assessment of climate change risk to municipal ......assessment of climate change risk to municipal...
TRANSCRIPT
Assessment of Climate Change Risk to Municipal Infrastructure - City of London
Lisa Bowering, Angela Peck, and Slobodan P. SimonovicThe University of Western Ontario
The Institute for Catastrophic Loss ReductionThe University of Waterloo
Key messages
Municipal infrastructure is vulnerable to climate change
Adaptation cost can be very high Adaptation = Risk management Comprehensive risk assessment methodology is
required to gather and examine available data in order to develop an understanding of the relevant climate effects and their interactions with infrastructure.
Time to act is now
www.slobodansimonovic.com -> research -> FIDS 2
Friday Forum 2010
Outline
Methodology introduction and data Climate modelling Hydrologic modelling Hydraulic modelling
Risk assessment Conclusions
www.slobodansimonovic.com -> research -> FIDS 3
Friday Forum 2010
Study team
Slobodan P. Simonovic, Professor (UWO, ICLR) Donald H. Burn, Professor (UW) Dan Sandink, Manager (ICLR) Hyung-Il Eum, PostDoctoral Fellow (UWO) Angela Peck, MESc candidate (UWO) Lisa Bowering, MESc candidate (UWO) Dragan Sredojevic, MESc candidate (UWO).
www.slobodansimonovic.com -> research -> FIDS 4
Friday Forum 2010
Research methodologyInput
Climate Scenarios Weather Generator
Temperature, Precipitation
Rainfall-runoff transformationHydrologic Model
Floodplain mappingHydraulic Model
Risk Assessment
www.slobodansimonovic.com -> research -> FIDS 5
Friday Forum 2010
Research methodology Data Input
Inventory of infrastructure components; Data gathering and sufficiency analysis;
Climate Modelling Existing climate scenario Wet climate scenario
Hydrologic Modelling HEC-HMS model
Hydraulic Modelling HEC-RAS model
Risk Assessment Qualitative vulnerability assessment; Quantitative vulnerability assessment; and
Prioritization of the infrastructure components based on the level of risk
www.slobodansimonovic.com -> research -> FIDS 6
Friday Forum 2010
City of London, Ontario, Canada
www.slobodansimonovic.com -> research -> FIDS 7
Friday Forum 2010
Spatial data
www.slobodansimonovic.com -> research -> FIDS 8
Friday Forum 2010
Infrastructure data input
Buildings Transportation
Roadways Bridges
Critical Infrastructure Schools Hospitals and Emergency Services
Barriers Dams, Dikes, Other flood control
infrastructure Sewer Infrastructure
Wastewater Treatment Plants Outlets Sanitary and Storm Systems
www.slobodansimonovic.com -> research -> FIDS 9
Friday Forum 2010
Climate modelling
10www.slobodansimonovic.com -> research -> FIDS 10
Friday Forum 2010
Input
Climate Scenarios Weather Generator
Temperature, Precipitation
Rainfall-runoff transformationHydrologic Model
Floodplain mappingHydraulic Model
Risk Assessment
Climate scenarios
Lower bound climate scenario No modifications due to climate change
and future emissions Weather generator with perturbation of
historical data
Upper bound climate scenario Recommended by the previous study Data modified by GCM
www.slobodansimonovic.com -> research -> FIDS 11
Friday Forum 2010
Choice of climate scenario
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
CSI
RO
Mk2
b_B1
1_PR
GIS
SE-R
_B1_
PR
GIS
SE-R
_A2_
PR
NC
ARC
CSM
3_A2
_PR
NC
ARC
CSM
3_B1
_PR
CSI
RO
MK3
_SR
A1B_
PR
CSI
RO
MK3
_SR
B1_P
R
NC
ARC
CSM
3_A1
B_PR
CG
CM
3T47
_PR
_B1
CSI
RO
MK3
_SR
A2_P
R
CG
CM
3T47
_PR
_A1B
NC
ARPC
M_A
1B_P
R
CG
CM
3T47
_PR
_A2
NC
ARPC
M_A
2_PR
GIS
SAO
M_B
1_PR
MIR
OC
3.2_
MED
RES
_A2…
MIR
OC
3.2_
MED
RES
_A1…
GIS
SAO
M_A
1B_P
R
HAD
GEM
1_A1
B_PR
HAD
GEM
1_A2
_PR
ECH
O-G
_B1_
PR
CG
CM
3T63
_PR
_A2
MIR
OC
3.2_
MED
RES
_B1…
ECH
O-G
_A2_
PR
CG
CM
3T63
_PR
_A1B
GFD
LCM
2.1_
B1_P
R
CG
CM
3T63
_PR
_B1
GFD
L30_
A21_
PR
ECH
O-G
_A1B
_PR
Miro
c3.2
_HIR
ES_B
1_PR
GFD
LCM
2.1_
A2_P
R
HAD
CM
3_B1
_PR
GFD
LCM
2.1_
A1B_
PR
CC
SRN
IES_
B21_
PR
HAD
CM
3_A1
B_PR
HAD
CM
3_A2
_PR
Miro
c3.2
_HIR
ES_A
1B_P
R
ECH
AM5O
M_A
1B_P
R
ECH
AM5O
M_B
1_PR
ECH
AM5O
M_A
2_PR
Prec
(mm
)
Pmean (2050s)
www.slobodansimonovic.com -> research -> FIDS 12
Friday Forum 2010
Weather generator
K-NN model Successful applications (Yates,
2003; Sharif and Burn, 2006) Ability to generate
meteorological variables out of the historical range
Combined with Principle Component Analysis to reduce computational burden
Use of 15 stations and 3 variables (precipitation, maximum and minimum temperature)
13
Friday Forum 2010
www.slobodansimonovic.com -> research -> FIDS
Weather generator
www.slobodansimonovic.com -> research -> FIDS 14
Friday Forum 2010
Hydrologic modelling
15www.slobodansimonovic.com -> research -> FIDS 15
Friday Forum 2010
Input
Climate Scenarios Weather Generator
Temperature, Precipitation
Rainfall-runoff transformationHydrologic Model
Floodplain mappingHydraulic Model
Risk Assessment
Hydrologic modelling Modification of HEC-HMS Nesting of sub-basins
Medway (5 sub-basins) Stoney (6 sub-basins) Pottersburg (4 sub-basins) Dingman (16 sub-basins)
www.slobodansimonovic.com -> research -> FIDS 16
Friday Forum 2010
Hydrologic modelling
More frequent floodingMore severe floods
www.slobodansimonovic.com -> research -> FIDS 17
Friday Forum 2010
www.slobodansimonovic.com -> research -> FIDS 18
Friday Forum 2010
www.slobodansimonovic.com -> research -> FIDS 19
Friday Forum 2010
Hydraulic modelling
20www.slobodansimonovic.com -> research -> FIDS 20
Friday Forum 2010
Input
Climate Scenarios Weather Generator
Temperature, Precipitation
Rainfall-runoff transformationHydrologic Model
Floodplain mappingHydraulic Model
Risk Assessment
Hydraulic modelling Input: Streamflows
from hydrologic model
HEC-RAS and HEC-GeoRAS
Output: floodplains to represent flood extent and depth for use in risk analysis
www.slobodansimonovic.com -> research -> FIDS 21
Friday Forum 2010
Hydraulic modelling
100 yr 250 yr
www.slobodansimonovic.com -> research -> FIDS 22
Friday Forum 2010
Risk assessment
2323
Input
Climate Scenarios Weather Generator
Temperature, Precipitation
Rainfall-runoff transformationHydrologic Model
Floodplain mappingHydraulic Model
Risk Assessment
www.slobodansimonovic.com -> research -> FIDS
Friday Forum 2010
Risk assessment
Risk IndicesConsequences
-Loss of Function -Loss of Equipment-Loss of Structure
Infrastructure Flood Risk Assessment due to Climate Change
Risk Tables
Risk AssessmentOutput
Risk Maps
Monetary Value
Probability
Risk = Probability of hazard x Σ[Monetary damage value x Consequence ]
www.slobodansimonovic.com -> research -> FIDS 24
Friday Forum 2010
Floodplain
Aerial photo
Buildings
Identify inundated infrastructure
Risk assessment
www.slobodansimonovic.com -> research -> FIDS 25
Friday Forum 2010
Risk assessment
Risk IndicesConsequences
-Loss of Function -Loss of Equipment-Loss of Structure
Infrastructure Flood Risk Assessment due to Climate Change
Risk Tables
Risk AssessmentOutput
Risk Maps
Monetary Value
Probability
www.slobodansimonovic.com -> research -> FIDS 26
Friday Forum 2010
Risk assessment Probability - The likelihood that a particular flood
event will occur in a given year
100yr RP 100yr RP 250yr RP 250yr RP
CC_LB CC_UB CC_LB CC_UB
www.slobodansimonovic.com -> research -> FIDS 27
Friday Forum 2010
Risk assessment
Risk IndicesConsequences
-Loss of Function -Loss of Equipment-Loss of Structure
Infrastructure Flood Risk Assessment due to Climate Change
Risk Tables
Risk AssessmentOutput
Risk Maps
Monetary Value
Probability
www.slobodansimonovic.com -> research -> FIDS 28
Friday Forum 2010
Flood Consequence Multipliers Loss of Function (IM1) - a fraction of the damage
an infrastructure incurs as a result of losing its function during a flood event [0,1]
Loss of Equipment (IM2) - a fraction of the damage to any equipment related to the infrastructure as a result of a particular flood event [0,1]
Loss of Structure (IM3) - a level of damage to the infrastructure itself which may need repair or replacement as a result of a particular flood event
Risk assessment
www.slobodansimonovic.com -> research -> FIDS 29
Friday Forum 2010
Risk assessment
Deterministic (quantitative) and fuzzy (qualitative) damage measures are combined to describe loss of structure (IM3)
30www.slobodansimonovic.com -> research -> FIDS
Friday Forum 2010
Risk assessment
Risk IndicesConsequences
-Loss of Function -Loss of Equipment-Loss of Structure
Infrastructure Flood Risk Assessment due to Climate Change
Risk Tables
Risk AssessmentOutput
Risk Maps
Monetary Value
Probability
www.slobodansimonovic.com -> research -> FIDS 31
Friday Forum 2010
Risk assessment
Risk IndicesConsequences
-Loss of Function -Loss of Equipment-Loss of Structure
Infrastructure Flood Risk Assessment due to Climate Change
Risk Tables
Risk AssessmentOutput
Risk Maps
Monetary Value
Probability
www.slobodansimonovic.com -> research -> FIDS 32
Friday Forum 2010
Risk assessment
www.slobodansimonovic.com -> research -> FIDS 33
Friday Forum 2010
Risk assessment
Friday Forum 2010
34www.slobodansimonovic.com -> research -> FIDS
Risk assessment
100 CC_ LB 100 CC_ UB 250 CC_LB 250 CC_UB
Total risk
573,000,000 984,000,000 917,000,000 1,252,000,000
0.00 0.61 0.51 1.00
5,730,000 9,840,000 3,668,000 5,004,000
0.33 1.00 0.00 0.22
Friday Forum 2010
35www.slobodansimonovic.com -> research -> FIDS
Risk assessment
250 UTRCA 250 CC_LB 250 CC_UB
797,000,000 917,000,000 1,252,000,000
0.00 0.26 1.00
3,188,000 3,668,000 5,004,000
0.00 0.27 1.00
Friday Forum 2010
www.slobodansimonovic.com -> research -> FIDS 36
Risk assessment
www.slobodansimonovic.com -> research -> FIDS 37
Friday Forum 2010
Risk assessment
www.slobodansimonovic.com -> research -> FIDS 38
Friday Forum 2010
Risk assessment100 CC_ LB 100 CC_ UB 250 CC_LB 250 CC_UB
Roads0.00 0.00 0.00 0.00
Bridges0.50 0.58 0.23 0.27
Buildings0.43 1.00 0.37 0.55
Pollution Control Plants0.57 0.62 0.24 0.30
Critical Facilities0.00 0.01 0.00 0.00
Barriers0.16 0.65 0.23 0.32
Friday Forum 2010
39www.slobodansimonovic.com -> research -> FIDS
Risk assessment
www.slobodansimonovic.com -> research -> FIDS 40
Friday Forum 2010
Conclusions
Insights into climate change caused flood risk to municipal infrastructure
Multiple recommendations (engineering, operational, policy)
Input into adaptation policy development
Prioritization of adaption action
www.slobodansimonovic.com -> research -> FIDS 41
Friday Forum 2010