Iron Corporation acting on behalf of Thomas Henry Poupore, Hubert Barry Hemsworth and Frank Comelis Smeenk, the claim holders of several active mining claims in Scholes Township. The claims are in the vicinity of Cummings Lake and in an area in which numerous claims had been surveyed and brought to lease in the late 50's and early 60's. The leases have long since expired, the claims had reverted to the Crown and the ground has since been restaked.

The current claim holders wished to conduct further investigations with respect to the mineral potential of the abandoned deposit and wanted to be able to integrate any new work with the previous exploration activity that had been done in the vicinity so as to be better able to interpret the nature and extent of the potential ore body.

The focus of this assignment was to re-establish the circa 1957 baseline (established by North American Rare Metals Ltd.), for use as the control line for an August 2007 magnetometer field survey program. No accurate information was found in the Assessment Files or on the ground to determine where the control baseline should be placed. It was therefore determined that a field search should be carried out to locate old drill hole locations, then reverse engineer the locations in order to re-establish the control baseline. Having carried out this work to establish the said control baseline, the claim holders commissioned Meegwich Consultants Inc. to carry out a field magnetometer survey.

The client's geologist had undertaken an initial search of the Assessment Records to determine what files existed and to ascertain whether there was enough information in the files to permit resurrection of a previously existing baseline to which a drill hole program had been referenced. The initial documentary research was unable to find much information regarding the baseline. Field visits were undertaken but the client was unable to determine the existence of any physical evidence of the baseline on the ground, although the abandoned shaft and some other workings were found.

Since conSiderable survey work had been undertaken in the 60's when the claims were brought to lease, we were approached to see if we could complete a more extensive search of historical

Page 1 of 5

survey records in the hopes of finding ties from the surveyed claims and/or topographic ties to the lost exploration baseline.

If the documentary research proved unsuccessful, then we were asked to conduct fie!ld investigations to see if we could uncover the baseline and/or use previous drill hole locations (if they could be found) to re-establish the baseline location.

Documentary Research

We reviewed the information provided from the Assessment Files which included: 1) An 8.5 by 11 inch index sketch showing very rough locations of the earlier drill holes

referenced to the surveyed claim limits from the 60's. 2) A plan for North American Rare Metals Ltd., dated October 30, 1957 at a scale of 1 \\ =

400 ' showing the approximate location of 21 drill holes, the approximate missing baseline location and the results of a magnetometer survey.

3) Sketches of about a half dozen claims purporting to show accurate ties from the claim limits to the drill holes.

4) A Plan of Survey by W.E.G. Taylor, O.L.S. dated August 25, 1960 prepared for the Rio Tinto Mining Company of Canada showing a separate, nearby East-West gridline pattern; a surveyed connection to the shaft and ties to a few of the surveyed claim boundaries as well as a tie to a north/south surveyed line established through the middle of Scholes Township by E.L. Moore, O.L.S. in 1945.

5) Several other plans and reports, none of which provided any actionable information with respect to re-establishing the baseline.

Although we had several pieces of information, purporting to show the interrelationship between the potential ore body, the earlier exploration work and the underlying survey fabric, the reality was that none of this information had been properly referenced to anything existing today, including any identifiable topographic features in the area that would allow the reconstruction of the earlier work and its integration with any new exploration initiatives to be undertaken.

In a final attempt at avoiding a costly field survey to attempt to reestablish the baseline, we conducted an extensive search of the survey records of the three separate survey firms we knew had worked in the area at around the time the drill program was undertaken. The purpose of this records search was to attempt to find if any surveyed ties had been made to either the missing baseline and/or the drill holes shown on the previous plans. After reviewing the notes provide!d, we were unable to find any new information or surveyed connections.

Having found no other information relating to the missing baseline, we determined that the only way to resurrect the line was to visit the field to see if there was evidence of the line on the ground or alternatively, to find enough drill holes to "reverse engineer" the baseline based on the 1" 400 \ plan as being the best possible indicator of how to position and orient the previous work.

Page 2 of 5

· .

Summary of Work Performed on Project (all dates 2007):

Office Calculations and Data Processing:

Performed on: July 7,10,11,25,30,31 August 1,3,10,13

Total Days: 5.5 days

Field Survey:

Performed on: July 12,19,20,26,27 August 2

Total Days: 6.0 days

Research. Supervision and Report Preparation:

Performed on: July 1,3,5,7,17,18,19,21,29 August 9,11,12,13

Total Days: 4.0 days

Personnel:

Field Survey Personnel:

Office Personnel:

Consultant's Address:

Steve Gossling Ryan Seguin Patrick Grout

Steve Gossling Todd Neider Ryan Seguin

289 Cedar Street, Suite 102 Sudbury, ON P3B 1M8

Page 4 of 5

" I I •

Summary of Findings

Our findings are summarized in the attached sketch dated August 12, 2007.

The final direction for the baseline was established by holding the scaled offset distance from the baseline to DH 2 of 152.4 metres (as derived from the October 30, 1957 plan, referenced earlier) and joining to the most northerly found point on the baseline, that being DH 17.

This gave a final bearing for the baseline of N 59 degrees, 15 minutes and 40 seconds E (grid bearing, as opposed to astronomic or magnetic) as shown on the attached sketch.

We were unable to set new permanent markers on the final location of the baseline due to satellite coverage and radio problems experienced on the final day in the field. We have, however, provided offset ties from permanent features in the vicinity of the shaft to the baseline as shown in Detail A in the sketch provided.

This report respectfully submitted, August 13, 2007,

Page 5 of 5

I I I I I I I I I I I I I I I I I I I

GROUND GEOPHYSICAL SURVEYS Magnetometer Surveys Assessment Report

Scholes Twp.

NTS 41 P/16

POUPORE, SMEENK, HEMSWORTH PROPERTY

August 2007.

Meegwich Consultants Inc. P.o. Box 482, Temagami, Ontario POll 2110 Tel (705) 569- 2904 Fax. (705) 569-2817

I I I I I I I I I I I I I I I I I I I

Scholes Tp. - Poupore, Smeenk, Hemsworth Property Page 2

TABLE OF CONTENTS

1.0 Summary

2.0 Property Description

3.0 Location and Access

4.0 Magnetometer Survey

4.1 Instrumentation

4.2 Survey Results and Interpretation

5.0 Conclusions and Recommendations

LIST OF FIGURES

Figure 1 Claim and Grid Sketch

LIST OF MAPS

Total Field Contours 1:5000

Meegwich Consultants Inc. P.o. Box 482, Temagami, Ontario POH 2HO Tel (705) 569- 2904 Fax. (705) 569-2817

I I I I I I I I I I I I I I I I I I I

Scholes Tp. - Poupore, Smeenk, Hemswolth Property Page 3

1.0 SUMMARY:

From August 1 to 10, 2007 a program of grid establishment and detail

magnetometer surveying was carried out on the Poupore, Smeenk, Hemsworth

Property located in northern Scholes and southern Belfast Townships. The

property contains a substantial iron deposit 2.5 km in length. The purpose of

the work was to define the limits of the deposit on the ground. The property is

held by Poupore, Smeenk and Hemsworth, of 2200-181 University Street,

Toronto, Ontario M5H 3M7.

The grid establishment and magnetometer surveying was done by Kevin Picard

and Curtis Charlton on behalf of Meegwich Consultants Inc. P.O. Box 482,

Temagami, Ontario POH 2HO. David Laronde was the field supervisor and

the author of this work report. There was a grand total of 35 km of grid lines

established and surveyed with magnetometer. The lines of the grids were

located with WAAS enabled GPS units using the UTM NAD 83 co-ordinate

system to help ensure precise location. Stations were flagged at 25 meter

intervals.

2.0 PROPERTY:

The work was done on contiguous mining claims that are part of an extensive

land holding of 149 claim units situated in unsurveyed Scholes and Belfast Tp.

There is a total area of 2384 hectares covered by 17 mining claims numbered

as follows:

Meegwich Consultants Inc. P.o. Box 482, TemagmnI.. Ontario POH 2HO Tel. (705) 569- 2904 I'ax. (705) 569-2817

I I I I I I I I I I I I I I I I I I I

Scholes Tp. - Poupore, Smeenk, Hemsworth Property Page 4

CLAIM NO. DUE DATE UNITS

3014444 January 17, 200~ 1

3017117 August 19, 2007 1

3017138 August 19, 2007 2

4209100 March 29, 2008 4

4209791 " " 16

4209792 " " 4

4209793 " 4

4209794 16

4209795 " 8

4209796 " " 16

4209797 " " 6

4209798 " " 6

4209799 " " 15

4209801 " " 16

4209802 " " 4

4209803 " " 4

4209804 " 16

4215615 August 7, 2009 2

4215614 August 14,2009 8

Note that claim 4209795 and 4215615 are the only claims in Belfast Tp.. The

remainder of the claims are in Scholes Tp. with a sliver of 4209794 in Phyllis

Tp ..

The topography on the property is rugged in general with jackpine, poplar and

birch on ridges. Much of the area had been cutover about 20-30 years ago and

regeneration is poplar and birch.

Meegwicb Consultants Inc. P.o. Box 482, Temagami, Onlario POH 2HO Tel (705) 569-2904 Fax. (705) 569-2817

I I I I I I I I I I I I I I I I I I I

Scholes Tp. - Poupore, Smeenk, Hemsworth Property PageS

3.0 LOCATION AND ACCESS:

The grid is located 30 km southwest of Temagami as the crow flies. Road

access to the property is by taking Hwy 805 north from River Valley for 40 km.

From this point near Rachel Lake a rough logging road heads east for another 4

km onto the claim group.

4.0 MAGNETOMETER SURVEY:

4.1 Instrumentation: Gem Systems GSM-19 overhauser magnetometers

serial no. 58479 and 712776 were used for field units measuring in nanoteslas

(nT) with an accuracy of +1-1/100th nT. These instruments have an excellent

gradient tolerance at 10,000 nT/m.

A Scintrex EDA Omni IV proton precession magnetometer ser. No. 255228 was

used for a base station to monitor the diurnal variation. The base station cycled

at 20 second intervals. This instrument has an accuracy of 1/10th nT.

Survey Results and Interpretation: The results are presented in

contour format on plans at 1 :5000 scale. Quality control was monitored by

comparing several readings at a common base station. This referencing

technique confirms good data and checked out on these surveys. A total of 35

km of line was surveyed (2800 readings) at 12.5 meter intervals throughout the

surveys.

Meegwich Consultants Inc. P.o. Box 482, T emagami. Ontario POH 2HO Tel ('705) 569- 2904 Fax. ('705) 569--2817

I I I I I I I I I I I I I I I I I I I

Scholes Tp. - Poupore, Smeenk, Hemsworth Property Page 6

In general the survey has outlined a massive, intensely magnetic feature with a

strike length of 2500 meters and a width of 500 meters. Readings range up to

10,000 nT over background near the core of the body and gradually decrease

further from the centre outwards. There are two zones about the same size that

could be referred to as east and west. These are basically identical in intensity

and size. A steep dip to the south is apparent.

5.0 CONCLUSIONS AND RECOMMENDATIONS:

The survey has achieved the goal of defining the limits of a massive, intensely

magnetic body 2.5 km in length and +/- 500 meters wide.

Further work should focus on evaluating the economics of the magnetic feature

by drilling and metallurgical study.

Meegwich Consultants Inc. P.o. Box 482, Temagami., Ontario POH 2HO Tel (705) 569- 2904 Fax. (705) 569-.2817

I I I I I I I I I I I I I I I I I I I

Scholes Tp. - Poupore, Smeenk, Hemsworth Property

References

Ontario Geologic Survey Map 2361 Geological Compilation Series

1:250,000

Page 7

Meegwich Consultants Inc. P.o. Boll. 482, Tanagami., Ontario POH 1110 TeL (705) 569- 2904 Fu. (705) 569-1817

I I I I I I I I I I I I I I I I I I I

Scholes Tp. - Poupore, Smeenk, Hemsworth Property Page 8

CERTIFICATE OF AUTHOR

I, David Laronde of the town of T emagami, Ontario hereby certify:

1. That I am a geology engineering technologist and have been

engaged in mineral exploration for the past 27 years.

2. That I am a graduate of Cambrian College in Sudbury

with a diploma in Geology Engineering Technology

1979.

3. That my knowledge of the property described herein

was acquired by field work and documentation.

Dated at Temagami this 14th day of August 2007.

( ... /C:~_ David Laronde

Meegwicb Consultants Inc. P.O. Box 482, Temagami, Ontario POR 2RO Tel. (705) 569- 2904 Fax. (705) 569-2817

I I I I I I I I I I I I I I I I I I I

4215614

.-----

I /

/

i \

'" I' I ,

I \ I 1

1 ;

\. '1\4// 3 1)-171 7

3 171 8

/~

420 Q1"9'; - -~/- ~ /

/ /

I

I

I

I I

I

.. I

/

\ -- -I-

1 . / 4215615 • I-I f \

f 1

\ I

I

4209 7 99 i I

I

/ /

I

1 \

\ \

\ \

/-"',

11

------""'"' ClAIM MIl GRJO MAP